<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="https://www.jain.com/assets/img/6adafce5-1.1"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>DC power &#8211; Jain.com</title>
	<atom:link href="/tag/dc-power/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>Data centers, connectivity, and security — news and analysis</description>
	<lastBuildDate>Wed, 09 Sep 2026 11:28:45 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>/wp-content/uploads/2026/08/jain-com-icon-512-150x150.png</url>
	<title>DC power &#8211; Jain.com</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>ABB and BCG Make the Case for DC Power in AI Data Centers</title>
		<link>/abb-bcg-direct-current-ai-data-center-power/</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Wed, 09 Sep 2026 11:28:45 +0000</pubDate>
				<category><![CDATA[Power Infrastructure]]></category>
		<category><![CDATA[800 VDC]]></category>
		<category><![CDATA[ABB]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[DC power]]></category>
		<category><![CDATA[electrical architecture]]></category>
		<category><![CDATA[energy efficiency]]></category>
		<category><![CDATA[grid capacity]]></category>
		<category><![CDATA[power distribution]]></category>
		<guid isPermaLink="false">/abb-bcg-direct-current-ai-data-center-power/</guid>

					<description><![CDATA[ABB and Boston Consulting Group say direct current is moving to the center of data center power design, with 800-volt DC emerging for AI racks. Their new hybrid AC/DC report argues that fragmented standards and a shortage of DC-skilled engineers, not the technology itself, now set the pace of adoption.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<ul>
<li>The Swiss engineering group ABB and the consultancy Boston Consulting Group published a report saying the electricity inside data centers should increasingly flow the way it does in a battery, not the way it does in a wall socket.</li>
<li>Computers, solar panels and batteries all run on that kind of power already. Every time electricity is converted from one form to the other, a little is lost as heat, like a phone charger warming up.</li>
<li>Artificial intelligence machines use so much power that those small losses now add up to real money and real capacity.</li>
<li>ABB sells the equipment, so it has a stake in the argument.</li>
</ul>
</section>
<p>ABB said on September 9 that it has published <em>The Strategic Case for Hybrid AC/DC Power: Shaping the Transition to the Next Electrical Architecture</em>, a report developed with Boston Consulting Group. The Zurich-headquartered electrification and automation group argues that direct current, or DC, is moving from the periphery to the center of industrial, commercial and digital infrastructure, and that choices made by executives and policymakers over the next two to three years will decide who shapes the transition and who simply inherits it.</p>
<p>The report singles out AI data centers as one of the most immediate drivers of DC adoption, finding that 800-volt DC distribution is emerging as the defining architecture for next-generation AI infrastructure. It frames the outcome not as a contest between DC and alternating current, or AC, but as a hybrid system: AC remains the backbone of transmission and regional distribution, while DC spreads inside facilities where the major sources and loads already run natively on it.</p>
<h2>Executive Summary</h2>
<p>The argument rests on a piece of electrical plumbing that most people never see. Grids deliver alternating current, in which the flow reverses direction many times a second, because that form is cheap to push over long distances and easy to step up and down in voltage with transformers. Almost everything now growing fastest, though, is natively direct current: solar photovoltaic panels, batteries, electric vehicles, industrial automation gear and the graphics processors inside AI servers. Each handoff between the two forms runs through a converter, and each converter throws off a percentage of the energy as heat.</p>
<p>ABB and BCG contend that stripping conversion steps out of the chain does three things at once: it raises efficiency, it increases the usable compute capacity behind an existing grid connection, and it simplifies the integration of on-site generation and storage. That middle point is the commercially interesting one. In markets where new grid capacity is the scarce input, an efficiency gain converts directly into more revenue-generating hardware behind the same meter.</p>
<p>The report also reframes the obstacle. Concerns about DC at scale, its safety and its economics reflect outdated assumptions rather than the capabilities of current equipment, ABB and BCG conclude. What actually slows deployment, they say, is fragmented standards and a shortage of engineers and technicians trained on DC systems. That is a claim about institutions and labor markets rather than about physics, and it points to a slower, less predictable fix.</p>
