<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="https://www.jain.com/assets/img/6adafce5-1.1"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>North Dakota &#8211; Jain.com</title>
	<atom:link href="/tag/north-dakota/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>Data centers, connectivity, and security — news and analysis</description>
	<lastBuildDate>Thu, 15 Oct 2026 11:26:42 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>/wp-content/uploads/2026/08/jain-com-icon-512-150x150.png</url>
	<title>North Dakota &#8211; Jain.com</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>$4M in Boyce, $350K in Oliver County: AI Campus Community Payments Have No Standard Rate</title>
		<link>/applied-digital-4-million-community-benefit-deal-boyce-louisiana/</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Thu, 15 Oct 2026 11:26:42 +0000</pubDate>
				<category><![CDATA[Data Center]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[APLD]]></category>
		<category><![CDATA[Applied Digital]]></category>
		<category><![CDATA[community benefit agreements]]></category>
		<category><![CDATA[data center siting]]></category>
		<category><![CDATA[Louisiana]]></category>
		<category><![CDATA[North Dakota]]></category>
		<guid isPermaLink="false">/applied-digital-4-million-community-benefit-deal-boyce-louisiana/</guid>

					<description><![CDATA[Applied Digital agreed to a $4 million community benefit deal for Boyce, KALB reported, over 11 times its $350,000 in Oliver County grants. The spread shows Applied Digital's payments to host communities are set site by site, with no standard rate or form, and belong in AI campus cost models.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>Applied Digital, a company that builds huge computer centers for artificial intelligence, has agreed to a $4 million deal to benefit the town of Boyce, Louisiana.</p>
<p>That is more than eleven times the $350,000 in grants it recently promised a rural North Dakota county that hosts another of its sites.</p>
<p>The takeaway: there is no going rate for what a town gets when one of these projects arrives. It comes down to each local deal, and those deals are now part of what it costs to build.</p>
</section>
<p>KALB reported that Applied Digital (Nasdaq: APLD) has agreed to a $4 million community benefit deal for Boyce, Louisiana. Applied Digital develops and operates large data centers built for artificial intelligence and other high-performance computing workloads.</p>
<p>The deal follows the company&#8217;s October 7 fiscal first-quarter earnings release, which disclosed $350,000 in grants across five organizations in Oliver County, North Dakota, home to its Polaris Forge 3 campus. The same release reported quarterly revenue of $341.9 million, up 322% year over year, and 250 MW of live capacity at its Polaris Forge 1 campus.</p>
<h2>Executive Summary</h2>
<p>Applied Digital&#8217;s $4 million commitment to Boyce is small next to the billions in leases and debt behind its AI campuses, but it is a concrete, priced obligation to a host community. Set beside the $350,000 the company committed to Oliver County organizations through its Applied Digital Cares program, it shows the same developer&#8217;s local commitments ranging by more than elevenfold, and taking different forms, from one site to the next.</p>
<p>For local officials, that means there is no fixed benchmark to anchor a negotiation. For investors and lenders, it means community commitments behave like land and power costs: site-specific, negotiated, and worth modeling explicitly rather than assuming away. The Louisiana commitment also points to Applied Digital activity beyond the North Dakota campuses that have defined the company so far.</p>
<h2>$4 Million Versus $350,000: No Going Rate for Host Towns</h2>
<p>Applied Digital&#8217;s two most recently disclosed community commitments differ by more than a factor of eleven. Alongside the $4 million Boyce deal, the company&#8217;s October 7 earnings release said that through Applied Digital Cares it committed $350,000 in grants across five organizations in Oliver County, North Dakota, supporting first responders, schools and community facilities.</p>
<p>The form differs as much as the amount. A community benefit agreement is generally a negotiated, contract-style commitment from a developer to a host community, often made alongside local approvals or incentives. Grants from a corporate giving program are discretionary. One developer using two different instruments, at two very different price points, within weeks of each other, is strong evidence that this cost is set place by place rather than by formula. The company also highlighted that Polaris Forge 1 was named Project of the Year by the Mid-America Economic Development Council, with community investment among the cited reasons, a sign that Applied Digital treats local standing as something to build and report.</p>
<p>The comparison is between headline commitments, not rates. Applied Digital has not disclosed the megawatt scale of its plans at Boyce, the payment period, or whether the Oliver County grants are the first of several, so a per-megawatt figure cannot be calculated. That is exactly the problem for anyone trying to budget: a cost that varies this widely cannot be extrapolated from one site to the next.</p>
<h2>Why Paying for Local Certainty Pencils Out</h2>
<p>Against the company&#8217;s capital stack, $4 million is small. In the quarter ended August 31, Applied Digital closed $1.59 billion of 7.000% senior secured notes to fund a 150 MW building at Polaris Forge 1; the Boyce commitment equals roughly 0.25% of that single raise.</p>
<p>The more useful comparison is the cost of delay. The 210 MW, 15-year Delta Forge 2 lease the company signed with its hyperscaler customer (one of the giant cloud and AI companies) represents about $5.2 billion of base-term revenue, an average of roughly $29 million a month. A one-month slip in a contract of that size would defer about seven times the entire Boyce commitment. When zoning, permits, road access and utility work all run through local bodies, a payment that smooths those steps is cheap insurance for a developer whose revenue starts only when capacity is delivered.</p>
<p>That does not make these costs trivial. Applied Digital reported a $221.0 million net loss attributable to common stockholders for the quarter (an adjusted net loss of $4.1 million) and is funding growth with 7% debt. Each community commitment is modest alone, but it recurs with every new campus, and the company is adding campuses.</p>
<h2>A Footprint Spreading Beyond the Dakotas</h2>
<p>North Dakota remains the center of the business. Polaris Forge 1 reached 250 MW of critical IT load (the power available to run computing equipment) on October 1, and the company expects Polaris Forge 2 in Harwood to bring its North Dakota total to 300 MW by the end of 2026. Management cites the state&#8217;s low-cost power, abundant energy, low population density and cool climate.</p>
<p>The Boyce deal, a Finland agreement for up to roughly 1 GW of potential power capacity, and a power purchase agreement with Base Electron tied to a planned 1,200 MW natural gas plant in North Dakota all extend the company&#8217;s reach into new jurisdictions and partnerships. Each new region brings new local counterparties, from parish and county governments to utilities, with their own expectations. The company says its near-term priorities remain centered on its U.S. portfolio; how it prices community commitments as that portfolio spreads will be worth watching.</p>
<h2>Background</h2>
<p>Applied Digital is a Dallas-based designer, developer, owner and operator of large data centers built for AI, machine learning and other accelerated computing, which it calls AI factories. Its core campuses are in North Dakota, including Polaris Forge 1, Polaris Forge 2 in Harwood and Polaris Forge 3 in Oliver County, and it leases capacity under long-term contracts to large cloud customers. Its majority-owned ChronoScale subsidiary, itself a public company, runs the historic cloud services business.</p>
<p>As AI campuses have grown to hundreds of megawatts, developers have increasingly dealt with host communities over land use, roads, water and power. Commitments such as community benefit agreements and local grants are one way developers address those concerns, and their size and structure are set locally rather than by any common standard.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMioAFBVV95cUxPWmo5R2pncFp3RHFDWkJtX0ZfeWNyQk1XcVN1dWgwZF91WDF5cUpKVk83a2R5eEhWdzllUDg0ZlRqZTNqT2FfWDRkY3R4TmVmUWZLQkd6LXVMb3ByWkFVamk2djJ3MmlxQzBjdjNIb1NyT1pQN3V0akJSWXl5RFlmeDRYbnBYSmIxd3FRR2t5Z2RQWUJyai15Q3pLN2MtSXpW?oc=5">Applied Digital agrees to $4 million community benefit deal for Boyce (KALB)</a>, on Applied Digital&#8217;s $4 million community benefit deal for Boyce.</p>
