<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="https://www.jain.com/assets/img/6adafce5-1.1"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Rubix Data Centers &#8211; Jain.com</title>
	<atom:link href="/tag/rubix-data-centers/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>Data centers, connectivity, and security — news and analysis</description>
	<lastBuildDate>Thu, 24 Sep 2026 19:32:19 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>/wp-content/uploads/2026/08/jain-com-icon-512-150x150.png</url>
	<title>Rubix Data Centers &#8211; Jain.com</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Submer&#8217;s €1bn Flix Bet: An AI Cooling Firm Sees the Value in Land and Power</title>
		<link>/submer-1bn-ai-data-center-flix-catalonia-ercros-chemical-plant-rubix/</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Wed, 15 Jul 2026 16:00:00 +0000</pubDate>
				<category><![CDATA[Data Center]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[brownfield redevelopment]]></category>
		<category><![CDATA[Catalonia]]></category>
		<category><![CDATA[immersion cooling]]></category>
		<category><![CDATA[Rubix Data Centers]]></category>
		<category><![CDATA[Spain]]></category>
		<category><![CDATA[Submer]]></category>
		<guid isPermaLink="false">/submer-1bn-ai-data-center-flix-catalonia-ercros-chemical-plant-rubix/</guid>

					<description><![CDATA[Submer plans a €1 billion AI data center at the former Ercros chemical plant in Flix, Catalonia, run by its new Rubix division. The move shows a liquid-cooling supplier betting that land and power, not equipment, hold lasting value. Capacity, timing and tenant are still undisclosed.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>A Barcelona company best known for keeping computers cool is spending about €1 billion to build and run its own huge computer warehouse for artificial intelligence.</p>
<p>Submer plans to put it on the grounds of an old chemical factory in the Spanish town of Flix, which stopped operating in 2023. Catalonia&#8217;s regional president turned out for the announcement.</p>
<p>What makes it interesting: a company that used to sell equipment to building owners now wants to be the owner. It has not yet said how big the site will be, when it opens, or who will use it.</p>
</section>
<p>Submer, the Barcelona-based company that built its name in immersion cooling, plans a €1 billion ($1.14 billion) AI data center on the site of the former Ercros chemical plant in Flix, Catalonia, Data Center Dynamics reported. The facility will be built in two phases and operated by Rubix Data Centers, the AI data center division Submer launched in June, which aims to lease it to a single tenant running AI workloads.</p>
<p>The project was unveiled on Saturday, July 11, at an event attended by Salvador Illa, president of the government of Catalonia, and Miquel Sàmper, the regional minister of business and labor. Submer has not disclosed the facility&#8217;s planned capacity or construction timeline; renders appear to show four data halls arranged around a central building.</p>
<h2>Executive Summary</h2>
<p>The headline number is €1 billion, but the more consequential fact is who is spending it. Submer&#8217;s business has been supplying cooling systems to other people&#8217;s data centers. With Flix, it becomes a developer and operator in its own right, following last year&#8217;s launch of the InferX AI cloud platform and June&#8217;s launch of Rubix Data Centers.</p>
<p>Submer CEO Patrick Smets framed the move as a deliberate climb up the value chain: “we will expand across the full stack, from land and power to cloud and Edge.” Rubix, led by former Stack executive John Eland, leads its pitch not with cooling technology but with a claim of 8GW of power available across vacant sites in the Americas, EMEA and APAC. That ordering signals where the company believes durable value in AI infrastructure now sits.</p>
<p>What the announcement does not yet establish is the project&#8217;s scale, power supply, financing or customer. Until those are disclosed, Flix is best read as a statement of strategy and site selection rather than a funded, contracted build.</p>
<h2>From Selling Cooling to Owning the Building</h2>
<p>Submer&#8217;s trajectory over roughly a year tells the story: an immersion cooling specialist (immersion cooling submerges servers in a non-conductive liquid to carry heat away more efficiently than air) launched an AI cloud platform, InferX, then a data center division, Rubix, and now a €1 billion campus. Each step moves the company closer to the end customer and further from being a component supplier.</p>
