<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="https://www.jain.com/assets/img/6adafce5-1.1"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Calvert Cliffs &#8211; Jain.com</title>
	<atom:link href="https://www.jain.com/tag/calvert-cliffs/feed" rel="self" type="application/rss+xml" />
	<link>https://www.jain.com/</link>
	<description>Data centers, connectivity, and security — news and analysis</description>
	<lastBuildDate>Thu, 01 Oct 2026 11:11:46 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.jain.com/assets/img/e2794d1c-jain-com-icon-512-150x150.png</url>
	<title>Calvert Cliffs &#8211; Jain.com</title>
	<link>https://www.jain.com/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Only 190 of Amazon&#8217;s 690 Nuclear MW Are New. The Bigger AI Stake Is a 2034 License.</title>
		<link>https://www.jain.com/constellation-amazon-20-year-690-mw-calvert-cliffs-nuclear-deal</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Thu, 01 Oct 2026 11:11:46 +0000</pubDate>
				<category><![CDATA[Power Infrastructure]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[Amazon]]></category>
		<category><![CDATA[Calvert Cliffs]]></category>
		<category><![CDATA[Constellation Energy]]></category>
		<category><![CDATA[Maryland]]></category>
		<category><![CDATA[nuclear power]]></category>
		<category><![CDATA[PJM]]></category>
		<category><![CDATA[power purchase agreements]]></category>
		<guid isPermaLink="false">https://www.jain.com/constellation-amazon-20-year-690-mw-calvert-cliffs-nuclear-deal</guid>

					<description><![CDATA[Constellation Energy signed a 20-year deal to sell Amazon 690 MW from Maryland's Calvert Cliffs nuclear plant, including a 190 MW uprate due 2030–2032. The term outlasts both reactor licenses, which expire in 2034 and 2036, making relicensing, not the new megawatts, the bigger stake for AI power.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>Amazon has signed a 20-year deal to buy about a third of the electricity from Calvert Cliffs, Maryland&#8217;s only nuclear power plant, which today produces enough for more than 1.3 million homes. The plant&#8217;s owner, Constellation Energy, says the deal unlocks more than $3 billion of investment.</p>
<p>The twist: most of that power already exists. Just over a quarter of Amazon&#8217;s share will come from new equipment, due between 2030 and 2032. The plant&#8217;s two reactors have federal operating licenses that expire in 2034 and 2036, long before the contract ends. The power also stays on the shared grid rather than being walled off for Amazon.</p>
</section>
<p>Constellation Energy and Amazon signed a 20-year agreement on Sept. 30, 2026 under which Amazon will buy 690 megawatts (MW) of output from the Calvert Cliffs Clean Energy Center in Maryland, Mugglehead Investment Magazine reported. The 690 MW includes a planned 190 MW capacity increase at the 1,790 MW station, expected to come online between 2030 and 2032. Constellation says the agreement is expected to enable more than $3 billion in Maryland infrastructure investment.</p>
<p>Amazon said electricity from Calvert Cliffs will continue flowing to the PJM regional grid. The companies also signed a separate retail supply agreement covering Amazon operations across PJM&#8217;s 13 states and the District of Columbia. Constellation did not disclose a price per megawatt-hour or a spending schedule for the investment.</p>
<h2>Executive Summary</h2>
<p>Amazon, one of the hyperscalers (the largest cloud and AI computing operators), has committed to two decades of nuclear power from Maryland&#8217;s only nuclear plant. The contract covers 690 MW, roughly a third of the station&#8217;s output once a planned 190 MW uprate is complete. Constellation ties the deal to more than $3 billion of state investment, to relicensing the plant for another 20 years, and to potential new clean energy plants at the site.</p>
<p>The deal is less about new megawatts than the headline suggests. About 500 MW of the contract comes from reactors already running, and the new 190 MW will not arrive until 2030 to 2032. The larger consequence is financial: a 20-year revenue stream for a station whose two reactor licenses expire in 2034 and 2036 strengthens the case for keeping all 1,790 MW running into the 2050s. The structure matters too. The plant stays connected to the shared grid instead of being dedicated to an Amazon campus built on site.</p>
<p>What remains open is the economics. There is no disclosed price, start date, investment schedule, or relicensing application date. Constellation has also named no design or budget for the new plants it says the deal will help advance.</p>
<h2>Most of the 690 Megawatts Already Exists</h2>
<p>A megawatt measures generating capacity. Calvert Cliffs&#8217; current 1,790 MW supplies the equivalent of more than 1.3 million homes and about 80 per cent of Maryland&#8217;s clean energy, by Constellation&#8217;s count. Amazon&#8217;s 690 MW contract includes the planned 190 MW increase, so roughly 500 MW of it is output from reactors that are already operating. The 190 MW is an uprate, meaning engineering changes that let existing reactors produce more power. It is not a newly ordered reactor.</p>
<p>For anyone modeling new electricity supply for data center growth in PJM, the timing is the point. In the near term, the deal assigns existing carbon-free output to a named buyer. The net addition to the grid, about a tenth more capacity at the station, arrives between 2030 and 2032.</p>