<p>Primary sources: <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000059/apld-20260831.htm">Applied Digital Form 10-Q for the quarter ended August 31, 2026 (filed October 7, 2026)</a>; <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apld-20261007.htm">Applied Digital Form 8-K filed October 7, 2026</a>; <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apldq127earningsrelease.htm">Applied Digital Reports Fiscal First Quarter 2027 Results (Exhibit 99.1)</a>.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Project scope:</strong> Applied Digital has not publicly identified the Boyce project the deal supports, its planned capacity in megawatts, its timeline, or its customer.</li>
<li><strong>Deal terms:</strong> The company has not disclosed the payment schedule for the $4 million, who receives it, what it funds, or whether it is tied to tax incentives, zoning or other local approvals.</li>
<li><strong>Power and policy:</strong> Applied Digital has not said how a Louisiana site would be powered, whether the Oliver County grants are the first of further commitments, or whether it applies any consistent framework for sizing community commitments across sites.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did Applied Digital agree to in Boyce?</h3>
<p>KALB reported that Applied Digital agreed to a $4 million community benefit deal for Boyce, Louisiana. The company has not publicly detailed the payment schedule, the recipients, or the project the deal supports.</p>
<h3>What is a community benefit agreement?</h3>
<p>It is a commitment in which a developer provides money or services to a host community, often alongside local approvals or incentives. Funds commonly go to schools, emergency services or infrastructure. Terms vary widely from place to place.</p>
<h3>How does the Boyce deal compare with Applied Digital&#x27;s other community commitments?</h3>
<p>Applied Digital said it committed $350,000 in grants across five organizations in Oliver County, North Dakota, home to Polaris Forge 3. The Boyce figure is more than 11 times larger, and the two are structured differently: a negotiated deal versus program grants.</p>
<h3>Why would an AI data center developer pay a host community?</h3>
<p>Large campuses depend on local zoning, permits, road access and utility cooperation. For a developer whose lease revenue starts only when capacity is delivered, avoiding delays can be worth far more than the cost of a community commitment.</p>
<h3>Is $4 million significant for Applied Digital?</h3>
<p>Relative to its financing, it is small. The company closed $1.59 billion of senior secured notes in its latest quarter, so $4 million is about 0.25% of that one raise. For a small community, a multimillion-dollar commitment can be meaningful.</p>
<h3>How did Applied Digital perform in its latest quarter?</h3>
<p>For the quarter ended August 31, 2026, Applied Digital reported revenue of $341.9 million, up 322% year over year, a net loss attributable to common stockholders of $221.0 million, and adjusted EBITDA of $64.4 million.</p>
<h3>What is Polaris Forge 1?</h3>
<p>It is Applied Digital&#8217;s AI data center campus in North Dakota. It reached 250 MW of live critical IT load on October 1, 2026, across two buildings and 10 data halls, and was named Project of the Year by the Mid-America Economic Development Council.</p>
<h3>What does a megawatt of critical IT load mean?</h3>
<p>It measures the electrical power available to run the computing equipment itself, excluding cooling and other overhead. Data center capacity is usually quoted this way, so 250 MW describes how much computing a campus can power.</p>
<h3>Who are Applied Digital&#x27;s customers?</h3>
<p>The company describes its anchor tenant as a tier-one, investment-grade hyperscaler, meaning one of the largest cloud and AI companies. It signed a 210 MW, 15-year lease at Delta Forge 2 worth about $5.2 billion in base-term revenue. It has not named the customer.</p>
<h3>Is Applied Digital expanding outside North Dakota?</h3>
<p>Yes. The Boyce deal points to Louisiana activity, and the company signed an agreement for up to about 1 GW of potential power capacity in Finland. Management says near-term priorities remain centered on its U.S. portfolio, with North Dakota central to strategy.</p>
<h3>How is Applied Digital securing power for growth?</h3>
<p>Among other steps, it entered a power purchase agreement with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired plant that Base Electron plans to develop in North Dakota.</p>
<h3>What is ChronoScale?</h3>
<p>ChronoScale is Applied Digital&#8217;s majority-owned, publicly traded accelerated-compute platform that runs its historic cloud business. It announced plans with Microsoft for a 50 MW AI compute deployment using NVIDIA GB300 NVL72 systems and liquid cooling.</p>
<h3>What should investors watch after the Boyce deal?</h3>
<p>Key items are disclosure of the Boyce project&#8217;s scope and customer, whether community commitments recur at each new campus, how such costs are reported, and whether the company sets any consistent approach to sizing them.</p>
<h3>What does this mean for communities hosting AI data centers?</h3>
<p>Applied Digital&#8217;s disclosed commitments range from $350,000 in grants to a $4 million deal, so one developer&#8217;s record offers no fixed benchmark. Local officials evaluating a proposal will likely need to negotiate terms on the specifics of their site.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "$4M in Boyce, $350K in Oliver County: AI Campus Community Payments Have No Standard Rate", "description": "Applied Digital agreed to a $4 million community benefit deal for Boyce, KALB reported, over 11 times its $350,000 in Oliver County grants. The spread shows Applied Digital's payments to host communities are set site by site, with no standard rate or form, and belong in AI campus cost models.", "image": ["/wp-content/uploads/2026/10/applied-digital-boyce-community-benefit-deal-ai-data-center.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-10-15T11:26:38.329796+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did Applied Digital agree to in Boyce?", "acceptedAnswer": {"@type": "Answer", "text": "KALB reported that Applied Digital agreed to a $4 million community benefit deal for Boyce, Louisiana. The company has not publicly detailed the payment schedule, the recipients, or the project the deal supports."}}, {"@type": "Question", "name": "What is a community benefit agreement?", "acceptedAnswer": {"@type": "Answer", "text": "It is a commitment in which a developer provides money or services to a host community, often alongside local approvals or incentives. Funds commonly go to schools, emergency services or infrastructure. Terms vary widely from place to place."}}, {"@type": "Question", "name": "How does the Boyce deal compare with Applied Digital's other community commitments?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital said it committed $350,000 in grants across five organizations in Oliver County, North Dakota, home to Polaris Forge 3. The Boyce figure is more than 11 times larger, and the two are structured differently: a negotiated deal versus program grants."}}, {"@type": "Question", "name": "Why would an AI data center developer pay a host community?", "acceptedAnswer": {"@type": "Answer", "text": "Large campuses depend on local zoning, permits, road access and utility cooperation. For a developer whose lease revenue starts only when capacity is delivered, avoiding delays can be worth far more than the cost of a community commitment."}}, {"@type": "Question", "name": "Is $4 million significant for Applied Digital?", "acceptedAnswer": {"@type": "Answer", "text": "Relative to its financing, it is small. The company closed $1.59 billion of senior secured notes in its latest quarter, so $4 million is about 0.25% of that one raise. For a small community, a multimillion-dollar commitment can be meaningful."}}, {"@type": "Question", "name": "How did Applied Digital perform in its latest quarter?", "acceptedAnswer": {"@type": "Answer", "text": "For the quarter ended August 31, 2026, Applied Digital reported revenue of $341.9 million, up 322% year over year, a net loss attributable to common stockholders of $221.0 million, and adjusted EBITDA of $64.4 million."}}, {"@type": "Question", "name": "What is Polaris Forge 1?", "acceptedAnswer": {"@type": "Answer", "text": "It is Applied Digital's AI data center campus in North Dakota. It reached 250 MW of live critical IT load on October 1, 2026, across two buildings and 10 data halls, and was named Project of the Year by the Mid-America Economic Development Council."