<p>The economic logic is straightforward. An equipment vendor is typically paid once per deployment, and its fortunes depend on how many facilities its customers build. An operator that leases a facility earns recurring rent for the life of the lease and controls the asset that everything else depends on: the site, the building and its power supply. Smets&#8217; own phrasing, “from land and power to cloud and Edge,” puts land and power first. Eland made the same point from the operator&#8217;s side: “We intend to operate the facility we are building here, so we are not simply passing through Flix.”</p>
<p>That is the substance behind reading Flix as a bet on land and power rather than on cooling hardware. The company has not said whether Submer&#8217;s own immersion systems will be deployed at Flix, which underlines the point: the announcement is about owning capacity, not showcasing a product.</p>
<h2>Why Power Is the Asset Rubix Leads With</h2>
<p>For AI data centers, the scarce input is increasingly not buildings or servers but a site with a large, deliverable grid connection. That is why Rubix&#8217;s headline claim is 8GW of available power across vacant sites, a figure measured in gigawatts, or thousands of megawatts. Framing a data center business around power first reflects how the market now prices development opportunities.</p>
<p>Former heavy-industrial sites such as the Ercros plant are attractive candidates in principle, because industrial users often required substantial electrical infrastructure and the land is already zoned for industrial use. Ercros also operates a solar farm on the site today. But Submer has not said what grid capacity is available at Flix, whether it is already connected, or how the solar installation fits into the project&#8217;s power plans. Those details will determine how quickly and how large Flix can realistically become.</p>
<p>The 8GW figure deserves the same even-handed reading. It is a claim about power available across vacant sites, and Rubix has not broken it down by location, by grid status or by how much of it is contractually secured versus identified. As a signal of ambition it is clear; as a measure of deliverable capacity it is not yet substantiated.</p>
<h2>The Single-Tenant Model Cuts Both Ways</h2>
<p>Rubix aims to lease Flix to a single tenant for AI workloads. This build-to-suit approach is common for large AI campuses: one creditworthy customer on a long lease can anchor the financing for a very large build, and two-phase construction lets capital be deployed in step with demand.</p>
<p>The flip side is concentration. Until a tenant signs, the €1 billion figure describes an intended investment rather than a committed one, and the facility&#8217;s design, timing and financing will likely hinge on that single counterparty. Without a disclosed capacity, it is also impossible to judge whether €1 billion is a large or modest sum per megawatt relative to comparable AI builds.</p>
<h2>A Supplier Becoming a Peer, With Political Backing</h2>
<p>Moving into operations can create tension with existing customers: data center operators that buy Submer cooling may now find the same company bidding for AI tenants. How Submer manages that overlap between its cooling business and Rubix will be worth watching.</p>
<p>On the other side of the ledger, the project arrives with visible public support. The presence of Catalonia&#8217;s president and its business minister at the launch, and Submer&#8217;s framing of the project as part of the “reindustrialization of Flix,” suggest the regional government sees AI infrastructure as a use for idled industrial land. That backing can matter for permitting and grid access, though no specific commitments from the administration were announced.</p>
<h2>Background</h2>
<p>Submer, based in Barcelona, established itself as a specialist in immersion cooling, a technique that submerges servers in a non-conductive fluid to remove heat more efficiently than traditional air cooling, an approach that has gained attention as AI chips grow denser and hotter. Over the past year the company has expanded beyond cooling, launching the InferX AI cloud platform and, in June 2026, Rubix Data Centers, a division that develops and operates AI data centers and is headed by John Eland, formerly of data center operator Stack.</p>
<p>The Flix site was home to a chemical plant run by Ercros until industrial operations ceased in January 2023. Ercros now operates a solar farm on the site. Redeveloping former industrial land for data centers has become a recurring theme as developers look for sites with industrial zoning and access to power.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMirwFBVV95cUxPRDVzN0J5VE5ES0s1QlYyQ24xbjlWWjkzMHE2RWxWWUxCZnZDTFVpaGZIQi03XzBCdjdVSVlBTUhrQUFwWmotRjVweEVQSE85YlBQSERVZGIxMjRnN2VpenBBSWFCOEtjNEFQeTRvY0QxTVFUT3gzMUJEVjdIMG1Ub3R4WHhyelEyaTY1aGV0S3dpN3dDLVZfRl9pTE1pamlNRnctbWxQT0hGd25xcXpF?oc=5">Submer plans €1bn data center at former chemical plant in Catalonia</a> (Data Center Dynamics) — Submer&#8217;s Rubix division will build and operate a two-phase AI data center on the former Ercros site in Flix.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Capacity and power:</strong> Submer has not disclosed the planned IT capacity of either phase, the grid connection available at Flix, whether it is already secured, or how the existing solar farm operated by Ercros relates to the project.</li>