<h2>Why AI Racks Are Rewriting the Electrical Diagram</h2>
<p>Conventional data center power design has been remarkably stable for two decades. Utility alternating current arrives at a substation, passes through switchgear, an uninterruptible power supply and a power distribution unit, then reaches a server whose internal supply finally converts it to the low-voltage direct current the chips actually consume. Each stage was tolerable when a rack drew a few kilowatts. The report&#8217;s contention is that at AI power densities, conventional architectures are reaching practical limits, and the accumulated conversion overhead stops being a rounding error.</p>
<p>The 800-volt DC figure is the specific technical claim worth understanding. Raising the distribution voltage lets a given amount of power travel through thinner conductors, because power is voltage multiplied by current and it is current that dictates copper cross-section and resistive heating. Delivering high-density racks at low voltage means either enormous busbars or unacceptable losses. Pushing distribution to 800 volts DC and converting close to the load is the same trick the automotive industry adopted for fast-charging electric vehicles, applied to a data hall.</p>
<p>The practical consequence is that the change does not stop at the rack. It touches switchgear, protection, uninterruptible power supply topology, on-site storage and the interface with the substation. That is a supply-chain shift as much as an engineering one, and it favors vendors who already hold the protection and conversion portfolios.</p>
<h2>The Real Prize Is the Grid Connection</h2>
<p>Read commercially, the strongest line in the release is not about efficiency in the abstract. It is that DC distribution lets operators maximize compute capacity within constrained grid connections. In the markets where AI capacity is being built hardest, the binding constraint is rarely capital or land. It is the megawatts a utility will actually deliver, and when they will deliver them.</p>
<p>Under that constraint, the economics change character. An efficiency improvement in a power-abundant market is a cost saving measured against the electricity bill. The same improvement behind a fixed, fully subscribed grid connection is a capacity unlock, measured against the revenue of the additional accelerators it lets you energize. Those two framings can differ by an order of magnitude in value, which explains why an argument about conversion losses is landing now rather than a decade ago.</p>
<p>It also explains the report&#8217;s two-to-three-year window. Electrical architecture is set early in a data center&#8217;s design and is expensive to revisit. Operators committing to buildings that will be energized late this decade are choosing their topology now, which is precisely when a vendor wants the conversation to happen.</p>
<h2>Standards and Skills Are the Stated Bottleneck</h2>
<p>ABB and BCG place the constraint on adoption in two unglamorous places: fragmented standards and a shortage of DC-specific skills. Both are credible. Direct current has no natural zero crossing, the instant of zero flow that lets a conventional breaker extinguish an arc, which is why DC protection historically demanded different hardware and different design practice. ABB says it launched the industry&#8217;s first solid state circuit breaker in 2022, and holds more than 700 DC-related patents.</p>
<p>That patent position is also why the call for harmonized standards deserves to be read with clear eyes. Common standards genuinely enlarge a market and reduce buyer risk, and buyers should want them. They also tend to reward whoever arrives with the deepest existing portfolio in the standardized technology. Nothing about that is improper, and ABB is not alone in it, but a customer evaluating this report should treat it as a well-argued position paper from an interested party rather than as neutral market research.</p>
<p>The skills point may be the more stubborn of the two. Standards can be negotiated on a schedule. A workforce of electricians, commissioning engineers and facility staff fluent in high-voltage DC protection is built over years, and its scarcity would constrain even operators fully convinced by the argument.</p>
<h2>What Is Substantiated and What Is Asserted</h2>
<p>The quantified evidence in the announcement is drawn from marine propulsion, where ABB says a DC-based onboard vessel power system achieved fuel savings of up to 27 percent. That is a real, specific result, and it is not a data center result. Ships run isolated power systems with variable-speed loads and their own economics; the number establishes that ABB has long-running DC field experience, not that a data hall should expect a comparable gain.</p>