<p>Amazon&#8217;s earlier PJM nuclear agreement follows a similar pattern. Talen Energy&#8217;s June 11, 2025 contract covers 1,920 MW from the existing Susquehanna plant in Pennsylvania, reaching full quantity no later than 2032 and running through 2042. Talen treats any extra output from uprates as a separate possibility. Two contracts with one buyer do not make a market-wide trend. Still, both of Amazon&#8217;s disclosed PJM nuclear deals are anchored on reactors that already exist, with new capacity small or optional.</p>
<h2>Why the 2034 License Date Is the Bigger Stake</h2>
<p>The U.S. Nuclear Regulatory Commission (NRC) lists Unit 1&#8217;s operating license as expiring July 31, 2034 and Unit 2&#8217;s as expiring Aug. 13, 2036. Both licenses were renewed in 2000. A 20-year contract signed in 2026 runs into the mid-2040s at the earliest. If deliveries begin soon after signing, more than half of the term falls after Unit 1&#8217;s current license ends. The contract can be fully performed only if the NRC grants subsequent license renewal. That process extends reactor operation from 60 to 80 years and requires its own safety and environmental reviews.</p>
<p>The arithmetic shows where the stake lies. The uprate adds 190 MW. Operation beyond the mid-2030s depends on relicensing for all 1,790 MW, more than nine times as much capacity. Constellation says the agreement helps provide the revenue certainty needed to relicense the plant for another 20 years. That is the mechanism: long-dated contracted revenue is what justifies the cost of a renewal application and the plant investment that goes with it. “Amazon&#8217;s commitment supports the long-term operation of Calvert Cliffs for generations to come,” chief executive Joe Dominguez said.</p>
<p>Several parties depend on that outcome. Amazon needs the plant running to receive its contracted supply. Maryland gets most of its clean electricity from this one station. PJM would lose far more capacity if the plant closed than the uprate adds. A power sale does not renew a license, though, and Constellation has given no date for an application. The deal&#8217;s most consequential effect is a stronger financial case for keeping the station open. The regulatory decision is still years away.</p>
<h2>A Hyperscaler Pays for Nuclear Without Taking It Off the Grid</h2>
<p>Amazon said Calvert Cliffs&#8217; electricity will keep flowing to PJM, the operator of the regional grid serving 13 states and Washington, D.C. That footprint includes Northern Virginia, the world&#8217;s largest data center market. The main alternative is co-location, in which a data center is built at the plant and draws power directly, &#8220;behind the meter,&#8221; before it reaches the grid. Co-location has drawn regulatory scrutiny in PJM over its effect on other customers.</p>
<p>Calvert Cliffs instead uses what the industry calls a grid-side power purchase agreement (PPA), a long-term contract to buy a plant&#8217;s output. The plant sends its electricity into the grid, and Amazon&#8217;s facilities are served through a separate retail supply agreement. Under a structure like this, the buyer underwrites the plant&#8217;s revenue while its output stays available to the regional system. That reduces the friction co-location attracts.</p>
<p>The trade-off is that Amazon&#8217;s sites still depend on the grid&#8217;s ability to deliver power where its data centers are located. The nuclear contract secures a source of electricity, but it does not settle questions of local grid connections or transmission capacity.</p>
<h2>The $3 Billion Figure Still Needs a Schedule</h2>
<p>Constellation says the deal will &#8220;enable&#8221; more than $3 billion of Maryland investment. That figure is not described as Amazon&#8217;s direct spending, and no spending timeline was given. It is also unclear how the sum divides among the uprate, relicensing work, and the potential new clean energy plants, for which Constellation named no design, equipment order, budget, or completion date.</p>
<p>Without a price per megawatt-hour, outside observers cannot compare the contract with market power prices or judge how much of the plant&#8217;s future revenue it locks in. Constellation&#8217;s shares rose after the announcement, which suggests investors value the long-term revenue certainty. Overall, the announcement is concrete on duration, volume, and the uprate window, and thin on economics.</p>
<h2>Background</h2>
<p>Constellation Energy, spun off from Exelon in 2022, operates the largest fleet of nuclear plants in the United States. Calvert Cliffs, on Maryland&#8217;s Chesapeake Bay shore, has two reactors totaling 1,790 MW. The company is also working to restart an 835 MW reactor in Pennsylvania under a separate long-term agreement with Microsoft. That unit received an NRC environmental finding on Sept. 25, 2026.</p>
<p>Since 2024, hyperscalers have turned to existing nuclear plants for around-the-clock, carbon-free power for cloud and AI data centers. Many of these deals sit inside PJM, the grid serving 13 states and Washington, D.C., where data center demand has grown fastest. Amazon&#8217;s 1,920 MW contract with Talen Energy&#8217;s Susquehanna plant, signed in June 2025, is the closest comparable.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMiiwFBVV95cUxPMVZQSUloNDlrcnFfOE04WkRTUnNEM2xhWDQ3dmlwZGxBQnVpS0lIN2doaC1kcWVZbU9PYnRTWFdsM3BzTHdmemU5cjdpRnMwSUVtM251VmwyQ0drZEkwcXpjbE92NWFoWTlPZTFRcWQ4QzNBZ0VxNG1QVjlRUkgzTGZrUmxBcmhUQnpF?oc=5">Constellation Energy signs 20‑year Amazon deal for 690 MW at Calvert Cliffs</a> (Mugglehead Investment Magazine): report on the Sept. 30, 2026 Constellation–Amazon power purchase agreement covering Calvert Cliffs&#8217; output and a planned 190 MW uprate.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Price and start date:</strong> Neither company has disclosed the price per megawatt-hour, when deliveries begin, or how volumes ramp before the uprate arrives.</li>
