ERCOT batch-zero studied load capacity Texas
Company: CleanSpark
The claim, verbatim
ERCOT granted CleanSpark conditional batch-zero classification for 300 MW of studied load capacity
Source (primary)
CleanSpark Bitcoin Production Hits 593 BTC As Treasury Falls - TronWeekly (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “300 MW of studied load capacity”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms CleanSpark Bitcoin Production Hits 593 BTC As Treasury Falls - TronWeekly
Quote: “300 MW of studied load capacity”