<p>For the data center case itself, the announcement offers direction rather than magnitude. It says 800-volt DC is emerging as the defining architecture and that efficiency and usable capacity improve, without published percentages, capital-cost comparisons or named deployments in the summary. The conclusion that scale, safety and economic objections are now outdated is likewise stated as a finding, with the supporting analysis sitting in the full report published on ABB&#8217;s site.</p>
<p>None of that undercuts the thesis, which aligns with where high-density computing and on-site storage are visibly heading. It does mean the announcement is best treated as a framing document. The buyer&#8217;s question is not whether DC distribution helps, but by how much, at what installed cost premium, and with which protection and service ecosystem behind it.</p>
<h2>Background</h2>
<p>The choice between alternating and direct current was settled commercially in the late nineteenth century, when transformers made it cheap to step alternating voltage up for long-distance transmission and back down for use. Direct current never disappeared, though. It survived in specialist niches such as long submarine transmission links, traction systems and shipboard power, and it returned quietly through the back door as solar panels, batteries and electronics proliferated, each of them a direct current device tethered to an alternating current grid through a converter.</p>
<p>ABB sits on both sides of that history as one of the largest electrification and automation suppliers globally, selling switchgear, drives, protection and power distribution equipment into utilities, industry and data centers. The AI buildout has made its data center segment strategically prominent, because the constraint on new compute has shifted from chips and capital toward electrical delivery. This report, produced with Boston Consulting Group, is the company&#8217;s argument that the resulting architecture will look meaningfully different from the one the industry has built for the past twenty years.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://www.prnewswire.com/news-releases/new-abb-and-bcg-report-highlights-growing-role-of-direct-current-technologies-in-future-power-systems-302873232.html">New ABB and BCG report highlights growing role of direct current technologies in future power systems</a> — ABB&#8217;s September 9, 2026 announcement of a report developed with Boston Consulting Group on the shift toward hybrid AC/DC electrical architectures, including 800 VDC distribution for AI data centers. The full report is published at <a href="https://www.abb.com/global/en/company/innovation/hybrid-ac-dc-power">abb.com</a>.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<p>ABB and BCG have not published, in the announcement, any data center-specific quantification of the benefit they describe. There is no stated efficiency gain, no percentage increase in usable capacity behind a fixed grid connection, and no capital-cost comparison between an 800-volt DC design and the conventional alternating-current build it would replace. Without those figures, an operator cannot model the payback.</p>
<p>Other material questions remain open for both companies:</p>
<ul>
<li><strong>Customers and deployments.</strong> No AI data center operator is named as having adopted 800-volt DC distribution, and no live or contracted installation is cited.</li>
<li><strong>Product availability and pricing.</strong> ABB does not say which parts of an 800-volt DC data center portfolio are commercially available today, at what lead times, or how solid state breaker supply scales.</li>
<li><strong>Standards pathway.</strong> The companies call for harmonized standards without identifying which bodies, which work items, or what timeline would resolve the fragmentation they describe.</li>
<li><strong>Basis for the two-to-three-year window.</strong> The report asserts a decision window without explaining what makes it close, such as design-freeze cycles or equipment lead times.</li>
<li><strong>Safety and protection detail.</strong> Having declared safety concerns outdated, ABB and BCG do not set out in the announcement how arc-flash risk, fault clearing and maintenance practice are handled at 800 volts DC.</li>
<li><strong>Skills gap size and remedy.</strong> No estimate is given of how many DC-qualified personnel the transition requires, nor what training programs ABB or its partners will fund.</li>
<li><strong>Retrofit versus greenfield.</strong> The announcement does not address whether existing AC facilities can be economically converted or whether the opportunity is confined to new builds.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did ABB and BCG announce?</h3>
<p>ABB published a report developed with Boston Consulting Group, titled The Strategic Case for Hybrid AC/DC Power, arguing that direct current technology is moving from the periphery to the center of industrial, commercial and digital infrastructure.</p>
<h3>What is the difference between AC and DC power?</h3>
<p>In alternating current the flow reverses direction many times a second, which suits long-distance transmission. In direct current it flows one way, which is what batteries, solar panels and computer chips produce or consume natively.</p>