<li><strong>Relicensing timeline:</strong> Constellation has given no date for a subsequent license renewal application. It has not said how the contract treats deliveries if renewal for either unit is delayed or denied.</li>
<li><strong>The $3 billion:</strong> Constellation has not said who funds the investment, on what schedule, or how much goes to the uprate, relicensing, or new plants.</li>
<li><strong>Uprate approvals:</strong> Constellation has not said where the 190 MW uprate stands in regulatory review or what could move it outside the 2030–2032 window.</li>
<li><strong>New plants:</strong> The potential new clean energy plants at Calvert Cliffs have no named design, equipment order, budget, or completion date.</li>
<li><strong>Retail supply terms:</strong> The companies have not disclosed the volumes, duration, or pricing of the separate retail agreement covering Amazon&#8217;s PJM operations.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did Constellation Energy and Amazon announce?</h3>
<p>On Sept. 30, 2026, they signed a 20-year agreement under which Amazon buys 690 megawatts of output from the Calvert Cliffs nuclear plant in Maryland, plus a separate retail power supply agreement for Amazon operations across PJM&#8217;s footprint.</p>
<h3>How much of the 690 megawatts is new capacity?</h3>
<p>About 190 megawatts. That is a planned uprate at the existing 1,790 MW station, expected between 2030 and 2032. The remaining roughly 500 megawatts comes from reactors that are already operating.</p>
<h3>What is a nuclear uprate?</h3>
<p>An uprate is a set of engineering changes that let an existing reactor safely produce more electricity. It adds capacity without building a new reactor, which is why it is typically faster and cheaper than new construction.</p>
<h3>When will the new nuclear capacity come online?</h3>
<p>Constellation expects the approximately 190 megawatts of added capacity at Calvert Cliffs to come online between 2030 and 2032. It is the next dated milestone the company has given for the plant.</p>
<h3>Does the Amazon deal renew Calvert Cliffs&#x27; operating licenses?</h3>
<p>No. Licenses are granted by the Nuclear Regulatory Commission after safety and environmental reviews. Constellation says the deal provides the revenue certainty to pursue another 20-year renewal, but it has given no application date.</p>
<h3>When do the Calvert Cliffs licenses expire?</h3>
<p>NRC records list Unit 1&#8217;s license as expiring July 31, 2034 and Unit 2&#8217;s as expiring Aug. 13, 2036. Both were renewed in 2000. A further renewal would extend operation from 60 to 80 years.</p>
<h3>Will Amazon take the plant&#x27;s power off the grid?</h3>
<p>No. Amazon said Calvert Cliffs&#8217; electricity will continue flowing to the PJM regional grid. Amazon&#8217;s facilities are served through a separate retail supply agreement, rather than a data center built at the plant.</p>
<h3>What is PJM?</h3>
<p>PJM Interconnection operates the regional electricity grid and wholesale power market covering 13 states and Washington, D.C. Its territory includes Maryland and Northern Virginia, one of the world&#8217;s densest concentrations of data centers.</p>
<h3>What is the $3 billion investment for?</h3>
<p>Constellation says the agreement is expected to enable more than $3 billion in Maryland infrastructure investment. It has not published a spending schedule or a breakdown among the uprate, relicensing, and potential new plants.</p>
<h3>How much is Amazon paying for the power?</h3>
<p>The price has not been disclosed. Constellation did not give a price per megawatt-hour, so the contract&#8217;s value and how it compares with market electricity prices cannot be assessed from the announcement.</p>
<h3>How does this compare with Amazon&#x27;s Talen Energy deal?</h3>
<p>Talen&#8217;s June 2025 agreement covers 1,920 megawatts from the existing Susquehanna plant in Pennsylvania, reaching full quantity by 2032 and running through 2042. The Calvert Cliffs deal is smaller but includes a dated 190 MW uprate.</p>
<h3>Why are cloud companies signing long-term nuclear contracts?</h3>
<p>Nuclear plants run around the clock and emit no carbon, which suits data centers that need constant power. Long contracts give buyers supply certainty and give plant owners the revenue certainty to invest in uprates and license extensions.</p>
<h3>What does the deal mean for Maryland?</h3>
<p>Calvert Cliffs is Maryland&#8217;s only nuclear plant and supplies about 80 per cent of the state&#8217;s clean energy, per Constellation. A contract supporting its relicensing affects the state&#8217;s power supply well beyond the 190 MW addition.</p>
<h3>Is Constellation building new reactors at Calvert Cliffs?</h3>
<p>Not yet. Constellation says the deal will help advance potential new clean energy plants at the site, but it has named no design, equipment order, construction budget, or completion date.</p>
<h3>What should investors and power buyers watch next?</h3>
