{"cached_at":"2026-09-12T09:49:07.899632+00:00","cl_docket_id":"72127384","docket":{"resource_uri":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","id":72127384,"court":"https://www.courtlistener.com/api/rest/v4/courts/casd/","court_id":"casd","original_court_info":null,"idb_data":null,"clusters":[],"audio_files":[],"assigned_to":"https://www.courtlistener.com/api/rest/v4/people/2830/","referred_to":null,"bankruptcy_information":null,"absolute_url":"/docket/72127384/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-09T14:09:33.137049-08:00","date_modified":"2026-06-29T18:54:25.703846-07:00","source":1,"appeal_from_str":"","assigned_to_str":"Janis L. Sammartino","referred_to_str":"Lupe Rodriguez Jr.","panel_str":"","date_last_index":null,"date_cert_granted":null,"date_cert_denied":null,"date_argued":null,"date_reargued":null,"date_reargument_denied":null,"date_filed":"2026-01-09","date_terminated":null,"date_last_filing":"2026-05-29","case_name_short":"","case_name":"Imperial Valley Computer Manufacturing, LLC v. City of Imperial","case_name_full":"","slug":"imperial-valley-computer-manufacturing-llc-v-city-of-imperial","docket_number":"3:26-cv-00128","docket_number_core":"2600128","docket_number_raw":"3:26-cv-00128","docket_number_source":0,"federal_dn_office_code":"3","federal_dn_case_type":"cv","federal_dn_judge_initials_assigned":"JLS","federal_dn_judge_initials_referred":"LR","federal_defendant_number":null,"pacer_case_id":"839861","cause":"42:1983cvp Civil Rights (Personal Property)","nature_of_suit":"440 Civil Rights: Other","jury_demand":"Plaintiff","jurisdiction_type":"Federal Question","appellate_fee_status":"","appellate_case_type_information":"","mdl_status":"","filepath_ia":"","filepath_ia_json":"","ia_upload_failure_count":null,"ia_needs_upload":true,"ia_date_first_change":"2026-01-09T14:09:33.115489-08:00","date_blocked":null,"blocked":false,"appeal_from":null,"parent_docket":null,"tags":[],"panel":[]},"parties":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602465/","id":19602465,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Defendant","date_terminated":null,"extra_info":"in his individual capacity","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:25.071045-07:00","date_modified":"2026-04-13T12:48:25.071056-07:00","name":"Othon Mora","extra_info":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602464/","id":19602464,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Defendant","date_terminated":null,"extra_info":"in her individual capacity","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:24.998861-07:00","date_modified":"2026-04-13T12:48:24.998870-07:00","name":"Katie Turner","extra_info":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602463/","id":19602463,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Defendant","date_terminated":null,"extra_info":"in his individual capacity","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:24.928260-07:00","date_modified":"2026-04-13T12:48:24.928268-07:00","name":"Dennis Morita","extra_info":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602462/","id":19602462,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Defendant","date_terminated":null,"extra_info":"in her individual capacity","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:24.862562-07:00","date_modified":"2026-04-13T12:48:24.862570-07:00","name":"Katherine Burnsworth","extra_info":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602461/","id":19602461,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463452/","attorney_id":13463452,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463453/","attorney_id":13463453,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Defendant","date_terminated":null,"extra_info":"a California municipal corporation","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:24.749196-07:00","date_modified":"2026-04-13T12:48:24.749206-07:00","name":"City of Imperial","extra_info":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/parties/19602460/","id":19602460,"attorneys":[{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463451/","attorney_id":13463451,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":1},{"attorney":"https://www.courtlistener.com/api/rest/v4/attorneys/13463451/","attorney_id":13463451,"date_action":null,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"role":2}],"party_types":[{"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","docket_id":72127384,"name":"Plaintiff","date_terminated":null,"extra_info":"a California limited liability company","highest_offense_level_opening":"","highest_offense_level_terminated":"","criminal_counts":[],"criminal_complaints":[]}],"date_created":"2026-04-13T12:48:24.594225-07:00","date_modified":"2026-04-13T12:48:24.594234-07:00","name":"Imperial Valley Computer Manufacturing, LLC","extra_info":""}],"entries":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/469192279/","id":469192279,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/484517105/","id":484517105,"tags":[],"absolute_url":"/docket/72127384/19/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-06-29T18:54:26.991488-07:00","date_modified":"2026-06-29T18:54:27.007495-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"19","attachment_number":null,"pacer_doc_id":"","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order of Judge Transfer","acms_document_guid":""}],"date_created":"2026-06-29T18:54:26.956418-07:00","date_modified":"2026-06-29T18:54:26.965868-07:00","date_filed":"2026-05-26","time_filed":null,"entry_number":19,"recap_sequence_number":"2026-05-26.001","pacer_sequence_number":null,"description":"","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/465687084/","id":465687084,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/480897124/","id":480897124,"tags":[],"absolute_url":"/docket/72127384/20/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-05-29T13:28:45.874882-07:00","date_modified":"2026-06-30T06:00:03.197598-07:00","sha1":"7bc3ac685c583b0e61ff1cf96092550456711b75","page_count":2,"file_size":172334,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.20.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.20.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"     Case 3:26-cv-00128-JLS-LR     Document 20        Filed 05/29/26   PageID.591    Page 1 of\n                                              2\n\n\n 1\n 2\n 3\n 4\n 5\n 6\n 7\n 8                            UNITED STATES DISTRICT COURT\n 9                           SOUTHERN DISTRICT OF CALIFORNIA\n10\n11    IMPERIAL VALLEY COMPUTER                            Case No.: 26cv128-JLS(LR)\n      MANUFACTURING, LLC,\n12\n                                         Plaintiff,       ORDER DENYING PLAINTIFF\u2019S\n13                                                        REQUEST FOR EARLY NEUTRAL\n      v.                                                  EVALUATION CONFERENCE,\n14\n                                                          DISCOVERY CONFERENCE, OR\n      CITY OF IMPERIAL, et al.,\n15                                                        STATUS CONFERENCE\n                                      Defendants.\n16\n                                                          [ECF No. 18]\n17\n18\n19          On May 21, 2026, Plaintiff moved the Court to schedule an Early Neutral\n20    Evaluation conference (\u201cENE\u201d), a discovery conference, and/or a status/case\n21    management conference pursuant to Civil Local Rule 16.1(c)(1). (ECF No. 18.)\n22    In support of its request, Plaintiff states that more than four months have passed since the\n23    filing and service of the Complaint on Defendants City of Imperial, Katherine\n24    Burnsworth, Dennis Morita, Katie Turner, and Othon Mora (\u201cDefendants\u201d). (ECF No. 18\n25    at 1.) Plaintiff also notes that defense counsel declined to meet and confer pursuant to\n26    Federal Rule of Civil Procedure 26(f) before an Answer is filed. (Id. at 2.)\n27          Civil Local Rule 16.1(c)(1) provides that \u201c[a]t any time after the filing of a\n28    complaint and before an answer has been filed, counsel for any party may make a request\n\n                                                      1\n                                                                                      26cv128-JLS(LR)\n\f     Case 3:26-cv-00128-JLS-LR     Document 20     Filed 05/29/26    PageID.592    Page 2 of\n                                              2\n\n\n 1    in writing to the judge in the case to hold an ENE conference, discovery conference or\n 2    status/case management conference,\u201d and that \u201c[u]pon receiving such request, the judge\n 3    will examine the circumstances of the case and the reasons for the request and determine\n 4    whether any such conference would assist in the reduction of expense and delay in the\n 5    case.\u201d The Court notes that on March 2, 2026, Defendants moved to dismiss Plaintiff\u2019s\n 6    Complaint pursuant to Federal Rule of Civil Procedure 12(b)(6). (See ECF No. 12.)\n 7    Plaintiff filed an opposition on March 17, 2026, and Defendants replied on April 2, 2026.\n 8    (ECF Nos. 13, 16.) On May 26, 2026, the case was transferred from Magistrate Judge\n 9    Brian J. White to Magistrate Judge Lupe Rodriguez, Jr. (ECF No. 19.)\n10          Because the Motion to Dismiss remains pending before District Judge Sammartino,\n11    and Defendants have declined to meet and confer before filing an Answer, the Court finds\n12    that the circumstances of the case and Plaintiff\u2019s stated reasons do not warrant setting an\n13    ENE conference, a discovery conference, or a status conference at this time.\n14    Accordingly, the Court DENIES Plaintiff\u2019s motion.\n15          IT IS SO ORDERED.\n16    Dated: May 29, 2026\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n                                                   2\n                                                                                     26cv128-JLS(LR)\n\f","ocr_status":2,"date_upload":"2026-06-29T18:53:42.449546-07:00","document_number":"20","attachment_number":null,"pacer_doc_id":"037022660697","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order on Motion for Hearing","acms_document_guid":""}],"date_created":"2026-05-29T13:28:45.847595-07:00","date_modified":"2026-06-29T18:54:27.028679-07:00","date_filed":"2026-05-29","time_filed":"12:47:45","entry_number":20,"recap_sequence_number":"2026-05-29.001","pacer_sequence_number":67,"description":"","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/465235680/","id":465235680,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/480434763/","id":480434763,"tags":[],"absolute_url":"","date_created":"2026-05-26T14:06:49.214658-07:00","date_modified":"2026-05-26T14:06:49.221221-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"","attachment_number":null,"pacer_doc_id":"","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order of Judge Transfer","acms_document_guid":""}],"date_created":"2026-05-26T14:06:49.199286-07:00","date_modified":"2026-05-26T14:06:49.199298-07:00","date_filed":"2026-05-26","time_filed":"13:06:42","entry_number":null,"recap_sequence_number":"2026-05-26.001","pacer_sequence_number":null,"description":"","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/464903564/","id":464903564,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/480093210/","id":480093210,"tags":[],"absolute_url":"/docket/72127384/18/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-05-21T19:17:18.745194-07:00","date_modified":"2026-06-29T18:54:26.923924-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"18","attachment_number":null,"pacer_doc_id":"037022635049","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Motion for Hearing","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/484517075/","id":484517075,"tags":[],"absolute_url":"/docket/72127384/18/1/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-06-29T18:52:14.222036-07:00","date_modified":"2026-06-29T18:52:14.222045-07:00","sha1":"","page_count":2,"file_size":38254,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"18","attachment_number":1,"pacer_doc_id":"037022635050","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Proposed Order","acms_document_guid":""}],"date_created":"2026-05-21T19:17:18.710829-07:00","date_modified":"2026-06-29T18:54:26.901868-07:00","date_filed":"2026-05-21","time_filed":"18:44:02","entry_number":18,"recap_sequence_number":"2026-05-21.001","pacer_sequence_number":62,"description":"","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/462795317/","id":462795317,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/477919306/","id":477919306,"tags":[],"absolute_url":"/docket/72127384/17/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-05-03T14:18:05.179147-07:00","date_modified":"2026-06-29T18:54:26.865500-07:00","sha1":"f286a2c81426828b96bbf8c24acccd1fc2c1cd8b","page_count":2,"file_size":63546,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.17.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.17.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"     Case 3:26-cv-00128-JLS-BJW        Document 17        Filed 05/03/26    PageID.584      Page 1\n                                              of 2\n\n\n 1   Sebastian Rucci (State Bar #178114)\n     LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n 2   16400 Pacific Coast Highway, Suite 212\n     Huntington Beach, CA 92649\n 3   Tel: (562) 901-0199\n     Cell: (760) 989-5100\n 4\n     Fax: (562) 249-6910\n 5   Sebastian@Rucci.Law\n     Attorney for Plaintiff\n 6\n                           UNITED STATES DISTRICT COURT\n 7\n                         SOUTHERN DISTRICT OF CALIFORNIA\n 8\n 9   IMPERIAL VALLEY COMPUTER                     )   Case No: 26CV128 JLS BJW\n     MANUFACTURING, LLC                           )\n10                                                )\n                                                  )\n11                                                )   Judge: Hon. Janis L. Sammartino\n            Plaintiff\n                                                  )\n12   vs.\n                                                  )\n13                                                )   VOLUNTARY DISMISSAL OF\n     CITY OF IMPERIAL, et. al.                    )   DEFENDANT KATIE TURNER\n14                                                )\n                                                  )\n15          Defendants                            )\n                                                  )\n16\n17          COME NOW plaintiff and voluntarily dismiss defendant KATIE TURNER. Fed.\n18   Rule Civ P. 41(a)(1)(A)(i) allows plaintiff to dismiss claims against any defendant by filing\n\n19   \u201ca notice of dismissal\u201d against that defendant \u201cwithout court order\u201d before that defendant\n     \u201cserves either an answer or a motion for summary judgment.\u201d Defendant Katie Turner has\n20\n     not filed an answer or motion for summary judgement, accordingly all claims against\n21\n     defendant Katie Turner are voluntarily dismissed pursuant to Fed R. Civ P 41(a)(1)(A)(i).\n22\n23\n                                         Respectfully submitted,\n24\n25                                       LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n\n26\n27\n     Date: May 3, 2026                   Sebastian Rucci (SBN 178114)\n28                                       Attorney for Plaintiff\n\n\n                          VOLUNTARY DISMISSAL OF DEFENDANT KATIE TURNER                  PAGE I\n\f     Case 3:26-cv-00128-JLS-BJW         Document 17       Filed 05/03/26    PageID.585       Page 2\n                                               of 2\n\n\n 1                                  CERTIFICATE OF SERVICE\n 2          I hereby certify that on this 3rd day of May, 2026, I electronically filed the foregoing\n 3   VOLUNTARY DISMISSAL OF DEFENDANT KATIE TURNER with the Clerk of the Court\n 4   using the CM/ECF system which will send notification to all the parties. I Further Certify\n 5   That on March 16, 2026, the foregoing VOLUNTARY DISMISSAL OF DEFENDANT\n 6   KATIE TURNER was served electronically served on Defendant\u2019s counsel Konrad\n 7   Rasmussen, at kmr@mmr4law.com from my law office email Sebastian@Rucci.Law. The\n 8   transmission was complete and without error and I did not receive an electronic notification\n 9   to the contrary.\n10\n11                                       LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n\n12\n13   Date: May 3, 2026\n\n14                                       Sebastian Rucci (SBN 178114)\n15                                       Attorney for Plaintiffs\n\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                          VOLUNTARY DISMISSAL OF DEFENDANT KATIE TURNER                   PAGE II\n\f","ocr_status":2,"date_upload":"2026-05-04T13:00:17.668322-07:00","document_number":"17","attachment_number":null,"pacer_doc_id":"037022556250","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Notice of Voluntary Dismissal","acms_document_guid":""}],"date_created":"2026-05-03T14:18:05.148643-07:00","date_modified":"2026-06-29T18:54:26.843395-07:00","date_filed":"2026-05-03","time_filed":"13:43:56","entry_number":17,"recap_sequence_number":"2026-05-03.001","pacer_sequence_number":60,"description":"","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/459563462/","id":459563462,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/474593417/","id":474593417,"tags":[],"absolute_url":"/docket/72127384/16/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-04-02T16:58:07.539892-07:00","date_modified":"2026-06-29T18:54:26.790000-07:00","sha1":"8117195f196c5b827e81810a75d029fec99e322e","page_count":14,"file_size":294816,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.16.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.16.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW           Document 16   Filed 04/02/26   PageID.568   Page 1\n                                           of 14\n\n\n\n 1 Konrad M. Rasmussen, Esq. (SBN 157030)\n   Brett L. Cirincione, Esq. (SBN 330807)\n 2\n   Michael D. Alvarez, Esq. (SBN 362066)\n 3 McCORMICK, MITCHELL & RASMUSSEN\n   8885 Rio San Diego Drive, Suite 227\n 4 San Diego, CA 92108\n\n 5 Tel: (619) 235-8444\n   Fax: (619) 294-8447\n 6\n   Attorneys for Defendants CITY OF IMPERIAL, KATHERINE\n 7\n   BURNWORTH, DENNIS MORITA, KATIE TURNER\n 8 and OTHON MORA\n\n 9\n\n10                           UNITED STATES DISTRICT COURT\n\n11                        SOUTHERN DISTRICT OF CALIFORNIA\n12\n   IMPERIAL VALLEY COMPUTER                         Case No.: 26CV128 JLS BJW\n13 MANUFACTURING, LLC, a California\n   limited liability company,                       REPLY IN SUPPORT OF\n14                                                  DEFENDANTS\u2019 MOTION TO\n                        Plaintiff,                  DISMISS THE COMPLAINT\n15\n\n16 vs.\n                                                    Date: Thursday, April 9, 2026\n17 CITY OF IMPERIAL, a California municipal         Time: 1:30 p.m.\n                                                    Courtroom: 4D\n18 corporation; KATHERINE BURNWORTH                 Judge: Hon. Janis L. Sammartino\n     in her individual capacity; DENNIS\n19 MORITA in his individual capacity; KATIE\n\n20\n     TURNER in her individual capacity; and\n     OTHON MORA in his individual capacity,\n21\n                        Defendants.\n22\n\n23\n\n24\n\n25\n\n26\n27\n\n28\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW                        Document 16              Filed 04/02/26             PageID.569             Page 2\n                                                        of 14\n\n\n\n 1\n                                        TABLE OF CONTENTS\n 2 I.      INTRODUCTION ........................................................................................................ - 1 -\n 3 II. DISCUSSION .............................................................................................................. - 1 -\n\n 4         A.      The City\u2019s Approval Process is Discretionary and did Not Create an Entitlement - 1\n                   -\n 5\n           B.      The Data Center Project was Not Ministerial ...................................................... - 3 -\n 6         C.      Plaintiff was Required to Avail Itself to State Law Procedures .......................... - 4 -\n 7         D.      Plaintiff has Not Alleged Protected Speech Causally Connected to Defendants\u2019\n                   Conduct ................................................................................................................ - 5 -\n 8\n           E.      The City is Subject to Noerr-Pennington Immunity ........................................... - 6 -\n 9\n           F.      Plaintiff\u2019s Equal Protection Claim is Inadequately Pled ..................................... - 7 -\n10                 i.    A Rational Basis Exists for the City\u2019s Decision ........................................... - 7 -\n11                 ii. Plaintiff has Not identified Similarly Situated Individuals .......................... - 8 -\n12         G.      Plaintiff\u2019s Monell Claim is Similarly Deficient ................................................... - 8 -\n           H.      The Limited Conduct Attributed to the Individual Defendants Warrants a\n13                 Finding of Qualified Immunity ............................................................................ - 9 -\n14 III. CONCLUSION ........................................................................................................... - 9 -\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n27\n\n28\n\n              REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                    COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW                       Document 16             Filed 04/02/26           PageID.570            Page 3\n                                                       of 14\n\n\n\n 1                                                TABLE OF AUTHORITIES\n 2 Cases\n      Arroyo Vista Partners v. County of Santa Barbara\n 3      732 F.Supp. 1046 (C.D. Cal. 1990) ...................................................................................... 5\n 4    B & L Productions, Inc. v. Newsom\n        104 F.4th 108, 114 (9th Cir. 2024) ....................................................................................... 6\n 5    Enguist v. Oregon Dept. of Agriculture\n        478 F.3d 985 (9th Cir. 2007) ................................................................................................ 8\n 6\n      Evans Hotels, LLC v. Unite Here Local\n 7      433 F.Supp.3d 1130 (S.D. Cal. 2020) .................................................................................. 7\n      F.C.C. v. Beach Communications, Inc.\n 8      508 U.S. 307 (1993) ......................................................................................................... 8, 9\n 9    Felder v. Casey\n        487 U.S. 131 (1988) ............................................................................................................. 4\n10    Gini v. Las Vegas Metropolitan Police Department\n        40 F.3d 1041 (9th Cir. 1994) ................................................................................................ 7\n11\n      Lake Nacimiento Ranch Co. v. San Luis Obispo County\n12      841 F.2d 872 (9th Cir. 1987) ................................................................................................ 5\n      Las Lomas Land Cod., LLC v. City of Los Angeles\n13      177 Cal.App. 4th 837 (2009) ............................................................................................ 2, 3\n14    Los Angeles v. Heller\n        475 U.S. 796 (1986) ............................................................................................................. 9\n15    Lyng v. Automobile Workers\n        485 U.S. 360 (1988) ............................................................................................................. 8\n16\n      Mulligan v. Nichols\n17      835 F.3d 981 (9th Cir. 2016) ................................................................................................ 7\n      Nunez v. City of Los Angeles\n18      147 F.3d 867 (9th Cir. 1998) ................................................................................................ 7\n19    Sellars v. Procunier\n        641 F.2d 1295 (9th Cir. 1981) ............................................................................................ 11\n20    Shawnee Sewerage & Drainage Co. v. Stearns\n        220 U.S. 462 (1911) ........................................................................................................... 10\n21\n      Sullivan v. Stroop\n22      496 U.S. 478 (1990) ............................................................................................................. 8\n      White v. Lee\n23      277 F.3d 1214 (9th Cir. 2000) .............................................................................................. 7\n24\n\n25 Statutes\n      14 California Code of Regulations \u00a7 15368 ............................................................................ 3\n26 14 California Code of Regulations \u00a7 15369 ............................................................................ 3\n27 California Civil Code \u00a7 1094.5 ................................................................................................ 5\n      Imperial Zoning Code \u00a7 24.07.120 ...................................................................................... 3, 8\n28 Imperial Zoning Code \u00a7 24.19.500 .......................................................................................... 1\n\n              REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                    COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW                   Document 16           Filed 04/02/26          PageID.571          Page 4\n                                                   of 14\n\n\n\n 1 Imperial Zoning Code \u00a7 24.19.510(B)(3) ................................................................................ 2\n   Imperial Zoning Code \u00a7 24.19.510(B)(5) ................................................................................ 2\n 2\n   Imperial Zoning Code \u00a7 24.19.530(G) .................................................................................... 1\n 3 Imperial Zoning Code \u00a7 24.19.540 .......................................................................................... 1\n   Imperial Zoning Code \u00a7 24.19.540(B) ..................................................................................... 1\n 4 Imperial Zoning Code \u00a7 24.19.541(B) ..................................................................................... 2\n\n 5 Imperial Zoning Code \u00a7 24.19.550 ...................................................................................... 1, 2\n   Imperial Zoning Code \u00a7 24.19.560 .......................................................................................... 4\n 6\n\n 7\n\n 8\n\n 9\n\n10\n\n11\n\n12\n\n13\n\n14\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n27\n\n28\n\n             REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                   COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW          Document 16       Filed 04/02/26     PageID.572      Page 5\n                                          of 14\n\n\n\n 1                                       I.     INTRODUCTION\n 2         The Opposition does little more than regurgitate the same circular logic and\n 3 conclusions of law presented ad nauseam in the Complaint. The unprecedented 95-acre data\n\n 4 center is not a ministerial project simply because Plaintiff labels it as such, and Plaintiff is not\n\n 5 entitled to project approval by virtue of its misinterpretation of the City\u2019s Zoning Code. It is\n\n 6 clear from the Complaint\u2019s allegations and matters subject to judicial notice that Plaintiff was\n\n 7 not deprived of any entitlement which would support its procedural due process claim. It is\n\n 8 further evident the related conduct attributed to the City and individual Defendants does not\n\n 9 plausibly allege other violations of Plaintiffs Constitutional rights under the First or\n\n10 Fourteenth Amendments. Therefore, Defendants\u2019 Motion to Dismiss should be granted.\n\n11                                        II.    DISCUSSION\n12         A. The City\u2019s Approval Process is Discretionary and did Not Create an\n13             Entitlement\n14         Imperial\u2019s Zoning Code gives the Planning Director (Defendant Mora) broad authority\n15 \u201cto approve, deny or modify applications for Site Plan Review. Imperial Zoning Code\n\n16 \u00a7 24.19.550; Request for Judicial Notice, \u00b6 1 and Exhibit 1 thereto. Section 24.19.540\n\n17 specifically establishes the Director\u2019s discretion to \u201cspecify modifications, changes, and\n\n18 additions to the Development Plan in his recommendation or requirements for its approval.\u201d\n\n19 Imperial Zoning Code \u00a7 24.19.540, subd. (B) ; Request for Judicial Notice, \u00b6 1 and Exhibit 1\n\n20 thereto. This discretion includes recommendations \u201cby the Director to eliminate or mitigate\n\n21 significant adverse environmental effects disclosed by any environmental impact report [as\n\n22 well as] modifications, changes and additions that are necessary to meet the purposes of\u201d\n\n23 section 24.19.500. Id. The Director also has discretion to \u201crequire additional data as deemed\n\n24 necessary to the decision-making process,\u201d just as Defendant Mora did with Plaintiff\u2019s\n\n25 application. Imperial Zoning Code \u00a7 24.19.530, subd. (G) ; Request for Judicial Notice, \u00b6 1\n\n26 and Exhibit 1 thereto.\n27         The Opposition\u2019s argument that site plan review procedure focuses only on \u201cdesign\n28 principles\u201d is disingenuous. The purposes of the ordinance include \u201c[m]aintain[ing] the public\n\n                                                    -1-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW         Document 16      Filed 04/02/26    PageID.573      Page 6\n                                         of 14\n\n\n\n 1 health, safety and general welfare, and property throughout the City,\u201d and ensuring that new\n\n 2 industrial developments do not have adverse effects on health, adjoining properties or the City\n\n 3 in general. Imperial Zoning Code \u00a7 24.19.510, subd. (B)(3) & (B)(5); Request for Judicial\n\n 4 Notice, \u00b6 1 and Exhibit 1 thereto.\n\n 5         The Opposition claims the site plan application process is not discretionary because\n 6 \u201c[t]he City lacked discretion to withhold approval once the [fifteen (15) day] statutory period\n\n 7 lapsed.\u201d Opposition, Page 9, Lines 10-14. However, this argument is premised on an\n\n 8 erroneous interpretation of section 24.19.550. An application is only deemed approved if the\n\n 9 Director fails to act \u201c[w]ithin fifteen (15) days of the date that the application is deemed\n\n10 complete by the Director.\u201d [Emphasis added] Imperial Zoning Code \u00a7 24.19.541, subd. (B)\n\n11 Request for Judicial Notice, \u00b6 1 and Exhibit 1 thereto. Thus, the fifteen (15) day period does\n\n12 not begin at the time an application is submitted. The fact that it is the Planning Director who\n\n13 ultimately determines when that clock begins to run demonstrates significant discretion is\n\n14 afforded to the City in the site plan approval process. See again Las Lomas Land Cod., LLC\n\n15 v. City of Los Angeles, 177 Cal.App. 4th 837, 853 (2009) (\u201cA benefit is not a protected\n\n16 property interest under the due process clause if the decision maker has the discretion to grant\n\n17 or deny the benefit.\u201d)\n\n18         The Complaint does not plead facts indicating Defendant Mora deemed any of\n19 Plaintiffs applications complete. This requirement is mentioned only once with regard to the\n\n20 May 15, 2025 revised site plans. The Complaint alleges Mr. Mora sent an email on May 27,\n\n21 2025 stating, \u201cThank you for your submission. We have received the documents and will\n\n22 begin our review.\u201d Complaint, \u00b6 37. It further alleges Plaintiff\u2019s application was deemed\n\n23 complete 12 days earlier \u201c[s]ince that email did not ask for anything else.\u201d Id. However, such\n\n24 a conclusion is illogical. How could Mr. Mora deem the application complete before he\n\n25 reviewed it?\n\n26         Because none of Plaintiff\u2019s applications were ever deemed complete by the Planning\n27 Director, they were not yet subject to the fifteen (15) day approval provision. Defendant Mora\n\n28 had authority to modify or deny each application and discretion to establish additional\n\n                                                  -2-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW        Document 16      Filed 04/02/26    PageID.574      Page 7\n                                        of 14\n\n\n\n 1 requirements. Therefore, the Complaint does not plausibly allege deprivation of Plaintiff\u2019s\n\n 2 right to procedural due process. See Las Lomas Land Cod., LLC, supra (\u201c[A] land use\n\n 3 application invokes procedural due process only if the owner has a legitimate claim of\n\n 4 entitlement to the approval\u2026.\u201d).\n\n 5         B. The Data Center Project was Not Ministerial\n 6         Plaintiff\u2019s entire lawsuit is based on the misguided assumption that its data center\n 7 constitutes a ministerial project. A \u201cministerial\u201d decision under CEQA is one \u201cinvolving little\n\n 8 or no personal judgment by the public official as to the wisdom or manner of carrying out the\n\n 9 project.\u201d 14 Cal. Code Reg. \u00a7 15369. However, Defendant Mora has broad discretionary\n\n10 authority under the Zoning Code to approve, deny or modify site plan applications as he\n\n11 deems necessary. Thus, the Site Plan Application procedure is, as a matter of law, not\n\n12 ministerial. Nonetheless, the determination of what is \u201cministerial\u201d is most appropriately\n\n13 made by \u201cthe particular public agency involved based upon its analysis of its own laws,\u201d and\n\n14 can be made on a case-by-case basis. 14 Cal. Code Reg. \u00a7 15268. It is evident on the face of\n\n15 the Complaint that the City of Imperial analyzed the applicable Zoning Code provisions and\n\n16 determined Plaintiff\u2019s project was not subject to ministerial approval.             Plaintiff\u2019s\n17 disagreement with this determination does not create a viable claim under section 1983.\n\n18         It is clear a ministerial approval of Plaintiff\u2019s project was not appropriate under the\n19 circumstances. A data center is not included as either a permitted or a conditional use under\n\n20 the City\u2019s Zoning Code. The Opposition\u2019s argument that a \u201csimilarity of use\u201d procedure\n\n21 should have been implemented is untenable. The types of businesses listed on Page 10 of the\n\n22 Opposition are either permitted or conditional uses for the I-2 zone. See Imperial Zoning Code\n\n23 \u00a7 24.07.120; Request for Judicial Notice, \u00b6 2 and Exhibit 2 thereto (Permitted/conditional uses\n\n24 include: distributors, lumber storage yards, gasoline dispensers, manufacturers, storage\n\n25 warehouses and building equipment sales). Plaintiff\u2019s 95-acre data center would require\n\n26 750 thousand gallons of reclaimed water per day. The project is unprecedented in its scale\n27 ///\n\n28 ///\n\n                                                 -3-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW                    Document 16           Filed 04/02/26          PageID.575          Page 8\n                                                    of 14\n\n\n\n 1 and the community resources it would require. As such, it is wholly dissimilar to the I-2 zone\n\n 2 businesses referenced in the Opposition.1\n\n 3              Undoubtedly, the data center project was not exempt from CEQA review.