}}, {"@type": "Question", "name": "What does a megawatt of critical IT load mean?", "acceptedAnswer": {"@type": "Answer", "text": "It measures the electrical power available to run the computing equipment itself, excluding cooling and other overhead. Data center capacity is usually quoted this way, so 250 MW describes how much computing a campus can power."}}, {"@type": "Question", "name": "Who are Applied Digital's customers?", "acceptedAnswer": {"@type": "Answer", "text": "The company describes its anchor tenant as a tier-one, investment-grade hyperscaler, meaning one of the largest cloud and AI companies. It signed a 210 MW, 15-year lease at Delta Forge 2 worth about $5.2 billion in base-term revenue. It has not named the customer."}}, {"@type": "Question", "name": "Is Applied Digital expanding outside North Dakota?", "acceptedAnswer": {"@type": "Answer", "text": "Yes. The Boyce deal points to Louisiana activity, and the company signed an agreement for up to about 1 GW of potential power capacity in Finland. Management says near-term priorities remain centered on its U.S. portfolio, with North Dakota central to strategy."}}, {"@type": "Question", "name": "How is Applied Digital securing power for growth?", "acceptedAnswer": {"@type": "Answer", "text": "Among other steps, it entered a power purchase agreement with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired plant that Base Electron plans to develop in North Dakota."}}, {"@type": "Question", "name": "What is ChronoScale?", "acceptedAnswer": {"@type": "Answer", "text": "ChronoScale is Applied Digital's majority-owned, publicly traded accelerated-compute platform that runs its historic cloud business. It announced plans with Microsoft for a 50 MW AI compute deployment using NVIDIA GB300 NVL72 systems and liquid cooling."}}, {"@type": "Question", "name": "What should investors watch after the Boyce deal?", "acceptedAnswer": {"@type": "Answer", "text": "Key items are disclosure of the Boyce project's scope and customer, whether community commitments recur at each new campus, how such costs are reported, and whether the company sets any consistent approach to sizing them."}}, {"@type": "Question", "name": "What does this mean for communities hosting AI data centers?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital's disclosed commitments range from $350,000 in grants to a $4 million deal, so one developer's record offers no fixed benchmark. Local officials evaluating a proposal will likely need to negotiate terms on the specifics of their site."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Applied Digital&#8217;s $1.59B at 7% Ties Its AI Campus Debt to Go-Live Speed</title>
		<link>/applied-digital-fiscal-q1-2027-results-revenue-322-percent-250-mw/</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Thu, 08 Oct 2026 11:24:07 +0000</pubDate>
				<category><![CDATA[AI Infrastructure]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[Applied Digital]]></category>
		<category><![CDATA[Data Center Financing]]></category>
		<category><![CDATA[earnings]]></category>
		<category><![CDATA[Hyperscale Leasing]]></category>
		<category><![CDATA[North Dakota]]></category>
		<category><![CDATA[power purchase agreements]]></category>
		<guid isPermaLink="false">/applied-digital-fiscal-q1-2027-results-revenue-322-percent-250-mw/</guid>

					<description><![CDATA[Applied Digital's fiscal Q1 2027 revenue rose 322% to $341.9 million, with a $221.0 million net loss, and live AI capacity at Polaris Forge 1 has since hit 250 MW. Its $1.59 billion of 7% notes make go-live speed the variable that decides how fast the buildout covers its debt.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>Applied Digital builds huge buildings packed with computers that tech giants rent to run artificial intelligence. Its sales more than quadrupled from a year earlier, to $341.9 million in three months.</p>
<p>It still lost $221 million under standard accounting rules. It also borrowed $1.59 billion at 7% interest, about $111 million a year, to build another one.</p>
<p>The catch: interest is owed from the day the money is borrowed, but rent only starts once a building is finished and a tenant moves in. How fast that gap closes is the thing to watch.</p>
</section>
<p>Applied Digital (Nasdaq: APLD) reported results on October 7, 2026 for its fiscal first quarter of 2027, the three months ended August 31. Revenue was $341.9 million, up 322% from a year earlier. The net loss attributable to common stockholders was $221.0 million, or $0.76 per share. On the company&#8217;s adjusted basis, which excludes its majority-owned ChronoScale subsidiary, the loss narrowed to $4.1 million, or $0.01 per share, and adjusted EBITDA (earnings before interest, taxes, depreciation and amortization) was $64.4 million.</p>
<p>The company said its Polaris Forge 1 campus in North Dakota reached 250 megawatts (MW) of live capacity on October 1. During the quarter it closed $1.59 billion of 7.000% senior secured notes due 2031 to fund a third 150 MW building there and repay a $300 million bridge loan. Barron&#8217;s read the results as a sign the company&#8217;s data center bet is starting to pay off.</p>
<h2>Executive Summary</h2>
<p>The quarter marks Applied Digital&#8217;s transition from a company announcing capacity to one reporting what that capacity earns. Live capacity at Polaris Forge 1 went from 100 MW to 175 MW on July 1 and to 250 MW on October 1. The company expects initial operations at Polaris Forge 2 in Harwood, North Dakota, to bring total delivered critical IT load across its North Dakota campuses to 300 MW by the end of calendar 2026. Critical IT load is the power available to the computing equipment itself, not counting cooling and other building systems.</p>
<p>The financing came at the same pace. The $1.59 billion note issue, made through subsidiary APLD ComputeCo 3 LLC, adds a fixed interest bill that starts before the building it funds produces any rent. The 210 MW, 15-year lease at Delta Forge 2, which the company valued at about $5.2 billion of base-term contracted revenue, shows the scale of the revenue on offer. The question for the next several quarters is how quickly finished halls convert into recognized lease revenue. This quarter&#8217;s results only partly answer it, because the newest 75 MW came online after the period closed.</p>
<h2>Why Go-Live Speed Now Sets the Debt Math</h2>
<p>The $1.59 billion of 7.000% senior secured notes, issued at par and listed among the quarter&#8217;s highlights, carry about $111.3 million of interest a year. That works out to roughly $27.8 million a quarter, or about $9.3 million a month, on these notes alone. The proceeds pay for construction of a third, 150 MW high-performance computing building at Polaris Forge 1 and repay a $300 million bridge loan. Simple subtraction leaves roughly $1.29 billion for construction before fees. Interest accrues from the day the notes are issued. The building earns nothing until it is delivered and its lease begins.</p>
<p>That gap is the mechanism behind this article&#8217;s headline. Every month between closing and lease commencement on building three is a month of coupon payments with no matching rent from the asset that secures the debt. Because the notes were issued through a project-level subsidiary, APLD ComputeCo 3 LLC, lenders are underwriting that specific building&#8217;s timeline. For a sense of how much revenue rides on timing, the company&#8217;s Delta Forge 2 lease implies about $1.65 million per megawatt per year in average base-term revenue ($5.2 billion over 15 years across 210 MW). Applied Digital has not said whether building three is priced similarly.</p>
<p>The people affected go beyond shareholders. Noteholders depend on the construction schedule. Contractors and equipment suppliers carry the schedule risk. Tenants need the halls ready when their own chip deliveries arrive. Applied Digital&#8217;s track record helps here. It hit two 75 MW Ready for Service milestones, on July 1 and October 1, roughly a quarter apart. Ready for Service is the point at which a finished, powered data hall is handed over for use. The company&#8217;s next proof point is whether building three follows a similar cadence.</p>
<h2>322% Growth and a $221 Million Loss Describe the Same Quarter</h2>
<p>Barron&#8217;s take that the bet is starting to pay off holds on the company&#8217;s operating measures. Adjusted EBITDA was $64.4 million, and net operating income was $58.8 million. Net operating income is a real-estate-style measure of property-level income before corporate overhead and financing costs. On the adjusted basis the company was close to break-even, with a $4.1 million loss.</p>