<p>Key milestones include a subsequent license renewal filing for Calvert Cliffs, regulatory progress on the 190 MW uprate, any disclosure of pricing or investment timing, and concrete plans for new generation at the site.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "Only 190 of Amazon's 690 Nuclear MW Are New. The Bigger AI Stake Is a 2034 License.", "description": "Constellation Energy signed a 20-year deal to sell Amazon 690 MW from Maryland's Calvert Cliffs nuclear plant, including a 190 MW uprate due 2030\u20132032. The term outlasts both reactor licenses, which expire in 2034 and 2036, making relicensing, not the new megawatts, the bigger stake for AI power.", "image": ["https://www.jain.com/assets/img/a4b6e3c9-amazon-constellation-calvert-cliffs-690-mw-nuclear-deal.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-10-01T11:11:44.796849+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did Constellation Energy and Amazon announce?", "acceptedAnswer": {"@type": "Answer", "text": "On Sept. 30, 2026, they signed a 20-year agreement under which Amazon buys 690 megawatts of output from the Calvert Cliffs nuclear plant in Maryland, plus a separate retail power supply agreement for Amazon operations across PJM's footprint."}}, {"@type": "Question", "name": "How much of the 690 megawatts is new capacity?", "acceptedAnswer": {"@type": "Answer", "text": "About 190 megawatts. That is a planned uprate at the existing 1,790 MW station, expected between 2030 and 2032. The remaining roughly 500 megawatts comes from reactors that are already operating."}}, {"@type": "Question", "name": "What is a nuclear uprate?", "acceptedAnswer": {"@type": "Answer", "text": "An uprate is a set of engineering changes that let an existing reactor safely produce more electricity. It adds capacity without building a new reactor, which is why it is typically faster and cheaper than new construction."}}, {"@type": "Question", "name": "When will the new nuclear capacity come online?", "acceptedAnswer": {"@type": "Answer", "text": "Constellation expects the approximately 190 megawatts of added capacity at Calvert Cliffs to come online between 2030 and 2032. It is the next dated milestone the company has given for the plant."}}, {"@type": "Question", "name": "Does the Amazon deal renew Calvert Cliffs' operating licenses?", "acceptedAnswer": {"@type": "Answer", "text": "No. Licenses are granted by the Nuclear Regulatory Commission after safety and environmental reviews. Constellation says the deal provides the revenue certainty to pursue another 20-year renewal, but it has given no application date."}}, {"@type": "Question", "name": "When do the Calvert Cliffs licenses expire?", "acceptedAnswer": {"@type": "Answer", "text": "NRC records list Unit 1's license as expiring July 31, 2034 and Unit 2's as expiring Aug. 13, 2036. Both were renewed in 2000. A further renewal would extend operation from 60 to 80 years."}}, {"@type": "Question", "name": "Will Amazon take the plant's power off the grid?", "acceptedAnswer": {"@type": "Answer", "text": "No. Amazon said Calvert Cliffs' electricity will continue flowing to the PJM regional grid. Amazon's facilities are served through a separate retail supply agreement, rather than a data center built at the plant."}}, {"@type": "Question", "name": "What is PJM?", "acceptedAnswer": {"@type": "Answer", "text": "PJM Interconnection operates the regional electricity grid and wholesale power market covering 13 states and Washington, D.C. Its territory includes Maryland and Northern Virginia, one of the world's densest concentrations of data centers."}}, {"@type": "Question", "name": "What is the $3 billion investment for?", "acceptedAnswer": {"@type": "Answer", "text": "Constellation says the agreement is expected to enable more than $3 billion in Maryland infrastructure investment. It has not published a spending schedule or a breakdown among the uprate, relicensing, and potential new plants."}}, {"@type": "Question", "name": "How much is Amazon paying for the power?", "acceptedAnswer": {"@type": "Answer", "text": "The price has not been disclosed. Constellation did not give a price per megawatt-hour, so the contract's value and how it compares with market electricity prices cannot be assessed from the announcement."}}, {"@type": "Question", "name": "How does this compare with Amazon's Talen Energy deal?", "acceptedAnswer": {"@type": "Answer", "text": "Talen's June 2025 agreement covers 1,920 megawatts from the existing Susquehanna plant in Pennsylvania, reaching full quantity by 2032 and running through 2042. The Calvert Cliffs deal is smaller but includes a dated 190 MW uprate."}}, {"@type": "Question", "name": "Why are cloud companies signing long-term nuclear contracts?", "acceptedAnswer": {"@type": "Answer", "text": "Nuclear plants run around the clock and emit no carbon, which suits data centers that need constant power. Long contracts give buyers supply certainty and give plant owners the revenue certainty to invest in uprates and license extensions."}}, {"@type": "Question", "name": "What does the deal mean for Maryland?", "acceptedAnswer": {"@type": "Answer", "text": "Calvert Cliffs is Maryland's only nuclear plant and supplies about 80 per cent of the state's clean energy, per Constellation. A contract supporting its relicensing affects the state's power supply well beyond the 190 MW addition."}}, {"@type": "Question", "name": "Is Constellation building new reactors at Calvert Cliffs?", "acceptedAnswer": {"@type": "Answer", "text": "Not yet. Constellation says the deal will help advance potential new clean energy plants at the site, but it has named no design, equipment order, construction budget, or completion date."}}, {"@type": "Question", "name": "What should investors and power buyers watch next?", "acceptedAnswer": {"@type": "Answer", "text": "Key milestones include a subsequent license renewal filing for Calvert Cliffs, regulatory progress on the 190 MW uprate, any disclosure of pricing or investment timing, and concrete plans for new generation at the site."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Amazon&#8217;s 2.4M Sq Ft Calvert Cliffs Exit Shows a Nuclear Plant Can&#8217;t Shortcut Zoning</title>