\n 4              C. Plaintiff was Required to Avail Itself to State Law Procedures\n 5              The Opposition cites to Felder v. Casey, 487 U.S. 131 (1988) to support its argument\n 6 that Plaintiff was not required to exhaust state law administrative remedies prior to bringing\n\n 7 a section 1983 claim. This argument is misleading. Felder addresses a state law \u201cnotice-of-\n\n 8 claim\u201d statute which required a section 1983 plaintiff to \u201cprovide the requisite notice of injury\n\n 9 within 120 days of the civil rights violation, then wait an additional 120 days while the\n\n10 governmental defendant investigates the claim and attempts to settle it.\u201d Id. at 146. The case\n\n11 specifically addresses the inability of state legislatures to place administrative limits on an\n\n12 individual\u2019s ability to bring a section 1983 claim. Defendants\u2019 motion does not address any\n\n13 such provision.\n\n14              Rather, Defendants argue Plaintiff is incapable of stating a claim for procedural due\n15 process if it has not first sought compensation through available state remedies. See Lake\n\n16 Nacimiento Ranch Co. v. San Luis Obispo County, 841 F.2d 872, 879 (9th Cir. 1987)\n\n17 (\u201c[S]ection 1983 claim is barred because there is an available state remedy.\u201d); See also Arroyo\n\n18 Vista Partners v. County of Santa Barbara, 732 F.Supp. 1046, 1053 (C.D. Cal. 1990) (A\n\n19 section 1983 claim for deprivation of procedural due process is barred \u201cwhenever a procedure\n\n20 for redress of a deprivation of procedural due process is available under state law.\u201d). Again,\n\n21 Plaintiff neither availed itself of the appeal process under section 24.19.560 of Imperial\u2019s\n\n22 Zoning Code nor sought judicial review of Defendant Mora\u2019s decision with the Superior\n\n23 Court. As a result, his procedural due process claim is barred.\n\n24              The Opposition claims there was nothing for Plaintiff to appeal because \u201cthe\n25 Complaint alleges deemed approvals by operation of law, not merely appealable denials.\u201d\n\n26\n27\n     1\n         Defendants concede their Points and Authorities mistakenly states Plaintiff\u2019s data center will require 6 million gallons\n28 of reclaimed water, as opposed to the 750,000 gallons per day actually alleged in the Complaint. Defendants\u2019 mistake was\n     inadvertent and stemmed from the allegations set forth in paragraph 101 of the Complaint.\n                                                               -4-\n               REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                     COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW         Document 16       Filed 04/02/26    PageID.576      Page 9\n                                         of 14\n\n\n\n 1 Opposition, Page 11, Lines 13-14. However, Plaintiff should not be permitted to argue out of\n\n 2 both sides of its mouth. If there was no adverse decision to appeal, how can there be a\n\n 3 procedural due process violation? Plaintiff obviously takes issue with Mr. Mora\u2019s\n\n 4 determination that its data center project was not ministerial and that a CEQA review was\n\n 5 required. This decision was subject to both the administrative appeal procedure and judicial\n\n 6 review under California Civil Code section 1094.5.\n\n 7         D. Plaintiff has Not Alleged Protected Speech Causally Connected to\n 8             Defendants\u2019 Conduct\n 9         The Opposition claims the following constituted Plaintiff\u2019s protected speech:\n10 \u201c(1) insisting on strict compliance with the City\u2019s ministerial review process; (2) petitioning\n\n11 Imperial County for land use approvals; (3) speaking publicly to counter the City\u2019s narrative\n\n12 about the project and (4) threatening litigation.\u201d Opposition, Page 12, Lines 5-9. The first two\n\n13 categories of speech clearly pertain entirely to Plaintiff\u2019s business dealings and are, therefore,\n\n14 not constitutionally protected. See B & L Productions, Inc. v. Newsom, 104 F.4th 108, 114\n\n15 (9th Cir. 2024) (business agreements and business dealings are \u201cnonexpressive conduct\n\n16 unprotected by the First Amendment.\u201d). Plaintiff entirely ignores this argument.\n\n17         Regardless, the Complaint does not adequately plead a causal nexus between these\n18 four categories of speech and the \u201cretaliatory\u201d conduct attributed to Defendants. First,\n\n19 \u201cinsisting on strict compliance with the City\u2019s ministerial review process\u201d references nothing\n\n20 more than a disagreement between Plaintiff and Defendant Mora regarding the appropriate\n\n21 interpretation of the City\u2019s ordinances. Again, the City is in the best position to determine\n\n22 which approvals are ministerial. It is nonsensical to suggest the City evaluating its laws and\n\n23 making such a determination constitutes first amendment retaliation.\n\n24         The Opposition relies on generic allegations concerning campaigns by Imperial\n25 Irrigation District and \u201cgreenmail operatives\u201d from Comit\u00e9 C\u00edvico del Valle. These entities\n\n26 are not agents of the City of Imperial, and the Complaint contains no specific allegations\n27 describing the individual Defendants\u2019 participation in these campaigns. While the Complaint\n\n28 does allege Defendant Burnworth met with individuals from IID and CCV, the claim that she\n\n                                                   -5-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW       Document 16 Filed 04/02/26          PageID.577     Page 10\n                                        of 14\n\n\n\n 1 \u201ccoordinate[d] opposition to force a ministerial project into a discretionary CEQA process,\u201d\n\n 2 is conclusory and inadequate to plead first amendment retaliation.\n\n 3         The Complaint contains no specific allegations demonstrating who participated in the\n 4 posting of the City\u2019s flyers and \u201chostile\u201d social-media messaging. Still, the Opposition points\n\n 5 to vague allegations that the individual Defendants directed such conduct. Nevertheless,\n\n 6 critical government speech is insufficient to constitute First Amendment retaliation.\n\n 7 \u201cRestricting the ability of government decisionmakers to engage in speech risks interfering\n\n 8 with their ability to effectively perform their duties\u2026. The marketplace of ideas is\n\n 9 undermined if public officials are prevented from responding to speech of citizens with speech\n\n10 of their own.\u201d Mulligan v. Nichols, 835 F.3d 981, 989 (9th Cir. 2016). Even \u201can act of\n\n11 defamation by government officials [is] insufficient [standing alone] to create a right to a\n\n12 remedy under the First Amendment\u2026.\u201d Id. (citing Gini v. Las Vegas Metropolitan Police\n\n13 Department, 40 F.3d 1041, 1045 (9th Cir. 1994)). \u201cIt would be the height of irony, indeed, if\n\n14 mere speech, in response to speech, could constitute a First Amendment violation.\u201d Nunez v.\n\n15 City of Los Angeles, 147 F.3d 867, 875 (9th Cir. 1998).\n\n16         E. The City is Subject to Noerr-Pennington Immunity\n17         Plaintiff mischaracterizes the City\u2019s Petition to the California Superior Court. When\n18 compared to the actual legal claims asserted in the Petition, the Complaint\u2019s allegations\n\n19 demonstrate nothing more than a legitimate disagreement regarding the interpretation of the\n\n20 County of Imperial\u2019s zoning regulations and the extent of the City\u2019s role in zoning decisions\n\n21 which affect properties within its sphere of influence. Yet, Plaintiff\u2019s attempt to circumvent\n\n22 the Noerr-Pennington Doctrine is subject to a heightened pleading standard. Evans Hotels,\n\n23 LLC v. Unite Here Local, 433 F.Supp.3d 1130, 1144 (S.D. Cal. 2020). Plaintiff labeling this\n\n24 disagreement a \u201csham\u201d is insufficient to plausibly allege the non-application of Noerr-\n\n25 Pennington immunity.\n\n26         Moreover, the fact that the City did not prevail in opposing a dispositive motion \u201cdoes\n27 not show that [its] lawsuit was objectively baseless for purposes of Noerr-Pennington\n\n28 immunity\u2026.\u201d White v. Lee, 277 F.3d 1214, 1232 (9th Cir. 2000). A lawsuit which is arguably\n\n                                                 -6-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW                 Document 16 Filed 04/02/26                    PageID.578           Page 11\n                                                  of 14\n\n\n\n 1 warranted by existing law or at the very least based on \u201can objectively good faith argument\u201d\n\n 2 is subject to Noerr-Pennington immunity. Id.\n\n 3            F. Plaintiff\u2019s Equal Protection Claim is Inadequately Pled\n 4                 i.    A Rational Basis Exists for the City\u2019s Decision\n 5            \u201cWhether embodied in the Fourteenth Amendment or inferred from the Fifth, equal\n 6 protection is not a license for courts to judge the wisdom, fairness, or logic of [a government\n\n 7 official\u2019s] choices.\u201d F.C.C. v. Beach Communications, Inc., 508 U.S. 307, 313 (1993). A\n\n 8 governmental decision \u201cmust be upheld against equal protection challenge if there is any\n\n 9 reasonably conceivable state of facts that could provide a rational basis for the [decision]. Id.\n\n10 (citing Sullivan v. Stroop, 496 U.S. 478, 485 (1990)). On rational-basis review, government\n\n11 actions bear \u201ca strong presumption of validity.\u201d Id. at 314-315 (citing Lyng v. Automobile\n\n12 Workers, 485 U.S. 360, 370 (1988)).\n\n13            As noted in the City\u2019s moving papers, Defendant Mora expressed his rational basis for\n14 requiring a CEQA review, including the potential that Plaintiff\u2019s unprecedented data center\n\n15 project would have substantial impacts on the environment and community at large. See\n\n16 Exhibit 17 to Complaint [DOC 01-18]. The Opposition argues the concerns shared in\n\n17 Mr. Mora\u2019s July 15, 2025 email constitute a \u201ccalculated pretext.\u201d However, the Complaint\n\n18 does not plead these concerns were either illegitimate or based upon an improper motive. 2\n\n19 Instead, the Complaint alleges the following:\n\n20            The Defendants\u2019 sudden invocation of \u2018environmental impact\u2019 is a calculated\n              pretext. A genuine environmental steward would not torpedo a project that\n21\n              subsidizes regional water infrastructure and provides a massive, free infusion\n22            of freshwater to the Salton Sea.\n\n23                                                                                              Complaint, \u00b6 103(b).\n24 ///\n\n25 ///\n\n26\n27   2\n       See Enguist v. Oregon Dept. of Agriculture, 478 F.3d 985, 1014 (9th Cir. 2007) (\u201c[A] pretext may be shown by\n     demonstrating \u2018either: (1) the proferred rational basis was objectively false; or (2) the defendant actually acted based on\n28   improper motive.\u2019\u201d).\n\n                                                                -7-\n            REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                  COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW         Document 16 Filed 04/02/26         PageID.579       Page 12\n                                          of 14\n\n\n\n 1         It is unclear what relevance Plaintiff\u2019s plan to replenish the Salton Sea (a body of water\n 2 located many miles outside of the City of Imperial) has to its data center\u2019s potential\n\n 3 environmental impact within the City. The Complaint fails to plead a plausible pretext, and\n\n 4 Defendant Mora\u2019s rational basis for requiring CEQA review defeats Plaintiff\u2019s equal\n\n 5 protection claim. See Beach Communications, Inc., 508 U.S. at 313.\n\n 6            ii.    Plaintiff has Not identified Similarly Situated Individuals\n 7         The Opposition argues Plaintiff\u2019s data center project was \u201csingled out\u201d and subjected\n 8 to differential treatment. However, a large-scale data center is incomparable to a distributor,\n\n 9 manufacturer, building equipment supplier, gasoline dispenser, storage warehouse or lumber\n\n10 storage yard. Each of these supposedly similar businesses squarely fit within the permitted\n\n11 and conditional use categories established by Imperial\u2019s Zoning Code. Imperial Zoning Code\n\n12 \u00a7 24.07.120; Request for Judicial Notice, \u00b6 2 and Exhibit 2 thereto. On the other hand, neither\n\n13 data centers nor any other developments requiring large quantities of energy and water are\n\n14 contemplated for the I-2 zone. Plaintiff\u2019s equal protection class of one claim fails for this\n\n15 reason as well.\n\n16         G. Plaintiff\u2019s Monell Claim is Similarly Deficient\n17         To the extent it shares the same deficiencies discussed above, Plaintiff\u2019s Fourth Claim\n18 fails to plausibly allege municipal liability against the City of Imperial. See Los Angeles v.\n\n19 Heller, 475 U.S. 796, 799 (1986) (municipal liability does not attach absent underlying\n\n20 constitutional violation).\n\n21         The Opposition argues the City \u201cbreaching the reclaimed-water agreement after\n22 Plaintiff had incurred expenses\u201d supports Monell liability. However, no such agreement\n\n23 existed (see City\u2019s Points and Authorities, Pages 21 \u2013 22), and a breach of contract cannot\n\n24 create liability under 42 U.S.C. section 1983. See Shawnee Sewerage & Drainage Co. v.\n\n25 Stearns, 220 U.S. 462, 473 (1911) (\u201cThe breach of a contract is neither a confiscation of\n\n26 property nor a taking of property without due process of law.\u201d). The Opposition entirely\n27 ignores the City\u2019s argument on this issue. Furthermore, the Complaint does not plead any\n\n28 specific facts demonstrating the City of Imperial \u201cpressure[ed] El Centro to terminate its\n\n                                                   -8-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW         Document 16 Filed 04/02/26           PageID.580      Page 13\n                                          of 14\n\n\n\n 1 agreement with Plaintiff.\u201d In fact, Plaintiff\u2019s allegations indicate no such agreement ever\n\n 2 existed. Complaint, \u00b6 92.\n\n 3         As the Complaint fails to identify any policy, practice or custom of the City of Imperial\n 4 that resulted in a deprivation of Plaintiff\u2019s constitutional rights, Plaintiff has failed to state a\n\n 5 claim for municipal liability against the City of Imperial.\n\n 6         H. The Limited Conduct Attributed to the Individual Defendants Warrants a\n 7             Finding of Qualified Immunity\n 8         The Opposition confirms the allegations against the individual Defendants are paper-\n 9 thin. Defendant Mora\u2019s legitimate interpretation and enforcement of the City\u2019s municipal\n\n10 code did not violate a clearly established right. (See discussion above.) Defendants Turner\n\n11 and Burnworth are not specifically alleged to have taken any action which would rise to the\n\n12 level of a constitutional deprivation. The Opposition solely repeats conclusory allegations that\n\n13 the two participated in a coordinated campaign to obstruct Plaintiff\u2019s data center project.\n\n14 However, the extent of their individual participation in this \u201ccampaign\u201d is not specified.\n\n15 Plaintiff makes a similar leap in logic with Defendant Morita. The City Manager simply\n\n16 asking for a copy of El Centro\u2019s will-serve letter and indicating he plans to contact El Centro\n\n17 does not support the conclusion that he sabotaged a deal with El Centro.\n\n18         The innocuous conduct attributed to the individual Defendants neither rose to the level\n19 of a constitutional deprivation nor clearly violated an established right held by Plaintiff. A\n\n20 determination of qualified immunity is warranted. See Sellars v. Procunier, 641 F.2d 1295,\n\n21 1300 (9th Cir. 1981) (Qualified Immunity should be afforded to public officials \u201cfor decisions\n\n22 made in the good faith exercise of their official responsibilities.\u201d).\n\n23                                       III.   CONCLUSION\n24         The Motion to Dismiss demonstrates the Complaint fails to state viable constitutional\n25 claims against Defendants City of Imperial, Katie Turner, Katherine Burnworth, Othon Mora\n\n26 and Dennis Morita. The Opposition offers tenable argument to the contrary or potential\n27 amendments that could cure the Complaint\u2019s deficiencies. Nor does it otherwise indicate how\n\n28\n\n                                                    -9-\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\fCase 3:26-cv-00128-JLS-BJW       Document 16 Filed 04/02/26         PageID.581     Page 14\n                                        of 14\n\n\n\n 1 Plaintiff can supplement the facts asserted in its extensive Complaint and exhibits to\n\n 2 adequately plead section 1983 liability. As such, the motion should be granted with prejudice.\n\n 3\n\n 4                                           McCORMICK, MITCHELL & RASMUSSEN\n 5\n\n 6 Date: April 2, 2026                         /s/ Brett L. Cirincione\n                                             Konrad M. Rasmussen\n 7                                           Brett L. Cirincione\n 8                                           Michael D. Alvarez\n                                             Attorneys for Defendants CITY OF IMPERIAL,\n 9                                           KATHERINE BURNWORTH, DENNIS\n                                             MORITA, KATIE TURNER,\n10\n                                             and OTHON MORA\n11\n\n12\n\n13\n\n14\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n27\n\n28\n\n                                                - 10 -\n          REPLY IN SUPPORT OF DEFENDANTS\u2019 MOTION TO DISMISS THE\n                                COMPLAINT\n\f","ocr_status":1,"date_upload":"2026-05-20T12:28:16.609147-07:00","document_number":"16","attachment_number":null,"pacer_doc_id":"037022433467","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Reply to Response to Motion","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/479886394/","id":479886394,"tags":[],"absolute_url":"/docket/72127384/16/1/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-05-20T12:27:45.939938-07:00","date_modified":"2026-05-20T12:27:45.939955-07:00","sha1":"","page_count":2,"file_size":179730,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"16","attachment_number":1,"pacer_doc_id":"037022433468","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Proof of Service","acms_document_guid":""}],"date_created":"2026-04-02T16:58:07.518819-07:00","date_modified":"2026-06-29T18:54:26.729966-07:00","date_filed":"2026-04-02","time_filed":"16:34:42","entry_number":16,"recap_sequence_number":"2026-04-02.001","pacer_sequence_number":57,"description":"REPLY to Response to Motion re 12 MOTION to Dismiss the complaint filed by Katherine Burnsworth, City of Imperial, Othon Mora, Dennis Morita, Katie Turner. (Attachments: # 1 Proof of Service)(Cirincione, Brett) (aas). (Entered: 04/02/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/459074218/","id":459074218,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/474091514/","id":474091514,"tags":[],"absolute_url":"/docket/72127384/15/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-03-30T15:22:56.072644-07:00","date_modified":"2026-06-29T18:54:26.700190-07:00","sha1":"ecf3f42272938e2674190d7a3e0387088b24922d","page_count":1,"file_size":125247,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.15.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.15.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"     Case 3:26-cv-00128-JLS-BJW    Document 15         Filed 03/30/26   PageID.567   Page 1\n                                          of 1\n\n\n 1\n 2\n 3\n 4\n 5\n 6\n 7\n 8                           UNITED STATES DISTRICT COURT\n 9                        SOUTHERN DISTRICT OF CALIFORNIA\n10\n11    IMPERIAL VALLEY COMPUTER                         Case No.: 26-CV-128 JLS (BJW)\n      MANUFACTURING, LLC,\n12\n                                      Plaintiff,       ORDER VACATING HEARING ON\n13                                                     DEFENDANTS\u2019 MOTION TO\n      v.                                               DISMISS THE COMPLAINT AND\n14\n                                                       TAKING MATTER UNDER\n      CITY OF IMPERIAL, et al.,\n15                                                     SUBMISSION\n                                   Defendants.\n16\n                                                       (ECF No. 12)\n17\n18         Presently before the Court is Defendants\u2019 Motion to Dismiss the Complaint (\u201cMot.,\u201d\n19   ECF No. 12).    Pursuant to Civil Local Rule 7.1(d)(1), the Court finds this matter\n20   appropriately decided on the papers without oral argument; accordingly, the Court\n21   VACATES the April 9, 2026, hearing and takes the Motion under submission.\n22         IT IS SO ORDERED.\n23   Dated: March 30, 2026\n24\n25\n26\n27\n28\n\n                                                   1\n                                                                                26-CV-128 JLS (BJW)\n\f","ocr_status":2,"date_upload":"2026-05-20T12:27:50.208822-07:00","document_number":"15","attachment_number":null,"pacer_doc_id":"037022413453","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order","acms_document_guid":""}],"date_created":"2026-03-30T15:22:56.042661-07:00","date_modified":"2026-06-29T18:54:26.675957-07:00","date_filed":"2026-03-30","time_filed":"14:47:09","entry_number":15,"recap_sequence_number":"2026-03-30.001","pacer_sequence_number":54,"description":"ORDER Vacating Hearing on 12 Defendant's Motion to Dismiss the Complaint and Taking Matter Under Submission. Signed by Judge Janis L. Sammartino on 3/30/26.(aas) (Entered: 03/30/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/457371017/","id":457371017,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/472353699/","id":472353699,"tags":[],"absolute_url":"/docket/72127384/14/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-03-16T18:25:31.425572-07:00","date_modified":"2026-06-29T18:54:26.646466-07:00","sha1":"b9a26e6a9381db3f0c0d4aa5f9980a649c488b15","page_count":13,"file_size":954709,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.14.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.14.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"     Case 3:26-cv-00128-JLS-BJW             Document 14        Filed 03/16/26     PageID.554    Page 1\n                                                  of 13\n\n\n 1   Sebastian Rucci (State Bar #178114)\n     LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n 2   16400 Pacific Coast Highway, Suite 212\n     Huntington Beach, CA 92649\n 3   Tel: (562) 901-0199\n     Cell: (330) 720-0398\n 4\n     Fax: (562) 249-6910\n 5   Sebastian@Rucci.Law\n     Attorney for Plaintiff\n 6\n                             UNITED STATES DISTRICT COURT\n 7\n                           SOUTHERN DISTRICT OF CALIFORNIA\n 8\n 9   IMPERIAL VALLEY COMPUTER                         )   Case No: 26CV128 JLS BJW\n     MANUFACTURING, LLC                               )\n10                                                    )   Judge: Hon. Janis L. Sammartino\n                                                      )\n11          Plaintiff                                 )\n                                                      )   PLAINTIFF\u2019S REQUEST FOR\n12   vs.                                                  JUDICIAL NOTICE;\n                                                      )\n13                                                    )   DECLARATION IN SUPPORT\n     CITY OF IMPERIAL, et. al.                        )\n14                                                    )   Date: Thursday, April 9, 2026\n                                                      )\n15          Defendants                                )   Time: 1:30 p.m.\n                                                      )   Courtroom: 4D\n16\n17          Plaintiff respectfully request the Court take judicial notice under Federal Rules of\n18   Evidence, Rule 201, of the Superior Court\u2019s February 27 Order in the case that the City of\n19   Imperial filed against the County, regarding application of CEQA. Defendants sought judicial\n20   notice of the February 10, 2026 minute order, but overlooked the more detailed February 27,\n21   2026 Order which explicitly rejected the City\u2019s position on CEQA. The courts order is\n22   attached to this request.\n23                                           Respectfully submitted,\n24\n                                             LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n25\n26\n27   Date: March 16, 2026                    Sebastian Rucci (SBN 178114)\n                                             Attorney for Plaintiff\n28\n\n\n                        Plaintiff\u2019s Request for Judicial Notice; Declaration in Support        PAGE I\n\f     Case 3:26-cv-00128-JLS-BJW              Document 14         Filed 03/16/26       PageID.555         Page 2\n                                                   of 13\n\n\n 1                               DECLARATION OF SEBASTIAN RUCCI\n 2                       IN SUPPORT OF REQUEST FOR JUDICIAL NOTICE\n 3\n 4           I, Sebastian Rucci, declare as follows:\n 5           1.      I am an attorney in good standing licensed to practice in this court and I am the\n 6   attorney representing the defendant in this action. I have personal knowledge of the matters and facts\n 7   that are stated herein and if called upon to testify to the facts set forth in this declaration, I could and\n 8   would do so competently.\n 9           2.      I am an attorney for the real parties in interest, which include the Plaintiff in this case,\n10   in Imperial Superior Court in Case No. ECU004457, City of Imperial vs. Imperial County, et. al.\n11           3.      Attached is a true and correct copy of the February 27, 2026 Order, by the\n12   Imperial Superior Court, in Case No. ECU004457, which I obtained from the co-defendant\n13   (Imperial County) in that case.\n14\n15           I Sebastian Rucci declare under penalty of perjury under the laws of the United States\n16   and the laws of the State of California that the foregoing is true and correct.\n17\n18\n19   Date: March 16, 2026\n20                                            Sebastian Rucci (SBN 178114)\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                       Plaintiff\u2019s Request for Judicial Notice; Declaration in Support                 PAGE II\n\f     Case 3:26-cv-00128-JLS-BJW           Document 14      Filed 03/16/26      PageID.556    Page 3\n                                                of 13\n\n\n 1                                      CERTIFICATE OF SERVICE\n 2          I hereby certify that on this 16th day of March, 2026, I electronically filed the\n 3   foregoing PLAINTIFF\u2019S REQUEST FOR JUDICIAL NOTICE; DECLARATION IN\n 4   SUPPORT with the Clerk of the Court using the CM/ECF system which will send\n 5   notification to all the parties.\n 6          I Further Certify That on March 16, 2026, the foregoing PLAINTIFF\u2019S REQUEST\n 7   FOR JUDICIAL NOTICE; DECLARATION IN SUPPORT was served electronically served\n 8   on Defendant\u2019s counsel Konrad Rasmussen, at kmr@mmr4law.com from my law office\n 9   email Sebastian@Rucci.Law. The transmission was complete and without error and I did not\n10   receive an electronic notification to the contrary.\n11\n12                                         LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n\n13   Date: March 16, 2026\n14\n                                           Sebastian Rucci (SBN 178114)\n15                                         Attorney for Plaintiffs\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                     Plaintiff\u2019s Request for Judicial Notice; Declaration in Support        PAGE III\n\f     Case 3:26-cv-00128-JLS-BJW   Document 14     Filed 03/16/26   PageID.557    Page 4\n                                        of 13\n\n\n\n 1 MISTELLE I. ABDELMAGIED, SBN 240885\n   Assistant County Counsel\n 2 COUNTY OF IMPERIAL COUNTY COUNSEL\n\n 3 940 West Main Street, Suite 205\n   El Centro, CA 92243\n 4 Telephone: (442) 265-1120\n   Facsimile: (760) 353-9347\n 5 Email: mistelleabdelmagied@co.imperial.ca.us\n\n 6\n   Attorneys for Respondents\n 7 COUNTY OF IMPERIAL and\n   BOARD OF SUPERVISORS OF THE COUNTY OF IMPERIAL\n 8\n   NATHAN O. GEORGE, SBN 303707\n 9 SARA K. HELMS, SBN 356868\n                                                  EXEMPT FROM FILING FEES\n   REMY MOOSE MANLEY, LLP\n10                                                [GOVERNMENT CODE \u00a7 6103]\n   555 Capitol Mall, Suite 800\n11 Sacramento, CA 95814\n   Telephone: (916) 443-2745\n12 Facsimile: (916) 443-9017\n   Email: ngeorge@rmmenvirolaw.com\n13         shelms@rmmenvirolaw.com\n14\n   Attorneys for Respondents\n15 COUNTY OF IMPERIAL and\n   BOARD OF SUPERVISORS OF THE COUNTY OF IMPERIAL\n16\n                         SUPERIOR COURT OF THE STATE OF CALIFORNIA\n17\n                               IN AND FOR THE COUNTY OF IMPERIAL\n18\n    CITY OF IMPERIAL, a general law city        Case No.: ECU004457\n19\n                   Petitioner and Plaintiff,\n20\n           v.                                   [PROPOSED] ORDER GRANTING MOTION\n21 COUNTY OF IMPERIAL, a general law county, FOR JUDGMENT ON THE PLEADINGS\n    IMPERIAL COUNTY BOARD OF                    WITH LEAVE TO AMEND\n22 SUPERVISORS; and\n    DOES 1 through 20, inclusive,\n23                                              [CEQA, Pub. Res. Code \u00a7 21000, et seq.; Code\n                   Respondents and Defendants,\n24                                              of Civil Procedure \u00a7\u00a7 1094.5, 1085]\n    IMPERIAL VALLEY COMPUTER\n25 MANUFACTURING, LLC, a California             ASSIGNED FOR ALL PURPOSES:\n    Limited Liability Company; DUBOSE           Hon. L. Brooks Anderholt\n26 DESIGN GROUP, INC., a California             Dept. 09\n    General Stock Corporation; JESUS\n27 BARRIGA, an individual; ROBERTO              Date Filed: December 4, 2025\n    BARRIGA, an individual; ATEN\n28  PROPERTIES,     LLC,  a California Limited  Hearing Date:\n\n           [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE PLEADINGS\n                                WITH LEAVE TO AMEND\n\f     Case 3:26-cv-00128-JLS-BJW         Document 14   Filed 03/16/26   PageID.558   Page 5\n                                              of 13\n\n\n      Liability Company; HERMENEGILDA\n 1    LEIMGRUBER, AS TRUSTEE OF THE\n      MAX AND HERMENEGILDA\n 2    LEIMGRUBER LIVING TRUST\n      SURVIVOR\u2019S TRUST, U/A DATED\n 3    AUGUST 14, 2024; DARYL\n      DICKERSON AND HEATHER\n 4    DICKERSON, AS TRUSTEES OF THE\n      DARYL AND HEATHER DICKERSON\n 5    FAMILY TRUST UNDER\n      DECLARATION OF TRUST DATED\n 6    APRIL 21, 2009; JAMES A. SANDERS\n      JR., AND STEPHANIE A. SANDERS AS\n 7    TRUSTEES OF THE JAMES A. AND\n      STEPHANIE A. SANDERS FAMILY\n 8    TRUST DATED JULY 27, 2009; RYAN\n      DICKERSON, an individual; and, ROES 1\n 9    to 20, inclusive,\n10           Real Parties in Interest\n11\n\n12\n\n13\n\n14\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n\n27\n\n28\n                                                2\n           [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE PLEADINGS\n                                WITH LEAVE TO AMEND\n\f     Case 3:26-cv-00128-JLS-BJW           Document 14        Filed 03/16/26      PageID.559       Page 6\n                                                of 13\n\n\n\n 1          On February 10, 2026, the Honorable L. Brooks Anderholt in Department 9 of the Imperial\n\n 2 County Superior Court held a hearing on the Joint Motion for Judgment on the Pleadings (\u201cMJOP\u201d)\n\n 3 filed by Respondents County of Imperial and Board of Supervisors of the County of Imperial\n\n 4 (\u201cCounty\u201d) and Real Parties in Interest Imperial Valley Computer Manufacturing, LLC et al. (\u201cReal\n\n 5 Parties\u201d) challenging the First Amended Verified Petition for Writ of Mandate and Complaint for\n\n 6 Injunctive Relief (\u201cAmended Petition\u201d) filed by Petitioner City of Imperial (\u201cPetitioner\u201d). Nathan\n\n 7 George appeared as counsel for the County; Sebastian Rucci appeared as counsel for Real Parties; and\n\n 8 Alene Taber appeared as counsel for Petitioner.\n\n 9          The Amended Petition alleges three causes of action. First, a cause of action under the state\n\n10 Planning and Zoning Law (Gov. Code, \u00a7 65000 et seq.), alleging that the County\u2019s approval of a grading\n\n11 permit for Real Parties\u2019 proposed Data Center Campus project (\u201cProject\u201d) did not comply with state law\n\n12 and the County\u2019s municipal code. Second, a cause of action under the California Environmental Quality\n\n13 Act (Pub. Resources Code, \u00a7 21000 et seq.) (\u201cCEQA\u201d) alleging that the County\u2019s determination that the\n\n14 Project is statutorily exempt from CEQA review was an abuse of discretion. Third, a derivative request\n\n15 for injunctive relief based on the allegations in the first and second causes of action.\n\n16          The MJOP challenged the Amended Petition on the grounds that, even assuming the truth of all\n\n17 well-plead factual allegations, the Amended Petition failed to state facts sufficient to constitute a cause\n\n18 of action and was therefore subject to judgment in the County and Real Parties\u2019 favor as a matter of law.\n\n19 Specifically, the MJOP argued that the first cause of action failed because the Project is a \u201cby-rights\u201d\n\n20 permissible use on industrial land under the County Code and no discretionary approvals are required by\n\n21 state law or the County Code prior to issuing a grading permit. Similarly, the MJOP argued that the\n\n22 second cause of action failed because the Project is a \u201cby-rights\u201d permissible use on industrial land\n\n23 under the County Code and no discretionary approvals were required so the County\u2019s determination that\n\n24 the Project is statutorily exempt from CEQA review as ministerial was correct as a matter of law. Lastly,\n\n25 because the third cause of action was derivative of the first two, it cannot state a cause of action on its\n\n26 own. Petitioner opposed the MJOP, arguing that the Amended Petition stated causes of action under the\n\n27 state Planning and Zoning Law and CEQA because the Project includes elements that are not \u201cby-\n\n28\n                                            3\n             [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE PLEADINGS\n                                  WITH LEAVE TO AMEND\n\f     Case 3:26-cv-00128-JLS-BJW           Document 14        Filed 03/16/26      PageID.560       Page 7\n                                                of 13\n\n\n\n 1 rights\u201d permissible uses under the County Code and required additional discretionary approvals by the\n\n 2 County, under state law and/or the County Code. Petitioner\u2019s opposition also argued that the County\u2019s\n\n 3 notice of exemption constituted impermissible piecemealing of the Project.\n\n 4          The parties also submitted requests for judicial notice of various provisions of the County\u2019s\n\n 5 Municipal Code and a letter issued by the County to Real Parties on September 4, 2025 (\u201cDetermination\n\n 6 Letter\u201d), regarding the Project. Petitioner challenged the suitability of taking judicial notice of the\n\n 7 Determination Letter and filed evidentiary objections, to which the County and Real Parties responded.