<p>Under standard accounting (GAAP), the loss attributable to common stockholders was $221.0 million. The roughly $217 million gap between that figure and the adjusted loss is large for a single quarter. Investors will want to examine the company&#8217;s reconciliation of the two closely. Part of the gap reflects the exclusion of ChronoScale, Applied Digital&#8217;s majority-owned, separately listed accelerated-compute business, which is consolidated in GAAP results but stripped out of the adjusted figures. The 10-Q filed the same day also shows Series E, E-1 and G preferred stock in the capital structure. That matters because any preferred dividends sit ahead of common holders, and the headline loss is measured after them.</p>
<p>Neither reading is wrong. They answer different questions. The adjusted figures show what the operating data center business is starting to generate. The GAAP figure shows what the whole enterprise, including its financing and its subsidiary, cost shareholders this quarter.</p>
<h2>The Reported Quarter Mostly Predates the Capacity That Matters</h2>
<p>The timing explains why this is only the first part of the test. In the quarter ended August 31, Polaris Forge 1 ran at about 100 MW for June and 175 MW for July and August. The second 75 MW phase of Building 2 did not reach Ready for Service until October 1, a month after the quarter closed. Fiscal Q2, which runs September through November, will include one month at 175 MW and two at 250 MW. Fiscal Q3 is the first quarter that could reflect the full 250 MW. If Polaris Forge 2 starts on schedule, that quarter would also include the start of Harwood.</p>
<p>Applied Digital has not broken out how much of its $300.4 million in adjusted revenue came from Polaris Forge 1. It also has not said whether the October 1 phase began billing on its Ready for Service date. Revenue per live megawatt, tracked quarter to quarter, is the clearest test of whether delivered capacity is turning into recognized revenue on schedule. Two more quarters of data should make that measurable.</p>
<h2>Power Is Being Secured Ahead of Buildings</h2>
<p>After the quarter, Applied Digital signed a power purchase agreement with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired plant that Base Electron is to develop in North Dakota. It also agreed to up to approximately 1 GW of potential power capacity in Finland. Both are long-dated options on future growth, not operating capacity. In the case of Base Electron, the plant has not yet been built.</p>
<p>This sequencing reflects a real constraint. Grid power is now one of the slowest inputs to an AI campus, and the company argues that low-cost, power-rich regions will hold value better as coastal and metro markets tighten. Chief Executive Wes Cummins framed the strategy around “durable, high-quality, long-term contracts” with investment-grade hyperscalers, meaning the largest cloud and AI platform operators. Securing power ahead of signed tenants creates an obligation to fill that capacity. Each new campus will also need its own financing, likely structured like the ComputeCo 3 notes. The Delta Forge 2 lease shows hyperscaler demand exists. Matching that demand to each new block of power is the ongoing execution test.</p>
<h2>Background</h2>
<p>Applied Digital is a Dallas-based company that designs, builds, owns and operates large data centers purpose-built for high-performance computing, including artificial intelligence training and inference. Its strategy centers on North Dakota, where it operates Polaris Forge 1 and is developing Polaris Forge 2 in Harwood and Polaris Forge 3 in Oliver County. Its stated goal is to lease capacity on long-term contracts to investment-grade hyperscalers, the largest cloud and AI platform operators.</p>
<p>The company also holds a majority stake in ChronoScale, a separately listed company that runs its legacy cloud services business and is pursuing a 50 MW deployment with Microsoft built on NVIDIA GB300 NVL72 rack-scale systems with liquid cooling. Because ChronoScale is consolidated, Applied Digital reports both GAAP figures and adjusted figures that exclude it. Investing.com&#8217;s market wrap placed the results alongside a broader wave of AI-related debt deals, which is the financing context for this buildout.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMihAFBVV95cUxONmhsTkFPODR4OVMwUmJnQ0ZmaHk1UHhvVnF2bk55RzhJWlJuWVIzTGJLeUFpUjRES0xtVnB1VDU2VzNzS2hlbWxfUzc0VGFOVzB6WmplLVdLdlpQY1FoOTlMVUUwc1kxOXBIQW5GbHBwdEtVV1VIU1JMMXFMVk9acWJBT2o?oc=5">Applied Digital’s Earnings Show Its Data Center Bet Is Starting to Pay Off</a> (Barron&#8217;s), on Applied Digital&#8217;s fiscal first-quarter 2027 results; and <a href="https://news.google.com/rss/articles/CBMiwAFBVV95cUxNR0dPSUJxM19abURKdFJIN0lpdF9QdGdSY3lpZVN4WldlTHZqcDZ4b25TVXliMnI5TGFNaHk3Ym9Ea25Dd2FPM1Y3eER1bGk2dDJ1T3JHdGxaVnlNaE5mYklNSUJWUFBNdkFGQk1uVmdRYjhBN3ZNdXFJWVZWTWhBX3I4eUdZZXJlR1FvRWhQT181RkpIcGlSaG8xZU92SS1BVzdZeHpLM0l4N3E5dkhSaEF5MmQ1eVFYTkNWMXQ1TVE?oc=5">AI debt deal wave reports; Applied Digital reports &#8211; what’s moving markets</a> (Investing.com), a market wrap covering the results.</p>
<p>Primary sources: <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000059/apld-20260831.htm">Applied Digital Form 10-Q for the quarter ended August 31, 2026 (filed October 7, 2026)</a>; <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apld-20261007.htm">Applied Digital Form 8-K (filed October 7, 2026)</a>; <a href="https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apldq127earningsrelease.htm">Applied Digital Reports Fiscal First Quarter 2027 Results (Exhibit 99.1 to 8-K)</a>.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Building three timing and tenant:</strong> Applied Digital has not given a Ready for Service date, tenant or lease terms for the 150 MW third building at Polaris Forge 1 that the $1.59 billion notes finance.</li>
<li><strong>Ready for Service versus billing:</strong> The company has not said when lease revenue begins relative to Ready for Service for the July 1 and October 1 phases, or how much quarterly revenue Polaris Forge 1 contributes.</li>
<li><strong>Delta Forge 2 delivery:</strong> The company has not disclosed the location, construction schedule, power source or financing plan for the 210 MW Delta Forge 2 lease, and it has not named the hyperscaler customer.</li>
<li><strong>Base Electron agreement:</strong> Applied Digital has not disclosed the price, term or volume it has committed to buy under the power purchase agreement, or the plant&#8217;s permitting and construction timeline.</li>
<li><strong>Finland and Polaris Forge 2:</strong> The company has not disclosed capital commitments for the Finland agreement or a named tenant and financing structure for the Harwood campus.</li>
<li><strong>Recourse:</strong> The company has not explained whether, or how far, the parent company stands behind subsidiary-level notes if a building&#8217;s lease start slips.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What did Applied Digital report for fiscal first quarter 2027?</h3>
<p>For the quarter ended August 31, 2026, Applied Digital reported revenue of $341.9 million, up 322%. It posted a net loss attributable to common stockholders of $221.0 million, or $0.76 per share, an adjusted net loss of $4.1 million, and adjusted EBITDA of $64.4 million.</p>
<h3>Why is fiscal 2027 already reporting in 2026?</h3>
<p>Applied Digital&#8217;s fiscal year ends May 31. Its fiscal first quarter of 2027 covers June 1 through August 31, 2026, and the results were released on October 7, 2026.</p>
<h3>Why is the GAAP loss so much bigger than the adjusted loss?</h3>
<p>The adjusted measures exclude ChronoScale, the company&#8217;s majority-owned subsidiary, along with other items set out in the company&#8217;s reconciliation. The difference between the $221.0 million GAAP loss and the $4.1 million adjusted loss is roughly $217 million for the quarter.</p>
<h3>What does Ready for Service mean for a data center?</h3>
<p>Ready for Service is the milestone at which a data hall is built, powered and cooled, then handed over for the tenant&#8217;s equipment. Rent recognition depends on when the lease formally commences, which may or may not be the same date.</p>
<h3>How much AI capacity does Applied Digital have live?</h3>
<p>As of October 1, 2026, Polaris Forge 1 had 250 MW of fully operational critical IT load across two buildings and 10 data halls. The company expects 300 MW across its North Dakota campuses by the end of calendar 2026, once Polaris Forge 2 in Harwood begins operating.</p>
<h3>What are the $1.59 billion senior secured notes for?</h3>
<p>The notes were issued at par through subsidiary APLD ComputeCo 3 LLC. The proceeds fund construction of a third 150 MW building at Polaris Forge 1 and repay a $300 million bridge loan. The notes carry a 7.000% coupon and are due in 2031.</p>
<h3>How much interest will the notes cost each year?</h3>