		<link>https://www.jain.com/amazon-aws-withdraws-calvert-cliffs-nuclear-data-center-campus-maryland</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Tue, 04 Aug 2026 16:00:00 +0000</pubDate>
				<category><![CDATA[Data Center]]></category>
		<category><![CDATA[AI infrastructure]]></category>
		<category><![CDATA[Amazon Web Services]]></category>
		<category><![CDATA[Calvert Cliffs]]></category>
		<category><![CDATA[Constellation Energy]]></category>
		<category><![CDATA[Data Center Moratorium]]></category>
		<category><![CDATA[Maryland]]></category>
		<category><![CDATA[nuclear power]]></category>
		<category><![CDATA[Zoning]]></category>
		<guid isPermaLink="false">https://www.jain.com/amazon-aws-withdraws-calvert-cliffs-nuclear-data-center-campus-maryland</guid>

					<description><![CDATA[Amazon Web Services withdrew its 2.4 million-square-foot data center plan at Maryland's Calvert Cliffs nuclear plant on August 4, 2026. Siting beside the state's largest clean power source did not exempt the project from county site-plan review, a proposed moratorium, or voters.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>Amazon has dropped plans to build a large group of data centers on the grounds of a nuclear power plant in southern Maryland. Data centers are warehouse-sized buildings full of computers that run apps, websites and artificial intelligence. This one would have covered roughly 40 football fields of floor space.</p>
<p>Having a giant power plant next door was not enough. Local voters removed three county leaders who had resisted pausing these projects, and the county is now considering a six-month freeze. Amazon calls it a business decision. Either way, local approval proved as important as electricity.</p>
</section>
<p>Amazon Web Services (AWS), Amazon&#8217;s cloud computing arm, has abandoned its proposal to build data centers on the campus of the Calvert Cliffs Nuclear Power Plant near Lusby, Maryland, Maryland Matters reported on August 4, 2026, citing a Calvert County government news release. The proposal, submitted to the county in early May, called for “multiple data center campuses” covering 2.4 million square feet.</p>
<p>The withdrawal follows the June 23 primary election, in which all three Calvert County commissioners who had voted against a pause on data centers lost their races. The county has scheduled an August 18 public meeting on a temporary six-month moratorium on site plan approvals for data center projects. Amazon described the move as a business decision; plant owner Constellation Energy said the opportunity at the site continues.</p>
<h2>Executive Summary</h2>
<p>AWS has walked away from what was, on paper, one of the most attractive data center sites in the Mid-Atlantic: land beside a nuclear plant that Constellation calls Maryland&#8217;s largest source of clean, reliable energy. Co-locating a data center with a power plant is the siting strategy much of the industry has pursued to secure the large, round-the-clock electricity that AI and cloud computing demand.</p>
<p>The Calvert Cliffs outcome shows the limit of that strategy. Power next door does not remove the need for local land-use approval, and in Calvert County the politics of that approval shifted sharply between Amazon&#8217;s May filing and its August exit. Amazon&#8217;s own statement names development timelines as a deciding factor — the variable a county moratorium directly controls.</p>
<p>For developers, utilities and investors, the lesson extends well beyond one county. Much of Maryland&#8217;s population now lives under some form of data center moratorium, according to a regional climate advocacy group, and state lawmakers may take up statewide proposals in 2027.</p>
<h2>Power Next Door Did Not Replace the Permit</h2>
<p>Data center developers have spent the past two years chasing power, not land. Large facilities that train and run AI models draw electricity continuously, and securing that supply through a crowded regional grid can take years. Building beside a nuclear plant — often called co-location — is attractive because the plant produces large amounts of steady, carbon-free power on site. Calvert Cliffs, with Units 1 and 2 near Lusby, offered exactly that.</p>
<p>But a site plan still has to be approved by the county. Amazon filed its 2.4 million-square-foot proposal in early May. On June 23, voters removed commission president Todd Ireland, vice president Mark C. Cox Sr. and commissioner Earl F. “Buddy” Hance, the three commissioners who had voted against a data center pause, in favor of candidates critical of the county&#8217;s data center trajectory. On August 4, the county announced both Amazon&#8217;s withdrawal and a hearing on a six-month moratorium on data center site plan approvals, intended to allow time for new zoning rules and studies.</p>