\n\n 8          The court took judicial notice of the County ordinances cited in the Amended Petition and as\n\n 9 requested by the Parties. The court noted the objection from Petitioner to the County and Real Party\u2019s\n\n10 request that the court take judicial notice of a County letter dated 09/04/2025. The court overruled\n\n11 Petitioner\u2019s objection, and took judicial notice of the letter, but not the findings.\n\n12          After considering the briefing and supporting documents submitted by the parties, as well as the\n\n13 arguments and responses provided by counsel at the hearing, the court: (1) granted the MJOP with leave\n\n14 to amend as to the first cause of action as it fails to state a cause of action regarding zoning and planning\n\n15 violations as there is a lack of ultimate facts; (2) granted with leave to amend as to the second cause of\n\n16 action as it contains the same deficiencies as the first cause of action; and, (3) determined the third cause\n\n17 of action is derivative of the first two and is moot pending any amendment. (See Exhibit A.) Amended\n\n18 pleadings are to be filed and served by Petitioner by March 13, 2026.\n\n19          The court directed the County to prepare an order consistent with the court\u2019s decision.\n\n20 / / /\n\n21 / / /\n\n22 / / /\n\n23 / / /\n\n24 / / /\n\n25 / / /\n\n26 / / /\n\n27 / / /\n\n28\n                                            4\n             [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE PLEADINGS\n                                  WITH LEAVE TO AMEND\n\f     Case 3:26-cv-00128-JLS-BJW         Document 14       Filed 03/16/26     PageID.561       Page 8\n                                              of 13\n\n\n\n 1         IT IS HEREBY ORDERED, ADJUDGED, and DECREED THAT:\n\n 2      1. The Motion for Judgment on the Pleadings filed by Respondents and Real Parties in Interest is\n\n 3 granted as to the first and second causes of action in the Amended Petition, with leave to amend.\n\n 4      2. The third cause of action is derivative and therefore MOOT pending amendment of the first and\n\n 5 second causes of action.\n\n 6      3. Amended pleadings are to be filed and served by Petitioner by March 13, 2026.\n\n 7\n\n 8 Dated: ___________________________, 2026\n                                02/27/2026              By:__________________________________\n                                                              The Hon. L. Brooks Anderholt\n 9                                                            Judge of the Superior Court\n10\n\n11\n\n12\n\n13\n\n14\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n\n27\n\n28\n                                           5\n            [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE PLEADINGS\n                                 WITH LEAVE TO AMEND\n\fCase 3:26-cv-00128-JLS-BJW   Document 14   Filed 03/16/26   PageID.562   Page 9\n                                   of 13\n\n\n\n\n                             EXHIBIT\n                             EXHIBIT A\n                                     A\n   Minutes:\n   Minutes: Motion\n            Motion Hearing\n                    Hearing Judgment\n                            Judgment on\n                                     on\n                 Pleadings\n                 Pleadings\n\n\n\n\n                                     6\n\f   Case 3:26-cv-00128-JLS-BJW                Document 14 Filed 03/16/26                PageID.563      Page 10\n                                                    of 13\n\n\n                                       SUPERIOR COURT OF CALIFORNIA\n                                            COUNTY OF IMPERIAL\n\n                                                   Jud. Officer:   L. Anderholt\nCity of Imperial                                   Clerk:          Alexandra Esparza\n         Plaintiff/Petitioner,                     Bailiff:        Rubio\nvs.                                                CSR:            Not Reported\nCounty of Imperial et al\n         Defendant/Respondent.\n\n\n\n\n                                                   Interpreter:    Not Required\n                                                   Language:\n\nMinutes: Motion Hearing                            Case No.        ECU004457\n         Judgment on Pleadings Filed 1-14-                         El Centro Dept. 9\n              2026\n\nDate:      February 10, 2026                       Related Cases:\n\n        8:45 A.M., Matter is called on calendar.\n\n        Attorney, Alene Taber, is present on behalf of the Plaintiff, City of Imperial. Attorney, Nathan George, is\n        present on behalf of the Defendant, County of Imperial. Attorney, Sebastian Rucci, is present on behalf\n        of the Real Parties in Interest. No other appearances are noted.\n\n        The Court discloses it is familiar with a party to this case; however, it is not sufficient to warrant\n        disqualification.\n\n        The Court notes there are a number of people in the gallery that include parties to the case and\n        spectators.\n\n        The Court states there are county ordinances referenced by the City of Imperial that weren\u2019t attached to\n        the petition or opposition, but the Court did research the ordinances and inquires if counsel objects to\n        the Court referencing and taking judicial notice of said ordinances.\n\n        There is no objection from counsel.\n\n        The Court notes the objection from the City of Imperial to the letter dated 09/04/2025 and overrules the\n        objection, and will take judicial notice of the letter, but not the findings.\n\n        The Court states the petition contains 3 causes of action and addresses them.\n\n        Matter is further discussed regarding county ordinances as to noticing the public.\n\n        Matter is further discussed.\n\n\n\n\n                                                          Page 1 of 2\n\n                                                              7\n\fCase 3:26-cv-00128-JLS-BJW           Document 14 Filed 03/16/26             PageID.564       Page 11\n                                            of 13\n\n\n The Court finds a lack of ultimate facts in several of the allegations or paragraphs with only opinion on\n belief, including but not limited to, paragraphs 29, 75, 83. Other paragraphs are vague such as\n paragraphs 49, 63, 72, 73, 74, 76, and 79.\n\n The Court states, after having gone through various paragraphs, its tentative is as follows:\n\n Grant the motion with leave to amend as to the 1st cause of action as it fails to state action regarding\n zoning and planning violations as there is a lack of ultimate facts.\n\n Grant with leave to amend as to the 2nd cause of action as it contains same deficiencies as the 1st\n cause of action.\n\n The 3rd cause of action is derivative of the first two and is moot pending any amendment.\n\n Mr. George and Mr. Rucci state they submit as to the Court\u2019s tentative and further address the matter.\n\n Ms. Taber addresses the Court\u2019s tentative.\n\n IT IS THE ORDER OF THE COURT:\n\n The Court adopts its tentative.\n\n Amended pleadings are to be filed and served by 03/13/2026 by Ms. Taber.\n\n Mr. George is to prepare and submit the order for the Court\u2019s signature.\n\n Counsel waives notice.\n\n Mr. George further states the administrative record is being prepared and will be ready by 03/10/2026.\n\n IT IS FURTHER ORDER OF THE COURT:\n\n Case Management Conference currently set for 06/02/2026 is vacated and advanced to\n 03/19/2026 at 8:30 A.M., in Department 9.\n\n\n\n\n                                                 Page 2 of 2\n ECU004457, February 10, 2026                     8\n\f     Case 3:26-cv-00128-JLS-BJW         Document 14 Filed 03/16/26             PageID.565       Page 12\n                                               of 13\n\n\n 1 City of Imperial v. County of Imperial, et al.\n   Imperial County Superior Court Case No.: ECU004457\n 2\n\n 3                                           PROOF OF SERVICE\n 4\n           I, Kendra E. Ledoux, am employed in the County of Sacramento. My business address is 555\n 5 Capitol Mall, Suite 800, Sacramento, California 95814 and my email address is\n   kledoux@rmmenvirolaw.com. I am over the age of 18 years and I am not a party to the above-entitled\n 6 action.\n\n 7          On February 24, 2026, I served the following:\n 8\n            [PROPOSED] ORDER GRANTING MOTION FOR JUDGMENT ON THE\n 9                      PLEADINGS WITH LEAVE TO AMEND\n10          VIA ELECTRONIC TRANSMISSION OR EMAIL by causing a true copy thereof to be\n11          electronically delivered to the following person(s) or representative(s) at the email address(es)\n            listed below. I did not receive any electronic message or other indication that the transmission\n12          was unsuccessful.\n\n13          VIA OVERNIGHT DELIVERY by causing a true copy thereof to be placed in an envelope\n            or package designated by the express service carrier with delivery fees paid or provided for,\n14          addressed to the person(s) or representative(s) as listed below, and deposited in a dropbox or\n15          other facility regularly maintained by the express service carrier.\n\n16          VIA FIRST CLASS MAIL by causing a true copy thereof to be placed in a sealed envelope,\n            with postage fully prepaid, addressed to the following person(s) or representative(s) as listed\n17          below, and placed for collection and mailing following ordinary business practices.\n18          VIA PERSONAL SERVICE by causing a true copy thereof to be hand-delivered to the\n19          following person(s) or representative(s) at the address(es) listed below.\n\n20\n                                      SEE ATTACHED SERVICE LIST\n21\n\n22\n          I declare under penalty of perjury that the foregoing is true and correct. Executed this 24th day\n23 of February 2026, at Sacramento, California.\n\n24\n\n25\n                                                          Kendra E. Ledoux\n26\n\n27\n\n28\n\n\n                                              PROOF OF SERVICE\n\f     Case 3:26-cv-00128-JLS-BJW      Document 14 Filed 03/16/26          PageID.566     Page 13\n                                            of 13\n\n\n 1 City of Imperial v. County of Imperial, et al.\n   Imperial County Superior Court Case No.: ECU004289\n 2\n\n 3                                         SERVICE LIST\n 4\n\n 5      Alene M. Taber                                  Attorneys for Petitioner\n        ALENE TABER LAW, APC                            CITY OF IMPERIAL\n 6      1820 West Orangewood, Suite 105\n        Orange, CA 92868                                VIA E-Service and Mail\n 7\n        Telephone: (949) 678-8464\n 8      E-mail: alene@alenetaberlaw.com\n\n 9\n        Sebastian Rucci                                 Attorneys for Real Parties and Defendants\n10      LAW OFFICE OF SEBASTIAN RUCCI, P.C.             IMPERIAL VALLEY COMPUTER\n        16400 Pacific Coast Highway, Suite 212          MANUFACTURING, LLC\n11\n        Huntington Beach, CA 92649\n12      Telephone: (562) 901-0199                       VIA E-Service and Mail\n        Fax: (562) 249-6910\n13      Email: Sebastian@RucciLaw.com\n14\n\n15\n\n16\n\n17\n\n18\n\n19\n\n20\n\n21\n\n22\n\n23\n\n24\n\n25\n\n26\n\n27\n\n28\n\n\n                                          PROOF OF SERVICE\n\f","ocr_status":1,"date_upload":"2026-05-20T12:30:31.020832-07:00","document_number":"14","attachment_number":null,"pacer_doc_id":"037022356468","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Request for Judicial Notice","acms_document_guid":""}],"date_created":"2026-03-16T18:25:31.381293-07:00","date_modified":"2026-06-29T18:54:26.621337-07:00","date_filed":"2026-03-16","time_filed":"17:29:17","entry_number":14,"recap_sequence_number":"2026-03-16.002","pacer_sequence_number":52,"description":"REQUEST FOR JUDICIAL NOTICE by Imperial Valley Computer Manufacturing, LLC in Support of Opposition to Motion to Dismiss (Rucci, Sebastian) (aas). (Entered: 03/16/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/457363920/","id":457363920,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/472346351/","id":472346351,"tags":[],"absolute_url":"/docket/72127384/13/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-03-16T16:24:07.310081-07:00","date_modified":"2026-06-29T18:54:26.584434-07:00","sha1":"21ef759c3c8d4309c44894c9e768f7ae6abeb318","page_count":29,"file_size":268936,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.13.0.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.13.0.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"     Case 3:26-cv-00128-JLS-BJW                  Document 13             Filed 03/16/26            PageID.525            Page 1\n                                                       of 29\n\n\n 1   Sebastian Rucci (State Bar #178114)\n     LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n 2   16400 Pacific Coast Highway, Suite 212\n     Huntington Beach, CA 92649\n 3   Tel: (562) 901-0199\n     Cell: (330) 720-0398\n 4\n     Fax: (562) 249-6910\n 5   Sebastian@Rucci.Law\n     Attorney for Plaintiff\n 6\n                              UNITED STATES DISTRICT COURT\n 7\n                            SOUTHERN DISTRICT OF CALIFORNIA\n 8\n 9   IMPERIAL VALLEY COMPUTER                                 )   Case No: 26CV128 JLS BJW\n     MANUFACTURING, LLC                                       )\n10                                                            )   Judge: Hon. Janis L. Sammartino\n                                                              )\n11         Plaintiff                                          )\n                                                              )   PLAINTIFF\u2019S OPPOSITION TO\n12   vs.                                                          DEFENDANTS\u2019 MOTION TO DISMISS\n                                                              )\n13                                                            )\n     CITY OF IMPERIAL, et. al.                                )   Date: Thursday, April 9, 2026\n14                                                            )   Time: 1:30 p.m.\n                                                              )\n15         Defendants                                         )   Courtroom: 4D\n                                                              )\n16\n17                                              TABLE OF CONTENTS\n18   1.    SUMMARY OF ARGUMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1\n\n19   2.    LEGAL STANDARD FOR MOTION TO DISMISS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n           2.1       Factual Allegations as Accepted as True . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n20\n           2.2       Twombly and Iqbal Plausibility Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n21\n     3.    LEGAL STANDARD GOVERNING CEQA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3\n22\n           3.1       Legal Standards Governing Ministerial Projects . . . . . . . . . . . . . . . . . . . . . . . . . . 3\n23\n           3.2       Legal Standards Governing CEQA Review Framework . . . . . . . . . . . . . . . . . . . . 4\n24         3.3       Data Center is \u201cBy-Right\u201d Permissible Use and Statutorily Exempt from CEQA\n25                   (Superior Court Order Feb. 27, 2026). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5\n26   4.    COUNT 1: THE COMPLAINT PLAUSIBLY ALLEGES PROCEDURAL DUE\n\n27         PROCESS VIOLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6\n\n28         4.1       Site Plan Review Is Ministerial and Limited to Design Compliance . . . . . . . . . . . 6\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                                      PAGE I\n\f     Case 3:26-cv-00128-JLS-BJW                    Document 13              Filed 03/16/26             PageID.526              Page 2\n                                                         of 29\n\n\n 1         4.2       The Self-Executing 15-Day Deemed Approval Provisions Creates Vested Rights 7\n 2         4.3       Plaintiff Had a Protected Property Interest in the Deemed-Approved Site Plans. . 8\n\n 3         4.4       The City Arbitrarily Refused to Use Its Own Similarity-of-Use Procedure . . . . . . 9\n           4.5       Complaint Alleges the Data Center Was Similar to Existing Permitted Uses . . . 10\n 4\n           4.6       Defendants Deprived Plaintiff of a Property Interest Without Adequate Process 10\n 5\n           4.7       Exhaustion Is Not Required for a \u00a7 1983 Procedural Due Process Claims . . . . . 11\n 6\n     5.    COUNT 2: THE COMPLAINT PLAUSIBLY ALLEGES FIRST AMENDMENT\n 7\n           RETALIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11\n 8         5.1       Plaintiff Engaged in Protected Activity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12\n 9         5.2       Defendants and Imperial Irrigation District\u2019s Coordinated Campaign of\n10                   Obstruction and Misinformation Constituted Adverse Action. . . . . . . . . . . . . . . 13\n\n11         5.3       The Complaint Also Plausibly Alleges Coordination With CEQA \u201cGreenmail\u201d\n\n12                   Operatives as Part of the Retaliatory Scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14\n           5.4       Noerr-Pennington Does Not Bar the Claim Because the Complaint Plausibly\n13\n                     Alleges Sham Litigation.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15\n14\n           5.5       The Complaint Plausibly Alleges Causation and Chilling Effect. . . . . . . . . . . . . 16\n15\n     6.    COUNT 3: THE COMPLAINT PLAUSIBLY ALLEGES A CLASS-OF-ONE EQUAL\n16\n           PROTECTION VIOLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16\n17         6.1       The Complaint Identifies Similarly Situated Comparators. . . . . . . . . . . . . . . . . . 17\n18         6.2       The Complaint Plausibly Alleges Intentional Differential Treatment. . . . . . . . . . 18\n19         6.3       Defendants\u2019 Purported Rational Bases Are Plausibly Pretextual. . . . . . . . . . . . . 18\n\n20         6.4       Complaint Alleges Data Center Was Singled Out for Burdensome Treatment . . 19\n\n21         6.5       The Complaint Plausibly Alleges No Rational Basis. . . . . . . . . . . . . . . . . . . . . . 19\n     7.    COUNT 4: THE COMPLAINT PLAUSIBLY ALLEGES MUNICIPAL LIABILITY\n22\n           UNDER MONELL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20\n23\n     8.    QUALIFIED IMMUNITY DOES NOT APPLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22\n24\n           8.1       The Complaint Plausibly Alleges Multiple Constitutional Violations. . . . . . . . . 22\n25         8.2       The Rights at Issue Were Clearly Established. . . . . . . . . . . . . . . . . . . . . . . . . . . . 22\n26         8.3       Defendants\u2019 Individual Arguments Do Not Support Immunity.. . . . . . . . . . . . . . 23\n27   8.4   Reclaimed Water Interference Further Supports Plaintiff\u2019s Constitutional Claims . . . . . 24\n28   9.    CONCLUSION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24\n\n\n                           PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                                          PAGE II\n\f     Case 3:26-cv-00128-JLS-BJW                       Document 13             Filed 03/16/26             PageID.527            Page 3\n                                                            of 29\n\n\n 1                                                 TABLE OF AUTHORITIES\n 2   CASES\n 3   Arizona Students\u2019 Ass\u2019n v. Arizona Board of Regents, 824 F.3d 858 (9th Cir. 2016) . . . . . . 14, 16\n 4   Ashcroft v. Iqbal, 556 U.S. 662 (2009) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n 5   Ashcroft v. Iqbal, 556 U.S. 662 (2009) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n 6   Bell Atlantic Corp. v. Twombly, 550 U.S. 544 (2007) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n 7   Bell Atlantic Corp. v. Twombly, 550 U.S. 544 (2007) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n 8   Board of Regents v. Roth, 408 U.S. 564 (1972) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6, 8\n 9   Boquist v. Courtney, 32 F.4th 764 (9th Cir. 2022) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22, 23\n10   Brosterhous v. State Bar, 12 Cal.4th 315 (1995) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11\n11   City of Monterey v. Del Monte Dunes at Monterey, Ltd., 526 U.S. 687 (1999) . . . . . . . . . . . 17, 19\n12   Clark v. City of Hermosa Beach, 48 Cal.App.4th 1152 (1996) . . . . . . . . . . . . . . . . . . . . . . . . . . . 6\n13   Crawford-El v. Britton, 523 U.S. 574 (1998) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13\n14   Del Monte Dunes at Monterey v. City of Monterey, 920 F.2d 1496 (9th Cir. 1990) . . . . . 6, 17, 19\n15   E. Rail. Presidents Conf. v. Noerr Motor Freight, Inc., 365 U.S. 127 (1961) . . . . . . . . . . . . . . . 15\n16   Endy v. County of Los Angeles, 975 F.3d 757 (9th Cir. 2020) . . . . . . . . . . . . . . . . . . . . . . . . . . . 21\n17   Felder v. Casey, 487 U.S. 131 (1988). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11\n18   Fuentes v. Shevin, 407 U.S. 67 (1972) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11\n19   Gerhart v. Lake County, Mont., 637 F.3d 1013 (9th Cir. 2011) . . . . . . . . . . . . . . . . . . . . . . . 17, 19\n20   Groten v. California, 251 F.3d 844 (9th Cir. 2001) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6\n21   Harlow v. Fitzgerald, 457 U.S. 800 (1982) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22\n22   Health First v. March Joint Powers Authority, 174 Cal. App. 4th 1135 (2009) . . . . . . . . . . . . . . 3\n23   Hope v. Pelzer, 536 U.S. 730 (2002) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22\n24   Horn v. County of Ventura, 24 Cal.3d 605 (1979) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22, 23\n25   Kearney v. Foley & Lardner, LLP, 590 F.3d 638 (9th Cir. 2009) . . . . . . . . . . . . . . . . . . . . . . . . 15\n26   Las Lomas Land Co., LLC v. City of Los Angeles, 177 Cal.App.4th 837 (2009). . . . . . . . . . . 8, 24\n27   Mahon v. Cnty. of San Mateo, 139 Cal.App.4th 812 (2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8\n28   McCann v. City San Diego, 70 Cal. App. 5th 51 (2021) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4\n\n\n                              PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                                        PAGE III\n\f     Case 3:26-cv-00128-JLS-BJW                      Document 13             Filed 03/16/26            PageID.528            Page 4\n                                                           of 29\n\n\n 1   McCorkle E. Neig. Group v. City of St. Helena, 31 Cal.App.5th 80 (2018) . . . . . . . . . . . . . . . . . 3\n 2   Monell v. Dep\u2019t of Soc. Servs., 436 U.S. 658 (1978) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20, 21, 24\n 3   Nieves v. Bartlett, 587 U.S. 391 (2019) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12\n 4   Pearson v. Callahan, 555 U.S. 223 (2009). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22\n 5   Portman v. Cnty. of Santa Clara, 995 F.2d 898 (9th Cir. 1993). . . . . . . . . . . . . . . . . . . . . . . . . . . 6\n 6   Preserve Poway v. City of Poway, 245 Cal.App.4th 560 (2016) . . . . . . . . . . . . . . . . . . . . . . . . . . 4\n 7   Prof. Real Estate Investors v. Columbia Pict. Ind. Inc., 508 U.S. 49 (1993) . . . . . . . . . . . . . . . . 15\n 8   Prot. Our Water & Envtl. Res. v. Cnty. of Stanislaus (2020) 10 Cal. 5th 479 . . . . . . . . . . . . . . 3, 9\n 9   Prot. Our Water & Envtl. Res. v. County of Stanislaus, 10 Cal. 5th 479 (2020) . . . . . . . . . . . . . . 3\n10   Riley\u2019s Am. Heritage Farms v. Elsasser, 32 F.4th 707 (9th Cir. 2022) . . . . . . . . . . . . . . . . . 14, 16\n11   Sabra v. Maricopa Cnty. Cmty. Coll. Dist., 44 F.4th 867 (9th Cir. 2022) . . . . . . . . . . . . . . . . . . 20\n12   Starr v. Baca, 652 F.3d 1202 (9th Cir. 2011) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n13   Starr v. Baca, 652 F.3d 1202 (9th Cir. 2011) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n14   Stockton Citiz. for S. Pl. v. City of Stockton, 48 Cal.4th 481 (2010) . . . . . . . . . . . . . . . . . . . . . . . 3\n15   Swierkiewicz v. Sorema, 534 U.S. 506 (2002) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2\n16   Union of Med. Marij. Pat. v. City of San Diego, 7 Cal. 5th 1171 (2019) . . . . . . . . . . . . . . 4, 12, 23\n17   Village of Willowbrook v. Olech, 528 U.S. 562 (2000) . . . . . . . . . . . . . . . . . . . . . . . 16, 17, 22, 23\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                              PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                                      PAGE IV\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13         Filed 03/16/26       PageID.529       Page 5\n                                                  of 29\n\n\n 1        MEMORANDUM IN OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS\n 2   1.      SUMMARY OF ARGUMENT\n 3           The Complaint plausibly alleges that City officials ignored mandatory ministerial approval\n 4   provisions, retaliated against protected petitioning activity, intentionally singled out Plaintiff for\n 5   irrational treatment, and ratified that conduct at the highest levels of municipal government.\n 6           FIRST, the Complaint plausibly alleges a procedural due process violation. The City\u2019s\n 7   Municipal Code requires ministerial site plan review and provides that applications are deemed\n 8   approved if the City fails to act within fifteen days. Multiple site plan applications were deemed\n 9   approved by operation of law. Defendants instead forced the project into discretionary review,\n10   arbitrarily disregarding vested land-use approvals.\n11           SECOND, the Complaint plausibly alleges First Amendment retaliation. Plaintiff engaged\n12   in protected activity by insisting on lawful ministerial processing, petitioning Imperial County for\n13   approvals, speaking publicly about the project, and threatening litigation. Defendants responded with\n14   a coordinated campaign of obstruction--including regulatory delays, misinformation, interference\n15   with utilities, and litigation--intended to punish Plaintiff for asserting its legal rights.\n16           THIRD, the Complaint plausibly alleges a class-of-one equal protection violation. The\n17   Complaint alleges that industrial users in the same zoning district routinely receive ministerial\n18   processing, while Defendants singled out Plaintiff\u2019s project for uniquely burdensome discretionary\n19   review without a rational basis. Such disparate treatment states a classic \u201cclass-of-one\u201d claim.\n20           FOURTH, the Complaint plausibly alleges municipal liability under Monell. Senior City\n21   officials--including the Planning Director, City Manager, City Attorney and City Council--directed,\n22   participated in, and ratified the actions at issue, including filing litigation designed to delay and\n23   undermine the project. Ratification by final policymakers is sufficient to establish municipal liability.\n24           Defendants\u2019 remaining defenses fail as a matter of law at the pleading stage. Qualified\n25   immunity does not apply because the rights at issue have long been clearly established. Noerr\n26   -Pennington immunity does not bar Plaintiff\u2019s claims because the Complaint plausibly alleges that\n27   Defendants\u2019 litigation against the County was objectively baseless and filed for retaliatory and\n28   obstructive purposes to delay and undermine the project. Defendants\u2019 motion should be denied.\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 1\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13         Filed 03/16/26      PageID.530           Page 6\n                                                 of 29\n\n\n 1   2.     LEGAL STANDARD FOR MOTION TO DISMISS.\n 2          The Supreme Court articulated the proper framework for a Rule 12(b)(6) motion in Bell\n 3   Atlantic Corp. v. Twombly, 550 U.S. 544 (2007) and Ashcroft v. Iqbal, 556 U.S. 662 (2009).\n 4   2.1    Factual Allegations as Accepted as True.\n 5          In evaluating the allegations under Rule 12(b)(6) the court does not consider whether the\n 6   factual allegations are probably true; instead the court must proceed \u201con the assumption that all the\n 7   allegations in the complaint are true (even if doubtful in fact).\u201d Twombly, 550 U.S. at 555. The\n 8   \u201cwell-pleaded complaint may proceed even if it strikes a savvy judge that actual proof is\n 9   improbable.\u201d Twombly, 550 U.S. at 556. \u201cIndeed it may appear on the face of the pleadings that a\n10   recovery is very remote and unlikely but that is not the test.\u201d Swierkiewicz v. Sorema, 534 U.S. 506,\n11   515 (2002). If a reasonable person can figure out from the face of the complaint why they are being\n12   sued, and based on what occurrences or transactions, there is no basis for dismissal.\n13   2.2    Twombly and Iqbal Plausibility Standard.\n14          The court must \u201cassume\u201d the \u201cveracity\u201d of \u201cwell pleaded factual allegations\u201d and \u201cdetermine\n15   whether they plausibly give rise to an entitlement to relief.\u201d Iqbal, 556 U.S. at 679. \u201cPlausibility,\u201d\n16   as used in Twombly and Iqbal, refers to whether the factual allegations \u201callow[] the court to draw\n17   the reasonable inference that the defendant is liable for the misconduct alleged.\u201d Id. at 678. A claim\n18   has \u201cfacial plausibility\u201d when the facts \u201callow[] the court to draw the reasonable inference that\n19   [Defendant] is liable for the misconduct alleged.\u201d Id. at 678. The Ninth Circuit explained Twombly\n20   and Iqbal\u2019s plausibility standard in Starr v. Baca, 652 F.3d 1202, 216 (9th Cir. 2011) as follows:\n21          \u201cIf there are two alternative explanations, one advanced by defendant and the other\n            advanced by plaintiff, both of which are plausible, plaintiff\u2019s complaint survives a\n22\n            motion to dismiss under Rule 12(b)(6). Plaintiff\u2019s complaint may be dismissed only\n23          when defendant\u2019s plausible alternative explanation is so convincing that plaintiff\u2019s\n            explanation is implausible.\u201d\n24\n25          Iqbal and Twombly require the court to weigh non-conclusory factual allegations to see if\n\n26   they are sufficient to \u201cnudge the claims across the line from conceivable to plausible.\u201d Twombly, 550\n\n27   U.S. at 570. Ultimately, a court may not dismiss a complaint in which the plaintiff has alleged\n\n28   \u201cenough facts to state a claim to relief that is plausible on its face.\u201d Iqbal, 556 U.S. at 697.\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 2\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13         Filed 03/16/26      PageID.531         Page 7\n                                                 of 29\n\n\n 1   3.     LEGAL STANDARD GOVERNING CEQA\n 2   3.1    Legal Standards Governing Ministerial Projects\n 3          Ministerial decisions involve little or no personal judgment and require only a determination\n 4   of conformity with fixed standards (14 Cal. Code Regs. \u00a7\u00a7 15357, 15369). Where a project is\n 5   permitted by right in a zoning district and the City is merely verifying compliance with objective\n 6   development standards -- like the Site Plan Review under \u00a7 24.19.500 -- the action is ministerial.\n 7          Ministerial projects are projects whose approval does not require an agency to exercise\n 8   discretion. The California Supreme Court clarified in Prot. Our Water & Envtl. Res. v. County of\n 9   Stanislaus, 10 Cal. 5th 479, 493-94 (2020), that not all discretion will trigger CEQA; only discretion\n10   that allows the agency to address environmental effects triggers CEQA review:\n11          \u201cThe statutory distinction between discretionary and purely ministerial projects\n            implicitly recognizes that unless a public agency [is authorized to] shape the project\n12\n            in a way that would respond to concerns raised in an EIR, or its functional equivalent,\n13          environmental review would be a meaningless exercise. . . [E]ven if a statute grants\n            an agency some discretionary authority over an aspect of a project, the project is\n14          ministerial for CEQA purposes if the agency lacks authority to address\n15          environmental impacts.\u201d\n\n16\n            For example, in McCorkle E. Neig. Group v. City of St. Helena, 31 Cal.App.5th 80, 94 (2018)\n17\n     the power to conduct an aesthetic design review did not make a project discretionary because the\n18\n     agency \u201clack[ed]\u2026any discretion to address environmental effects.\u201d\n19\n            Many cases confirm if a project aligns with permitted uses I can proceed with a ministerial\n20\n     exemptions from CEQA. See Health First v. March Joint Powers Authority, 174 Cal. App. 4th 1135\n21\n     (2009) (1,925,000 sq ft distribution center in industrial zone \u201cexempt as a ministerial\u201d because it\n22\n     complied with design guidelines); Stockton Citiz. for S. Pl. v. City of Stockton, 48 Cal.4th 481 (2010)\n23\n     (Wal-Mart supercenter held ministerial in conformity with objective criteria).\n24\n            Consistent with these authorities, Plaintiff provided the City on June 6, 2025 with a 33-page\n25\n     memorandum documenting 25 data centers in California and other states that were approved\n26\n     ministerially (\u201cas of right\u201d) due to their location on industrial land. (Compl. \u00b6 47; Compl. Ex. 11;\n27\n     ECF No. 1-12.) Where a data center is a permitted use as of right in an industrial zone and complies\n28\n     with applicable site plan standards, its approval is ministerial and exempt from CEQA.\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 3\n\f     Case 3:26-cv-00128-JLS-BJW           Document 13         Filed 03/16/26      PageID.532         Page 8\n                                                of 29\n\n\n 1   3.2    Legal Standards Governing CEQA Review Framework\n 2          Public Resources Code \u00a7 21080(b)(1) explicitly states that CEQA does not apply to\n 3   \u201cministerial projects.\u201d Under 14 Cal. Code Regs. \u00a7 15268(a), \u201c[m]inisterial projects are exempt from\n 4   the requirements of CEQA.\u201d Determining whether CEQA applies follows a three-step framework:\n 5          \u201cCEQA proceeds by way of a multistep decision tree, which has been characterized\n            as having three tiers. First, the agency must determine whether the proposed activity\n 6\n            is subject to CEQA at all. Second, assuming CEQA is found to apply, the agency\n 7          must decide whether the activity qualifies for one of the many exemptions that\n            excuse otherwise covered activities from CEQA\u2019s environmental review. Finally,\n 8          assuming no applicable exemption, the agency must undertake environmental review\n 9          of the activity, the third tier.\u201d\n\n10   Union of Med. Marij. Pat. v. City of San Diego, 7 Cal. 5th 1171, 1185 (2019). The Court explained:\n11          \u201cIf the lead agency concludes it is faced with a project, it must then decide \u2018whether\n12          the project is exempt from the CEQA review process under either a statutory\n            exemption or a categorical exemption set forth in the CEQA Guidelines.\u2019 The\n13          statutory exemptions, created by the Legislature, are found in \u00a7 21080, subd. (b).