<li><strong>Tenant, financing and timeline:</strong> Rubix has not named a tenant or said whether talks are underway, how the €1 billion will be funded, or when construction and first operations are expected. Nor has it broken down its claimed 8GW by site, region or how much is contractually secured.</li>
<li><strong>Site and technology:</strong> The companies have not said what permitting or site-preparation work a former chemical plant requires before construction, whether Submer&#8217;s own immersion cooling will be used, or how many local jobs the project is expected to create.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did Submer announce in Flix?</h3>
<p>Submer plans a €1 billion ($1.14 billion) AI data center on the site of the former Ercros chemical plant in Flix, Catalonia. It will be built in two phases and operated by Rubix Data Centers, Submer&#8217;s new AI data center division.</p>
<h3>Where exactly will the Submer data center be built?</h3>
<p>On the site of the old Ercros chemical factory in Flix, a town in Catalonia, Spain. Industrial operations there ceased in January 2023, and Ercros now operates a solar farm on the site.</p>
<h3>How large will the Flix data center be?</h3>
<p>Submer has not disclosed the planned capacity or a construction timeline. It said the facility will be built in two phases, and published renders appear to show four data halls arranged around a central building.</p>
<h3>What is Rubix Data Centers?</h3>
<p>Rubix is the AI data center division Submer launched in June 2026. Led by former Stack executive John Eland, it develops and operates AI data centers and claims 8GW of power available across vacant sites in the Americas, EMEA and APAC.</p>
<h3>Who is Submer?</h3>
<p>Submer is a Barcelona-based company that built its business on immersion cooling for data centers. It has been diversifying, launching the InferX AI cloud platform last year and Rubix Data Centers in June 2026.</p>
<h3>What is immersion cooling?</h3>
<p>Immersion cooling submerges servers in a liquid that does not conduct electricity. The liquid absorbs heat far more effectively than air, which makes it well suited to dense, power-hungry AI hardware.</p>
<h3>Why would a cooling company build its own data center?</h3>
<p>Operating a facility lets a company earn recurring lease income and control the site and power, rather than relying on one-off equipment sales. Submer&#8217;s CEO described the plan as expanding across the full stack, from land and power to cloud and Edge.</p>
<h3>Who will use the Flix data center?</h3>
<p>Rubix aims to secure a single tenant to run AI workloads at the facility. No tenant has been named.</p>
<h3>What does a single-tenant data center mean?</h3>
<p>One customer leases the whole facility, usually on a long contract. A signed lease can anchor financing for a large build, but it also makes the project heavily dependent on that one customer.</p>
<h3>Will Submer&#x27;s immersion cooling be used at Flix?</h3>
<p>The company has not said. The announcement focused on Submer and Rubix owning and operating the facility rather than on the cooling technology it will use.</p>
<h3>What does Rubix&#x27;s 8GW claim mean?</h3>
<p>Rubix says it has 8 gigawatts, or 8,000 megawatts, of power available across vacant sites in several regions. It has not broken the figure down by site or said how much of it is contractually secured.</p>
<h3>How will the €1 billion project be financed?</h3>
<p>Submer has not disclosed how the investment will be funded. For single-tenant AI campuses, financing often depends on signing the anchor tenant, which Rubix has not yet announced.</p>
<h3>Why did Catalan government leaders attend the announcement?</h3>
<p>Catalonia&#8217;s president, Salvador Illa, and business and labor minister Miquel Sàmper attended the July 11 launch. Submer framed the project as part of reindustrializing Flix and positioning Spain as a leader in AI infrastructure.</p>
<h3>What does this mean for data center operators and AI buyers?</h3>