<p>Amazon says the decision was a business one, and nothing public contradicts that. Its statement, however, lists the factors it weighs: “development timelines, operational requirements, and our ability to deliver quickly for customers.” A six-month pause followed by a zoning rewrite is a timeline risk that no amount of nearby generation can offset. The mechanism is straightforward: the power advantage of a nuclear site is realized only after the building exists, while the permitting clock starts first. For hyperscalers — the largest cloud operators — that measure value in speed to capacity, an uncertain local calendar can outweigh a favorable power position.</p>
<h2>Maryland&#8217;s Moratorium Map Is Now a Siting Input</h2>
<p>Calvert County is not an isolated case. The Chesapeake Climate Action Network (CCAN), an advocacy group that supports moratoriums, said in July that nearly 77% of Maryland&#8217;s population lives under some kind of data center moratorium. That figure comes from an interested party, but the underlying measures are matters of public record: Prince George&#8217;s County enacted a two-year hold in July, Harford County has a ban with no time limit, Montgomery County, Baltimore County and Baltimore City have adopted measures, and Queen Anne&#8217;s and Washington counties have one-year pauses.</p>
<p>The political signal is also visible in Frederick County, where voters ousted council chair Brad Young after the council expanded a data center zone in Adamstown. County Executive Jessica Fitzwater then paused data center development through year-end — while county leaders still intend to proceed with a planned 2,500-acre campus. That combination matters: it suggests the backlash is producing delays and new process rather than blanket rejection everywhere, which is a different risk for developers to price.</p>
<p>CCAN&#8217;s Maryland director expects the General Assembly to consider statewide moratorium bills in 2027. That is a forecast, not a filed bill, but for anyone evaluating Maryland sites it turns a county-by-county patchwork into a possible statewide variable.</p>
<h2>What Constellation and the Next Applicant Are Left Holding</h2>
<p>Constellation, which owns Calvert Cliffs, loses a named tenant but not its thesis. It said the opportunity remains to “create jobs, grow the economy and support in-state federal agencies” and that this can be done “responsibly while protecting and expanding” the plant. Those are claims about future projects that have yet to be specified; the county&#8217;s proposed review of zoning and heavy industrial use is where they would be tested.</p>
<p>Opponents have their own case to make. Petition organizer Melissa Emmal, whose Change.org petition has passed 10,000 signatures, and the nonprofit Save Lusby Inc. are asking for studies and zoning changes before any project proceeds. The June results suggest broad local support for that position, though the scope of the studies and the criteria for lifting a pause remain undefined — questions the county will need to answer if a moratorium is meant to lead to rules rather than indefinite delay.</p>
<p>Meanwhile, the pipeline has not emptied. Natelli Holdings has proposed a separate data center nearby along Route 4, near Calvert Cliffs State Park, an existing landfill, a wastewater treatment facility and a county-owned gun range. Amazon could also resubmit. Whoever moves next will face the same question Amazon did: not whether the power is there, but how long approval will take.</p>
<h2>Background</h2>
<p>Calvert Cliffs Nuclear Power Plant, with Units 1 and 2 near Lusby in Southern Maryland, is owned by Constellation Energy, which describes it as the state&#8217;s largest source of clean, reliable energy. Amazon Web Services is one of the hyperscalers — the handful of companies that build and operate the largest cloud and AI data centers — and has been pursuing sites with reliable access to large amounts of electricity.</p>
<p>Maryland has become a focal point for local resistance to data center development. Through 2026, counties including Prince George&#8217;s, Montgomery, Harford, Baltimore County, Queen Anne&#8217;s and Washington adopted pauses or bans, and data center policy became a deciding issue in county primaries in Calvert and Frederick counties.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMingFBVV95cUxQYjlrM29mMnp4VUdtOTRHX1UtOGd5SFpnZzQ1bnF1MVM0S1BaNjhIdlU3TTFjaHNlN2NjSGduZnFudDF3UDhVVFA0Uy1XUVMxM0JsNW1JWnpUUFQxbWNiNW9SQkZWQWUwWW9PU3F4ZUpUem5jdlVyMm5iNFJnYy1yN2RaS1pYdzgtVWM1cUlOd2cwbHRycjhrNWlvY0NIdw?oc=5">Amazon abandons plans for data center campus at Calvert Cliffs</a> — Maryland Matters on AWS withdrawing its Calvert Cliffs data center proposal after a county primary centered on data centers.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker"><img src="https://www.jain.com/assets/img/dbaaff79-26a0.png" alt="⚠" class="wp-smiley" style="height: 1em; max-height: 1em;" /> What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Amazon</strong> has not disclosed how much electricity the proposed campuses would have required, whether it had reached any power supply agreement with Constellation, or whether power would have come directly from the plant or through the regional grid — each of which carries different regulatory approvals.</li>
<li><strong>Amazon</strong> has not said what development timeline it was working to, which of its stated factors was decisive, where the planned capacity will be built instead, or whether it intends to resubmit in Calvert County once zoning rules are settled.</li>