\n14          Among the most important exemptions is the first, for \u2018ministerial\u2019 projects,\n            which are defined generally as projects whose approval does not require an agency\n15          to exercise discretion. (Pub. Resources Code, \u00a721080, subd. (b)(1).) . . . If the lead\n            agency concludes a project is exempt from review, it must issue a notice of\n16\n            exemption citing the evidence on which it relied in reaching that conclusion. The\n17          agency may thereafter proceedwithout further consideration of CEQA.\u201d\n18\n     Union of Med. Marij. Pat. v. City of San Diego, 7 Cal. 5th at 1186.\n19\n            Defendants were repeatedly informed of this three-step framework but bypassed step two,\n20\n     proceeding directly to environmental review. However, step two--whether the project is exempt from\n21\n     CEQA--must be resolved before step three--determining what level of environmental review applies.\n22\n            By skipped step two, Defendants convert a ministerial approval, exempt from CEQA, into\n23\n     a discretionary process driven by subjective community sentiment. \u201cCEQA does not require an\n24\n     analysis of subjective psychological feelings or social impacts.\u201d Preserve Poway v. City of Poway,\n25\n     245 Cal.App.4th 560, 579 (2016). Nor does controversy alter a project\u2019s CEQA status. \u201cIndeed, it\n26\n     is entirely possible, if not common, for a controversial or unpopular project to be exempt from\n27\n     CEQA. Neighborhood sentiment is not an impact that must be directly considered in the\n28\n     environmental determination process.\u201d McCann v. City San Diego, 70 Cal. App. 5th 51, 86 (2021).\n\n                        PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                 PAGE 4\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13         Filed 03/16/26      PageID.533        Page 9\n                                                 of 29\n\n\n 1   3.3    Data Center is \u201cBy-Right\u201d Permissible Use and Statutorily Exempt from CEQA\n            (Superior Court Order Feb. 27, 2026).\n 2\n            The clearest illustration of the law applicable to a data center approved as of right is the\n 3\n     February 27, 2026 decision of the Superior Court, which definitively confirmed the Project\u2019s\n 4\n     \u201cby-right\u201d status in litigation filed by the City of Imperial against Imperial County. (Compl. \u00b6 107.)\n 5\n     In that case, the City alleged that the data center required discretionary approvals.\n 6\n            The February 27 Order was already part of the record when Defendants filed their request\n 7\n     for judicial notice on March 2, 2026. Plaintiff therefore seek judicial notice of the February 27 Order,\n 8\n     which expressly rejected the City\u2019s first cause of action alleging that the grading permit failed to\n 9\n     comply with state law and the County\u2019s municipal code. The Court held:\n10\n            \u201cThe first cause of action failed because the Project is a \u2018by-rights\u2019 permissible use\n11          on industrial land under the County Code and no discretionary approvals are\n12          required by state law or the County Code prior to issuing a grading permit.\u201d\n13          (2-27-26 Order Granting MJOP at 3).\n\n14          The Superior Court likewise rejected the City\u2019s second cause of action challenging the\n15   County\u2019s determination that the project was statutorily exempt from CEQA. The City argued that\n16   discretionary rezoning and a conditional use permit were required. The Court disagreed, explaining\n17   that because the data center is a \u201cby-right\u201d use, the County\u2019s role was purely ministerial:\n18          \u201cThe second cause of action failed because... no discretionary approvals were\n19          required so the County\u2019s determination that the Project is statutorily exempt from\n            CEQA review as ministerial was correct as a matter of law.\u201d (2-27-26 Order\n20          Granting MJOP at 3).\n21\n            Defendants were provided repeated notice that the project qualified as a ministerial, by-right\n22\n     industrial use under both City and County codes. (Compl. \u00b6113). Industry practice likewise\n23\n     recognizes that development permitted as of right and compliant with applicable standards proceeds\n24\n     ministerially and is exempt from CEQA. (Compl. \u00b647). The Superior Court\u2019s ruling confirms that\n25\n     the data center, substation, and battery storage are permitted by right. These are the same arguments\n26\n     Plaintiff presented to Defendants. Consequently, the City\u2019s central allegations -- that a rezoning text\n27\n     amendment was required -- is squarely refuted by the Superior Court\u2019s February 27 Order.\n28\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 5\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26               PageID.534        Page 10\n                                                   of 29\n\n\n 1    4.      COUNT 1: THE COMPLAINT PLAUSIBLY ALLEGES PROCEDURAL DUE\n              PROCESS VIOLATION.\n 2\n              To state a procedural due process claim, the Complaint must allege: (1) a protected liberty\n 3\n      or property interest; (2) deprivation of that interest; and (3) inadequate process. Portman v. Cnty. of\n 4\n      Santa Clara, 995 F.2d 898, 904 (9th Cir. 1993). Property interests arise from state law when it\n 5\n      creates a legitimate claim of entitlement. Board of Regents v. Roth, 408 U.S. 564, 577 (1972).\n 6\n              \u201cWhether a property-holder possesses a legitimate claim of entitlement to a permit or\n 7\n      approval turns on whether, under state and municipal law, the local agency lacks all discretion to\n 8\n      deny issuance of the permit or to withhold its approval.\u201d Clark v. City of Hermosa Beach, 48\n 9\n      Cal.App.4th 1152, 1180 (1996). See also Groten v. California, 251 F.3d 844, 850 (9th Cir. 2001)\n10\n      (protected property interest existed where applicable law entitled the applicant to a license upon\n11\n      satisfaction of statutory requirements); Del Monte Dunes at Monterey, Ltd. v. City of Monterey, 920\n12\n      F.2d 1496, 1508 (9th Cir. 1990) (city council gave approval to 190 unit project, with conditions that\n13\n      plaintiff substantially met; yet the city council abruptly changed course and rejected the plan.\u201d)\n14\n              Defendants argue that Plaintiff lacked a protected property interest in site plan approval,\n15\n      because the Planning Director retained discretion. (Mot; ECF No. 12-1 at 10\u201312.) The Complaint\n16\n      plausibly alleges that site plan review was ministerial, the City\u2019s failure to act within 15 days resulted\n17\n      in deemed approval of the site plan by operation of law.\n18\n      4.1     Site Plan Review Is Ministerial and Limited to Design Compliance\n19\n              Defendants argue that IMC \u00a7 24.19.550, entitled \u201cSite Plan Review Procedure,\u201d gives the\n20\n      Planning Director discretion to \u201capprove, deny or modify\u201d site plan applications and therefore\n21\n      defeats any legitimate claim of entitlement. (Mot.; ECF No. 12-1 at 11.) That argument ignores both\n22\n      the self-executing deemed-approval provision and the ministerial nature of site plan review.\n23\n              The Site Plan Review procedure focuses on \u201cdesign principles.\u201d (IMC \u00a7 24.19.510, subd. B.)\n24\n      Its stated purposes include encouraging harmonious structures, signs, landscaping, parking areas, and\n25\n      streets (id., subd. B.2), addressing \u201cconcerns for the aesthetics of development\u201d (id., subd. B.4), and\n26\n      ensuring that new developments do not have an adverse aesthetic effect on adjoining properties (id.,\n27\n      subd. B.5). The Planning Director\u2019s task is not to make open-ended policy judgments, but to evaluate\n28\n      plans \u201cfor conformance with the site plan review standards.\u201d (\u00a7 24.19.540, subd. A.)\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                     PAGE 6\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.535      Page 11\n                                                  of 29\n\n\n 1           Those standards are objective. The Industrial Zone Performance Standards require review\n 2    of setbacks, ingress and egress, circulation, parking, landscaping, screening of HVAC units, and\n 3    enclosure of outdoor storage areas. (See IMC \u00a7\u00a7 24.07.130, subd. B.1\u20132, B.5; 24.07.140, subds. A,\n 4    B, C, M.) In other words, the Director\u2019s role is to determine compliance with fixed criteria.\n 5           Defendants omit these allegations, even though the Complaint\u2019s exhibits show that Plaintiff\n 6    expressly explained them to the City. The Court must consider exhibits attached to the complaint.\n 7    U.S. v. Ritchie, 342 F.3d 903, 908 (9th Cir. 2003). On May 15, 2025, Plaintiff submitted a nine-page\n 8    letter explaining that site plan review \u201cfocuses mainly on aesthetic design principles\u201d and detailing\n 9    the objective review criteria governing the Director\u2019s obligations. (ECF No. 1-7 at 5-7.)\n10           The exhibits attached to the Complaint reinforce that Plaintiff advised the City on May 14,\n11    2025 that \u201cthe Site Plan Review Procedure, which focuses primarily on design principles, including\n12    aesthetics, is ministerial\u201d and that, because the revised plans complied with all Site Plan Review\n13    requirements, they should be approved as submitted. (Compl. Ex. 6; ECF No. 1-7 at 10.)\n14           Every ministerial review includes authority to deny an application that fails to satisfy\n15    objective requirements. The relevant question is whether the agency may deny approval after the\n16    objective criteria are met. The Complaint plausibly alleges that it may not.\n17    4.2    The Self-Executing 15-Day Deemed Approval Provisions Creates Vested Rights.\n18           Defendants likewise ignore the self-executing deadline in IMC \u00a7 24.19.550. Plaintiff alleged\n19    that, when they submitted revised site plans on May 15, 2025, they specifically informed the City\n\n20    that: \u201cFailure of the Director to act within 15 days shall be deemed approval of the application.\u201d\n\n21    (Compl. \u00b6 35.) The use of \u201cshall\u201d is mandatory, the Director \u201cshall approve\u201d or deny the application,\n\n22    and failure to act \u201cshall be deemed approval.\u201d The Complaint alleges three separate applications,\n      each of which was deemed approved when the City failed to act within the prescribed 15 day period.\n23\n             As to the first application, Plaintiff allege the initial submission was made on March 4, 2025,\n24\n      and revised plans were submitted on May 15, 2025. (Compl. \u00b6\u00b6 28, 35; Exs. 3, 6.) City Planner\n25\n      Cordero sent an adverse site-plan letter and recalled it five minutes later. (Compl. \u00b6 56.) On July 15,\n26\n      2025, Director Mora stated he wanted a text amendment and CUP that would take \u201capproximately\n27\n      6 to 9 months.\u201d (Compl. \u00b6 61.) By then, 61 days had elapsed since the revised submission, and the\n28\n      revised site plan had already been deemed approved by operation of law. (Compl. \u00b6\u00b6 41, 57.)\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 7\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26               PageID.536        Page 12\n                                                   of 29\n\n\n 1            As to the second application, Plaintiff again reminded the City that site plan review required\n 2    action within 15 days. (Compl. \u00b658.) Plaintiff submitted the second application on July 22, 2025.\n 3    (Compl. \u00b6 64.) Director Mora rejected it on August 20, 2025, 29 days later. (Compl. \u00b6\u00b6 69\u201370.)\n 4    Therefore that application was deemed approved by operation of law before the City acted. (Id.)\n 5            As to the third application, Plaintiff submitted a scaled-down 80 MW data center on\n 6    September 9, 2025. (Compl. \u00b6 76; Ex. 28.) At an October 16, 2025 meeting, City officials stated that\n 7    a public process was required for a data center. (Compl. \u00b6 79.) But as of the filing of the Complaint\n 8    in this case, no written denial had ever been issued. (Compl. \u00b6 80.) Hence, because the City failed\n 9    to act within 15 days, the third application also was deemed approved by operation of law. (Id.)\n10            Thus, the Complaint alleges a concrete entitlement grounded in the Code itself: once the City\n11    failed to act within the statutory period, approval occurred automatically. The first application on\n12    March 19, 2025; the second on August 19, 2025; and the third on October 16, 2025. (Compl. \u00b6 184.)\n13    Whether every date is ultimately proven is not the issue at this stage; the issue is plausibility, and the\n14    pleaded facts plausibly allege an entitlement created by mandatory law.\n15    4.3     Plaintiff Had a Protected Property Interest in the Deemed-Approved Site Plans.\n16            A land-use application implicates procedural due process when the applicant has a legitimate\n17    claim of entitlement to approval. Las Lomas Land Co., LLC v. City of Los Angeles, 177 Cal.App.4th\n18    837, 853 (2009). The Complaint plausibly alleges such an entitlement here.\n19            Under IMC \u00a7 24.19.550, site plan review is ministerial and failure to act within 15 days\n20    results in automatic approval. (Compl. \u00b6\u00b6 34, 40, 74.) That self-executing framework creates an\n\n21    enforceable entitlement. The same principle is reflected in California\u2019s Permit Streamlining Act,\n\n22    which provides that when an agency fails to approve or disapprove a development project within\n\n23    applicable time limits, \u201cthe failure to act shall be deemed approval of the permit application for the\n      development project.\u201d (Gov. Code, \u00a7 65956, subd. (b).) See also Gov. Code, \u00a7 65957.\n24\n              \u201cTo encourage prompt resolution of permit applications, the Act provides that an application\n25\n      will be deemed approved if not acted upon within the statutory time period.\u201d Mahon v. Cnty. of San\n26\n      Mateo, 139 Cal.App.4th 812, 818 (2006). Property interests arise when state law creates entitlements\n27\n      \u201csecured by existing rules or understandings.\u201d Board of Regents v. Roth, 408 U.S. at 577. The\n28\n      Complaint alleges exactly that: approval was automatic upon the City\u2019s failure to act.\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                     PAGE 8\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26              PageID.537        Page 13\n                                                   of 29\n\n\n 1            The Complaint alleges that on August 21, 2025, Plaintiff withdrew the second application.\n 2    (Compl. \u00b6 71; Compl. Ex. 25; ECF No. 1-26.) But the second application had already been deemed\n 3    approved because the City\u2019s rejection came 29 days after submission. (Compl. \u00b6\u00b6 69\u201370.) Once\n 4    approval vested by operation of law, Defendants could not simply disregard it without due process.\n 5            Defendants also argue that building permits were not guaranteed by site plan approval. (Mot.;\n 6    ECF No. 12-1 at 11.) That misses the point. The deprivation alleged here is not the denial of a\n 7    building permit; it is Defendants\u2019 refusal to recognize and honor the site plan approvals that had\n 8    already vested by operation of law. In any event, building permits are generally presumed ministerial.\n 9    Protect Our Water & Env. Res. v. County of Stanislaus, 10 Cal.5th 479, 493 (2020).\n10            The Complaint therefore plausibly alleges a protected property interest. If the Director fails\n11    to act within 15 days, the application \u201cshall be deemed approved.\u201d The City\u2019s review was ministerial,\n12    limited to objective compliance with standards such as setbacks, landscaping, etc. The City lacked\n13    discretion to withhold approval once the statutory period lapsed. Hence, Defendants refusal to\n14    acknowledge the resulting deemed approvals deprived Plaintiff of a protected property interest.\n15    4.4     The City Arbitrarily Refused to Use Its Own Similarity-of-Use Procedure.\n16            Defendants argue that the data center did not qualify as a ministerial project in the I-2 zone\n17    and therefore required CEQA review. (Mot.; ECF No. 12-1 at 11.) The Complaint plausibly alleges\n18    that this position was arbitrary and contrary to both law and the City\u2019s own code. The City\u2019s zoning\n19    code does not expressly prohibit data centers and provides a procedure for unlisted uses. Under IMC\n20    \u00a7\u00a7 24.19.220\u2013250, an unlisted use \u201cshall be deemed a permitted use\u201d if the Planning Commission\n21    determines it is similar to listed uses. (Compl. \u00b618.) Plaintiff repeatedly asked the City to invoke that\n22    procedure. (Compl. \u00b6\u00b6 58, 62, 72, 79.) Plaintiff also alleges that the City had historically used the\n23    similarity-of-use process for other applicants. (Compl. \u00b6\u00b6 63, 202.)\n24            Defendants refused to use that mandatory pathway for similarity of use and instead insisted\n25    on a legislative text amendment that would take six to nine months. (Compl. \u00b6\u00b6 60, 202.) The\n26    Complaint plausibly characterizes that refusal as arbitrary and an attempt to manufacture discretion\n27    where the Code did not otherwise provide it. (Compl. \u00b6123.)\n28\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 9\n\f     Case 3:26-cv-00128-JLS-BJW           Document 13 Filed 03/16/26               PageID.538      Page 14\n                                                 of 29\n\n\n 1    4.5    Complaint Plausibly Alleges the Data Center Was Similar to Existing Permitted Uses.\n 2           The Complaint also plausibly alleges that the proposed data center fell within the City\u2019s\n 3    industrial-use scheme, or at minimum qualified for a similarity-of-use determination. Plaintiff\n 4    repeatedly explained this to the City. On June 4, 2025, Plaintiff advised the City that contiguous\n 5    property in Imperial County allowed data centers as a permitted use in the M-1 zone and attached\n 6    a draft sketch plan for a related data center project. (Compl. \u00b6 54; Compl. Ex. 10; ECF No. 1-11.)\n 7           On June 23, 2025, Plaintiff identified numerous companies who currently operate in the I-2\n 8    Zone despite not being expressly named in the zoning code:\n 9           \u2022 Alford Distributing (beverage distributor), 344 Crown Court\n             \u2022 Vilore Distributing (beverage distributor), 2421 Vilore Avenue\n10\n             \u2022 Sellers Petroleum Products (petroleum distributor), 350 Aten Road\n11           \u2022 VPE Inc. (petroleum equipment sales), 506 Industry Way\n12           \u2022 Imperial Pre-Mix Company (fertilizer manufacturer), 422 Barioni Blvd\n             \u2022 Ferrellgas (propane supplier), 501 Barioni Blvd\n13           \u2022 Dune Company (fertilizer supplier), 506 E. 2nd Street\n14           \u2022 Imperial Truss and Lumber, 701 E. 2nd Street\n             \u2022 Blackman Plumbing (plumbing supplier), 542 Industry Way\n15\n             \u2022 Imperial Valley Food Bank (food distributor), 486 Aten Road\n16\n             Plaintiff also compared the data center to a wide range of expressly permitted I-2 uses,\n17\n      including distributors, showrooms, administrative offices, newspaper publishing, bottling plants,\n18\n      blueprinting and photocopying services, and other industrial and service-oriented operations.\n19\n      (Compl. Ex. 15; ECF No. 1-16.) Plaintiff emphasized on June 24, 2025, July 18, 2025, and July 21,\n20\n      2025 that the Code\u2019s broad industrial-use language and similarity-of-use provision supported treating\n21\n      the data center as permitted uses subject only to site plan review. (Compl. Exs. 15, 18, 25.)\n22\n             At the pleading stage, those allegations are more than sufficient to plausibly allege that\n23\n      Defendants arbitrarily refused to recognize a ministerial or similarity-based pathway to approval.\n24\n      4.6    Defendants Deprived Plaintiff of a Property Interest Without Adequate Process.\n25\n             The Complaint plausibly alleges deprivation and inadequate process. Defendants ignored\n26\n      deemed approvals, demanded CEQA review notwithstanding the project\u2019s ministerial status, insisted\n27\n      on unauthorized text amendments, and refused to use the applicable similarity-of-use procedure.\n28\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 10\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.539       Page 15\n                                                  of 29\n\n\n 1    (Compl. \u00b6\u00b6 61, 69, 123, 202.) The Complaint alleges a pocket veto: City officials refused to timely\n 2    act, refused to recognize the legal consequence of their inaction, and instead attempted to reroute the\n 3    project into a discretionary process. That is sufficient to plead deprivation of a protected property\n 4    interest without constitutionally adequate process. See Fuentes v. Shevin, 407 U.S. 67, 82 (1972).\n 5    4.7     Exhaustion Is Not Required for a \u00a7 1983 Procedural Due Process Claims.\n 6            Defendants also argue that Plaintiff was required to pursue state remedies before bringing\n 7    their procedural due process claim in federal court. (Mot.; ECF No. 12-1 at 17.) \u201cThe Supreme Court\n 8    has made it clear that a \u00a7 1983 plaintiff need not have exhausted alternative remedies before\n 9    initiating a \u00a7 1983 action.\u201d Brosterhous v. State Bar, 12 Cal.4th 315, 336 (1995). Defendants\u2019\n10    reliance on state remedial procedures is therefore misplaced.\n11            Defendants separate argument that Plaintiff failed to appeal under IMC \u00a7 24.19.560 fares no\n12    better. That provision allows an applicant to appeal a \u201cdecision of the Director\u201d to the Planning\n13    Commission within ten days. But The Complaint alleges deemed approvals by operation of law, not\n14    merely appealable denials. The Complaint\u2019s theory is that no timely valid denial existed because\n15    approval had already vested automatically under IMC \u00a7 24.19.550. An appeal provision governing\n16    express adverse decisions does not nullify a self-executing deemed-approval rule.\n17            Moreover, the Complaint alleges there was no formal written denial to the third application,\n18    it was verbally rejected 37 days later after the application was filed. (Compl. \u00b6\u00b6 76, 79\u201380.) Plaintiff\n19    cannot appeal a denial that was untimely and never formally issued. In any event, administrative\n20    exhaustion is not required for a \u00a7 1983 claim. Felder v. Casey, 487 U.S. 131, 147 (1988).\n21            In sum, Plaintiff plausibly allege that the City\u2019s site plan review was ministerial, that the\n22    applications were deemed approved by operation of law, that those approvals created a protected\n23    property interest, and that Defendants deprived Plaintiff of that interest without adequate process.\n24    5.      COUNT 2: THE COMPLAINT PLAUSIBLY ALLEGES FIRST AMENDMENT\n              RETALIATION\n25\n              The First Amendment prohibits government officials from retaliating against individuals for\n26\n      engaging in protected speech or petitioning activity. \u201cIf an official takes adverse action against\n27\n      someone based on that forbidden motive, and non-retaliatory grounds are in fact insufficient to\n28\n      provoke the adverse consequences, the injured person may generally seek relief by bringing a First\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 11\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.540       Page 16\n                                                  of 29\n\n\n 1    Amendment claim.\u201d Nieves v. Bartlett, 587 U.S. 391, 398 (2019). A retaliation claim requires\n 2    protected activity, adverse action that would chill a person of ordinary firmness, and a causal\n 3    connection between the two. Id. The Complaint plausibly alleges each element.\n 4    5.1    Plaintiff Engaged in Protected Activity\n 5           The Complaint alleges that Plaintiff engaged in multiple forms of protected activity,\n 6    including: (1) insisting on strict compliance with the City\u2019s ministerial review process; (2)\n 7    petitioning Imperial County for land use approvals; (3) speaking publicly to counter the City\u2019s\n 8    narrative about the project; and (4) threatening litigation in response to the City\u2019s delays and\n 9    obstruction. (Compl. \u00b6 191.) Each is protected by the First Amendment.\n10           Defendants relying on Defendant Mora\u2019s letter, attached as Exhibit 17, reframe the dispute\n11    as a mere disagreement, and Mora\u2019s concerns about environmental impacts supplied a legitimate,\n12    non-retaliatory motive. (Mot.; ECF No. 12-1 at 18.) But that argument ignores Plaintiff\u2019s core\n13    allegation: CEQA requires a threshold exemption analysis and the project qualified for ministerial\n14    treatment, yet Defendants bypassed that step and insisted focused on environmental impacts.\n15           As Plaintiff explained to Defendants on July 18, 2025, CEQA proceeds in stages and \u201c[s]tep\n16    two is often overlooked, but it\u2019s very important because if a project is statutorily exempt or\n17    categorically exempt, there\u2019s no requirement for an environmental review under CEQA.\u201d (Compl.\n18    Ex. 18; ECF No. 1-19.) Plaintiff reiterated the point on July 21, 2025: \u201cthe second step in the CEQA\n19    process is to determine whether the project is exempt from CEQA . . . Environmental impacts (step\n20    three) are not considered where a statutory exemption applies.\u201d (Compl. Ex. 25; ECF No. 1-26.)\n21           As the California Supreme Court explained, \u201c[a]mong the most important exemptions is the\n22    first, for \u2018ministerial\u2019 projects,\u201d and if an agency determines that a project is exempt, it may proceed\n23    \u201cwithout further consideration of CEQA.\u201d Union of Med. Marij. Patients, Inc. v. City of San Diego,\n24    7 Cal.5th 1171, 1186 (2019). Thus, a project that is ministerial is exempt regardless of alleged\n25    environmental impacts; its exemption does not turn on the perceived magnitude of those impacts.\n26           The Mora letter, supports Plaintiff\u2019s theory rather than Defendants. Mora jumped directly to\n27    environmental impacts without first addressing whether the project was exempt at step two. There\n28    is no allegation that Mora engaged the exemption question, despite Plaintiff\u2019s repeated explanations\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 12\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26              PageID.541        Page 17\n                                                   of 29\n\n\n 1    and supporting authorities. Plaintiff also provided the City a memorandum documenting 25 data\n 2    centers approved as of right on industrial land, reflecting an industry standard that such facilities may\n 3    proceed ministerially where zoning permits them. (Compl. Ex. 11; ECF No. 1-12.)\n 4            The Complaint also alleges that Mora refused to use the City\u2019s own \u201cSimilar Use\u201d procedure,\n 5    even though Plaintiff repeatedly requested that route as the proper way to resolve any perceived\n 6    ambiguity regarding whether the data center qualified as a permitted use. (Compl. \u00b6\u00b6 29, 62, 72, 79.)\n 7            At the pleading stage, Plaintiff\u2019s insistence on lawful ministerial processing, their petitioning\n 8    of the County, and their public advocacy qualify as protected activity.\n 9    5.2     Defendants and Imperial Irrigation District\u2019s Coordinated Campaign of Obstruction\n              and Misinformation Constituted Adverse Action.\n10\n              Defendants argue they took no adverse action against Plaintiff. (Mot.; ECF No. 12-1 at 18.)\n11\n      The Complaint alleges the opposite in detail. Defendants \u201cengaged in a parallel track of obstruction,\n12\n      misrepresentations, and harassment in concert with IID. Starting in late November 2025, the City\n13\n      and IID executed a coordinated media campaign of misinformation designed to incite public hostility\n14\n      and sabotage Plaintiff\u2019s data center project.\u201d (Compl. \u00b6125.) The campaign included obstructing\n15    project utilities, disseminating misleading information, inciting public opposition, and coordinating\n16    with outside actors to derail the project. (Compl. \u00b6\u00b6 3, 125\u2013149, 192.)\n17            The Complaint alleges that IID prioritized projects by Z-Global \u201ca direct competitor with\n18    a competing data center project.\u201d (Compl. \u00b6\u00b6127, 137.) Defendant Burnworth and IID Board\n19    member \u201cEugenio engaged in numerous discussions during November and December 2025 to\n20    coordinate the campaign against the data center.\u201d (Compl. \u00b6149.) These allegations support a\n21    plausible inference that City officials and allied actors were not neutrally applying the law but were\n\n22    instead lobbying against the project and coordinating opposition behind the scenes.\n\n23            The Complaint also alleges retaliatory conduct by IID after Plaintiff\u2019s asserted legal rights.\n\n24    Plaintiff raised concerns regarding IID\u2019s favoritism toward Z-Global. (Compl. \u00b6143.) IID\u2019s General\n\n25    Manager responded by barring Plaintiff from communicating with IID staff. (Compl. \u00b6145.) By\n\n26    denying access to staff concerning an active application, IID retaliated for protected petitioning\n\n27    activity. (Compl. \u00b6146.) Retaliation of that kind threatens to inhibit the exercise of constitutional\n\n28    rights. See Crawford-El v. Britton, 523 U.S. 574, 588 n.10 (1998).\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 13\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.542      Page 18\n                                                  of 29\n\n\n 1           The Complaint further alleges a synchronized public messaging campaign. IID held a public\n 2    workshop on December 9, 2025. (Compl. \u00b6154.) Two days later, the City held its own workshop and\n 3    made specific attacks on Plaintiff\u2019s data center. (Compl. \u00b6156.) The Complaint alleges that the City\u2019s\n 4    false media campaign, disseminated through official government websites and social media, omitted\n 5    the project\u2019s ministerial status and was designed to inflame public hostility. (Compl. \u00b6126.)\n 6           Defendants deny involvement in City-authored flyers and hostile social-media messaging.\n 7    But the Complaint expressly alleges that Defendants \u201cdirect[ed] staff to circulate misleading flyers\n 8    to incite public hostility\u201d and post hostile messages on official City platforms in order to incite\n 9    opposition and punish Plaintiff. (Compl. \u00b6\u00b6 3(a), 192(c).)\n10           Taken together, the alleged obstruction, misinformation campaign, utility interference, public\n11    attacks, and coordinated conduct with IID easily qualify as adverse action that would chill a person\n12    of ordinary firmness from continuing to speak, petition, or threaten legal action.\n13    5.3    The Complaint Also Plausibly Alleges Coordination With CEQA \u201cGreenmail\u201d\n             Operatives as Part of the Retaliatory Scheme.\n14\n             The Complaint further alleges that Defendants coordinated with Comit\u00e9 C\u00edvico del Valle\n15\n      (\u201cCCV\u201d) and its Executive Director, Luis Olmedo, to force the project into a discretionary CEQA\n16\n      posture and thereby create leverage for extortion settlement demands. (Compl. \u00b6\u00b6160\u2013170.) CCV\n17\n      and Olmedo have an established history of using CEQA litigation to halt or delay development and\n18\n      extract payments. (Compl. \u00b6\u00b6160\u2013162.) Defendant Burnworth and Olmedo met multiple times to\n19    coordinate opposition to force a ministerial project into a discretionary CEQA process. (Compl.\n20    \u00b6165.) Defendants joined CCV in trying to manufacture discretion. (Compl. \u00b6\u00b6 165, 169\u2013172.)\n21    Threats and public opposition by CCV personnel were coordinated with Defendants. (Compl. \u00b6167.)\n22           Plaintiff sought approval through the County because the City refused to follow its own code.\n23    Defendants responded by escalating their obstruction, coordinating outside opposition, filing a\n24    baseless lawsuit, and launching a public campaign to devalue and delay the project. (Compl. \u00b6\u00b6\n25    170\u2013172, 192.) Temporal proximity, combined with escalating obstruction, plausibly supports\n26    causation. See Riley\u2019s Am. Heritage Farms v. Elsasser, 32 F.4th 707, 721 (9th Cir. 2022) (pretext\n27    may support causal inference); Arizona Students\u2019 Ass\u2019n v. Arizona Board of Regents, 824 F.3d 858,\n28    867 (9th Cir. 2016) (retaliatory conduct that would chill speech satisfies the adverse-action element).\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 14\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.543      Page 19\n                                                  of 29\n\n\n 1           In short, the Complaint plausibly alleges that Defendants\u2019 professed environmental or\n 2    procedural concerns were pretext, and that their actual objective was to punish Plaintiff for insisting\n 3    on ministerial treatment, speaking publicly, petitioning other agencies, and threatening litigation.\n 4    5.4    Noerr-Pennington Does Not Bar the Claim Because the Complaint Plausibly Alleges\n             Sham Litigation.\n 5\n             Defendants also invoke Noerr-Pennington immunity. That doctrine protects genuine\n 6\n      petitioning activity, but not sham litigation. Petitioning loses immunity when it is \u201ca mere sham to\n 7\n      cover what is actually nothing more than an attempt to interfere directly with the business\n 8\n      relationships of a competitor.\u201d E. Rail. Presidents Conf. v. Noerr Motor Freight, Inc., 365 U.S. 127,\n 9\n      144 (1961). The sham-litigation exception applies where the litigation is objectively baseless and\n10\n      subjectively intended to interfere rather than to obtain legitimate relief. Prof. Real Estate Investors\n11\n      v. Columbia Pict. Ind. Inc., 508 U.S. 49, 60 (1993). The Complaint plausibly alleges both elements.\n12\n             First, the Complaint alleges that the City\u2019s lawsuit challenging the County\u2019s approval was\n13\n      objectively baseless. The City\u2019s original petition was 23 pages and 97 paragraphs; its first amended\n14\n      petition grew to 35 pages and 121 paragraphs; and its second amended petition, filed March 11,\n15\n      2026, expanded to 68 pages and 294 paragraphs, with exhibits totaling 231 pages. Despite the\n16\n      expanding allegations, the court repeatedly found the pleadings legally insufficient and granted only\n17\n      limited leave to amend. Defendants argue that leave to amend defeats any claim of sham as a matter\n18\n      of law. Leave to amend does not establish merit, nor does it preclude a finding of objective\n19\n      baselessness. See Kearney v. Foley & Lardner, LLP, 590 F.3d 638, 643 (9th Cir. 2009).