<h3>Why does converting between AC and DC matter?</h3>
<p>Every conversion runs through equipment that loses a share of the energy as heat. Removing conversion steps between generation, storage and consumption improves efficiency and simplifies the electrical design.</p>
<h3>What is 800 VDC and why is it significant?</h3>
<p>It means distributing power at 800 volts of direct current. The report finds it is emerging as the defining architecture for next-generation AI infrastructure, because higher voltage moves the same power through less copper with lower losses.</p>
<h3>Is the report saying AC will be replaced?</h3>
<p>No. ABB and BCG describe a hybrid future. Alternating current remains the backbone of transmission and regional distribution networks, while direct current grows inside facilities where sources and loads already run on it.</p>
<h3>Why are AI data centers the immediate driver?</h3>
<p>AI workloads keep raising power density per rack, and the report says conventional electrical architectures are reaching practical limits at those densities. Direct current distribution is presented as the way past that ceiling.</p>
<h3>How does DC help when grid capacity is limited?</h3>
<p>The report says DC distribution lets operators maximize compute capacity within constrained grid connections. Energy not lost in conversion can instead power additional servers behind the same connection.</p>
<h3>What does ABB say is blocking wider DC adoption?</h3>
<p>Fragmented standards and a shortage of DC-specific skills. The report concludes that worries about scale, safety and economics reflect outdated assumptions rather than what current technology can do.</p>
<h3>What is ABB&#x27;s track record in DC?</h3>
<p>ABB says it was first to demonstrate DC&#8217;s energy-saving potential in vessels, with an onboard system achieving fuel savings of up to 27 percent, and launched the industry&#8217;s first solid state circuit breaker in 2022. It holds more than 700 DC-related patents.</p>
<h3>Does the 27 percent fuel saving apply to data centers?</h3>
<p>No. That figure comes from a DC-based onboard power system on vessels, which have different loads and economics. The announcement does not publish a comparable efficiency figure for data centers.</p>
<h3>Who is ABB?</h3>
<p>A global electrification and automation company headquartered in Zurich, with more than 140 years of history and around 110,000 employees. Its shares are listed on the SIX Swiss Exchange and Nasdaq Stockholm.</p>
<h3>Which sectors beyond data centers could use DC?</h3>
<p>The report highlights automation-intensive manufacturing plants, commercial buildings and, over the longer term, buildings generally, through lower conversion losses and better integration of on-site renewables and storage.</p>
<h3>What should a data center buyer take from this?</h3>
<p>Treat it as a well-argued position paper from an equipment vendor. The direction is credible, but the announcement offers no installed-cost comparison, payback figure or named deployment to model against.</p>
<h3>Why does the report stress the next two to three years?</h3>
<p>Electrical architecture is fixed early in a facility&#8217;s design and is costly to change later. ABB and BCG argue that decisions made in that window determine who shapes the transition and who inherits it.</p>
<h3>What would make the DC case easier to verify?</h3>
<p>Published efficiency and usable-capacity gains for data center deployments, capital-cost comparisons against conventional AC designs, named operator installations, and a defined standards timeline.</p>
<h3>Where can the full report be read?</h3>
<p>ABB has published it on its innovation pages covering hybrid AC/DC power, at abb.com. The announcement summarizes the findings but omits the underlying quantitative analysis.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "ABB and BCG Make the Case for DC Power in AI Data Centers", "description": "ABB and Boston Consulting Group say direct current is moving to the center of data center power design, with 800-volt DC emerging for AI racks. Their new hybrid AC/DC report argues that fragmented standards and a shortage of DC-skilled engineers, not the technology itself, now set the pace of adoption.", "image": ["/wp-content/uploads/2026/09/abb-bcg-direct-current-ai-data-center-power.png"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-09-09T11:28:40.817114+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did ABB and BCG announce?", "acceptedAnswer": {"@type": "Answer", "text": "ABB published a report developed with Boston Consulting Group, titled The Strategic Case for Hybrid AC/DC Power, arguing that direct current technology is moving from the periphery to the center of industrial, commercial and digital infrastructure."