<p>AI companies seeking European capacity gain another potential option in Spain, though no one can plan around it until capacity and timing are disclosed. Operators that buy Submer cooling now face a supplier that also wants to operate facilities.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "Submer's \u20ac1bn Flix Bet: An AI Cooling Firm Sees the Value in Land and Power", "description": "Submer plans a \u20ac1 billion AI data center at the former Ercros chemical plant in Flix, Catalonia, run by its new Rubix division. The move shows a liquid-cooling supplier betting that land and power, not equipment, hold lasting value. Capacity, timing and tenant are still undisclosed.", "image": ["/wp-content/uploads/2026/09/submer-rubix-1bn-ai-data-center-flix-catalonia.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-09-24T19:32:11.635248+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did Submer announce in Flix?", "acceptedAnswer": {"@type": "Answer", "text": "Submer plans a \u20ac1 billion ($1.14 billion) AI data center on the site of the former Ercros chemical plant in Flix, Catalonia. It will be built in two phases and operated by Rubix Data Centers, Submer's new AI data center division."}}, {"@type": "Question", "name": "Where exactly will the Submer data center be built?", "acceptedAnswer": {"@type": "Answer", "text": "On the site of the old Ercros chemical factory in Flix, a town in Catalonia, Spain. Industrial operations there ceased in January 2023, and Ercros now operates a solar farm on the site."}}, {"@type": "Question", "name": "How large will the Flix data center be?", "acceptedAnswer": {"@type": "Answer", "text": "Submer has not disclosed the planned capacity or a construction timeline. It said the facility will be built in two phases, and published renders appear to show four data halls arranged around a central building."}}, {"@type": "Question", "name": "What is Rubix Data Centers?", "acceptedAnswer": {"@type": "Answer", "text": "Rubix is the AI data center division Submer launched in June 2026. Led by former Stack executive John Eland, it develops and operates AI data centers and claims 8GW of power available across vacant sites in the Americas, EMEA and APAC."}}, {"@type": "Question", "name": "Who is Submer?", "acceptedAnswer": {"@type": "Answer", "text": "Submer is a Barcelona-based company that built its business on immersion cooling for data centers. It has been diversifying, launching the InferX AI cloud platform last year and Rubix Data Centers in June 2026."}}, {"@type": "Question", "name": "What is immersion cooling?", "acceptedAnswer": {"@type": "Answer", "text": "Immersion cooling submerges servers in a liquid that does not conduct electricity. The liquid absorbs heat far more effectively than air, which makes it well suited to dense, power-hungry AI hardware."}}, {"@type": "Question", "name": "Why would a cooling company build its own data center?", "acceptedAnswer": {"@type": "Answer", "text": "Operating a facility lets a company earn recurring lease income and control the site and power, rather than relying on one-off equipment sales. Submer's CEO described the plan as expanding across the full stack, from land and power to cloud and Edge."}}, {"@type": "Question", "name": "Who will use the Flix data center?", "acceptedAnswer": {"@type": "Answer", "text": "Rubix aims to secure a single tenant to run AI workloads at the facility. No tenant has been named."}}, {"@type": "Question", "name": "What does a single-tenant data center mean?", "acceptedAnswer": {"@type": "Answer", "text": "One customer leases the whole facility, usually on a long contract. A signed lease can anchor financing for a large build, but it also makes the project heavily dependent on that one customer."}}, {"@type": "Question", "name": "Will Submer's immersion cooling be used at Flix?", "acceptedAnswer": {"@type": "Answer", "text": "The company has not said. The announcement focused on Submer and Rubix owning and operating the facility rather than on the cooling technology it will use."}}, {"@type": "Question", "name": "What does Rubix's 8GW claim mean?", "acceptedAnswer": {"@type": "Answer", "text": "Rubix says it has 8 gigawatts, or 8,000 megawatts, of power available across vacant sites in several regions. It has not broken the figure down by site or said how much of it is contractually secured."}}, {"@type": "Question", "name": "How will the \u20ac1 billion project be financed?", "acceptedAnswer": {"@type": "Answer", "text": "Submer has not disclosed how the investment will be funded. For single-tenant AI campuses, financing often depends on signing the anchor tenant, which Rubix has not yet announced."}}, {"@type": "Question", "name": "Why did Catalan government leaders attend the announcement?", "acceptedAnswer": {"@type": "Answer", "text": "Catalonia's president, Salvador Illa, and business and labor minister Miquel S\u00e0mper attended the July 11 launch. Submer framed the project as part of reindustrializing Flix and positioning Spain as a leader in AI infrastructure."}}, {"@type": "Question", "name": "What does this mean for data center operators and AI buyers?", "acceptedAnswer": {"@type": "Answer", "text": "AI companies seeking European capacity gain another potential option in Spain, though no one can plan around it until capacity and timing are disclosed. Operators that buy Submer cooling now face a supplier that also wants to operate facilities."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