\n20\n             Second, the Complaint alleges that no amendment could cure the basic legal defects because\n21\n      the City\u2019s theory contradicted the plain text of the County Code. The City\u2019s petition rested on\n22\n      demonstrably false claims that the data center required a CUP, and rezoning, even though the County\n23\n      Code permitted the data center and its ancillary uses by right. The City falsely claimed the battery\n24\n      energy storage system was prohibited in the M-2 zone and that the substation and BESS required\n25\n      CUPs, despite the County Code\u2019s text to the contrary. City Manager Morita verified those assertions\n26\n      under penalty of perjury even after receiving repeated notice and the County determined on\n27\n      September 4, 2025 that the data center and ancillary infrastructure were permitted uses. (Compl. \u00b6\u00b6\n28\n      47, 75, 113; Compl. Ex. 27; ECF No. 1-28.)\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 15\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26              PageID.544        Page 20\n                                                   of 29\n\n\n 1            Plaintiff also alleges that the City wrongly insisted that a lot merger required rezoning,\n 2    despite County Code \u00a7 90501.01 expressly providing that parcels greater than 40 acres retain zoning\n 3    district boundaries. The City filed the lawsuit to \u201cdelay and devalue a project outside the City\u2019s\n 4    jurisdiction,\u201d convert a ministerial project into a discretionary one, and create leverage for opposition\n 5    actors seeking financial or strategic advantage. (Compl. \u00b6\u00b6 169\u2013172.) The alleged coordination with\n 6    IID, Z-Global interests, and CCV further supports the inference that the litigation was part of a\n 7    broader retaliatory and anti-competitive campaign.\n 8            For pleading purposes, if the City\u2019s petition was objectively baseless and filed for the purpose\n 9    of burdening Plaintiff rather than securing relief on the merits, Noerr-Pennington does not apply.\n10    5.5     The Complaint Plausibly Alleges Causation and Chilling Effect.\n11            The Complaint adequately pleads causation. Retaliation escalated after Plaintiff insisted on\n12    ministerial processing, and pursued approvals through the County. Defendants responded with a\n13    series of escalating measures: refusing to recognize deemed approvals, demanding CEQA and text\n14    amendments, coordinating public opposition, obstructing utility processing, disseminating\n15    misinformation, and filing objectively baseless litigation. (Compl. \u00b6192.)\n16            Those alleged actions would chill a person of ordinary firmness from engaging in protected\n17    advocacy, petitioning, or threatened legal action. See Arizona Students\u2019 Ass\u2019n, 824 F.3d at 867. And\n18    where the government\u2019s stated justifications are plausibly pretextual, that pretext supports the\n19    inference of retaliatory motive. See Riley\u2019s American Heritage Farms, 32 F.4th at 721.\n20            In sum, the Complaint plausibly alleges that Plaintiff engaged in protected activity, that\n21    Defendants responded with adverse actions designed to punish and chill that activity, and that those\n22    actions were causally connected to Plaintiff\u2019s petitioning.\n23    6.      COUNT 3: THE COMPLAINT PLAUSIBLY ALLEGES A CLASS-OF-ONE EQUAL\n              PROTECTION VIOLATION.\n24\n              The Equal Protection Clause permits a \u201cclass of one\u201d claim where the the Complaint alleges\n25\n      that it \u201chas been intentionally treated differently from others similarly situated and that there is no\n26\n      rational basis for the difference in treatment.\u201d Village of Willowbrook v. Olech, 528 U.S. 562, 564\n27\n      (2000). In Olech, the village demanded a 33-foot easement to connect to the public water supply,\n28\n      while requiring only a 15-foot easement from similarly situated owners. Id. at 563. The Supreme\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 16\n\f     Case 3:26-cv-00128-JLS-BJW              Document 13 Filed 03/16/26               PageID.545        Page 21\n                                                    of 29\n\n\n 1    Court held those allegations sufficient because the complaint alleged intentional differential\n 2    treatment that was \u201cirrational and wholly arbitrary.\u201d Id. at 565.\n 3            Likewise, in City of Monterey v. Del Monte Dunes at Monterey, Ltd., 526 U.S. 687 (1999),\n 4    the Supreme Court upheld an equal protection claim where the Plaintiff alleged they received\n 5    treatment inconsistent with zoning decisions involving similar properties. Id. at 705. As the Ninth\n 6    Circuit explained in that case, the plaintiffs \u201cwere singled out to bear the burden of the City\u2019s attempt\n 7    to bring back the Smith\u2019s Blue Butterfly by creating a \u2018butterfly park\u2019 on plaintiffs land.\u201d Del Monte\n 8    Dunes at Monterey, Ltd. v. City of Monterey, 920 F.2d 1496, 1508\u20131509 (9th Cir. 1990). The same\n 9    basic theory is alleged here: Plaintiff was singled out for uniquely burdensome treatment that was\n10    not imposed on similarly situated industrial users.\n11            To state a class-of-one claim, a plaintiff must plausibly allege that Defendants: (1)\n12    intentionally treated Plaintiff differently from others similarly situated; and (2) lacked a rational basis\n13    for doing so. Olech, 528 U.S. at 564; Gerhart v. Lake County, Mont., 637 F.3d 1013, 1022 (9th Cir.\n14    2011). A plaintiff need not show that defendants were motivated by subjective ill will. Gerhart, 637\n15    F.3d at 1022. The Complaint plausibly alleges both disparate treatment and irrationality.\n16    6.1     The Complaint Identifies Similarly Situated Comparators.\n17            The Complaint expressly alleges that \u201cPlaintiff is similarly situated to other property owners\n18    and developers in the I-2 Rail-Served Industrial Zone.\u201d (Compl. \u00b6 200.) Defendants attempt to recast\n19    the claim by arguing Plaintiff failed to identify other data center applications that received\n20    preferential treatment. (Mot.; ECF No. 12-1 at 20.) But that is not the pleading standard. A\n21    class-of-one plaintiff need not identify an identical twin.\n22            The question is whether the comparators are similarly situated in all material respects. Here,\n23    the Complaint alleges that other substantial industrial users in the same I-2 zone were processed\n24    ministerially under the same site-plan framework and broader industrial-use categories. Specifically,\n25    The Complaint alleges that Vilore Foods, a 289,000-square-foot warehouse at 2421 Vilore Way, and\n26    Alford Distributing, at 344 Crown Court, are large industrial facilities in the City that were approved\n27    through the ministerial site plan review process. (Compl. \u00b6 200.)\n28\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                      PAGE 17\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.546      Page 22\n                                                  of 29\n\n\n 1           The Complaint also alleges that numerous other industrial operations currently function in\n 2    the I-2 zone even though they are not expressly listed in the zoning code, including beverage\n 3    distributors, petroleum-related businesses, fertilizer manufacturers and suppliers, plumbing supply\n 4    businesses, lumber operations, and the Imperial Valley Food Bank. (Compl. Ex. 15; ECF No. 1-16.)\n 5    The Complaint alleges these uses were permitted under broader industrial, service, manufacturing,\n 6    or distribution categories, and that the City\u2019s code expressly provides that an unlisted use \u201cshall be\n 7    deemed a permitted use\u201d based on similarity to listed uses. (Id.; see also IMC \u00a7 24.19.210.)\n 8           At the pleading stage, those allegations adequately identify a comparator class: other\n 9    industrial users in the same zone who were allowed to proceed through ordinary ministerial or\n10    streamlined administrative review, including uses not expressly named in the zoning table.\n11    6.2    The Complaint Plausibly Alleges Intentional Differential Treatment.\n12           The Complaint plausibly alleges that Plaintiff was treated differently from those similarly\n13    situated industrial users. While comparable I-2 zone users were permitted to proceed through\n14    ministerial staff review, Defendant\u2019s singled out Plaintiff\u2019s data center and demanded a discretionary\n15    CUP process, legislative text amendments, and CEQA review. (Compl. \u00b6\u00b6 200\u2013203.)\n16           The Complaint further alleges that Plaintiff repeatedly asked the City to use the Municipal\n17    Code\u2019s \u201csimilarity of use\u201d procedure to resolve any claimed ambiguity regarding whether the data\n18    center qualified as a permitted use. (Compl. \u00b6\u00b618, 202.) The Complaint alleges that Defendants had\n19    historically used that procedure for other applicants, yet refused to do so here. (Compl. \u00b6202.)\n20    Instead, Defendants insisted on a text amendment that would take six to nine months. (Compl. \u00b6 60.)\n21           The Complaint alleges that while similar uses received ministerial review, Plaintiff was\n22    forced into a uniquely burdensome discretionary and CEQA-heavy process. The Complaint plausibly\n23    alleges that this difference in treatment was intentional.\n24    6.3    Defendants\u2019 Purported Rational Bases Are Plausibly Pretextual.\n25           The Complaint also plausibly alleges the absence of a rational basis. First, Plaintiff expressly\n26    advised the City that CEQA proceeds in stages and that step two--whether the project is exempt--\n27    must be decided before step three--what environmental review applies. (Compl. Ex. 18; ECF No.\n28    1-19; Compl. Ex. 25; ECF No. 1-26.) Thus, the Complaint plausibly alleges that Defendants\u2019\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 18\n\f     Case 3:26-cv-00128-JLS-BJW             Document 13 Filed 03/16/26              PageID.547        Page 23\n                                                   of 29\n\n\n 1    invocation of environmental concerns ignored the legal predicate question and served as a post hoc\n 2    justification rather than a real basis for the differential treatment.\n 3            Second, the Complaint alleges that the City refused to use its own similarity-of-use procedure\n 4    even though that procedure existed precisely to address unlisted uses. Plaintiff repeatedly requested\n 5    that process; Defendants refused and instead demanded a far more burdensome discretionary route.\n 6    (Compl. \u00b6\u00b6 60, 202.) That refusal supports the inference of irrationality.\n 7            Third, Defendants characterize the proposal as requiring six million gallons of reclaimed\n 8    water per day. (Mot.; ECF No. 12-1 at 20.) This misstates the facts. The project would require 0.75\n 9    million gallons per day for cooling. (Compl. \u00b6101.) The City\u2019s sudden concern with environmental\n10    impacts was \u201ca calculated pretext.\u201d (Compl. \u00b6103.) For pleading purposes, the allegations are enough\n11    to support the inference that Defendants\u2019 stated reasons were irrational, arbitrary, or pretextual.\n12    6.4     The Complaint Alleges the Data Center Was Singled Out for Burdensome Treatment.\n13            The Complaint alleges disparate treatment in Defendants\u2019 refusal to use the \u201cSimilarity of\n14    Use\u201d provision. Defendants historically utilized that provision to classify unlisted uses as permitted\n15    when similar to listed uses. (Compl. \u00b6202.) Defendants refused the the \u201cSimilarity of Use\u201d provision\n16    and insisted on the legislative text amendment process instead. (Compl. \u00b6202.) Those allegations are\n17    sufficient to plausibly allege that Plaintiff was singled out for uniquely burdensome treatment.\n18    6.5     The Complaint Plausibly Alleges No Rational Basis.\n19            The Complaint alleges that it was \u201cirrational and wholly arbitrary to require a lengthy\n20    discretionary review and legislative amendment\u201d for the data center while approving other\n21    high-impact industrial uses through ministerial procedures. (Compl. \u00b6 203.) No rational basis existed\n22    for requiring CEQA review and discretionary approvals for a project that was permitted by right or,\n23    at minimum, subject to the code\u2019s similarity-of-use procedure. (Compl. \u00b6\u00b6 200\u2013203.)\n24            In Gerhart v. Lake County, the Ninth Circuit held that disparate land-use treatment may\n25    support a class-of-one claim where officials irrationally depart from ordinary treatment. Id. 637 F.3d\n26    at 1023. And in Del Monte Dunes, the Ninth Circuit recognized that even if a government objective\n27    is rational in the abstract, it may still be irrational to single out one parcel or applicant to bear the\n28    burden of that objective. Del Monte Dunes, 920 F.2d at 1509. The same principle applies here. Even\n\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 19\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.548       Page 24\n                                                  of 29\n\n\n 1    assuming the City could legitimately care about land use compatibility or environmental concerns,\n 2    the Complaint plausibly alleges that it was irrational to impose extraordinary burdens on Plaintiff\n 3    alone while processing comparable industrial uses ministerially.\n 4            The Complaint also alleges retaliation, misinformation, and administrative obstruction, which\n 5    further support the inference that Defendants\u2019 conduct lacked a legitimate rational basis. Allegations\n 6    of pretext and obstruction reinforce the plausibility of arbitrary treatment.\n 7            In sum, the Complaint plausibly alleges that Plaintiff was intentionally treated differently\n 8    from other similarly situated industrial developers in the I-2 zone and that there was no rational basis\n 9    for that difference in treatment. Other industrial users received ordinary ministerial or streamlined\n10    administrative processing. Plaintiff, by contrast, were denied the benefit of the same code provisions,\n11    denied access to the similarity-of-use process, and forced into a discretionary CEQA-heavy pathway\n12    that the code did not require. That is the essence of a class-of-one claim. Count 3 therefore states a\n13    plausible Equal Protection violation and survives Rule 12(b)(6).\n14    7.      COUNT 4: THE COMPLAINT PLAUSIBLY ALLEGES MUNICIPAL LIABILITY\n              UNDER MONELL.\n15\n              Municipal liability under 42 U.S.C. \u00a7 1983 exists where a constitutional violation results\n16\n      from an official policy, custom, or practice of the municipality. Monell v. Dep\u2019t of Soc. Servs., 436\n17\n      U.S. 658, 694 (1978). In the Ninth Circuit, municipal liability may also be established through\n18\n      ratification by a final policymaker, including in a single incident, where the policymaker knows of\n19\n      the subordinate\u2019s unconstitutional conduct and deliberately approves both the conduct and its basis.\n20\n      Sabra v. Maricopa Cnty. Cmty. Coll. Dist., 44 F.4th 867, 885 (9th Cir. 2022).\n21\n              At the pleading stage, the Court must accept well-pleaded factual allegations as true and draw\n22\n      reasonable inferences in Plaintiff\u2019s favor. Under that standard, the Complaint plausibly alleges\n23\n      municipal liability based on ratification and official policymaker conduct.\n24\n              The Complaint alleges a coordinated course of action directed and approved by senior City\n25\n      officials, including Defendants Burnworth, Morita, Turner, and Mora. According to the Complaint,\n26\n      that course of conduct included: knowingly disregarding the City\u2019s own ministerial approval\n27\n      mandates under \u00a7 24.19.550; refusing to honor deemed approvals; breaching the reclaimed-water\n28\n      agreement after Plaintiff had incurred expenses; pressuring El Centro to terminate its agreement with\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 20\n\f     Case 3:26-cv-00128-JLS-BJW           Document 13 Filed 03/16/26               PageID.549      Page 25\n                                                 of 29\n\n\n 1    Plaintiff; partnering with IID to obstruct utility processing; disseminating misleading public\n 2    materials; coordinating with outside actors, including Z-Global and environmental groups, to extract\n 3    concessions; and filing objectively baseless sham litigation against the County to delay and devalue\n 4    the project outside the City\u2019s jurisdiction. (Compl. \u00b6\u00b6 4, 116\u2013140, 171\u2013180.)\n 5           The Complaint further alleges that these actions were taken after Plaintiff engaged in\n 6    protected activity, including insisting on lawful ministerial processing and shifting its efforts to\n 7    County approvals when the City refused to follow its own code. Read as a whole, the pleading\n 8    plausibly alleges that the City\u2019s response was not accidental or unauthorized, but an official\n 9    municipal course of conduct designed to punish Plaintiff for asserting its rights.\n10           The Complaint also alleges specific involvement by officials with final policymaking\n11    authority. Defendant Mora, as Planning Director, had final authority over site-plan decisions.\n12    (Compl. \u00b6 207(a).) Defendant Morita, as City Manager, authorized interference with water-related\n13    arrangements. (Compl. \u00b6 207(b).) Defendant Burnworth, through the Council, ratified a practice of\n14    converting ministerial matters into discretionary processes when expedient. (Compl. \u00b6\u00b6 207\u2013208.)\n15    The Complaint also alleges that City resources were used to disseminate the challenged publications\n16    and messaging, confirming they were official municipal communications. (Compl. \u00b6209.)\n17           These allegations plausibly support ratification. Final policymakers knew of the challenged\n18    conduct, approved it, participated in it, and continued it over time. That is sufficient at the Rule\n19    12(b)(6) stage. See Endy v. County of Los Angeles, 975 F.3d 757, 769 (9th Cir. 2020) (municipal\n20    policy may be established through acts of officials with final policymaking authority). Plaintiff is\n21    only required at the pleading stage to allege facts making it plausible that the constitutional\n22    violations were chargeable to the municipality. The Complaint does so.\n23           Defendants\u2019 assertion that no municipal policy or custom has been alleged mischaracterizes\n24    the pleading. The Complaint alleges deliberate municipal choices by senior officials, repeated over\n25    time, and ratified at the highest levels of City government. Whether discovery will reveal additional\n26    evidence of policymaker knowledge and approval is a matter for later stages. At this stage, the\n27    Complaint easily crosses the plausibility threshold. Accordingly, Count 4 plausibly alleges municipal\n28    liability under Monell and should survive the motion to dismiss.\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 21\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26              PageID.550       Page 26\n                                                  of 29\n\n\n 1    8.     QUALIFIED IMMUNITY DOES NOT APPLY\n 2           Qualified immunity protects government officials if their conduct does not violate clearly\n 3    established statutory or constitutional rights of which a reasonable official would have known.\n 4    Harlow v. Fitzgerald, 457 U.S. 800, 818 (1982). Courts apply a two-step inquiry: (1) whether the\n 5    facts alleged make out a violation of a constitutional right, and (2) whether the right was clearly\n 6    established at the time of the alleged misconduct. Pearson v. Callahan, 555 U.S. 223, 232 (2009).\n 7           A right is \u201cclearly established\u201d when existing precedent places the constitutional question\n 8    \u201cbeyond debate.\u201d Officials need not confront identical facts to have fair warning that their conduct\n 9    is unlawful. Hope v. Pelzer, 536 U.S. 730, 741 (2002). At the pleading stage, the Court must accept\n10    the Complaint\u2019s well-pleaded allegations as true and draw all reasonable inferences in Plaintiff\u2019s\n11    favor. Under that standard, qualified immunity cannot be resolved in Defendants\u2019 favor.\n12    8.1    The Complaint Plausibly Alleges Multiple Constitutional Violations.\n13           The Complaint plausibly alleges violations of several clearly established constitutional rights:\n14    Procedural Due Process: Defendants refused to recognize vested approvals that arose by operation\n15    of law under the City\u2019s deemed-approval provision. (Compl. \u00b6\u00b634, 40, 74.) Vested land-use\n16    approvals constitute protected property interests that cannot be disregarded without due process.\n17    Horn v. County of Ventura, 24 Cal.3d 605, 616 (1979). First Amendment Retaliation: Defendants\n18    retaliated against Plaintiff for protected petitioning activity, including insisting on ministerial\n19    processing, petitioning Imperial County, and speaking publicly. Government retaliation for protected\n20    speech violates the First Amendment where retaliatory animus is a but-for cause of adverse action.\n21    Boquist v. Courtney, 32 F.4th 764, 778 (9th Cir. 2022). Equal Protection: Defendants intentionally\n22    treated Plaintiff differently from similarly situated industrial users without a rational basis. Such\n23    disparate treatment is prohibited under Village of Willowbrook v. Olech, 528 U.S. 562, 564 (2000).\n24           Taken together, these allegations plausibly establish constitutional violations sufficient to\n25    satisfy the first prong of the qualified immunity analysis.\n26    8.2    The Rights at Issue Were Clearly Established.\n27           The constitutional rights implicated here were clearly established long before the events\n28    alleged in the Complaint. First, the procedural structure of CEQA has been settled law for decades.\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                   PAGE 22\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26              PageID.551        Page 27\n                                                  of 29\n\n\n 1    Agencies must determine whether a project is exempt before conducting environmental review. See\n 2    Union of Med. Marijuana Pat. v. City of San Diego, 7 Cal.5th 1171, 1185 (2019). Plaintiff\n 3    repeatedly explained this statutory framework to Defendants, including the City Attorney, yet\n 4    Defendants ignored the exemption inquiry and forced the project into discretionary review.\n 5           Second, the City\u2019s own Municipal Code contains longstanding provisions governing\n 6    ministerial site-plan review, deemed approvals, and similarity-of-use determinations. These\n 7    provisions have existed for decades and impose mandatory duties on City officials. Reasonable\n 8    officials are presumed to know and follow the governing law contained in their own municipal code.\n 9           Third, longstanding precedent clearly establishes that vested land-use approvals cannot be\n10    arbitrarily disregarded by government officials. Horn, 24 Cal.3d at 616.\n11           Fourth, it has long been clearly established that officials may not retaliate against individuals\n12    for exercising their First Amendment rights. See Boquist, 32 F.4th at 778.\n13           Finally, it has long been clearly established that government officials may not intentionally\n14    single out a property owner for irrational disparate treatment. Olech, 528 U.S. at 564.\n15           Taken together, these authorities gave Defendants more than adequate notice that the conduct\n16    alleged in the Complaint would violate constitutional rights.\n17    8.3    Defendants\u2019 Individual Arguments Do Not Support Immunity.\n18           Defendants attempt to characterize their conduct as routine administrative decision-making.\n19    They argue that Defendant Burnworth \u201cis not alleged to have taken any overt actions.\u201d (Mot. at 26.)\n20    But the Complaint alleges her participation in and ratification of the coordinated municipal response\n21    to Plaintiff\u2019s\u2019 project. At the motion-to-dismiss stage, those allegations must be accepted as true.\n22           Defendants similarly contend that Defendant Turner\u2019s communications were \u201cinnocuous.\u201d\n23    (Mot. at 26.) Yet the Complaint alleges that senior City officials--including Turner--participated in\n24    the coordinated strategy that obstructed the project and ignored ministerial approval requirements.\n25           Finally, Defendants argue that Defendant Mora was simply complying with California law.\n26    But the Complaint alleges the opposite--that Mora knowingly disregarded mandatory ministerial\n27    approval provisions and forced the project into discretionary review contrary to the City\u2019s own code.\n28\n\n\n                         PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                    PAGE 23\n\f     Case 3:26-cv-00128-JLS-BJW            Document 13 Filed 03/16/26               PageID.552      Page 28\n                                                  of 29\n\n\n 1           Reasonable officials know that municipal codes governing ministerial approvals bind them.\n 2    See Las Lomas Land Co., LLC v. City of Los Angeles, 177 Cal.App.4th 837, 853 (2009).\n 3    Accordingly, Defendants are not entitled to qualified immunity at this stage.\n 4    8.4    Reclaimed Water Interference Further Supports Plaintiff\u2019s Constitutional Claims\n 5           Defendants argue that City Manager Dennis Morita merely obtained El Centro\u2019s will-serve\n 6    letter and therefore did not violate any constitutional right. (Mot.; ECF No. 12-1 at 25.) The\n 7    Complaint alleges far more. The City initially encouraged Plaintiff to pursue reclaimed water for the\n 8    data center and directed Plaintiff to retain a consultant to develop the project. (Compl. \u00b6\u00b6 29\u201330.)\n 9    City officials repeatedly confirmed that the requested recycled-water supply was \u201cwell within [the\n10    City\u2019s] capabilities.\u201d (Compl. \u00b648.) The City transmitted a feasibility report confirming the earlier\n11    discussions. (Compl. \u00b666; Compl. Ex. 21.) City officials repeatedly confirmed supplying reclaimed\n12    water. (Compl. \u00b6\u00b6 73, 77\u201378.) On Nov. 20, 2025, City Manager Morita stated the City was preparing\n13    a reclaimed-water will-serve agreement and that a draft would be provided shortly. (Compl. \u00b688.)\n14           These allegations provide additional evidence of Defendants\u2019 broader pattern of conduct--\n15    encouraging Plaintiff to invest in project infrastructure, then obstructing the project after Plaintiff\n16    insisted on ministerial approval and pursued approvals through Imperial County. Viewed in context,\n17    the reclaimed-water allegations reinforce the plausibility of Plaintiff\u2019s constitutional claims,\n18    including retaliation, arbitrary treatment, and interference with vested project rights.\n19    9.     CONCLUSION\n20           Accepting all allegations as true and drawing reasonable inferences in Plaintiff\u2019s favor, the\n21    Complaint states claims for procedural due process violation, First Amendment retaliation, equal\n22    protection under a \u201cclass of one\u201d theory, and municipal liability under Monell. The Motion to\n23    Dismiss should be denied in its entirety.\n24                                           Respectfully submitted,\n25\n                                             LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n26\n27\n28    Date: March 16, 2026                   Sebastian Rucci (SBN 178114)\n                                             Attorney for Plaintiff\n\n                          PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                  PAGE 24\n\f     Case 3:26-cv-00128-JLS-BJW          Document 13 Filed 03/16/26               PageID.553   Page 29\n                                                of 29\n\n\n 1                   ATTORNEY\u2019S CERTIFICATE OF SERVICE BY E-MAIL\n 2           I hereby certify that on this 16th day of March, 2026, I electronically filed the\n 3    foregoing PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS with\n 4    the Clerk of the Court using the CM/ECF system which will send notification to all the\n 5    parties. I Further Certify That on March 16, 2026, the foregoing                  PLAINTIFF\u2019S\n 6    OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS was served electronically served\n 7    on Defendant\u2019s counsel Konrad Rasmussen, at kmr@mmr4law.com from my law office\n 8    email Sebastian@Rucci.Law. The transmission was complete and without error and I did not\n 9    receive an electronic notification to the contrary.\n10\n11                                         LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n\n12    Date: January 15, 2026\n13\n                                           Sebastian Rucci (SBN 178114)\n14                                         Attorney for Plaintiffs\n15\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                        PLAINTIFF\u2019S OPPOSITION TO DEFENDANTS\u2019 MOTION TO DISMISS                PAGE 25\n\f","ocr_status":1,"date_upload":"2026-03-16T16:32:58.017772-07:00","document_number":"13","attachment_number":null,"pacer_doc_id":"037022355799","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Response in Opposition to Motion","acms_document_guid":""}],"date_created":"2026-03-16T16:24:07.286625-07:00","date_modified":"2026-06-29T18:54:26.554574-07:00","date_filed":"2026-03-16","time_filed":"15:48:35","entry_number":13,"recap_sequence_number":"2026-03-16.001","pacer_sequence_number":49,"description":"RESPONSE in Opposition re 12 MOTION to Dismiss the complaint filed by Imperial Valley Computer Manufacturing, LLC. (Rucci, Sebastian) (aas). (Entered: 03/16/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/455589933/","id":455589933,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/470537200/","id":470537200,"tags":[],"absolute_url":"/docket/72127384/12/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-03-02T16:22:07.624016-08:00","date_modified":"2026-06-29T18:54:26.525433-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"12","attachment_number":null,"pacer_doc_id":"037022301990","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Motion to Dismiss","acms_document_guid":""}],"date_created":"2026-03-02T16:22:07.596800-08:00","date_modified":"2026-06-29T18:54:26.503754-07:00","date_filed":"2026-03-02","time_filed":"16:13:58","entry_number":12,"recap_sequence_number":"2026-03-02.001","pacer_sequence_number":39,"description":"MOTION to Dismiss the complaint by Katherine Burnsworth, City of Imperial, Othon Mora, Dennis Morita, Katie Turner. (Attachments: # 1 Memo of Points and Authorities, # 2 Request for Judicial Notice, # 3 Declaration of Brett L. Cirincione, # 4 Proof of Service)(Cirincione, Brett)Attorney Brett Lee Cirincione added to party Katherine Burnsworth(pty:dft), Attorney Brett Lee Cirincione added to party City of Imperial(pty:dft), Attorney Brett Lee Cirincione added to party Othon Mora(pty:dft), Attorney Brett Lee Cirincione added to party Dennis Morita(pty:dft), Attorney Brett Lee Cirincione added to party Katie Turner(pty:dft) (aas). (Entered: 03/02/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/454937137/","id":454937137,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/469868867/","id":469868867,"tags":[],"absolute_url":"/docket/72127384/11/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-02-24T14:36:22.010685-08:00","date_modified":"2026-06-29T18:54:26.474081-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"11","attachment_number":null,"pacer_doc_id":"037022278130","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order on Motion for Extension of Time to File Response/Reply","acms_document_guid":""}],"date_created":"2026-02-24T14:36:21.986049-08:00","date_modified":"2026-06-29T18:54:26.452289-07:00","date_filed":"2026-02-23","time_filed":null,"entry_number":11,"recap_sequence_number":"2026-02-23.002","pacer_sequence_number":37,"description":"ORDER Granting 10 Joint Motion for Further Extension of Time for Defendants to File Responsive Pleading. Signed by Judge Janis L. Sammartino on 2/23/26. (aas) (Entered: 02/24/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/454745238/","id":454745238,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/469670850/","id":469670850,"tags":[],"absolute_url":"/docket/72127384/10/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-02-23T11:19:30.487564-08:00","date_modified":"2026-06-29T18:54:26.422143-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"10","attachment_number":null,"pacer_doc_id":"037022269015","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Motion for Extension of Time to File Response/Reply","acms_document_guid":""}],"date_created":"2026-02-23T11:19:30.462602-08:00","date_modified":"2026-06-29T18:54:26.398489-07:00","date_filed":"2026-02-23","time_filed":"10:30:54","entry_number":10,"recap_sequence_number":"2026-02-23.001","pacer_sequence_number":34,"description":"Joint MOTION for Extension of Time to File Response/Reply as to 1 Complaint,,,, [Proposed] Order granting joint motion for further extension of time to file responsive pleading [ECF No. 10] by Katherine Burnsworth, City of Imperial, Othon Mora, Dennis Morita, Katie Turner. (Attachments: # 1 Proof of Service)(Rasmussen, Konrad) (aas). (Entered: 02/23/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/452189381/","id":452189381,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/467050972/","id":467050972,"tags":[],"absolute_url":"/docket/72127384/9/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-30T11:26:10.288648-08:00","date_modified":"2026-06-29T18:54:26.331613-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"9","attachment_number":null,"pacer_doc_id":"037022188059","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Order on Motion for Extension of Time to File Response/Reply","acms_document_guid":""}],"date_created":"2026-01-30T11:26:10.232912-08:00","date_modified":"2026-06-29T18:54:26.308973-07:00","date_filed":"2026-01-30","time_filed":"11:06:02","entry_number":9,"recap_sequence_number":"2026-01-30.001","pacer_sequence_number":32,"description":"ORDER Granting 8 Joint Motion for Extension of Time for Defendants to File Responsive Pleading. Signed by Judge Janis L. Sammartino on 1/30/26. (aas) (Entered: 01/30/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/452100212/","id":452100212,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/466960415/","id":466960415,"tags":[],"absolute_url":"/docket/72127384/8/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-29T18:16:58.070149-08:00","date_modified":"2026-06-29T18:54:26.280272-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"8","attachment_number":null,"pacer_doc_id":"037022186484","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Motion for Extension of Time to File Response/Reply","acms_document_guid":""}],"date_created":"2026-01-29T18:16:58.045168-08:00","date_modified":"2026-06-29T18:54:26.257580-07:00","date_filed":"2026-01-29","time_filed":"17:40:07","entry_number":8,"recap_sequence_number":"2026-01-29.001","pacer_sequence_number":24,"description":"Joint MOTION for Extension of