}}, {"@type": "Question", "name": "What is the difference between AC and DC power?", "acceptedAnswer": {"@type": "Answer", "text": "In alternating current the flow reverses direction many times a second, which suits long-distance transmission. In direct current it flows one way, which is what batteries, solar panels and computer chips produce or consume natively."}}, {"@type": "Question", "name": "Why does converting between AC and DC matter?", "acceptedAnswer": {"@type": "Answer", "text": "Every conversion runs through equipment that loses a share of the energy as heat. Removing conversion steps between generation, storage and consumption improves efficiency and simplifies the electrical design."}}, {"@type": "Question", "name": "What is 800 VDC and why is it significant?", "acceptedAnswer": {"@type": "Answer", "text": "It means distributing power at 800 volts of direct current. The report finds it is emerging as the defining architecture for next-generation AI infrastructure, because higher voltage moves the same power through less copper with lower losses."}}, {"@type": "Question", "name": "Is the report saying AC will be replaced?", "acceptedAnswer": {"@type": "Answer", "text": "No. ABB and BCG describe a hybrid future. Alternating current remains the backbone of transmission and regional distribution networks, while direct current grows inside facilities where sources and loads already run on it."}}, {"@type": "Question", "name": "Why are AI data centers the immediate driver?", "acceptedAnswer": {"@type": "Answer", "text": "AI workloads keep raising power density per rack, and the report says conventional electrical architectures are reaching practical limits at those densities. Direct current distribution is presented as the way past that ceiling."}}, {"@type": "Question", "name": "How does DC help when grid capacity is limited?", "acceptedAnswer": {"@type": "Answer", "text": "The report says DC distribution lets operators maximize compute capacity within constrained grid connections. Energy not lost in conversion can instead power additional servers behind the same connection."}}, {"@type": "Question", "name": "What does ABB say is blocking wider DC adoption?", "acceptedAnswer": {"@type": "Answer", "text": "Fragmented standards and a shortage of DC-specific skills. The report concludes that worries about scale, safety and economics reflect outdated assumptions rather than what current technology can do."}}, {"@type": "Question", "name": "What is ABB's track record in DC?", "acceptedAnswer": {"@type": "Answer", "text": "ABB says it was first to demonstrate DC's energy-saving potential in vessels, with an onboard system achieving fuel savings of up to 27 percent, and launched the industry's first solid state circuit breaker in 2022. It holds more than 700 DC-related patents."}}, {"@type": "Question", "name": "Does the 27 percent fuel saving apply to data centers?", "acceptedAnswer": {"@type": "Answer", "text": "No. That figure comes from a DC-based onboard power system on vessels, which have different loads and economics. The announcement does not publish a comparable efficiency figure for data centers."}}, {"@type": "Question", "name": "Who is ABB?", "acceptedAnswer": {"@type": "Answer", "text": "A global electrification and automation company headquartered in Zurich, with more than 140 years of history and around 110,000 employees. Its shares are listed on the SIX Swiss Exchange and Nasdaq Stockholm."}}, {"@type": "Question", "name": "Which sectors beyond data centers could use DC?", "acceptedAnswer": {"@type": "Answer", "text": "The report highlights automation-intensive manufacturing plants, commercial buildings and, over the longer term, buildings generally, through lower conversion losses and better integration of on-site renewables and storage."}}, {"@type": "Question", "name": "What should a data center buyer take from this?", "acceptedAnswer": {"@type": "Answer", "text": "Treat it as a well-argued position paper from an equipment vendor. The direction is credible, but the announcement offers no installed-cost comparison, payback figure or named deployment to model against."}}, {"@type": "Question", "name": "Why does the report stress the next two to three years?", "acceptedAnswer": {"@type": "Answer", "text": "Electrical architecture is fixed early in a facility's design and is costly to change later. ABB and BCG argue that decisions made in that window determine who shapes the transition and who inherits it."}}, {"@type": "Question", "name": "What would make the DC case easier to verify?", "acceptedAnswer": {"@type": "Answer", "text": "Published efficiency and usable-capacity gains for data center deployments, capital-cost comparisons against conventional AC designs, named operator installations, and a defined standards timeline."}}, {"@type": "Question", "name": "Where can the full report be read?", "acceptedAnswer": {"@type": "Answer", "text": "ABB has published it on its innovation pages covering hybrid AC/DC power, at abb.com. The announcement summarizes the findings but omits the underlying quantitative analysis."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