<p>At 7% on $1.59 billion, the notes carry about $111.3 million of interest a year by simple arithmetic. That is roughly $27.8 million per quarter, which accrues whether or not the building it funds is earning rent yet.</p>
<h3>What is the Delta Forge 2 lease?</h3>
<p>Announced June 8, 2026, it is a 210 MW, 15-year lease with what Applied Digital describes as a tier-one, investment-grade hyperscaler. The company valued it at about $5.2 billion of base-term contracted revenue, or roughly $1.65 million per megawatt per year on average.</p>
<h3>Who is Applied Digital&#x27;s hyperscaler customer?</h3>
<p>Applied Digital describes the Delta Forge 2 tenant only as a tier-one, investment-grade hyperscaler and has not named it. Separately, its subsidiary ChronoScale announced plans with Microsoft for a 50 MW AI compute deployment in North America.</p>
<h3>What is ChronoScale?</h3>
<p>ChronoScale Holdings is Applied Digital&#8217;s majority-owned, publicly traded accelerated-compute platform. It runs the company&#8217;s historic cloud services business. Its results are consolidated into GAAP figures but excluded from Applied Digital&#8217;s adjusted measures.</p>
<h3>What is the Base Electron power purchase agreement?</h3>
<p>Applied Digital agreed to buy capacity and energy from an approximately 1,200 MW natural gas-fired plant that Base Electron plans to develop in North Dakota. The plant is not yet built. Pricing, term and committed volumes were not disclosed.</p>
<h3>What did Applied Digital sign in Finland?</h3>
<p>The company signed an agreement for up to approximately 1 GW of potential power capacity in Finland, its first step outside the United States. Management called it a measured, opportunistic move and said its near-term priorities remain in the US.</p>
<h3>Why does Applied Digital focus on North Dakota?</h3>
<p>The company cites low-cost power, abundant energy resources, low population density and a cool climate that supports efficient cooling. It argues that campuses in power-rich regions will hold value better as coastal and metro markets become constrained and more expensive.</p>
<h3>Does this quarter show the data center bet is paying off?</h3>
<p>On operating measures, yes: adjusted EBITDA was $64.4 million and net operating income was $58.8 million. On a GAAP basis the company still lost $221.0 million. The newest 75 MW came online after the quarter, so the fuller test comes in later quarters.</p>
<h3>What should investors and customers watch next?</h3>
<p>Watch whether revenue grows in line with the 250 MW now live, which fiscal Q2 and Q3 will show. Also watch the delivery date for the 150 MW third building, the Harwood start-up, and terms for the Delta Forge 2 build and the Base Electron plant.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "Applied Digital's $1.59B at 7% Ties Its AI Campus Debt to Go-Live Speed", "description": "Applied Digital's fiscal Q1 2027 revenue rose 322% to $341.9 million, with a $221.0 million net loss, and live AI capacity at Polaris Forge 1 has since hit 250 MW. Its $1.59 billion of 7% notes make go-live speed the variable that decides how fast the buildout covers its debt.", "image": ["/wp-content/uploads/2026/10/applied-digital-fiscal-q1-2027-ai-data-center-results.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-10-08T11:24:02.347221+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What did Applied Digital report for fiscal first quarter 2027?", "acceptedAnswer": {"@type": "Answer", "text": "For the quarter ended August 31, 2026, Applied Digital reported revenue of $341.9 million, up 322%. It posted a net loss attributable to common stockholders of $221.0 million, or $0.76 per share, an adjusted net loss of $4.1 million, and adjusted EBITDA of $64.4 million."}}, {"@type": "Question", "name": "Why is fiscal 2027 already reporting in 2026?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital's fiscal year ends May 31. Its fiscal first quarter of 2027 covers June 1 through August 31, 2026, and the results were released on October 7, 2026."}}, {"@type": "Question", "name": "Why is the GAAP loss so much bigger than the adjusted loss?", "acceptedAnswer": {"@type": "Answer", "text": "The adjusted measures exclude ChronoScale, the company's majority-owned subsidiary, along with other items set out in the company's reconciliation. The difference between the $221.0 million GAAP loss and the $4.1 million adjusted loss is roughly $217 million for the quarter."}}, {"@type": "Question", "name": "What does Ready for Service mean for a data center?", "acceptedAnswer": {"@type": "Answer", "text": "Ready for Service is the milestone at which a data hall is built, powered and cooled, then handed over for the tenant's equipment. Rent recognition depends on when the lease formally commences, which may or may not be the same date."}}, {"@type": "Question", "name": "How much AI capacity does Applied Digital have live?", "acceptedAnswer": {"@type": "Answer", "text": "As of October 1, 2026, Polaris Forge 1 had 250 MW of fully operational critical IT load across two buildings and 10 data halls. The company expects 300 MW across its North Dakota campuses by the end of calendar 2026, once Polaris Forge 2 in Harwood begins operating."}}, {"@type": "Question", "name": "What are the $1.59 billion senior secured notes for?", "acceptedAnswer": {"@type": "Answer", "text": "The notes were issued at par through subsidiary APLD ComputeCo 3 LLC. The proceeds fund construction of a third 150 MW building at Polaris Forge 1 and repay a $300 million bridge loan. The notes carry a 7.000% coupon and are due in 2031."}}, {"@type": "Question", "name": "How much interest will the notes cost each year?", "acceptedAnswer": {"@type": "Answer", "text": "At 7% on $1.59 billion, the notes carry about $111.3 million of interest a year by simple arithmetic. That is roughly $27.8 million per quarter, which accrues whether or not the building it funds is earning rent yet."}}, {"@type": "Question", "name": "What is the Delta Forge 2 lease?", "acceptedAnswer": {"@type": "Answer", "text": "Announced June 8, 2026, it is a 210 MW, 15-year lease with what Applied Digital describes as a tier-one, investment-grade hyperscaler. The company valued it at about $5.2 billion of base-term contracted revenue, or roughly $1.65 million per megawatt per year on average."}}, {"@type": "Question", "name": "Who is Applied Digital's hyperscaler customer?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital describes the Delta Forge 2 tenant only as a tier-one, investment-grade hyperscaler and has not named it. Separately, its subsidiary ChronoScale announced plans with Microsoft for a 50 MW AI compute deployment in North America."}}, {"@type": "Question", "name": "What is ChronoScale?", "acceptedAnswer": {"@type": "Answer", "text": "ChronoScale Holdings is Applied Digital's majority-owned, publicly traded accelerated-compute platform. It runs the company's historic cloud services business. Its results are consolidated into GAAP figures but excluded from Applied Digital's adjusted measures."}}, {"@type": "Question", "name": "What is the Base Electron power purchase agreement?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital agreed to buy capacity and energy from an approximately 1,200 MW natural gas-fired plant that Base Electron plans to develop in North Dakota. The plant is not yet built. Pricing, term and committed volumes were not disclosed."}}, {"@type": "Question", "name": "What did Applied Digital sign in Finland?", "acceptedAnswer": {"@type": "Answer", "text": "The company signed an agreement for up to approximately 1 GW of potential power capacity in Finland, its first step outside the United States. Management called it a measured, opportunistic move and said its near-term priorities remain in the US."}}, {"@type": "Question", "name": "Why does Applied Digital focus on North Dakota?", "acceptedAnswer": {"@type": "Answer", "text": "The company cites low-cost power, abundant energy resources, low population density and a cool climate that supports efficient cooling. It argues that campuses in power-rich regions will hold value better as coastal and metro markets become constrained and more expensive."}}, {"@type": "Question", "name": "Does this quarter show the data center bet is paying off?", "acceptedAnswer": {"@type": "Answer", "text": "On operating measures, yes: adjusted EBITDA was $64.4 million and net operating income was $58.8 million. On a GAAP basis the company still lost $221.0 million. The newest 75 MW came online after the quarter, so the fuller test comes in later quarters."}}, {"@type": "Question", "name": "What should investors and customers watch next?", "acceptedAnswer": {"@type": "Answer", "text": "Watch whether revenue grows in line with the 250 MW now live, which fiscal Q2 and Q3 will show. Also watch the delivery date for the 150 MW third building, the Harwood start-up, and terms for the Delta Forge 2 build and the Base Electron plant."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Applied Digital&#8217;s Harwood, ND AI Data Center (Polaris Forge 2): Site, Power, Cost</title>