Time to File Response/Reply as to 1 Complaint,,,, [Proposed] Order granting joint motion for extension of time to file responsive pleading by Katherine Burnsworth, City of Imperial, Othon Mora, Dennis Morita, Katie Turner. (Attachments: # 1 Proof of Service)(Rasmussen, Konrad)Attorney Konrad Muth Rasmussen added to party Katherine Burnsworth(pty:dft), Attorney Konrad Muth Rasmussen added to party City of Imperial(pty:dft), Attorney Konrad Muth Rasmussen added to party Othon Mora(pty:dft), Attorney Konrad Muth Rasmussen added to party Dennis Morita(pty:dft), Attorney Konrad Muth Rasmussen added to party Katie Turner(pty:dft) (aas). (Entered: 01/29/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/450090949/","id":450090949,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464900357/","id":464900357,"tags":[],"absolute_url":"/docket/72127384/3/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-12T17:26:31.384512-08:00","date_modified":"2026-06-29T18:54:26.021610-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"3","attachment_number":null,"pacer_doc_id":"037022117963","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Summons Returned Executed","acms_document_guid":""}],"date_created":"2026-01-12T17:26:31.332146-08:00","date_modified":"2026-06-29T18:54:25.998430-07:00","date_filed":"2026-01-12","time_filed":"16:41:40","entry_number":3,"recap_sequence_number":"2026-01-12.001","pacer_sequence_number":14,"description":"SUMMONS Returned Executed by Imperial Valley Computer Manufacturing, LLC. City of Imperial served. (Attachments: # 1 Exhibit Summons on Mayor Martinez, # 2 Exhibit Summons on Councilman Tucker, # 3 Exhibit Summons on Councilman Ampanaro, # 4 Exhibit Summons on Councilwoman Mendoza)(Rucci, Sebastian) (aas). (Entered: 01/12/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/450090946/","id":450090946,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464900354/","id":464900354,"tags":[],"absolute_url":"/docket/72127384/4/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-12T17:26:30.583871-08:00","date_modified":"2026-06-29T18:54:26.084179-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"4","attachment_number":null,"pacer_doc_id":"037022117976","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Summons Returned Executed","acms_document_guid":""}],"date_created":"2026-01-12T17:26:30.531056-08:00","date_modified":"2026-06-29T18:54:26.057431-07:00","date_filed":"2026-01-12","time_filed":"16:42:46","entry_number":4,"recap_sequence_number":"2026-01-12.002","pacer_sequence_number":16,"description":"SUMMONS Returned Executed by Imperial Valley Computer Manufacturing, LLC. Dennis Morita served. (Rucci, Sebastian) (aas). (Entered: 01/12/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/450090944/","id":450090944,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464900352/","id":464900352,"tags":[],"absolute_url":"/docket/72127384/5/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-12T17:26:30.142034-08:00","date_modified":"2026-06-29T18:54:26.133217-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"5","attachment_number":null,"pacer_doc_id":"037022117982","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Summons Returned Executed","acms_document_guid":""}],"date_created":"2026-01-12T17:26:30.093297-08:00","date_modified":"2026-06-29T18:54:26.110443-07:00","date_filed":"2026-01-12","time_filed":"16:44:06","entry_number":5,"recap_sequence_number":"2026-01-12.003","pacer_sequence_number":18,"description":"SUMMONS Returned Executed by Imperial Valley Computer Manufacturing, LLC. Katherine Burnsworth served. (Rucci, Sebastian) (aas). (Entered: 01/12/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/450090938/","id":450090938,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464900346/","id":464900346,"tags":[],"absolute_url":"/docket/72127384/6/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-12T17:26:28.966136-08:00","date_modified":"2026-06-29T18:54:26.184069-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"6","attachment_number":null,"pacer_doc_id":"037022117997","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Summons Returned Executed","acms_document_guid":""}],"date_created":"2026-01-12T17:26:28.922514-08:00","date_modified":"2026-06-29T18:54:26.160476-07:00","date_filed":"2026-01-12","time_filed":"16:44:58","entry_number":6,"recap_sequence_number":"2026-01-12.004","pacer_sequence_number":20,"description":"SUMMONS Returned Executed by Imperial Valley Computer Manufacturing, LLC. Othon Mora served. (Rucci, Sebastian) (aas). (Entered: 01/12/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/450090917/","id":450090917,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464900325/","id":464900325,"tags":[],"absolute_url":"/docket/72127384/7/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-12T17:26:24.285928-08:00","date_modified":"2026-06-29T18:54:26.232157-07:00","sha1":"","page_count":null,"file_size":null,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"7","attachment_number":null,"pacer_doc_id":"037022118060","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Summons Returned Executed","acms_document_guid":""}],"date_created":"2026-01-12T17:26:24.237142-08:00","date_modified":"2026-06-29T18:54:26.211822-07:00","date_filed":"2026-01-12","time_filed":"16:51:45","entry_number":7,"recap_sequence_number":"2026-01-12.005","pacer_sequence_number":22,"description":"SUMMONS Returned Executed by Imperial Valley Computer Manufacturing, LLC. Katie Turner served. (Rucci, Sebastian) (aas). (Entered: 01/12/2026)","tags":[]},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/docket-entries/449875512/","id":449875512,"docket":"https://www.courtlistener.com/api/rest/v4/dockets/72127384/","recap_documents":[{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464678926/","id":464678926,"tags":[],"absolute_url":"/docket/72127384/1/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-09T14:53:16.165696-08:00","date_modified":"2026-06-29T18:54:25.900511-07:00","sha1":"45c305370d311bced50416b0dbd6e3c96a77327a","page_count":52,"file_size":442641,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.0_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.0.pdf","ia_upload_failure_count":null,"thumbnail":"recap-thumbnails/gov.uscourts.casd.839861/464678926.thumb.1068.png","thumbnail_status":1,"plain_text":"     Case 3:26-cv-00128-JLS-BJW         Document 1        Filed 01/09/26    PageID.1     Page 1 of 52\n\n\n\n 1    Sebastian Rucci (State Bar #178114)\n 2    LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n      16400 Pacific Coast Highway, Suite 212\n 3    Huntington Beach, CA 92649\n 4    Tel: (562) 901-0199\n 5    Cell: (330) 720-0398\n      Fax: (562) 249-6910\n 6    Sebastian@Rucci.Law\n 7    Attorney for Plaintiffs\n 8\n                             UNITED STATES DISTRICT COURT\n 9                         SOUTHERN DISTRICT OF CALIFORNIA\n10\n11    IMPERIAL VALLEY COMPUTER                 )\n      MANUFACTURING, LLC, a California         )       Case No: '26CV128 JLS BJW\n12                                             )\n      limited liability company                )\n13                                             )       Judge:\n                                               )\n14           Plaintiff\n                                               )\n      vs.                                      )       Magistrate:\n15                                             )\n                                               )\n16    CITY OF IMPERIAL, a California           )\n17    municipal corporation; KATHERINE         )       VERIFIED CIVIL RIGHTS COMPLAINT\n      BURNWORTH in her individual capacity; )          (1) Violation of Procedural Due Process;\n18                                             )\n      DENNIS MORITA in his individual          )       (2) First Amendment Retaliation;\n19    capacity; KATIE TURNER in her individual )       (3) Equal Protection Class of One Claim; and\n      capacity; and OTHON MORA in his          )       (4) Municipal Liability (Monell) ;\n20                                             )\n      individual capacity                      )          (42 U.S.C. \u00a7 1983)\n21                                             )\n                                               )\n22           Defendants                                PLAINTIFF DEMANDS TRIAL BY JURY\n                                               )\n23                                             )\n\n24\n                          VERIFIED CIVIL RIGHTS COMPLAINT\n25           COME NOW the Plaintiff and for their claims against defendants City of Imperial,\n26    Katherine Burnworth, Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and\n27    severally state as follows:\n28\n\n\n                                     VERIFIED CIVIL RIGHTS COMPLAINT                            Page 1\n\f     Case 3:26-cv-00128-JLS-BJW                            Document 1               Filed 01/09/26               PageID.2             Page 2 of 52\n\n\n\n 1                                                         TABLE OF CONTENTS\n 2    Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3\n\n 3    Jurisdiction and Venue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4\n      Plaintiffs and Defendants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4\n 4\n      City\u2019s Zoning Code and Ministerial Approval Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5\n 5\n      Project Inception and the Ministerial Mandate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6\n 6\n      First Site Plan Application to the City . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7\n 7\n      Revised Plans Submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9\n 8    Reclaimed Water Agreement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10\n 9    First Application Deemed Approved by Operation of Law . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12\n10    City Refuses to Use available Streamlined Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13\n\n11    Second Scaled-Down Application Only on Industrial Land. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14\n\n12    Second Application Deemed Approved by Operation of Law . . . . . . . . . . . . . . . . . . . . . . . . . . . 15\n      Ministerial Approval of Data Center by the County. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17\n13\n      Third Application Deemed Approved by Operation of Law . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17\n14\n      City Breached Reclaimed Water Agreement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18\n15\n      City\u2019s Tortious Interference With El Centro Water Agreement . . . . . . . . . . . . . . . . . . . . . . . . . . 21\n16\n      City Blocks Reclaimed Water to Salton Sea (Environmental Pretext). . . . . . . . . . . . . . . . . . . . . 22\n17    Retaliatory Sham Litigation Filed for Sole Purpose of Delay. . . . . . . . . . . . . . . . . . . . . . . . . . . . 24\n18    Defendants Engage in Public Misrepresentation Campaign. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27\n19    Defendants and IID\u2019s Coordinated Misinformation Campaign . . . . . . . . . . . . . . . . . . . . . . . . . . 29\n\n20    Conspiracy to Extort: Coordination with \u201cGreenmail\u201d Operatives . . . . . . . . . . . . . . . . . . . . . . . 36\n\n21    Matrix Showing Coordinated Misinformation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39\n      Damages Sustained by the Plaintiff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40\n22\n      COUNT 1 - VIOLATION OF PROCEDURAL DUE PROCESS (42 U.S.C. \u00a7 1983). . . . . . . . . . . . . . . . 41\n23\n      COUNT 2 - FIRST AMENDMENT RETALIATION (42 U.S.C. \u00a7 1983) . . . . . . . . . . . . . . . . . . . . . . . 43\n24\n      COUNT 3 - EQUAL PROTECTION CLASS OF ONE CLAIM (42 U.S.C. \u00a7 1983) . . . . . . . . . . . . . . . . 47\n25    COUNT 4 - MUNICIPAL LIABILITY (MONELL) (42 U.S.C. \u00a7 1983) . . . . . . . . . . . . . . . . . . . . . . . . 49\n26    VERIFICATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51\n27    TABLE OF EXHIBITS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52\n28\n\n\n                                                       VERIFIED CIVIL RIGHTS COMPLAINT                                                        Page 2\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1        Filed 01/09/26       PageID.3       Page 3 of 52\n\n\n\n 1                                               INTRODUCTION\n 2            1.      This civil rights action is brought under 42 U.S.C. \u00a7 1983 to redress deprivation of\n 3    Plaintiff\u2019s First and Fourteenth Amendment rights by the City of Imperial (\u201cCity\u201d) and its senior\n 4    officials. This case arises from a bad-faith campaign of administrative obstruction and targeted\n 5    retaliation triggered by Plaintiff\u2019s refusal to submit to an unlawful discretionary approval process for\n 6    a data center project that was, by law, a \u201cpermitted use by right.\u201d\n 7            2.      At all relevant times, the property was zoned I-2 (Rail-Served Industrial), the City\u2019s\n 8    most intensive industrial classification. The City\u2019s review of the site plan was strictly ministerial,\n 9    not discretionary and Imperial Municipal Code \u00a7 24.19.550 provides a self-executing mandate: if\n10    the City fails to act within fifteen (15) days of a complete application, the site plan is \u201cdeemed\n11    approved\u201d by operation of law. Despite three compliant applications, the City willfully ignored its\n12    deadline, effectively pocket-vetoing a project it had no legal authority to deny.\n13            3.      Plaintiff refused to proceed with Defendants unauthorized discretionary process, and\n14    relocated the data center to adjacent industrial land in the County of Imperial. The County following\n15    the law, granted ministerial approval and issued a CEQA exemption. In direct retaliation for\n16    Plaintiff\u2019s exercise of its legal rights and its avoidance of the City\u2019s unlawful discretionary hurdles,\n17    Defendants launched a coordinated campaign to sabotage the data center, not withstanding the many\n18    benefits in taxes and jobs for its citizens. Defendants unlawful campaign included:\n19    (a).    Directing staff to circulate misleading flyers to incite public hostility;\n      (b).    Partnered with environmental groups\n20\n      (c).    Partnered with Z-Global\n21    (d).    Refusing to complete its agreement to provide reclaimed water eight months after expenses\n              were paid by Plaintiff;\n22\n      (e).    Pressuring the City of El Centro to terminate its reclaimed water service agreement;\n23    (f).    Partnering with the Imperial Irrigation District to obstruct project utilities;\n24    (g).    Filing meritless sham legal action based on outright misreading of the County\u2019s zoning code\n              intended to delay and devalue a project outside the City\u2019s jurisdiction.\n25\n26            4.      Defendants\u2019 actions constitute an official municipal policy characterized by the\n\n27    knowing disregard of mandatory statutes and the weaponization of governmental power to punish\n\n28    Plaintiff for asserting its constitutional rights, and to punish the County for following the law.\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                               Page 3\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1         Filed 01/09/26      PageID.4       Page 4 of 52\n\n\n\n 1    Defendants\u2019 deliberate and ongoing pattern of misconduct, including the knowing disregard of\n 2    Imperial Municipal Code and self-executing statutes, retaliation for protected activity, and abuse of\n 3    governmental authority. These actions violated Plaintiff\u2019s rights under the First and Fourteenth\n 4    Amendments to the United States Constitution and constitute official municipal policy and\n 5    retaliation actionable under 42 U.S.C. \u00a7 1983.\n 6           5.      Plaintiff\u2019s $10 billion AI Data Center project is projected to generate over $22 million\n 7    in net annual revenue for IID. The project would provide $72.5 million in one-time sales tax benefits\n 8    and approximately $28.75 million in annual in real and personal property taxes to the County. The\n 9    project will create over 1,688 construction jobs, 100 permanent jobs, and hundreds of indirect jobs.\n10                                        JURISDICTION AND VENUE\n11           6.      This Complaint alleges violations of the Plaintiffs\u2019 rights under the United States\n12    Constitution, giving this court original \u201cfederal question\u201d jurisdiction pursuant to 28 U.S.C. \u00a71331\n13    over those claims. This Complaint also alleges violations of the Plaintiff\u2019s rights under the Federal\n14    Civil Rights Act, 42 U.S.C. \u00a71983, to redress the deprivation, under color of law, of rights secured\n15    by the United States Constitution, giving this court original jurisdiction under 28 U.S.C. \u00a71343(a)(3)\n16    and (4) over those claims.\n17           7.      There are multiple bases for this court\u2019s jurisdiction and venue, including 28 U.S.C.\n18    \u00a7 1391(b)(1) because defendants are located in and transact their affairs in Imperial County,\n19    California which is within the geographical area of this court. Venue is proper pursuant to 28 U.S.C.\n20    \u00a7 1391(b)(2) because a substantial part of the events giving rise to the claims occurred in Imperial\n21    County, California which is located within the geographical area of this court. See 28 U.S.C. \u00a7 84(d)\n22    (Imperial County in Southern District of CA).\n23           8.      Plaintiff\u2019s federal constitutional claims are asserted under federal law and not subject\n24    to California\u2019s Government Claims Act, Cal. Gov. Code \u00a7\u00a7 810 et seq.\n25                                      PLAINTIFFS AND DEFENDANTS\n26           9.      The Plaintiff, Imperial Valley Computer Manufacturing LLC (\u201cPlaintiff\u201d) is a\n27    limited liability company incorporated in California and the applicant for the data center before the\n28    City of Imperial and later before Imperial County.\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 4\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1         Filed 01/09/26       PageID.5     Page 5 of 52\n\n\n\n 1           10.     The City of Imperial (\u201cCity\u201d), is a municipal corporation organized under the laws\n 2    of the State of California. Defendant Katherine Burnworth, was at all times relevant a City Council\n 3    member and is sued in her individual capacity. Defendant Dennis Morita was at all relevant times\n 4    the City Manager and is sued in his individual capacity. Defendant Katie Turner was at all relevant\n 5    times the City Attorney and is sued in her individual capacity. Defendant Othon Mora was at all\n 6    times relevant the City\u2019s community development director and is sued in his individual capacity\n 7    (collectively referred to as \u201cDefendants.\u201d)\n 8           11.     Whenever a reference is made to any act done by a defendant, the allegation means\n 9    the act was done with the knowledge, consent, approval, and ratification of all defendants and is\n10    thereby attributed to each defendant individually, jointly and severally.\n11                  CITY\u2019S ZONING CODE AND MINISTERIAL APPROVAL FRAMEWORK\n12           12.     Imperial\u2019s Municipal Code designates the I-2 Rail-Served Industrial Zone as its most\n13    intensive industrial classification, \u00a7 24.07.120(c) permits \u201cbusiness, professional, and research\n14    offices\u201d by right in the I-2 Rail-Served Industrial Zone.\n15           13.     Imperial\u2019s Site Plan Review procedure \u00a7 24.19.550, mandates the approval within 15\n16    days of a completed application: \u201cWithin fifteen (15) days of the date that application is deemed\n17    complete by the Director, the Director shall approve, conditionally approve, or disapprove the\n18    application... Failure of the Director to act within fifteen (15) days shall be deemed approval\n19    of the application.\u201d The use of the mandatory term \u201cshall\u201d strips the Planning Director of discretion.\n20    Furthermore, \u00a7 24.19.550 provides for deemed approval after 15 days without referencing a public\n21    hearing; hence, site plan review does not require a public hearing, and the City is bound by its own\n22    legislative enactments.\n23           14.     Imperial\u2019s Site Plan Review procedure \u00a7 24.19.500 is ministerial and requires staff\n24    to verify compliance with the proposed use and setbacks, height limits, and lot coverage. Staff\n25    checks plans against objective standards (permitted uses, setbacks, height limits).\n26           15.     Unlike discretionary reviews, which allow officials to weigh subjective policy\n27    considerations, site plan review is ministerial and leave no room for personal judgment or political\n28    maneuvering. If the objective standards are met, the permit must be issued.\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                             Page 5\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1         Filed 01/09/26      PageID.6       Page 6 of 52\n\n\n\n 1            16.     CEQA is only triggered by discretionary approvals. \u201cMinisterial projects are exempt\n 2    from the requirements of CEQA.\u201d (14 Cal. Code Regs., \u00a7 15268(a).) \u201cIf the lead agency concludes\n 3    a project is exempt . . . the agency may thereafter proceed without further consideration of CEQA.\u201d\n 4    (Union Med.M. v. City San Diego (2019), 7 Cal. 5th 1171, 1186).\n 5            17.     CEQA exemption is immune of controversy: \u201cIt is entirely possible, if not common,\n 6    for a controversial or unpopular project to be exempt from CEQA. Neighborhood sentiment is not\n 7    an impact that must be directly considered in the environmental determination process.\u201d (McCann\n 8    v. City San Diego (2021) 70 Cal. App. 5th 51, 86.)\n 9            18.     Imperial\u2019s Municipal Code provides that uses not specifically listed are treated as\n10    permitted based on similarity of use to other listed uses. (\u00a7\u00a7 24.19.220 -- 250.) Similarity of use\n11    procedure states: \u201ca use, not specifically listed as a permitted ... shall be deemed a permitted use...on\n12    the basis of similarity to uses specifically listed.\u201d (\u00a7 24.19.220). The Director shall compare\n13    proposed use with uses listed and make findings to the Planning Commission (\u00a724.19.230) and the\n14    Planning Commission \u201cshall make a determination whether the use is \u2018similar\u2019 and should be a\n15    permitted use.\u201d (\u00a724.19.250).\n16            19.     Imperial\u2019s Municipal Code also provides: \u201cIf ambiguity arises concerning the\n17    appropriate zone or classification of a particular use\u201d the Planning Director shall give his \u201cfindings\n18    and interpretations, to the Planning Commission for a recommendation and then transmit said\n19    recommendation to the Council\u201d and if \u201capproved by the Council, thereafter such interpretation\n20    shall govern.\u201d (\u00a724.01.150).\n21                                    PROCEDURAL CHRONOLOGY\n22                         PROJECT INCEPTION AND THE MINISTERIAL MANDATE\n23            20.     The development of the data center in the City was predicated on a clear regulatory\n24    understanding that the proposed use was permitted by right under existing zoning ordinances. In\n25    September 2024, the Plaintiff identified spare capacity on IID\u2019s 230 kV S-line, a critical component\n\n26    for the data center. Following this technical confirmation, Plaintiff engaged in preliminary\n      discussions with the City to verify land use compliance.\n27\n              21.     In late September 2024, Plaintiff met with Othon Mora, the City\u2019s Community\n28\n      Development Director (\u201cDirector Mora\u201d or \u201cPlanning Director\u201d). Plaintiff maintained--and the\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                               Page 6\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1         Filed 01/09/26       PageID.7      Page 7 of 52\n\n\n\n 1    Planning Director initially agreed--that the data center is a \u201cpermitted use\u201d in the I-2 zone as\n 2    \u201cBusiness, professional, and research offices.\u201d\n 3            22.     The City\u2019s initial confirmation of the data center\u2019s ministerial status induced the\n 4    Plaintiff to invest $12 million for the purchase of 95-acres and to spend millions in technical studies\n 5    for three separate applications to the City.\n 6            23.     Separately, Plaintiff also contracted for 75-acres of industrial land in the County and\n 7    24-acres in the City of El Centro for $15 million more, both of which confirmed data centers are\n 8    permitted as of right in their respective industrial zones.\n 9            24.     On January 17, 2025, Plaintiff emailed Director Mora plans for three contiguous data\n10    centers: (1) 95 acres in the City; (2) 75 acres in the County; and (3) 24 acres in the City of El Centro.\n11    All three sites were located on land zoned industrial with the 230 kV S-line bordering the land. The\n12    email asked Director Mora for \u201ccomments on any glaring issues\u201d and noted that, as \u201cour concept is\n13    being formulated your initial comments would be greatly appreciated\u201d (Exhibit 1).\n14            25.     On February 28, 2025, Plaintiff emailed the City stating: \u201cI\u2019ve attached our site plan\n15    for the . . . 95 acres at Imperial and Aten Road. Please schedule a pre-application meeting at your\n16    convenience to discuss compliance and purchasing reclaimed water, etc. . . . building sketches and\n17    animation videos are attached\u201d (Exhibit 2). City Planner Yvonne Cordero replied: \u201cWe look forward\n18    to working with your team on this exciting project.\u201d\n19                               FIRST SITE PLAN APPLICATION TO THE CITY\n20            26.     On March 4, 2025, a meeting to discuss the data center was held at the City with\n21    several City representatives, including Director Mora and City Engineer David Dale (\u201cCity\n22    Engineer\u201d). Plaintiff provided a copy of the City\u2019s zoning code and demonstrated that the data center\n23    is permitted in the industrial I-2 zone under \u201cBusiness, professional, and research offices.\u201d Director\n24    Mora agreed the industrial zoning permitted the data center.\n25            27.     Plaintiff also discussed the City selling reclaimed water for the data center with the\n26    City Engineer. The City expressed significant interest in the additional revenue, specifically\n27    conditioned upon Plaintiff's agreement to cover the cost of engineering, all upgrades, and the\n28    purchase of the reclaimed water.\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                               Page 7\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1        Filed 01/09/26      PageID.8       Page 8 of 52\n\n\n\n 1           28.     On March 4, 2025, Plaintiff filed an application for \u201csite plan review for proposed\n 2    imperial valley data center campus,\u201d paid the required fee, and received an email from the City of\n 3    the executed planning application for Site Plan Review 25-03 (Exhibit 3).\n 4           29.     On March 5, 2025, the City encouraged the Plaintiff to hire Webb and Associates, and\n 5    to decide which of two alternatives to secure reclaimed water for the data center: \u201cWe can do the\n 6    Title 22 Report in two different ways. You can contract directly with Webb or deposit $30,000 with\n 7    the City. Either way will work. The contract directly with Webb may work better since I may have\n 8    to get legal to draft an agreement, and that may take some time\u201d (Exhibit 4).\n 9           30.     Plaintiff contacted Webb and Associates and hired them to secure reclaimed water.\n10    On March 7, 2025, Plaintiff informed the City he asked \u201cWebb do the engineering work to secure\n11    approval for the City to sell reclaimed water\u201d (Exhibit 4, pg. 5).\n12           31.     On March 17, 2025, City Planner Yvonne Cordero emailed that she \u201crouted the\n13    project to our Development Review Committee and their comments should be received by the end\n14    of this week. Imperial County Fire Department which handles the City requested additional time for\n15    their review and I referred Andrew Loper to you for any questions. Once I have the departments\u2019\n16    comments, I\u2019ll start formulating the Site Plan Review letter.\u201d\n17           32.     On March 21, 2025, Engineering and Planning Project Manager Tom Dubose had an\n18    in-person meeting with Andrew Loper of the County Fire Department, which handles the City, to\n\n19    review the project, and was directed to make changes to the road width.\n             33.     On April 4, 2025, Director Mora emailed a site plan review letter seeking revised\n20\n      plans and technical studies (traffic, water, air, noise, and fire) and clarification on zoning because\n21\n      the \u201cdata center\u201d and \u201csubstation\u201d are not listed as uses. Director Mora asked for a new site plan with\n22\n      frontage on SR-86 for retail and for road improvements, and updates on utilities, parking,\n23\n      landscaping, and water (Exhibit 5).\n24           34.     On April 4, 2025, Director Mora did not issue site plan determination requesting\n25    various technical studies until 31 days after site plan submission. Consequently, the March 4, 2025,\n26    application was deemed approved on March 19, 2025.\n\n27\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 8\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1        Filed 01/09/26       PageID.9      Page 9 of 52\n\n\n\n 1                                        REVISED PLANS SUBMITTED\n 2           35.     On May 15, 2025, Plaintiff submitted revised plans comprising 17 pages responding\n\n 3    to the City\u2019s comments, which included 8 acres of commercial retail space along SR-86 and a\n      25-foot landscape strip with a concrete wall around the perimeter (Exhibit 6). The letter noted that\n 4\n      the project is \u201cpermitted by right\u201d in the I-2 industrial zone and the battery storage is a subordinate\n 5\n      \u201caccessory use.\u201d The letter also noted that\n 6\n             \u201cThe ministerial aspects of the Site Plan is also apparent from the 15 day limit for\n 7           Site Plan Review: . . . Within 15 days of the date that application... the Director shall\n 8           approve, conditionally approve, or disapprove the application, or shall request the\n 9           applicant to revise said applications. Failure of the Director to act within 15 days\n\n10           shall be deemed approval of the application ... (\u00a7 24.19.550).\u201d\n\n11           36.     Plaintiff informed the City its reclaimed water consultant had not responded and was\n12    looking to proceed. On May 19, 2025, City Engineer David Dale replied: \u201cLet me try to contact\n13    Webb. If they don\u2019t respond, I can have our attorney prepare a quick contract for us to do the report.\u201d\n14    Throughout May 2025, the City Engineer facilitated the relationship between Plaintiff and Webb to\n15    ensure the report was completed, emailing on May 20, 2025: \u201cI got word that Webb will provide you\n16    with a proposal within 2-3 days. If you don\u2019t hear from them, please let me know\u201d (Exhibit 7).\n17           37.     On May 27, 2025, twelve days after the revised plans were submitted, Director Mora\n18    stated in an email: \u201cThank you for your submission. We have received the documents and will begin\n19    our review. If we have any comments or require clarification, we\u2019ll be sure to let you know. Should\n20    a meeting be necessary, we\u2019ll coordinate with you to schedule one.\u201d Since that email did not ask for\n21    anything else, the application was deemed complete on May 15, 2025; hence, three days remained\n22    before deemed approval.\n23           38.     On May 28, 2025, Plaintiff emailed IID\u2019s feasibility study which found the 250 MW\n24    will \u201cnot cause any buses to experience voltage exceedances or deviations.\u201d\n25           39.     On May 30, 2025, Plaintiff emailed City Attorney Turner that \u201cwe have already\n26    agreed to conduct studies and provide mitigation\u201d, added \u201ccommercial retail development along\n27    Imperial Avenue to create a buffer zone\u201d and the \u201czoning code supports approval of this facility\n28    as-of-right.\u201d The email continued:\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                                  Page 9\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26           PageID.10       Page 10 of\n                                                    52\n\n\n 1           \u201cIf the City chooses to require CEQA review and does not approve the project as of\n 2           right, we will pivot and focus on other data center sites in the region that can be\n\n 3           approved as of right and would reallocate that power to the new site.\u201d (Exhibit 8).\n\n 4\n             40.     The City did not act within 15 days of the May 15, 2025, submission. Instead, on May\n 5\n      27, 2025--twelve days into the review period--Director Mora sent a generic acknowledgment of\n 6\n      receipt without deeming the application incomplete. The deemed approval deadline expired on May\n 7\n      30, 2025.\n 8\n             41.     It was not until June 23, 2025--39 days after submission--that City Planner Cordero\n 9\n      attempted to issue an adverse site plan review letter, which she immediately recalled. The site plan\n10\n      was deemed approved by operation of law on May 30, 2025.\n11\n                                      RECLAIMED WATER AGREEMENT\n12\n             42.     On May 30, 2025, Brian Knoll, with Webb and Associates, emailed stating that he\n13\n      would get the agreement on the reclaimed water, copying the City Engineer.\n14\n             43.     On June 2, 2025, Brian Knoll with Webb and Associates submitted a proposal\n15\n      to prepare the Title 22 report to purchase reclaimed water from the City. Relying on the City's\n16\n      promise that it intended to sell reclaimed water if the feasibility was proven, Plaintiff signed\n17\n      the contract with Webb and wired the initial deposit.\n18\n             44.     On June 3, 2025, City Attorney Turner emailed Plaintiff stating she wanted \u201csimilar\n19\n      projects in terms of the permitting and entitlement process in another jurisdiction\u201d to understand\n20\n      \u201csimilar projects and the litigation that follows.\u201d\n21\n             45.     On June 3, 2025, Plaintiff emailed City Attorney Turner that \u201cData Center #2 is\n22\n      contiguous and located in Imperial County\u201d and it is \u201ca permitted use in Imperial County. See\n23\n      attached Imperial County \u00a7 90515 - 01 Permitted uses in the M-1 zone, see subsection bbb, \u2018Data\n24\n      center\u2019 uses are permitted in the M-1 Zone\u201d (Exhibit 9).\n25\n             46.     On June 4, 2025, Plaintiff emailed City Attorney Turner: \u201cData Center #2 is located\n26\n      in Imperial County and under \u00a7 90515-01, permitted uses in the M-1 zone include \u2018Data center\u2019 uses,\n27\n      which \u2018are permitted in the M-1 Zone\u2019 as of right. I have attached a draft plan of the data center\n28\n      located on contiguous land in the County.