<li><strong>Constellation</strong> has not said whether other prospective tenants are in discussion for the Calvert Cliffs site, or what commercial structure it envisions. <strong>Natelli Holdings</strong> has not disclosed publicly available detail on the size, power source or schedule of its nearby Route 4 proposal.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did Amazon announce about Calvert Cliffs?</h3>
<p>Amazon Web Services withdrew its proposal to develop multiple data center campuses, totaling 2.4 million square feet, on the grounds of the Calvert Cliffs Nuclear Power Plant near Lusby, Maryland. Calvert County announced the withdrawal on August 4, 2026.</p>
<h3>Why did Amazon withdraw the Calvert Cliffs data center plan?</h3>
<p>Amazon called it a business decision, saying it evaluates sites on development timelines, operational requirements and its ability to deliver quickly for customers. The withdrawal followed a June primary in which voters ousted commissioners who had opposed a data center pause.</p>
<h3>When did Amazon submit the Calvert Cliffs proposal?</h3>
<p>Amazon submitted its proposal to Calvert County in early May 2026. It withdrew roughly three months later, on August 4, before the county acted on a proposed moratorium.</p>
<h3>What is the proposed Calvert County data center moratorium?</h3>
<p>The county scheduled an August 18 public meeting on a temporary six-month moratorium on site plan approvals for data center projects. It is meant to allow time to adopt zoning amendments and complete studies on data centers and heavy industrial uses.</p>
<h3>Who lost in the Calvert County primary over data centers?</h3>
<p>Commission president Todd Ireland, vice president Mark C. Cox Sr. and commissioner Earl F. “Buddy” Hance all lost their June 23 primaries. All three had voted against a pause on data centers, and their challengers criticized the county&#8217;s data center direction.</p>
<h3>Why do data center developers want to build next to nuclear plants?</h3>
<p>Nuclear plants generate large amounts of steady, carbon-free electricity around the clock. Data centers, especially those running AI workloads, need exactly that kind of continuous supply, and locating next to a plant can reduce reliance on a congested regional grid.</p>
<h3>Does building next to a power plant avoid local approval?</h3>
<p>No. A data center beside a power plant still needs local land-use and site plan approval. The Calvert Cliffs case shows that county zoning decisions and moratoriums can delay or reshape a project regardless of how close it is to power.</p>
<h3>Who owns Calvert Cliffs Nuclear Power Plant?</h3>
<p>Constellation Energy owns Calvert Cliffs, which it describes as Maryland&#8217;s largest source of clean, reliable energy. Constellation said Amazon remains a valued partner and that it will keep working with the county and state on data center development at the site.</p>
<h3>Could Amazon come back to Calvert County?</h3>
<p>Amazon said it is not moving forward “at this time” and remains committed to Maryland. Local petition organizer Melissa Emmal noted the company could still resubmit a proposal, which is why opponents continue to push for a moratorium.</p>
<h3>Are other data centers proposed near Calvert Cliffs?</h3>
<p>Yes. Natelli Holdings has proposed a data center along Route 4 near Calvert Cliffs State Park, close to an existing landfill, a wastewater treatment facility and a county-owned gun range.</p>
<h3>How much of Maryland is under a data center moratorium?</h3>
<p>The Chesapeake Climate Action Network said in July that nearly 77% of Maryland&#8217;s population lives under some kind of data center moratorium, including Montgomery, Prince George&#8217;s, Baltimore County, Baltimore City and Harford County.</p>
<h3>Which Maryland county has the longest data center ban?</h3>
<p>Prince George&#8217;s County has the longest time-limited hold, a two-year pause enacted in July 2026. Harford County has enacted a ban with no time limit, while Queen Anne&#8217;s and Washington counties have adopted one-year pauses.</p>
<h3>What is happening with data centers in Frederick County?</h3>
<p>After voters ousted council chair Brad Young, County Executive Jessica Fitzwater paused data center development through year-end by executive order. County leaders still plan to proceed with a data center campus planned at 2,500 acres.</p>
<h3>Could Maryland adopt a statewide data center moratorium?</h3>
<p>CCAN Action Fund&#8217;s Maryland director said she expects the General Assembly to take a serious look at statewide moratorium bills in the 2027 session. No statewide measure had been enacted as of August 2026.</p>
<h3>What does this mean for data center developers and investors?</h3>
<p>Local approval risk now sits alongside power availability as a core siting factor. In jurisdictions with active moratoriums or pending zoning rewrites, even well-powered sites can face timeline uncertainty that affects whether projects proceed.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "Amazon's 2.4M Sq Ft Calvert Cliffs Exit Shows a Nuclear Plant Can't Shortcut Zoning", "description": "Amazon Web Services withdrew its 2.4 million-square-foot data center plan at Maryland's Calvert Cliffs nuclear plant on August 4, 2026. Siting beside the state's largest clean power source did not exempt the project from county site-plan review, a proposed moratorium, or voters.", "image": ["https://www.jain.com/assets/img/1deaaaa8-amazon-calvert-cliffs-nuclear-data-center-withdrawal-maryland.