ERCOT studied load capacity classification
Company: CleanSpark
The claim, verbatim
ERCOT classified 300 megawatts of contracted capacity for batch zero studied load designation
Source (primary)
What's Going On With CleanSpark Shares On Thursday? - TradingView (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “It also classified 300 megawatts for batch zero studied load designation.”
How we checked this
Checked on September 25, 2026. The cited source supports part of this claim, but not all of it.
The article says ERCOT also classified 300 megawatts for batch zero studied load designation. It does not describe those 300 megawatts as contracted capacity.
Confirmed in the source:
- ERCOT classified 300 megawatts for batch zero studied load designation
We could not confirm this from the cited source:
- That the 300 megawatts is contracted capacity (the article says only '300 megawatts', and uses 'contracted capacity' only for the separate 585-megawatt baseload classification)
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of the publisher (https://www.tradingview.com/news/benzinga:f70920c38094b:0-what-s-going-on-with-cleanspark-shares-on-thursday/) in full (6,469 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms What's Going On With CleanSpark Shares On Thursday? - TradingView
Quote: “It also classified 300 megawatts for batch zero studied load designation.”