\u201d (Exhibit 10).\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                           Page 10\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26              PageID.11       Page 11 of\n                                                    52\n\n\n 1            47.     On June 6, 2025, Plaintiff emailed City Attorney Turner a memo listing 25 data\n 2    centers approved as of right in industrial zones, 14 were in California (Exhibit 11).\n 3            48.     On June 16, 2025, a video meeting regarding reclaimed water was held with the City\n 4    Engineer and Chris Kemp, the City\u2019s water treatment manager. The City Engineer noted that the\n 5    750,000 gallons per day \u201care well within our capabilities of recycled water\u201d further solidifying the\n 6    promise of availability. The City confirmed Plaintiff will have to pay for all upgrades. Later that\n 7    day, Plaintiff emailed the base flow and peak flow figures.\n 8            49.     On June 17, 2025, Plaintiff emailed the City Engineer stating he was \u201cassembling a\n 9    write-up of the benefits of the data center. . . . The daily cost for 500,000 gallons is $3,600 per day,\n10    or $109,500 per month, or $1.3 million per year. Is this correct?\u201d (Exhibit 12). On June 17, 2025,\n11    City Engineer Dale emailed the Plaintiff stating:\n12            \u201cBy law, the city can not charge more than it costs the city to treat the water. To\n              ensure fairness, the cost of reclaimed water will need to be studied (after the Title\n13\n              22 Report is complete to know what is required). This would include the costs of\n14            potential additional wastewater treatment plant personnel and certifications,\n              additional treatment to Title 22 standards (e.g., UV disinfection costs), pumping,\n15            pipeline maintenance, etc. The dollar figures you are quoting seem to be for\n16            wastewater treatment, which will be different than the reclaimed water cost. A closer\n              estimate would be to use the potable water rate scale of $4.06 per CCF\u2026 but again,\n17            it would have to be studied to be certain. $1.3 million per year sounds very high\n18            to me. I\u2019m pretty sure that the cost of the water would be part of a developer\n              agreement.\u201d (Exhibit 13).\n19\n              50.     On June 17, 2025, Plaintiff emailed City Engineer Dale: \u201cI know this is all\n20\n      preliminary. I received an even higher estimate from [Hyperscale Tenant] for the projected cost of\n21\n      the water. They used $6 per 1,000 gallons and set the annual cost at about $3 million per year in\n22\n      payment. I appreciate your help. I\u2019ve attached my memo outlining the benefits to the community\n23\n      and the environment of the data center campus\u201d (Exhibit 14).\n24\n              51.     The City directed Plaintiff to use Webb and Associates. Plaintiff followed through,\n25\n      hired Webb and Associates, signed the contract, and paid multiple invoices. The City acted as an\n26\n      active partner, held video meetings with the City Engineer and Water Treatment Manager to discuss\n27\n      technical feasibility.\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 11\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26              PageID.12       Page 12 of\n                                                    52\n\n\n 1            52.     The City Engineer explicitly stated, \u201cthe latest numbers you just sent are well within\n 2    our capabilities of recycled water.\u201d The City admitted it has the water and the capacity to deliver it.\n 3    While a specific price wasn\u2019t concluded, the City Engineer established the legal framework for the\n 4    price: \u201cBy law, the city can not charge more than it costs the city to treat the water.\u201d The Engineer\n 5    corrected the Plaintiff\u2019s high estimate ($1.3 million), suggesting a lower cost basis tied to actual\n 6    treatment expenses. The City Engineer\u2019s detailed explanation of how the price would be calculated\n 7    (treatment costs + UV disinfection + pumping) confirms that a deal was done in principle.\n 8            53.     Plaintiff hired Webb, paid all invoices, and agreed to pay for all upgrades. The City\n 9    stands to gain a new revenue stream and the environmental benefits of the extra reclaimed water. The\n10    City Engineer confirmed the agreement to sell. The \u201ccontract\u201d is the mutual understanding that the\n11    water will be provided; the contract is just the paperwork. The City requested Plaintiff to hire a\n12    specific engineer, paid for by Plaintiff, confirmed water capacity, and negotiated pricing formulas\n13    (cost-recovery). This creates a reasonable expectation a contract was formed, conditioned only on\n14    the technical validation.\n15                    FIRST APPLICATION DEEMED APPROVED BY OPERATION OF LAW\n16            54.     On June 23, 2025, Plaintiff emailed a letter to Director Mora and the City Attorney\n17    asserting that the data center fits under the classification of \u201cbusiness, professional, and research\n18    offices,\u201d as it is less intrusive than other uses, and that battery storage is a permitted accessory\n19    structure. The letter further noted that, under the code, unlisted uses are treated as permitted if they\n20    are similar to listed uses (Exhibit 15).\n21            55.     On June 23, 2025, at 9:34 PM, Plaintiff emailed City Attorney Turner stating:\n22    \u201cDuring our first meeting with Othon and others, we shared the zoning code and our view that\n23    we were a permitted use. I thought this was a non-issue and that the City agreed. If Othon believes\n24    that a data center is not a permitted use, based on my reading of the zoning code, in that case, we\n25    should proceed with a similar use determination by the Planning Commission under \u00a7 24.19.200\n26    . . .\u201d (Exhibit 16).\n27            56.     On June 23, 2025, City Planner Cordero emailed an adverse site plan review letter\n28    at 11:36 AM. Five minutes later, at 11:41 AM, Ms. Cordero emailed that she \u201cwould like to recall\u201d\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 12\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26              PageID.13       Page 13 of\n                                                    52\n\n\n 1    the prior email. The sequence of the \u201cadverse letter\u201d being immediately \u201crecalled\u201d is an admission\n 2    by the City that the denial was premature, erroneous, or procedurally flawed. As of that date, the\n 3    amended site plans had been under review for 39 days. Pursuant to \u00a7 24.19.550, the amended site\n 4    plans were deemed approve. By recalling the letter, the City effectively kept the clock ticking far past\n 5    15-day limit.\n 6            57.     Because the site plan review was withdrawn, the review continued to July 15, 2025,\n 7    when the City denied the application, 61 days had elapsed from date of submission. Hence, the\n 8    revised site plans were deemed approved as a matter of law.\n 9            58.     On July 2, 2025, a meeting was held at the City with Plaintiff, Project Manager Tom\n10    Dubose, Director Mora, City Attorney Turner, and City Manager Dennis Morita to discuss the data\n11    center and various paths to approval. During this meeting, Plaintiff reiterated his belief that the data\n12    center was a permitted use and that site plans required action within 15 days for approval.\n13            59.     Plaintiff also suggested a Planning Commission similarity of use determination under\n14    \u00a7 24.19.20. Plaintiff noted that the I-2 industrial zone explicitly permits livestock sales, feed yards,\n15    animal grazing, building equipment storage, automobile storage, lumber yards, laboratories, bottling\n16    plants, and cement products manufacturing.\n17            60.     Plaintiff emphasized that the data center generates minimal daily traffic, has limited\n18    on-site staff, has no retail foot traffic, and is quiet compared to other industrial uses. He noted the\n19    backup generators are subject to permits and monitoring. Director Mora confirmed a similarity of\n20    use determination would take two months and concluded by agreeing to submit as a path forward,\n21    suggesting an alternative path was possible with the Environmental Assessment Committee, which\n22    would take about one month.\n23                    CITY REFUSES TO USE AVAILABLE STREAMLINED PROCEDURES\n24            61.     On July 15, 2025, Director Mora emailed regarding the Environmental Assessment\n25    Committee path forward discussed at the July 2, 2025 meeting and that a Negative Declaration was\n26    likely but he wanted a text amendment and Conditional Use Permits which would \u201ctake\n27    approximately 6 to 9 months.\u201d (Exhibit 17).\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 13\n\f     Case 3:26-cv-00128-JLS-BJW              Document 1 Filed 01/09/26           PageID.14       Page 14 of\n                                                      52\n\n\n 1           62.     On July 18, 2025, Plaintiff emailed Director Mora asserting that \u201c[t]he City was\n 2    bypassing more streamlined procedures available under its code.\u201d The email continued:\n 3           \u201cFirst, we should discuss shrinking the project to a smaller data center, along with all\n             ancillary uses (substation, battery, and generator backup), all of which can be\n 4\n             accommodated on the industrial-zoned land. If this is the option, we can proceed with\n 5           new plans for site plan review, which takes 15 days under \u00a7 24.19.500. It seems\n 6           to me that a building with no windows, used for public traffic with ancillary energy\n             uses, should be permitted in the I-2 zone.\u201d\n 7\n 8           The email further explained the Plaintiff\u2019s reliance on the initial understanding and urged a\n\n 9    return to the ministerial process, or a similarity of use determination:\n\n10           \u201cFrom the outset, I selected the City of Imperial because I believed that our data\n             center would be a permitted use and exempt from CEQA. We revised the project\n11\n             to incorporate retail, demonstrating our commitment to collaboration. We are now\n12           many months into this process and must urgently consider more efficient procedural\n13           paths. Let\u2019s explore a project focuses solely on the industrially zoned portion,\n             encompassing the datacenter and all its ancillary infrastructure, to expedite the\n14\n             process under the ministerial Site Plan Review procedure. We should also discuss the\n15           Similar Use Determination before the Planning Commission.\u201d (Exhibit 18).\n16\n             63.     The City was bypassing its own streamlined codes, including the 15-day ministerial\n17\n      site plan review by shrinking the project to fit entirely within the industrial-zoned land, or by using\n18\n      the similarity of use determination.\n19\n                    SECOND SCALED-DOWN APPLICATION ONLY ON INDUSTRIAL LAND\n20\n             64.     Following continued obstruction, Plaintiff submitted a third, scaled-down application\n21\n      on July 22, 2025. The project was proposed entirely within the I-2 Rail-Served Industrial Zone,\n22\n      satisfying the use classification under \u00a7 24.07.120.C for \u201cbusiness, professional, and research\n23\n      offices.\u201d The application asserted the battery and backup generators are incidental to the data center,\n24\n      used exclusively to support its operations, and not designed for off-site distribution (Exhibit 19).\n25\n             65.     On July 30, 2025, Director Mora emailed Plaintiff that he was reviewing the \u201crevised\n26\n      site plan and detailed narrative\u201d and acknowledged \u201cthe project is now proposed entirely within the\n27\n      I-2 zoning designation. The Planning Department is currently reviewing the revised site plan and\n28\n      supporting information, and we will provide formal comments shortly. In the meantime, if any\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                             Page 14\n\f     Case 3:26-cv-00128-JLS-BJW              Document 1 Filed 01/09/26            PageID.15       Page 15 of\n                                                      52\n\n\n 1    technical studies, . . . have already been completed, please forward them at your earliest\n 2    convenience\u201d (Exhibit 20).\n 3            66.      On August 14, 2025, the City Engineer emailed the reclaimed water report and stated\n 4    that \u201cthe needed infrastructure, operations, and treatment are what were anticipated\u201d (Exhibit 21).\n 5    The report states on page 1 that the\n 6            \u201cCity of Imperial is currently working with a few entities that are interested in\n 7            receiving recycled water from the City. The objective is to identify the necessary\n              upgrades the City of Imperial intends to complete in order to comply with water\n 8\n              recycling requirements for cooling water.\u201d On pages 2\u20133, the report states that a \u201c12\n 9            inch purple pipe, recycled water distribution line is proposed to be installed from the\n10            existing wastewater treatment plant along P Street down to its intersection with Aten\n11            Road, approximately 2 miles. Figure 2-1 shows this proposed alignment on the City\u2019s\n              zoning map [the map shows the recycled water delivered to the data center site].\u201d\n12\n13            67.      On August 16, 2025, Plaintiff emailed the City Engineer stating they \u201creviewed the\n14    Title 22 Report and have one suggestion. I\u2019ve attached a map for the recycled water pipeline. This\n15    map could replace Figure 2-1. It accurately shows the recycled water going to the two sites for the\n16    recycled water: the site in the City and the site in Imperial County.\u201d The email asked: \u201cPlease get this\n17    concluded as soon as possible, as we are getting close with Site #1 [County], Site #2 [City] is before\n18    Othon, and we are certain he will approve the latest site plan with the project on Industrial land.\u201d\n19    (Exhibit 22).\n20            68.      On August 18, 2025, City Engineer Dale confirmed the City was acting on the\n21    reclaimed water project, emailing: \u201cOn it. I just sent the pipeline route [recycled water to both\n22    datacenters] to Webb.\u201d (Exhibit 23).\n23                    SECOND APPLICATION DEEMED APPROVED BY OPERATION OF LAW\n24            69.      On August 20, 2025, Director Mora emailed a letter rejecting the data center proposed\n25    completely on industrial land. The email stated that the City \u201cacknowledges that the revised site plan\n26    now depicts the entire project ... entirely within the I-2 Industrial zoning designation... the current\n27    zoning ordinance does not specifically identify \u2018data centers\u2019 as either a permitted or conditional\n28    use... the City finds that a Zoning Code Text Amendment is required ...\u201d (Exhibit 24).\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                             Page 15\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26            PageID.16       Page 16 of\n                                                     52\n\n\n 1           70.     This email was sent 29 days after the July 22, 2025, submission; hence, the second\n 2    application was likewise deemed approved by operation of law.\n 3           71.     On August 21, 2025, at 11:35 am, Plaintiff emailed Director Mora \u201cwe exceed all\n 4    zoning requirements for lot size, setbacks, building height, and lot coverage.\u201d\n 5           \u201cRegarding the lack of express listing of data centers. The industrial zoning\n 6           provisions are written in broad terms and expressly include \u2018business, professional,\n             and research offices,\u2019 alongside a wide range of other permitted uses such as\n 7\n             livestock sales, feed yards, animal grazing, building equipment storage, automobile\n 8           fleet storage, lumber yards, laboratories, bottling plants, cement products\n 9           manufacturing, and more. To read the zoning code as requiring specific enumeration\n10           of every possible modern use--when the code was intentionally drafted with broad\n             categories--is improper.\u201d\n11\n12    The email continued:\n13           \u201cThe category of \u2018business, professional, and research offices\u2019 comfortably includes\n14           datacenters, which are office based, research supportive facilities that require no\n             retail activity, no windows, and no retail traffic. . . From the beginning, we\n15\n             intended to proceed through the ministerial process. Since we haven\u2019t been able\n16           to convince you of this interpretation, we are withdrawing our current request for a\n17           data center at the Imperial site. We nevertheless look forward to continuing to\n\n18           work with the City on future opportunities like the reclaimed water purchase.\n             We are also available to help the City with recommendations if the City would like\n19\n             to amend its code on its own. Lastly, should the City reconsider, we are available to\n20           proceed with a ministerial data center project at any time.\u201d (Exhibit 25).\n21\n             72.     On August 21, 2025, at 11:36 AM, Tom DuBose emailed City Attorney Turner: \u201cthat\n22\n      vacant property that has sat empty for many decades, might stay that way. My thinking, and I have\n23\n      told Dennis this a week or so ago that the City should . . . go to the Planning Commission for a\n24\n      \u2018similarity of use determination\u2019. . . .\u201d\n25\n             73.     On September 3, 2025, Director Mora emailed Plaintiff: \u201cWe acknowledge your\n26\n      points regarding parcel size, zoning standards, and your interpretation of \u2018business, professional, and\n27\n      research offices.\u2019 While the City\u2019s interpretation of the code differs, we respect your thorough\n28\n      analysis and the professional manner in which you have presented your case. We also recognize and\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                            Page 16\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26           PageID.17       Page 17 of\n                                                     52\n\n\n 1    value your continued interest in collaborating with the City, particularly in areas such as reclaimed\n 2    water purchase, and potential code refinement. . . the City remains open to continued dialogue should\n 3    you decide to pursue this project again in the future\u201d (Exhibit 26).\n 4                      MINISTERIAL APPROVAL OF DATA CENTER BY THE COUNTY\n 5            74.     Following Defendants\u2019 refusal to honor the City\u2019s ministerial procedure or mandatory\n 6    approval process, Plaintiff formally applied to the County for site plan approval for a 250 MW data\n 7    center on 75-acres at the southeast corner of Aten and Clark Road.\n 8            75.     On September 4, 2025, the County issued a review of the data center site plan,\n 9    concluding that it is a permitted use and that the substation, battery, and generator backup are\n10    permitted ancillary uses (Exhibit 27). The County properly determined that the data center on\n11    industrial land is a permitted use, stating:\n12            \u201cThe proposed project is consistent with the current zoning. Specifically, Pursuant\n              to Division 5, Section 90515.01, Subsection (bbb) of the Imperial County Land Use\n13\n              Ordinance, a \u2018Data Center\u2019 is a permitted use within the M-1 (Light Industrial)\n14            zoning district. Ancillary components directly incidental to the primary data center\n15            operation-such as long-term power backup generators, electrical substation, gen-tie\n              lines, short-term power backup battery energy storage system (BESS), water\n16            treatment skid, and cooling yard-are likewise considered permitted uses within the\n17            M-1 zoning district.\u201d\n\n18                   THIRD APPLICATION DEEMED APPROVED BY OPERATION OF LAW\n19            76.     On September 6, 2025, Plaintiff was asked to apply again and email all relevant\n20    studies to Director Mora. On September 9, 2025, Plaintiff emailed Director Mora:\n21            \u201cWe will be applying again for a data center on the industrial land. To assist with\n22            that, attached are the following reports for the Imperial Ave. property: (1). Traffic\n              Access Analysis Memo; (2). Air Pollution Constraints Memo; (3). Geotechnical\n23\n              Report; (4). Phase I Environmental Report; (5). Draft Reclaimed Water Report; (6).\n24            Alta Survey. The latest data center drawing for Imperial, an 80 MW facility located\n              on industrial land, is attached.\u201d (Exhibit 28).\n25\n26            77.     On September 18, 2025, City Attorney Turner emailed Tom Dubose she was\n27    \u201cworking through the request to have the City of Imperial develop the reclaimed water system\u201d and\n28    enter into an agreement to provide the reclaimed water:\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 17\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1 Filed 01/09/26             PageID.18       Page 18 of\n                                                   52\n\n\n 1           \u201cI have some questions regarding Prop 218, Prop 26 and the Regional and State\n 2           Water Board permitting requirements. I have confidence Sebastian is familiar with\n             these laws and I would request any guidance he could provide me to clarify the\n 3           request he has and the hurdles he envisions. If he has examples or guidance, that\n 4           would speed up my analysis. I am requesting this communication be confidential\n 5           negotiation rather than public.\u201d (Exhibit 29).\n\n 6           78.     On October 7, 2025, Plaintiff emailed City Attorney Turner and City Manager Morita\n 7    providing responses to the questions regarding Prop 218, Prop 26, and Regional Water Board\n 8    permitting (Exhibit 30).\n 9           79.     On October 16, 2025, a meeting was held at the City to discuss the scaled-down data\n10    center located solely on the industrial parcel. Attendees included Tom Dubose, Director Mora, City\n11    Attorney Turner, and City Manager Morita. Sebastian Rucci attended via telephone and reiterated\n12    that the scaled-down data center was fully compliant and noted that a similarity of use process had\n13    not yet been exercised. The City representatives asked several questions and then requested Tom\n14    Dubose to leave the room to allow them to confer in private. Upon his return, City Manager Morita\n15    stated that it was their conclusion that a public process was necessary for a data center. He also\n16    clarified that the City remained interested in selling reclaimed water. Plaintiff informed them\n17    that he appreciated the reclaimed water cooperation and would proceed with the project on industrial\n18    land in the County.\n19           80.     As of this filing, no formal written denial was ever received. The verbal rejection of\n20    the scaled-down data center entirely within the industrial zone was on that date 37 days past the\n21    application and since the City failed to act within 15 days, the third application was deemed\n22    approved by operation of law.\n23                          CITY BREACHED RECLAIMED WATER AGREEMENT\n24           81.     On October 29, 2025, Tom Dubose texted City Attorney Turner: \u201cJust checking to\n25    see if the City is interested in following through with selling recycled water from the WWTP to use\n26    at the Data Center site in the County on Aten Road. Please advise on the City\u2019s interest.\u201d City\n27    Attorney Turner replied to Tom Dubose:\n28\n\n\n                                       VERIFIED CIVIL RIGHTS COMPLAINT                            Page 18\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1 Filed 01/09/26           PageID.19       Page 19 of\n                                                   52\n\n\n 1           \u201cI thought we were clear in our meeting that the City does have interest in\n 2           reclaimed water (especially in light of the state goals to move in that direction).\n             Based on Sebastian\u2019s email, I also agree it would have to be authorized by the State\n 3           or Regional Water Control Board. Are you asking for a specific commitment or\n 4           communication? I also remember that Sebastian was also trying to get the City of El\n 5           Centro to provide reclaimed water?\u201d\n\n 6           Tom Dubose replied: \u201cI guess just to confirm your interest and what next steps should we\n 7    be taking with the city of Imperial.\u201d\n 8           82.     On November 6, 2025, Plaintiff emailed City Attorney Turner and City Manager\n 9    Morita:\n10           \u201cWe\u2019re eager to move this forward. We plan to procure reclaimed water from\n11           both Imperial and El Centro, with most of that recycled water being directed\n             to the Salton Sea. This makes the project net water-positive by a factor of 6 to 1,\n12\n             meaning we are treating six times more water than we consume. The consultants we\n13           spoke with indicated that this approach could help address some of the environmental\n14           challenges affecting the Sea. If you need any more information to finalize the\n             reclaimed water arrangements, please don\u2019t hesitate to let me know\u201d (Exhibit 31).\n15\n16           83.     On Nov. 7, 2025, Plaintiff emailed City Attorney Turner and City Manager Morita:\n\n17           \u201cWe have continued to assure our hyperscale tenant that the City of Imperial is\n             genuinely interested in providing reclaimed water for their data center on Aten\n18\n             and Clark Road. Given the extended delay, we would appreciate a letter from the City\n19           confirming the sale of reclaimed water. The letter can state that we will cover all\n20           costs associated with engineering and any required plant upgrades necessary to\n             produce recycled water, and the city will then sell reclaimed water, etc.\u201d\n21\n             (Exhibit 32).\n22\n23           84.     On November 7, 2025, at 2:57 PM, City Attorney Turner emailed Plaintiff: \u201cCan you\n\n24    forward me those earlier email conversations to make sure we are looking at the same documents?\u201d\n\n25    (Exhibit 33). At 4:20 pm that day, Plaintiff emailed the City Attorney twelve emails documenting\n\n26    the prior discussions regarding reclaimed water (Exhibit 34).\n\n27           85.     On November 12, 2025, City Attorney Turner emailed Plaintiff: \u201cDo you have any\n\n28    public meeting scheduled with the County?\u201d (Exhibit 35).\n\n\n                                       VERIFIED CIVIL RIGHTS COMPLAINT                          Page 19\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.20       Page 20 of\n                                                    52\n\n\n 1           86.     On November 12, 2025, Plaintiff emailed City Attorney Turner:\n 2           \u201cThere are no public hearings that I am aware of because our project--located on\n 3           industrially zoned land--is a ministerial approval under the County\u2019s zoning code.\n             Our applications to the City of Imperial were similarly exempted. As you are aware,\n 4\n             after investing millions in engineering and site control, we shifted our focus to\n 5\n             adjacent parcels in the County and the City of El Centro, both of which recognized\n 6           that a data center is permitted as of right on industrial land. We remain\n 7           confident in our legal position and the clarity of our rights, as outlined in multiple\n 8           memos, and we are prepared to litigate this issue if necessary. Your email doesn\u2019t\n\n 9           address our outstanding reclaimed water request, which has been pending for some\n             time and may have taken an unexpected detour. If the City of Imperial does not wish\n10\n             to sell recycled water, please let us know directly.\u201d (Exhibit 36).\n11\n12           87.     On November 14, 2025, Tom Dubose sent a text to City Manager Morita: \u201cI wanted\n\n13    to see if I can come in to see you about the reclaimed water from WWTP and how we can get that\n\n14    moving forward.\u201d City Manager Morita responded that he was getting his people together for\n\n15    Monday afternoon and would \u201cconfirm time on Monday morning.\u201d\n\n16           88.     On November 20, 2025, at 12:22 PM, Tom Dubose texted City Manager Morita:\n\n17    \u201cChecking to see how Katie is coming along with a draft Will Serve agreement for reclaimed water?\n\n18    Hoping to be able to have that before we meet. . . .\u201d City Manager Morita replied: \u201cI am given to\n\n19    understand draft will be done shortly. I will pass it along as long as I have it. We can meet early\n\n20    next week.\u201d\n\n21           89.     On November 26, 2025, at 12:14 PM, City Manager Morita sent a text to Tom\n\n22    Dubose stating: \u201cA quick note to let you know we are working on the re-claimed water will-serve.\n\n23    You had indicated you would reach out to Abraham for permission to provide us with a copy of the\n\n24    will-serve given to you. We are also contacting El Centro.\u201d\n\n25           90.     On November 26, 2025, at 1:53 PM, the City posted on its Facebook page that the\n\n26    City \u201chas recently become aware\u201d the County is finalizing approval for a data center. The post stated\n\n27    \u201cbecause this project is unprecedented in its magnitude and use, the City Council feels it is critical\n\n28    to notify our residents\u201d and \u201cto empower\u201d residents to provide feedback:\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 20\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26               PageID.21       Page 21 of\n                                                     52\n\n\n 1            \u201cNotice regarding the County of Imperial potential approval associated with a\n 2            large-scale Data Center Complex at the Southeast corner of Aten Blvd & Clark Road.\n              The City of Imperial has recently become aware that the County of Imperial has\n 3\n              approved, or is in the process of finalizing approval for, an approximately\n 4\n              950,000-square-foot data center (330 MW) and Energy Storage System (862 MWh).\n 5            The project is planned to be built on 75 acres situated on the southeast corner of the\n 6            intersection of Aten and Clark roads. The City of Imperial is not the permitting\n 7            authority because the property is within the unincorporated County limits. Because\n\n 8            this project is unprecedented in its magnitude and use, the City Council feels it is\n              critical to notify our residents of this project. While the City supports\n 9\n              development, economic progress, and job creation, it is important to empower our\n10\n              residents to provide feedback to the County when such larger projects are built in\n11            our neighborhood.\u201d\n12\n              91.     On November 26, 2025, at 3:05 PM, Tom Dubose emailed City Manager Morita a\n13\n      copy of the will-serve letter after he \u201creceived permission from the city of El Centro\u201d allowing him\n14\n      \u201cto share this with you as you had requested earlier. Again, pointing out that this conditional will\n15\n      serve letter . . . for a site in El Centro that is being considered. Please confirm the City of Imperial\u2019s\n16\n      continued interest in doing the same...\u201d (Exhibit 37).\n17\n              92.     On December 12, 2025, two weeks after City Manager Morita contacted the City of\n18\n      El Centro, a post on El Centro\u2019s website stated:\n19\n              \u201cThe City of El Centro is aware of information circulating regarding a privately\n20\n              proposed data center ... related to the use of reclaimed wastewater. ... no\n21            commitments or decisions have been made regarding any proposed data center... The\n22            City did receive a request for a will-serve letter from the data center developer ... A\n              will-serve letter ... was issued... the City has not entered into any agreement or made\n23\n              any commitments related to a data center project.\u201d\n24\n25               CITY\u2019S TORTIOUS INTERFERENCE WITH EL CENTRO WATER AGREEMENT\n\n26            93.     The above correspondence reveals a calculated pattern by the City of Imperial to\n\n27    renege on its implied contract to sell reclaimed water and, subsequently, to actively sabotage\n\n28    Plaintiff\u2019s alternative water arrangements with the City of El Centro.\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                               Page 21\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26                PageID.22        Page 22 of\n                                                    52\n\n\n 1           94.     Despite Plaintiff funding studies and the City Engineer confirming capacity, City\n 2    officials began a campaign of feigned ignorance and delay. On November 7, 2025, City Attorney\n 3    Turner attempted to reset the clock, asking Plaintiff to \u201cforward me those earlier email\n 4    conversations,\u201d despite the long history of negotiations.\n 5           95.     On November 20 and 26, 2025, City Manager Morita misled Plaintiff, stating via text\n 6    that a \u201cdraft will-serve [agreement] will be done shortly\u201d and that \u201cwe are working on the re-claimed\n 7    water will-serve.\u201d These statements induced the Plaintiff to believe the City was honoring its\n 8    obligation, while in reality, no such draft was forthcoming.\n 9           96.     Under the false pretense of drafting Imperial\u2019s own agreement, City Manager Morita\n10    maneuvered to undermine the Plaintiff\u2019s relationship with the City of El Centro. On November 26,\n11    2025, City Manager Morita requested a copy of the City of El Centro\u2019s Will-Serve letter, implying\n12    it was needed to finalize Imperial\u2019s own agreement. Relying on this representation Plaintiff provided\n13    the El Centro will serve letter in good faith.\n14           97.     Instead of using the will serve letter to draft an agreement, the City used it to interfere.\n15    On November 26, 2025, Imperial posted a hostile notice on Facebook to rally opposition against the\n16    data center. Morita admitted he was \u201ccontacting El Centro.\u201d\n17           98.     The City\u2019s interference yielded immediate negative results. The City of El\n18    Centro--which had previously issued a will-serve letter--publicly retreated.\n19           99.     On December 12, El Centro posted a disclaimer stating \u201cno commitments or decisions\n20    have been made,\u201d effectively destabilizing the Plaintiff\u2019s secondary water source.\n21           100.    The City of Imperial did not merely breach its agreement to sell water; it used the\n22    promise of that agreement as bait to obtain information, which it then weaponized to interfere with\n23    the Plaintiff\u2019s contractual expectancy with the City of El Centro.