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-09-25T01:47:08.853870+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did Amazon announce about Calvert Cliffs?", "acceptedAnswer": {"@type": "Answer", "text": "Amazon Web Services withdrew its proposal to develop multiple data center campuses, totaling 2.4 million square feet, on the grounds of the Calvert Cliffs Nuclear Power Plant near Lusby, Maryland. Calvert County announced the withdrawal on August 4, 2026."}}, {"@type": "Question", "name": "Why did Amazon withdraw the Calvert Cliffs data center plan?", "acceptedAnswer": {"@type": "Answer", "text": "Amazon called it a business decision, saying it evaluates sites on development timelines, operational requirements and its ability to deliver quickly for customers. The withdrawal followed a June primary in which voters ousted commissioners who had opposed a data center pause."}}, {"@type": "Question", "name": "When did Amazon submit the Calvert Cliffs proposal?", "acceptedAnswer": {"@type": "Answer", "text": "Amazon submitted its proposal to Calvert County in early May 2026. It withdrew roughly three months later, on August 4, before the county acted on a proposed moratorium."}}, {"@type": "Question", "name": "What is the proposed Calvert County data center moratorium?", "acceptedAnswer": {"@type": "Answer", "text": "The county scheduled an August 18 public meeting on a temporary six-month moratorium on site plan approvals for data center projects. It is meant to allow time to adopt zoning amendments and complete studies on data centers and heavy industrial uses."}}, {"@type": "Question", "name": "Who lost in the Calvert County primary over data centers?", "acceptedAnswer": {"@type": "Answer", "text": "Commission president Todd Ireland, vice president Mark C. Cox Sr. and commissioner Earl F. \u201cBuddy\u201d Hance all lost their June 23 primaries. All three had voted against a pause on data centers, and their challengers criticized the county's data center direction."}}, {"@type": "Question", "name": "Why do data center developers want to build next to nuclear plants?", "acceptedAnswer": {"@type": "Answer", "text": "Nuclear plants generate large amounts of steady, carbon-free electricity around the clock. Data centers, especially those running AI workloads, need exactly that kind of continuous supply, and locating next to a plant can reduce reliance on a congested regional grid."}}, {"@type": "Question", "name": "Does building next to a power plant avoid local approval?", "acceptedAnswer": {"@type": "Answer", "text": "No. A data center beside a power plant still needs local land-use and site plan approval. The Calvert Cliffs case shows that county zoning decisions and moratoriums can delay or reshape a project regardless of how close it is to power."}}, {"@type": "Question", "name": "Who owns Calvert Cliffs Nuclear Power Plant?", "acceptedAnswer": {"@type": "Answer", "text": "Constellation Energy owns Calvert Cliffs, which it describes as Maryland's largest source of clean, reliable energy. Constellation said Amazon remains a valued partner and that it will keep working with the county and state on data center development at the site."}}, {"@type": "Question", "name": "Could Amazon come back to Calvert County?", "acceptedAnswer": {"@type": "Answer", "text": "Amazon said it is not moving forward \u201cat this time\u201d and remains committed to Maryland. Local petition organizer Melissa Emmal noted the company could still resubmit a proposal, which is why opponents continue to push for a moratorium."}}, {"@type": "Question", "name": "Are other data centers proposed near Calvert Cliffs?", "acceptedAnswer": {"@type": "Answer", "text": "Yes. Natelli Holdings has proposed a data center along Route 4 near Calvert Cliffs State Park, close to an existing landfill, a wastewater treatment facility and a county-owned gun range."}}, {"@type": "Question", "name": "How much of Maryland is under a data center moratorium?", "acceptedAnswer": {"@type": "Answer", "text": "The Chesapeake Climate Action Network said in July that nearly 77% of Maryland's population lives under some kind of data center moratorium, including Montgomery, Prince George's, Baltimore County, Baltimore City and Harford County."}}, {"@type": "Question", "name": "Which Maryland county has the longest data center ban?", "acceptedAnswer": {"@type": "Answer", "text": "Prince George's County has the longest time-limited hold, a two-year pause enacted in July 2026. Harford County has enacted a ban with no time limit, while Queen Anne's and Washington counties have adopted one-year pauses."}}, {"@type": "Question", "name": "What is happening with data centers in Frederick County?", "acceptedAnswer": {"@type": "Answer", "text": "After voters ousted council chair Brad Young, County Executive Jessica Fitzwater paused data center development through year-end by executive order. County leaders still plan to proceed with a data center campus planned at 2,500 acres."}}, {"@type": "Question", "name": "Could Maryland adopt a statewide data center moratorium?", "acceptedAnswer": {"@type": "Answer", "text": "CCAN Action Fund's Maryland director said she expects the General Assembly to take a serious look at statewide moratorium bills in the 2027 session. No statewide measure had been enacted as of August 2026."}}, {"@type": "Question", "name": "What does this mean for data center developers and investors?", "acceptedAnswer": {"@type": "Answer", "text": "Local approval risk now sits alongside power availability as a core siting factor. In jurisdictions with active moratoriums or pending zoning rewrites, even well-powered sites can face timeline uncertainty that affects whether projects proceed."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