		<link>/applied-digital-harwood-polaris-forge-2-time-to-power/</link>
		
		<dc:creator><![CDATA[Deepak Jain]]></dc:creator>
		<pubDate>Sat, 12 Sep 2026 11:35:41 +0000</pubDate>
				<category><![CDATA[AI Infrastructure]]></category>
		<category><![CDATA[AI data centers]]></category>
		<category><![CDATA[Applied Digital]]></category>
		<category><![CDATA[closed-loop cooling]]></category>
		<category><![CDATA[data center construction]]></category>
		<category><![CDATA[North Dakota]]></category>
		<category><![CDATA[Polaris Forge 2]]></category>
		<category><![CDATA[Power Infrastructure]]></category>
		<category><![CDATA[time to power]]></category>
		<guid isPermaLink="false">/applied-digital-harwood-polaris-forge-2-time-to-power/</guid>

					<description><![CDATA[Applied Digital's Polaris Forge 2 data center in Harwood, North Dakota reaches partial operation in late 2026, roughly 15 months after approval. The $3 billion campus draws 280 megawatts, and Applied Digital is paying $112 million for the substation and lines that feed it.]]></description>
										<content:encoded><![CDATA[<div class="jain-post-grid">
<div class="jain-post-main">
<section class="jain-tldr" aria-label="Plain-English summary">
<p class="jain-tldr-kicker">TL;DR · 30-second read</p>
<h2>The Short Version</h2>
<p>Two buildings north of Fargo, North Dakota are nearly finished, and together they are bigger than the largest building in the state, an Amazon warehouse two miles away. About 1,800 workers are on site.</p>
<p>The buildings will hold computers that run artificial intelligence, and they will draw about as much electricity as a small city. The local council approved the project in September 2025, and part of it is supposed to be running by the end of this year.</p>
<p>The company building it, Applied Digital, has not said which businesses will rent the space.</p>
</section>
<p>InForum reported that Applied Digital&#8217;s Polaris Forge 2 campus in Harwood, North Dakota is nearing completion, with roughly 1,800 workers finishing two buildings of 907,000 square feet each. The Harwood City Council approved the $3 billion project on September 10, 2025. Part of the campus is on pace to become operational by the end of 2026, with the remainder opening in early 2027, according to Nick Phillips, Applied Digital&#8217;s executive vice president of public affairs and real estate acquisition.</p>
<p>The site is a 280-megawatt facility drawing power from Cass County Electric, and Applied Digital is paying $112 million for the substation and transmission upgrades that serve it. The company has not disclosed which companies will occupy the buildings. It expects 200 to 250 permanent employees once the campus opens, on 400 acres of which about 300 have been graded.</p>
<h2>Executive Summary</h2>
<p>Harwood is Applied Digital&#8217;s third North Dakota project, after Jamestown and the Polaris Forge 1 campus at Ellendale, with a fourth under construction near Center. Ellendale, announced in late 2024, is partially operational. The pattern across all four is the same wager: build large blocks of power-dense capacity in a cold, cheap-power state and race to energize them while demand for artificial intelligence compute outruns supply.</p>
<p>What makes Harwood worth studying is the calendar. From a municipal approval on September 10, 2025 to first operational capacity at the end of 2026 is roughly fifteen months for a 280-megawatt campus. In a market where developers routinely quote three to five years between site control and delivered power, that interval is the entire product. &#8220;Time to power&#8221; is the industry&#8217;s shorthand for how long a tenant waits between signing and switching on machines, and it has become the variable that decides which sites win contracts.</p>
<p>The unresolved half of the story is commercial rather than physical. Steel, generators, cooling loops and a substation are visible and verifiable. Leases are not. Applied Digital has not named a tenant for Harwood, has not disclosed how much of the 280 megawatts is contracted, and has not detailed how the $3 billion build is financed. Those omissions do not undermine the construction progress, but they determine whether the speed converts into revenue.</p>
<h2>Fifteen Months From Vote to Volts</h2>
<p>The construction detail in the account is mostly a lesson in sequencing. Eight generator rooms in each building hold twelve units apiece, which is 96 generators per building and 192 across the campus, a level of on-site backup that signals a design intended for tenants who will not tolerate interruption. Roughly 86,000 electrical connections and several miles of copper cable have to be terminated and tested before any of it carries load. Workers wear helmets with augmented reality systems that check whether components are installed in the right place and whether crews are tracking to schedule, which is less a gadget than an admission that verification, not fabrication, is the thing most likely to slip.</p>
<p>Phillips describes the split inside each building as about 25% data halls and 75% supporting systems. That ratio is the clearest single indicator of how the economics have shifted. In a conventional enterprise facility, the computer room dominates the floor plan. In a building designed for dense artificial intelligence racks, the electrical rooms, switchgear, uninterruptible power supply gear and cooling plant swallow three-quarters of the envelope. Applied Digital is not really building a warehouse for servers. It is building a power conversion and heat rejection plant that happens to have servers in the middle of it.</p>
<p>The arithmetic underlines the point. If 280 megawatts is measured at the computers, spread across roughly 453,000 square feet of data hall, that is on the order of 600 watts per square foot, an order of magnitude above the densities most existing commercial data centers were designed for. Applied Digital has not specified whether the 280-megawatt figure is the load delivered to equipment or the total drawn from the utility, and the distinction changes that number materially. Either way, the campus is firmly in the density range that only recently became buildable at scale.</p>
<h2>The $112 Million Sentence</h2>
<p>The most consequential figure in the account is not the $3 billion headline but the $112 million Applied Digital says it will pay for the substation and transmission upgrades. That is roughly $400,000 per megawatt of connection, and it is the developer, not the utility&#8217;s other customers, footing the bill. Grid connection cost allocation is the live political question in nearly every jurisdiction now absorbing large computing loads, because the alternative structure, in which network upgrades are socialized across the rate base, is what makes residents worry about their bills. Harwood drew protesters on exactly that concern.</p>
<p>Applied Digital&#8217;s counter-claim is that its facilities do not raise electricity bills, and Phillips cited more than $46 million in savings for customers across North Dakota and South Dakota since the Ellendale project began. The underlying mechanism is plausible in principle: a very large, very steady customer spreads a utility&#8217;s fixed costs across more kilowatt-hours, which can lower the per-unit cost everyone pays. But the claim as stated is not yet verifiable by a reader. It does not identify which utility&#8217;s customers, over which period, measured against which counterfactual, or whether the figure is an avoided increase rather than a reduction. Those are answerable questions, and regulated utilities generally have to answer them in rate proceedings.</p>
<p>It is worth being precise about what each side is arguing, because they are not arguing about the same thing. The savings claim is retrospective and concerns Ellendale. The objection at Harwood is prospective and concerns what happens when a second large load lands on a different distribution system. A past result under one set of contracts does not settle the future question, and neither does a protest settle whether the mechanism works. The $112 million commitment is the strongest evidence Applied Digital has offered that it intends to carry its own interconnection costs, which is the part of the dispute that can actually be documented.</p>
<h2>Air, Not Water, and Why North Dakota Rewards That Choice</h2>
