ERCOT Batch Zero Studied Load Designation
Company: CleanSpark
The claim, verbatim
Received notice of conditional classification for 300 MW to receive ERCOT batch zero studied load designation
Source (primary)
CleanSpark Proposes $2.227B Senior Secured Notes to Fund Sandersville Build-Out - Unite.AI (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “300 MW to receive a batch zero studied load designation”
How we checked this
Checked on September 24, 2026. The cited source supports every part of this claim.
The same September 8, 2026 update, as reported in the article, says ERCOT conditionally classified 300 MW at CleanSpark's Texas sites for a batch zero studied load designation.
Confirmed in the source:
- CleanSpark received notice of conditional classification by ERCOT
- The classification covers 300 MW
- The classification is for a batch zero studied load designation
What we did: Read our cached copy of the publisher (https://www.unite.ai/cleanspark-proposes-2-227b-senior-secured-notes-to-fund-sandersville-build-out/) in full (9,705 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark Proposes $2.227B Senior Secured Notes to Fund Sandersville Build-Out - Unite.AI
Quote: “300 MW to receive a batch zero studied load designation”