<p>Cooling is where siting logic becomes visible. Branden Cummins, the company&#8217;s civil structure architecture superintendent, described a closed loop that circulates fluid through six data halls in each building, carries it to the roof, and uses large fans to shed the heat before recirculating it. Because the loop is sealed, Applied Digital says water consumption will be comparable to a household. That is a meaningful claim in an industry now facing real scrutiny over evaporative cooling, which chills equipment by boiling away water and can consume millions of gallons a year at this scale.</p>
<p>The trade is not free. Rejecting heat to air rather than to evaporating water costs electricity for fans, and the penalty grows with ambient temperature. In a Texas or Arizona summer, that penalty is severe enough that many operators accept the water consumption instead. In eastern North Dakota, where cold hours dominate the year, the fan energy penalty is small and the water savings are close to pure gain. The closed loop is not primarily an environmental gesture; it is the design that the climate makes cheapest, and the environmental benefit follows from the geography.</p>
<p>Noise and setback receive the same treatment. Silencing equipment and sound barriers on the generator plant, with the nearest home about half a mile away and the town of Harwood more than a mile off, reflect a siting choice made before mitigation was needed. Developers increasingly buy distance rather than engineer around its absence, because generator testing and rooftop fan arrays are the two complaints most likely to follow a facility through its operating life.</p>
<h2>A Builder Without a Named Tenant</h2>
<p>Applied Digital is a merchant developer, meaning it builds capacity and then leases it, as opposed to a hyperscaler building for its own use. That model turns on a single question: how much of the capacity is committed before it is energized. The company has not disclosed which companies will occupy Harwood. Until it does, an observer cannot distinguish between a campus built against signed leases and one built on conviction about demand.</p>
<p>The local economics are more legible. Roughly 1,800 construction workers will give way to 200 to 250 permanent employees, a ratio close to eight to one that is typical of the sector and worth stating plainly: data centers are enormous construction projects and modest employers. The durable local benefit is tax base rather than payroll. Polaris Forge 1 at Ellendale paid about $4.3 million in property tax for 2026, Harwood is receiving no tax incentives or abatements according to the company, and Phillips estimated Applied Digital would become the largest single taxpayer in the state by 2029, while acknowledging that Harwood&#8217;s own assessment is not yet estimated because the building is not finished.</p>
<p>The absence of abatements is the notable item. Large data centers are frequently recruited with property tax exemptions that hollow out the fiscal case communities were sold, and a project that forgoes them changes the arithmetic for the county. It also suggests the developer&#8217;s binding constraint was schedule rather than subsidy. When capacity delivered in 2026 is worth materially more than the same capacity delivered in 2029, a year of negotiation over abatements costs more than the abatements are worth.</p>
<h2>Background</h2>
<p>Applied Digital is a Texas-based developer that builds and leases data center capacity rather than operating computing services itself, a model the industry calls merchant development. Its North Dakota expansion began with a facility in Jamestown, followed by the Polaris Forge 1 campus at Ellendale announced in late 2024 and now partially operational, the Harwood project approved in September 2025, and a fourth site under construction near Center, about 40 miles northwest of Bismarck.</p>
<p>The expansion tracks a broader shift in where computing gets built. Training and running large artificial intelligence models requires racks that consume several times the power of conventional servers, which has turned electrical capacity, rather than fiber or floor space, into the binding constraint on the industry. Developers have responded by moving to regions with available generation, cold climates that reduce cooling costs, and utilities able to energize large loads quickly. That has brought industrial-scale construction to rural communities with no prior exposure to it, along with recurring local debates over electricity rates, noise, water and tax base that Harwood has seen in full.</p>
<section class="jain-sources" aria-label="Sources">
<h2>Sources</h2>
<p>Source: <a href="https://news.google.com/rss/articles/CBMioAFBVV95cUxQT1lzS1VzX09RU2l3Sk9RQmlyM2lJSGxxYjJTOVQwNWpaYnpOdFFEUW5NZndtenZxSWlsT04yUWJueFlpZnpPVWNBdVRxZ05BOTlvTU85c0ZGR25rSmlpdEF6U25WaHZnZ2ZVVXdGbDFqYm5yd1BfWHFmZ1hEZl8tR1YzWEJDVXJtbjRYb1M2U3BPYy1YMUY0TUFnX0lQc2FV?oc=5">An inside look at the Harwood data center as it nears completion</a> — InForum&#8217;s report from Applied Digital&#8217;s Polaris Forge 2 construction site in Harwood, North Dakota, with detail on schedule, power, cooling, staffing and taxes from company executives.</p>
</section>
</div>
<aside class="jain-rail">
<section class="jain-gaps" aria-label="What the release does not say">
<p class="jain-gaps-kicker">⚠ What They Aren’t Saying</p>
<h2>What the Release Doesn&#8217;t Say</h2>
<ul>
<li><strong>Tenants and contracted capacity.</strong> Applied Digital has not disclosed which companies will occupy Harwood, how much of the 280 megawatts is under signed lease, for what term, or whether any capacity remains unlet as the first phase approaches energization.</li>
<li><strong>Financing.</strong> The company has not described how the $3 billion build is capitalized, what portion is debt, at what cost, or whether financing is secured against specific leases.</li>
<li><strong>What 280 megawatts measures.</strong> Applied Digital has not specified whether that figure is the critical load delivered to computing equipment or total utility draw including cooling and losses, a distinction that changes the campus&#8217;s effective density and its grid impact.</li>
<li><strong>The savings claim.</strong> The company has not published the basis for the more than $46 million in customer savings it attributes to the Ellendale project, including which utilities and customer classes, what period, and what baseline.</li>
<li><strong>Energization schedule.</strong> Neither Applied Digital nor Cass County Electric has stated when the substation and transmission upgrades will be commissioned, how the load ramps across the two buildings, or what contingency exists if grid work lags building completion.</li>
<li><strong>Generators and permits.</strong> The company has not disclosed the fuel type, emissions permitting status, or testing regime for the 192 backup generators, nor the water and discharge permitting associated with the closed loop and on-site retention pond.</li>
<li><strong>Taxes.</strong> Applied Digital says estimates for Harwood are still being prepared and has not published the assumptions behind the projection that it will be North Dakota&#8217;s largest single taxpayer by 2029.</li>
</ul>
</section>
<section class="jain-faq">
<h2>Frequently Asked Questions</h2>
<h3>What is Polaris Forge 2?</h3>
<p>It is Applied Digital&#8217;s data center campus in Harwood, North Dakota, consisting of two buildings of 907,000 square feet each, designed for artificial intelligence computing and drawing 280 megawatts of power.</p>
<h3>When will the Harwood data center open?</h3>
<p>Part of the campus is on pace to become operational by the end of 2026, with the remainder opening in early 2027, according to Applied Digital executive vice president Nick Phillips.</p>
<h3>How much is the project costing?</h3>
<p>The Harwood City Council approved a $3 billion AI data center on September 10, 2025. Separately, Applied Digital says it will pay $112 million for the electrical substation and transmission upgrades serving the site.</p>
<h3>How big are the buildings?</h3>
<p>Each building is 907,000 square feet. Combined, the two structures exceed North Dakota&#8217;s largest building, a 1.2 million-square-foot Amazon fulfillment center about two miles south of the site.</p>
<h3>Who will use the data center?</h3>
<p>Applied Digital has not disclosed which companies will occupy the facility. For a developer that leases capacity rather than using it itself, that is the single most important undisclosed fact about the project.</p>
<h3>How many people will work there?</h3>
<p>Roughly 1,800 workers are on site during construction. Once operational, the campus is expected to employ 200 to 250 people, a ratio typical of data centers, which are large building projects and modest permanent employers.</p>
<h3>Will the data center raise local electricity bills?</h3>
<p>Applied Digital says it will not, and cites more than $46 million in savings for North Dakota and South Dakota customers since its Ellendale project began. The company has not published the underlying calculation. Protesters raised the opposite concern before approval.</p>
<h3>What does &#x27;time to power&#x27; mean?</h3>
<p>It is the interval between a customer committing to space and being able to run machines in it. Because electrical capacity is the scarce input in AI infrastructure, that interval now decides which sites win contracts.</p>
<h3>How much water will the facility use?</h3>
<p>Applied Digital says water use will be comparable to a household because the cooling system is a closed loop. Fluid circulates through the data halls to rooftop fans, sheds heat to the air, and returns, rather than evaporating away.</p>
<h3>Why build in North Dakota?</h3>
<p>Cold weather makes air-based cooling cheap year-round, land is available at scale, and power can be secured faster than in congested markets. The climate turns a water-saving design choice into the least expensive one.</p>
<h3>What other North Dakota sites does Applied Digital operate?</h3>
<p>The company has a data center in Jamestown, the Polaris Forge 1 campus in Ellendale about 150 miles southwest of Fargo which is partially operational, and another facility under construction near Center, northwest of Bismarck.</p>
<h3>Is the company receiving tax breaks?</h3>
<p>According to Applied Digital, the Harwood data center is not receiving any tax incentives or abatements. Polaris Forge 1 at Ellendale paid about $4.3 million in property tax for 2026.</p>
<h3>How much backup power is on site?</h3>
<p>Each building has eight generator rooms holding twelve generators apiece, 96 per building and 192 across the campus, arranged so that failures of individual units do not interrupt service. Fuel type has not been disclosed.</p>
<h3>Why is only a quarter of each building used for computers?</h3>
<p>Phillips said about 25% of each building holds the computers and 75% holds supporting systems. High-density AI equipment requires so much electrical conversion and cooling plant that the support infrastructure dominates the floor plan.</p>
<h3>What should prospective tenants ask about this site?</h3>
<p>Whether the 280 megawatts is measured at the rack or the meter, how much capacity remains uncontracted, when the substation is commissioned, and how the ramp across the two buildings is phased against the utility&#8217;s schedule.</p>
<h3>What should investors watch next?</h3>
<p>Lease announcements naming tenants and contracted megawatts, confirmation that the first phase energized on schedule at the end of 2026, and disclosure of how the $3 billion build is financed.</p>
</section>
</aside>
</div>
<p><script type="application/ld+json">{"@context": "https://schema.org", "@graph": [{"@type": "NewsArticle", "headline": "Inside Applied Digital's $3B Harwood AI Data Center Build", "description": "Applied Digital's Polaris Forge 2 data center in Harwood, North Dakota reaches partial operation in late 2026, roughly 15 months after approval. The $3 billion campus draws 280 megawatts, and Applied Digital is paying $112 million for the substation and lines that feed it.", "image": ["/wp-content/uploads/2026/09/applied-digital-polaris-forge-2-harwood-construction.webp"], "author": {"@type": "Organization", "name": "jain.com Editorial"}, "datePublished": "2026-09-12T11:35:34.664908+00:00"}, {"@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is Polaris Forge 2?", "acceptedAnswer": {"@type": "Answer", "text": "It is Applied Digital's data center campus in Harwood, North Dakota, consisting of two buildings of 907,000 square feet each, designed for artificial intelligence computing and drawing 280 megawatts of power."}}, {"@type": "Question", "name": "When will the Harwood data center open?", "acceptedAnswer": {"@type": "Answer", "text": "Part of the campus is on pace to become operational by the end of 2026, with the remainder opening in early 2027, according to Applied Digital executive vice president Nick Phillips."}}, {"@type": "Question", "name": "How much is the project costing?", "acceptedAnswer": {"@type": "Answer", "text": "The Harwood City Council approved a $3 billion AI data center on September 10, 2025. Separately, Applied Digital says it will pay $112 million for the electrical substation and transmission upgrades serving the site."}}, {"@type": "Question", "name": "How big are the buildings?", "acceptedAnswer": {"@type": "Answer", "text": "Each building is 907,000 square feet. Combined, the two structures exceed North Dakota's largest building, a 1.2 million-square-foot Amazon fulfillment center about two miles south of the site."}}, {"@type": "Question", "name": "Who will use the data center?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital has not disclosed which companies will occupy the facility. For a developer that leases capacity rather than using it itself, that is the single most important undisclosed fact about the project."}}, {"@type": "Question", "name": "How many people will work there?", "acceptedAnswer": {"@type": "Answer", "text": "Roughly 1,800 workers are on site during construction. Once operational, the campus is expected to employ 200 to 250 people, a ratio typical of data centers, which are large building projects and modest permanent employers."}}, {"@type": "Question", "name": "Will the data center raise local electricity bills?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital says it will not, and cites more than $46 million in savings for North Dakota and South Dakota customers since its Ellendale project began. The company has not published the underlying calculation. Protesters raised the opposite concern before approval."}}, {"@type": "Question", "name": "What does 'time to power' mean?", "acceptedAnswer": {"@type": "Answer", "text": "It is the interval between a customer committing to space and being able to run machines in it. Because electrical capacity is the scarce input in AI infrastructure, that interval now decides which sites win contracts."}}, {"@type": "Question", "name": "How much water will the facility use?", "acceptedAnswer": {"@type": "Answer", "text": "Applied Digital says water use will be comparable to a household because the cooling system is a closed loop. Fluid circulates through the data halls to rooftop fans, sheds heat to the air, and returns, rather than evaporating away."}}, {"@type": "Question", "name": "Why build in North Dakota?", "acceptedAnswer": {"@type": "Answer", "text": "Cold weather makes air-based cooling cheap year-round, land is available at scale, and power can be secured faster than in congested markets. The climate turns a water-saving design choice into the least expensive one."}}, {"@type": "Question", "name": "What other North Dakota sites does Applied Digital operate?", "acceptedAnswer": {"@type": "Answer", "text": "The company has a data center in Jamestown, the Polaris Forge 1 campus in Ellendale about 150 miles southwest of Fargo which is partially operational, and another facility under construction near Center, northwest of Bismarck."}}, {"@type": "Question", "name": "Is the company receiving tax breaks?", "acceptedAnswer": {"@type": "Answer", "text": "According to Applied Digital, the Harwood data center is not receiving any tax incentives or abatements. Polaris Forge 1 at Ellendale paid about $4.3 million in property tax for 2026."}}, {"@type": "Question", "name": "How much backup power is on site?", "acceptedAnswer": {"@type": "Answer", "text": "Each building has eight generator rooms holding twelve generators apiece, 96 per building and 192 across the campus, arranged so that failures of individual units do not interrupt service. Fuel type has not been disclosed."}}, {"@type": "Question", "name": "Why is only a quarter of each building used for computers?", "acceptedAnswer": {"@type": "Answer", "text": "Phillips said about 25% of each building holds the computers and 75% holds supporting systems. High-density AI equipment requires so much electrical conversion and cooling plant that the support infrastructure dominates the floor plan."}}, {"@type": "Question", "name": "What should prospective tenants ask about this site?", "acceptedAnswer": {"@type": "Answer", "text": "Whether the 280 megawatts is measured at the rack or the meter, how much capacity remains uncontracted, when the substation is commissioned, and how the ramp across the two buildings is phased against the utility's schedule."}}, {"@type": "Question", "name": "What should investors watch next?", "acceptedAnswer": {"@type": "Answer", "text": "Lease announcements naming tenants and contracted megawatts, confirmation that the first phase energized on schedule at the end of 2026, and disclosure of how the $3 billion build is financed."}}]}]}</script></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