\n24          CITY BLOCKS RECLAIMED WATER TO SALTON SEA (ENVIRONMENTAL PRETEXT)\n25           101.    As confirmed in the November 6, 2025 email (Exhibit 31), Plaintiff proposed a\n26    revolutionary water strategy: procuring 6 million gallons per day (MGD) of reclaimed water--2 MGD\n27    from Imperial and 4 MGD from El Centro. Plaintiff required only 0.75 MGD for cooling (12.5% of\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                                 Page 22\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1 Filed 01/09/26              PageID.23       Page 23 of\n                                                   52\n\n\n 1    the total). The remaining 5.25 MGD of treated freshwater would be released into the watershed\n 2    feeding the Salton Sea.\n 3    (a).   For every 1 gallon consumed, Plaintiff would pay to treat and release 8 gallons into the\n             environment.\n 4\n 5    (b).   Plaintiff offered to fund $20 million in upgrades to the Cities\u2019 aging wastewater\n             infrastructure at no cost to ratepayers, while generating an estimated $3 million annually in\n 6           new revenue for the City.\n 7\n             102.    CRITICAL LIFELINE FOR THE SALTON SEA: This project converted a municipal liability\n 8\n      (wastewater) into a critical environmental asset.\n 9\n10    (a).   DUST SUPPRESSION: By directing a consistent, high-volume flow of water into the Sea, the\n11           project would help submerge the exposed lakebed (playa), preventing the toxic dust storms\n             that plague Imperial Valley\u2019s respiratory health.\n12\n13    (b).   SALINITY DILUTION: The massive infusion of treated freshwater acts as a diluent, lowering\n             salinity in discharge areas to support endangered fish and bird populations.\n14\n      (c).   POTABLE WATER PRESERVATION: By using 100% reclaimed water, the project explicitly\n15\n             preserved Colorado River allocations for residential and agricultural use.\n16\n             103.    CITY\u2019S REJECTION PROVES MALICE: If the City\u2019s opposition were truly motivated by\n17\n      environmental concern, they would have embraced this proposal. Instead they:\n18\n      (a).   SABOTAGING THE ECOSYSTEM: By blocking the project, the City actively prevented the flow\n19\n             of millions of gallons of clean water into a dying ecosystem. They prioritized stopping the\n20           Plaintiff over the respiratory health of their own citizens.\n21\n      (b).   PRETEXTUAL OBJECTIONS: The Defendants\u2019 sudden invocation of \u201cenvironmental impact\u201d\n22\n             is a calculated pretext. A genuine environmental steward would not torpedo a project that\n23           subsidizes regional water infrastructure and provides a massive, free infusion of freshwater\n24           to the Salton Sea.\n\n25\n      (c).   INTENT TO DESTROY ENVIRONMENTAL PROTECTION: Defendants went further, weaponizing\n26           the \u201cwill-serve\u201d process to attack El Centro\u2019s participation and cut off Plaintiff\u2019s alternative\n27           water supply. This obstructionism confirms that their goal was never environmental\n             protection, but the intentional destruction of a permitted land use.\n28\n\n\n                                       VERIFIED CIVIL RIGHTS COMPLAINT                              Page 23\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.24      Page 24 of\n                                                    52\n\n\n 1           104.    Data centers are often criticized for using drinking (potable) water for cooling.\n 2    Plaintiffs proposal uses recycled water, which preserves precious Colorado River allocation and\n 3    creates a sustainable industrial model where \u201cwaste\u201d is repurposed for cooling, supports the\n 4    environment and Plaintiff cover all costs for engineering and any required plant upgrades.\n 5           105.    By reneging on the agreement, Defendants actively prevented the flow of millions of\n 6    gallons of treated water into a dying ecosystem. Defendants sudden invocation of environmental\n 7    concern are not genuine; it\u2019s a calculated pretext designed to obscure that Defendants are actively\n 8    sabotaging one of the most significant private environmental investments in Imperial\u2019s history.\n 9           106.    Instead of facilitating this environmental win, Defendants sough to torch Plaintiff\u2019s\n10    alternative water supply. Defendants\u2019 actions are designed to block a permitted land use, regardless\n11    of the cost to the Salton Sea or the public health of the Valley\u2019s residents.\n12                RETALIATORY SHAM LITIGATION FILED FOR SOLE PURPOSE OF DELAY\n13           107.    ESCALATION TO HOSTILITY: The Sham Petition (December 4, 2025) The City\u2019s\n14    opposition escalated from administrative delay to active hostility in late 2025. On December 4, 2025,\n15    the City filed a Petition for Writ of Mandamus (City of Imperial v. County of Imperial, Case No.\n16    ECU00457), seeking to invalidate the ministerial grading permit issued by the County. The Petition\u2019s\n17    central theory--that the project required discretionary Conditional Use Permits (CUPs) and a \u201czone\n18    change\u201d--was a fabrication directly contradicted by the plain text of the County\u2019s ordinances.\n19           108.    CITY MANAGER\u2019S FALSE TESTIMONY: To support this baseless Petition, City Manager\n20    Morita falsely attested under penalty of perjury that the \u201cdata center project is not eligible for\n21    ministerial approval\u201d because \u201cdiscretionary approvals are required\u201d alleging:\n22    (a).   That the substation required \u201ca CUP in the M-1 zone\u201d (City Petition \u00a7 60);\n23    (b).   That the Battery Energy Storage Systems (BESS) required \u201ca CUP in the M-2 zone\u201d (City\n24           Petition \u00a7 62); and\n25    (c).   That the project required a \u201czone change\u201d (City Petition \u00a7 56).\n26           109.    OBJECTIVE FALSITY OF THE CLAIMS: City Manager Morita\u2019s sworn statements were\n27    objectively false and legally untenable at the time they were made. The County Land Use Ordinance\n28    expressly permits these uses by right:\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 24\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.25        Page 25 of\n                                                    52\n\n\n 1    (a).    Data Centers are permitted by right in M-1 and M-2 zones (\u00a7\u00a7 90515.01(bbb), 90516.01(w));\n 2    (b).    Substations are permitted by right in the M-1 zone (\u00a7 90515.01(vvvvvvv)); and\n 3    (c).    Battery Storage is permitted as accessory structures in the M-2 zone (\u00a7 90516.01(hh)).\n 4            110.    Most importantly, the County had already issued a formal determination on\n 5    September 4, 2025, confirming the Data Center is a permitted use--a fact City Manager Morita\n 6    admitted he was aware of the County\u2019s determination in his declaration (City Petition \u00a7\u00a7 34, 41).\n 7            111.    RETALIATORY MISUSE OF PROCESS: The filing of the December 2025 Petition\n 8    exemplifies Defendants\u2019 retaliatory course of conduct. Having failed to block the project within its\n 9    own jurisdiction, the City sought to export its obstructionist tactics to the County. The Petition was\n10    a \u201csham\u201d litigation designed to interfere directly with Plaintiff\u2019s property rights. Defendants did not\n11    honestly believe the claim was meritorious; no reasonable litigant could expect success on a claim\n12    arguing that a \u201cpermitted use\u201d requires a \u201czone change\u201d when the zoning map already designates the\n13    land as industrial.\n14            112.    INTENT TO HARASS AND DELAY: The City\u2019s goal was not to win the lawsuit--which\n15    was destined to fail on the law--but to use the pendency of the lawsuit to create uncertainty, delay\n16    construction, and force Plaintiff to abandon the project. This constitutes an abuse of the\n17    governmental process, distinct from the outcome of that process. The City\u2019s simultaneous social\n18    media campaign to \u201cempower residents\u201d against the project confirms the intent was political\n19    harassment rather than legitimate legal redress.\n20            113.    ACTUAL KNOWLEDGE OF MINISTERIAL STATUS: The City\u2019s filing was not merely\n21    negligent; it was malicious. Plaintiff had repeatedly placed the City on actual notice that the project\n22    was a by-right, ministerial use under both City and County codes. The City\u2019s persistence in filing the\n23    lawsuit despite this knowledge demonstrates reckless indifference to Plaintiff\u2019s rights. The record\n24    of correspondence confirms the City\u2019s knowledge:\n25    (a).    May 15, 2025 (Letter): Plaintiff cited \u00a7 24.19.550: \u201cThe ministerial aspects of the Site Plan\n26            is apparent from the 15 day limit for Site Plan Review ...Within 15 days...the Director shall\n\n27            approve ... or disapprove ... Failure of the Director to act within 15 days shall be deemed\n              approval of the application.\u201d (Exhibit 6).\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                             Page 25\n\f     Case 3:26-cv-00128-JLS-BJW           Document 1 Filed 01/09/26            PageID.26       Page 26 of\n                                                   52\n\n\n 1    (b).   May 30, 2025 (Email): \u201cThe zoning code supports approval of this facility as-of-right. If the\n             City chooses to require CEQA review... we will pivot and focus on other data center sites\n 2           in the region that can be approved as of right.\u201d (Exhibit 8).\n 3\n      (c).   June 4, 2025 (Email): Plaintiff provided the County analysis: \u201cData Center #2 is located in\n 4           Imperial County and under \u00a7 90515-01, permitted uses in the M-1 zone include \u2018Data center\u2019\n 5           uses, which \u2018are permitted... as of right. I have attached a draft plan of the data center\n             located on contiguous land in the County.\u201d (Exhibit 10).\n 6\n      (d).   June 6, 2025 (Memo): Plaintiff provided the City Attorney a list of 25 data centers approved\n 7           as-of-right in industrial zones, including 14 in California. (Exhibit 11).\n 8\n      (e).   June 23, 2025 (Email): \u201cDuring our first meeting...we shared the zoning code and our view\n 9           that we were a permitted use...If the City believes a data center is not a permitted\n10           use...proceed with a similar use determination...\u201d (Exhibit 16).\n\n11    (f).   July 18, 2025 (Email): \u201cFrom the outset, I selected the City because... our data center would\n             be a permitted use and exempt from CEQA.\u201d (Exhibit 18).\n12\n13    (g).   August 21, 2025 (Email): \u201cWe exceed all zoning requirements... From the beginning, we\n             intended to proceed through the ministerial process.\u201d (Exhibit 25).\n14\n15    (h).   September 4, 2025 (County Determination): \u201c[Under] 90515.01, Subsection (bbb) of the\n             Imperial County Land Use Ordinance, a Data Center is a permitted use within the M-1\n16           (Light Industrial) zoning district. Ancillary components directly incidental to the primary\n             data center operation-such as long-term power backup generators, electrical substation,\n17           short-term power backup battery energy storage system ... are likewise considered permitted\n18           uses within the M-1 zoning district.\u201d (Exhibit 27).\n\n19    (i).   November 12, 2025 (Email): In response to a City inquiry about public hearings, Plaintiff\n20           replied: \u201cThere are no public hearings... because our project--located on industrially zoned\n             land--is a ministerial approval under the County\u2019s zoning code. . . after investing\n21           millions in engineering and site control, we shifted our focus to adjacent parcels in the\n             County... which recognized that a data center is permitted as of right on industrial\n22           land..\u201d (Exhibit 36).\n23\n             114.    PUBLIC MISINFORMATION CAMPAIGN: Despite this overwhelming record, on\n24\n      December 29, 2025, the City posted a misleading statement on its website and social media: \u201cAfter\n25\n      many months of staff-level review and the adherence to the City\u2019s commitment to public hearings\n26\n      and CEQA compliance, the developer voluntarily withdrew... the City did not mislead the public...\u201d\n27\n      This post was a repeated act of bad faith, attempting to rewrite the history of the City\u2019s\n28\n      obstructionism and refusal to process a valid ministerial application.\n\n                                       VERIFIED CIVIL RIGHTS COMPLAINT                            Page 26\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26            PageID.27       Page 27 of\n                                                     52\n\n\n 1            115.    The City\u2019s goal was not to win the lawsuit but to use the pendency of the lawsuit to\n 2    create uncertainty, delay construction, and force the Plaintiff to abandon the project. The social\n 3    media campaign to \u201cempower residents\u201d confirms the intent was political harassment rather than\n 4    legal redress. The conduct was motivated by reckless indifference to Plaintiff\u2019s protected rights.\n 5                   DEFENDANTS ENGAGE IN PUBLIC MISREPRESENTATION CAMPAIGN\n 6            116.    The legal filing was accompanied by a public relations campaign. The City posted\n 7    hyperlinks to the lawsuit and inflammatory commentary on its official website and Facebook page,\n 8    urging residents to \u201cprovide feedback\u201d and characterizing the project as \u201cunprecedented in its\n 9    magnitude.\u201d This coordinated effort to mobilize public opposition and use the judicial process to\n10    harass the Plaintiff is classic \u201csham litigation.\u201d\n11            117.    On November 26, 2025 at 1:53 pm the City posted on its Facebook page that the City\n12    \u201chas recently become aware\u201d the County is finalizing approval for a data center and \u201cbecause this\n13    project is unprecedented in its magnitude and use, the City Council feels it is critical to notify our\n14    residents\u201d and \u201cto empower\u201d residents to provide feedback:\n15            \u201cNotice regarding the County of Imperial potential approval associated with a\n              large-scale Data Center Complex at the Southeast corner of Aten Blvd & Clark Road.\n16\n              The City of Imperial has recently become aware that the County of Imperial has\n17            approved, or is in the process of finalizing approval for, an approximately\n18            950,000-square-foot data center (330 MW) and Energy Storage System (862 MWh).\n              The project is planned to be built on 75 acres situated on the southeast corner of the\n19\n              intersection of Aten and Clark roads. The City of Imperial is not the permitting\n20            authority because the property is within the unincorporated County of Imperial limits.\n21            Because this project is unprecedented in its magnitude and use, the City Council\n              feels it is critical to notify our residents of this project. While the City Council\n22            supports development, economic progress, and job creation, it is important to\n23            empower our residents to provide feedback to the County when such larger\n              projects are built in our neighborhood.\u201d\n24\n25            118.    On December 15, 2025, at 11:49 pm, the City of Imperial posted on its Facebook page\n26    a hyperlink to its lawsuit, and stated in the post: \u201cIn our continued commitment of transparency\n27    and keeping our residents informed, the City of Imperial has posted the petition recently filed in the\n28    Superior Court by the City of Imperial on our website.\u201d\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 27\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26               PageID.28        Page 28 of\n                                                    52\n\n\n 1           119.    On December 18, 2025, at 6:32 pm the City posted on its Facebook page a hyperlink\n 2    to its 86-page letter to the County Planning Commission, located on the City\u2019s website. The posting\n 3    stated that the \u201cCity of Imperial has submitted a letter to the Imperial County Planning Commission\n 4    urging commissioners to deny the proposed lot merger for the Data Center Project.\u201d\n 5           120.    The City DID NOT post Plaintiff\u2019s response to that letter which was emailed to City\n 6    officials and confirms the City\u2019s objections were based on patently false statements.\n 7           121.    On December 29, 2025, at 9:46 pm the City posted on its Facebook page a full copy\n 8    of a hyperlink to its ten page objections to the lot merger, and appeal to Board of Supervisors. The\n 9    City\u2019s posting stated:\n10           \u201cThe City supports responsible economic development. In fact, the City worked with\n11           this Developer who filed an application in the City of Imperial to develop a data\n             center at a location . . . After many months of staff-level review and the adherence\n12\n             to the City\u2019s commitment to public hearings and CEQA compliance, the\n13\n             developer voluntarily withdrew his application with the City of Imperial. . .\u2019\u201d\n14\n15           \u201c. . . the City did not mislead the public concerning any substantive elements of\n16           the proposed development. Unfortunately, the proponent of the development has,\n\n17           by way of paid advertisements and presentations to local service clubs, seen fit to\n             attack the City. Such attacks run counter to our efforts to involve our citizens\n18\n             in the process associated with reasoned, responsible development.\u201d\n19\n20           122.    Plaintiff had a property interest in the City processing the site plans as ministerial, and\n\n21    for approvals under \u00a7 24.19.550 which imposes a hard deadline and failure to timely deny the site\n\n22    plans \u201cshall be deemed approval\u201d of the three site plans.\n\n23           123.    Plaintiff repeatedly submitted complete site plans, revised them and provided\n\n24    countless studies. The City manufactured \u201cdiscretion\u201d (text amendment) to arrive at CEQA.\n\n25           124.    The decisions were being made by officials with final policymaking authority, and\n\n26    include the involvement by City Manager, City Attorney, Planning Director, Mayor and Council. The\n\n27    decisions to not process a compliant application were made/ratified by officials and employees at\n\n28    the highest level.\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                                Page 28\n\f     Case 3:26-cv-00128-JLS-BJW              Document 1 Filed 01/09/26             PageID.29       Page 29 of\n                                                      52\n\n\n 1                   DEFENDANTS AND IID\u2019S COORDINATED MISINFORMATION CAMPAIGN\n 2            125.      Plaintiff is informed and believes, and thereon alleges, that Defendants engaged in\n 3    a parallel track of obstruction, misrepresentations, and harassment in concert with the Imperial\n 4    Irrigation District (\u201cIID\u201d). Starting in late November 2025, the City and IID executed a coordinated\n 5    media campaign of misinformation designed to incite public hostility and sabotage Plaintiff\u2019s data\n 6    center project.\n 7            126.      The City and IID processed multiple applications for over a year by mid-November;\n 8    however, the false media campaign disseminated to the public using government websites and social\n 9    media pages portrayed them as \u201cinforming\u201d the public of a data center that was moving quickly\n10    through approvals in the County without oversight, despite the Defendants\u2019 prior deep involvement.\n11    At no time did a single article identify the data center\u2019s ministerial rights for which it was securing\n12    approvals by the County.\n13            127.      The motive underlying IID\u2019s obstruction was the prioritization of a competing project\n14    involving Z-Global, an energy consulting firm with a history of deep and improper entanglements\n15    with IID management. Following a year-long investigation by The Desert Sun, the engineering firm\n16    ZGlobal Inc. terminated its $9-million contract with IID, ending the relationship a year ahead of\n17    schedule.\n18            128.      The termination followed revelations that ZGlobal, while acting as a public consultant\n19    for IID, had significant conflicts of interest by simultaneously working for private developers\n20    conducting business with the utility. The central issue identified was that ZGlobal was \u201cworking both\n21    sides of the street,\u201d advising the public utility on decisions that benefited its private-sector clients.\n22            129.      In 2015, IID placed senior engineers on administrative leave based on ZGlobal\u2019s\n23    analysis and were subsequently replaced with ZGlobal consultants under a $9 million contract.\n24            130.      ZGlobal ran IID\u2019s transmission and planning unit while consulting for solar\n25    developers seeking to connect to IID\u2019s grid. ZGlobal\u2019s founder, Ziad Alaywan, while acting as a\n26    public consultant for IID, maintained significant conflicts of interest by simultaneously working for\n27    private developers conducting business with IID and holding interests in multiple LLCs doing\n28    business with the utility.\n\n\n                                          VERIFIED CIVIL RIGHTS COMPLAINT                             Page 29\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.30       Page 30 of\n                                                    52\n\n\n 1           131.    By way of example, ZGlobal advised IID to spend $9.4 million building a power line\n 2    which enabled the construction of solar farms developed by ZGlobal\u2019s private clients. In another\n 3    instance, IID awarded a $35-million contract to a company led by a former IID board member after\n 4    rejecting cheaper bids from experienced firms; ZGlobal wrote the proposal for said company while\n 5    simultaneously working for IID.\n 6           132.    Furthermore, ZGlobal\u2019s founder owned land where a community solar project was\n 7    to be built while advising IID on that very project. In one case, IID agreed to sell 1,400 acres of\n 8    farmland to a solar developer working with ZGlobal for $5.77 million; the property was shortly\n 9    flipped to another company for $14.2 million, resulting in millions of dollars in lost revenue for IID.\n10           133.    As a result of the investigation prompted by The Desert Sun, IID canceled a\n11    $75-million solar contract and a $7-million battery storage expansion. Former IID employees who\n12    were replaced by ZGlobal staff subsequently sued, alleging retaliation for raising concerns about the\n13    consultant.\n14           134.    IID\u2019s General Manager, Jamie Asbury, unlawfully obstructed, delayed, and\n15    discriminated against Plaintiff\u2019s $10 billion AI Data Center project. This project is projected to\n16    generate between $22 million and $30 million in net annual revenue for IID.\n17           135.    Between late 2024 and mid-2025, Plaintiff completed multiple technical studies\n18    required by IID, all of which confirmed the project\u2019s viability. A load injection study by Power\n19    Engineers in December 2024 established that IID\u2019s infrastructure possessed ample capacity, up to\n20    557.8 MW, to accommodate the project. In May 2025, IID\u2019s own Feasibility Study for 250 MW\n21    demonstrated no thermal violations or voltage exceedances. Furthermore, the System Impact Studies\n22    completed by IID in July 2025 and September 2025 showed no thermal, voltage, or stability\n23    violations, deeming the project \u201cfeasible\u201d.\n24           136.    Despite these technical clearances, IID General Manager Jamie Asbury actively\n25    sought to derail the project commencing in late August 2025. This most troubling because in early\n26    2025, IID implemented a whopping 69% increase in public electricity rates, the highest increase\n27    in the utility\u2019s history spanning over a century.\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                             Page 30\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.31       Page 31 of\n                                                    52\n\n\n 1           137.    On August 22, 2025, Asbury cancelled critical meetings regarding power supply,\n 2    citing a need for \u201cinternal conversations\u201d. Subsequently, on September 4, 2025, Asbury instructed\n 3    IID staff to \u201cput everything else aside\u201d and prioritize six projects from \u201cZ-Global\u201d--a direct\n 4    competitor with a competing data center project--thereby delaying Plaintiff\u2019s Facility Study.\n 5           138.    The Facility Study was the final technical prerequisite before entering into a power\n 6    agreement. IID initially estimated it would be completed in six weeks (by Sept. 15, 2025), IID later\n 7    claimed--once Jamie Asbury intervened--it could not perform the study. This forced Plaintiff, who\n 8    had already paid IID for the study, to retain Power Engineers to complete the study. The study is now\n 9    expected to be completed in mid-January. These acts delayed the project by six months. The\n10    prioritization of Z-Global projects over Plaintiff\u2019s Facility Study was improper, and discriminatory.\n11           139.    On September 16, 2025, Asbury informed Plaintiff that IID would not provide service\n12    absent a 15-year prepayment of electric fees, totaling over $4 billion. This demand patently violates\n13    standard electric utility practices, FERC regulations, and IID\u2019s own open access transmission tariff.\n14           140.    In an effort to mitigate IID\u2019s alleged risk, Plaintiff proposed a wholesale supply\n15    arrangement utilizing a cost-plus model. (Exhibit 38). Under this proposal, IID would receive a fee\n16    for scheduling coordinator time and expenses, its transmission rate, and an administrative markup.\n17    Plaintiff estimated these fees would generate between $22 and $30 million in positive annual\n18    revenue to IID. All economic and reliability risk is borne solely by the data center, which will\n19    absorb all energy, capacity, and administrative costs. This allowed the data center to proceed while\n20    long-term agreements are secured, generating permanent jobs and tax revenue.\n21           141.    On October 14, 2025, Jamie Asbury, on behalf of IID, rejected the proposal and\n22    falsely claimed Plaintiff had misrepresented generator data, and therefore had to restart of the entire\n23    application process. (Exhibit 39).\n24           142.    On October 17, 2025, Plaintiff emailed and called IID Board members Karin Eugenio,\n25    and Alex Cardenas (Exhibit 40). When Tom Dubose approached Alex Cardenas for assistance, text\n26    messages confirmed he was communicating with Z-Global senior managers while simultaneously\n27    feigning concerns that IID was delaying a $10 billion project for Z-Global\u2019s benefit. This conduct\n28    is in stark contrast to IID\u2019s repeated statements of \u201chonesty, integrity, and transparency.\u201d\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 31\n\f     Case 3:26-cv-00128-JLS-BJW              Document 1 Filed 01/09/26                PageID.32        Page 32 of\n                                                      52\n\n\n 1            143.    After Plaintiff raised legitimate legal concerns, IID\u2019s General Manager Asbury\u2019s\n 2    directive precluding Plaintiff from communicating with IID staff constituted clear retaliation against\n 3    protected speech and a violation of IID and FERC regulations. Under Asbury\u2019s leadership, IID failed\n 4    to process requests on a non-discriminatory, timely basis and obstructed the Facility Study despite\n 5    receiving payment and executing the necessary agreements. IID\u2019s prioritization of Z-Global projects\n 6    and the issuance of the baseless $4 billion prepayment demand constitute intentional interference\n 7    with Plaintiff\u2019s business relationships and financing opportunities.\n 8            144.    On October 17, 2025, Plaintiff emailed IID\u2019s General Manager asserting its intent to\n 9    exercise legal rights and seek remedies, submitting an arbitration brief (Exhibit 41) with relevant\n10    emails as exhibits. (Exhibit 42).\n11            145.    This communication constituted protected activity. Asbury responded immediately\n12    by banning Plaintiff from communicating with IID staff, explicitly stating that this prohibition was\n13    a result of the mention of litigation. IID effectively barred Plaintiff from communicating directly with\n14    technical staff, restricting contact solely to Paul Rodriguez and IID\u2019s outside counsel, whose services\n15    are believed to cost ratepayers $1,000 per hour. Plaintiff immediately emailed IID withdrawing the\n16    arbitration, believing the incident was resolved. (Exhibit 43).\n17            146.    The above conduct constitutes classic unconstitutional retaliation. IID cannot legally\n18    penalize Plaintiff for exercising its right to petition regarding Z-Global\u2019s preferential treatment. Nor\n19    can IID deny Plaintiff access to staff regarding an active application. By severing access to technical\n20    staff, IID imposed a penalty on Plaintiff in retaliation for the threat of litigation. This \u201cchilling effect\u201d\n21    is precisely the type of suppression prohibited by the First Amendment; the right to be free from\n22    retaliation for threatened litigation is a fundamental constitutional protection.\n23            147.    Concurrent with these events, unknown text messages were sent to the County Board\n24    of Supervisors with derogatory information regarding Sebastian Rucci, Plaintiff\u2019s general manager.\n25    Plaintiff further recently discovered that a retaliatory campaign commenced at that time, with Asbury\n26    and various IID Board members using the utility\u2019s website and social media pages to attack the data\n27    center--a project positioned to provide over $30 million in net revenue to IID.\n28\n\n\n                                          VERIFIED CIVIL RIGHTS COMPLAINT                                 Page 32\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26             PageID.33       Page 33 of\n                                                     52\n\n\n 1              148.   Plaintiff also recently learned that the manager of the data center project, Jose-Said\n 2    Ambriz, who disclosed that Jamie Asbury was holding up the project to benefit Z-Global had\n 3    suddenly retired from IID.\n 4              149.   The parallel track of obstruction, misrepresentations, and harassment was further\n 5    evidenced by the actions of Karin Eugenio, IID Board representative for District 5, which\n 6    encompasses the City of Imperial. Eugenio, who is set to serve as Board Chair in 2026, served as the\n 7    City of Imperial\u2019s Mayor in 2021, concurrent with Defendant Katherine Burnworth\u2019s service on the\n 8    City Council. Plaintiff is informed and believes that Burnworth and Eugenio engaged in numerous\n 9    discussions during November and December 2025 to coordinate the campaign against the data\n10    center.\n11              150.   On November 26, 2025, IID launched a public information initiative purported to\n12    address community concerns regarding transparency, costs, and environmental factors. The stated\n13    effort claimed to aim for a balance between economic growth and the protection of ratepayers,\n14    resources, and system stability amidst a national trend of data center development.\n15              151.   On November 26, 2025, IID, over one year after the first data center application,\n16    launched a public information campaign on data centers, stating that data centers: \u201cmay result in\n17    environmental impacts to natural resources close to their location, particularly if not appropriately\n18    mitigated through California\u2019s Environmental Quality Act required compliance... IID requires:\n19    Developers adhere to all environmental rules and regulations.\u201d The statement about CEQA was\n20    intended to force a ministerially compliant data center, exempt from CEQA, to proceed to CEQA\n21    under threat of withholding electricity. Fully aware that CEQA would provide an opportunity for\n22    Comite Civico Del Valle, an environmental group known to engage in public extortion through its\n23    founder, Jose Luis Olmedo Velez who is commonly known in Imperial County for obstructing\n24    development projects by abusing the CEQA process.\n25              152.   On November 28, 2025, regarding a post on the Instagram account for \u201cConcerned\n26    Imperial Residents\u201d questioning energy sources, Karin Eugenio (identifying herself as IID Director\n27    Division 5) commented: \u201cIt is not a sound proposal. It is environmentally degrading, and it would\n28    raise all of our energy rates.\u201d\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                            Page 33\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26              PageID.34       Page 34 of\n                                                     52\n\n\n 1            153.    IID stands to sell roughly $250 million in electricity per year to the data center and\n 2    receive a recoupment cost of approximately $30 million annually. Yet, after imposing a 69% rate\n 3    increase on customers in early 2025, Karin Eugenio appears willing to casually forfeit this revenue\n 4    to protect Z-Global\u2019s interests. Discarding tens of millions of dollars in annual revenue is\n 5    irreconcilable with her fiduciary duties to IID ratepayers.\n 6            154.    On December 5, 2025, IID issued a news release announcing a public workshop\n 7    scheduled for December 9, 2025, to discuss general data center development and potential impacts\n 8    on the District\u2019s service area. This workshop was ostensibly part of IID\u2019s ongoing commitment to\n 9    transparency. Over one year, after Plaintiff had gone through four studies at IID, on December 9,\n10    2025, IID hosted a public workshop to discuss general data center development and potential impacts\n11    on the District\u2019s service area. This workshop was ostensibly part of IID\u2019s ongoing commitment to\n12    transparency, and some of those in attendance were paid to attend by Comite Civico Del Valle.\n13            155.    On December 10, 2025, IID issued a public statement on its website and social media\n14    pages that following the community workshop about data centers, to \u201censure clear, factual\n15    information, IID provides the following clarifications: IID has not approved or endorsed the project\n16    ... Technical studies do not equal approval ... Public claims that the project poses no grid risk are not\n17    based on IID\u2019s findings ... Revenue claims ... have not been reviewed or validated by IID.\u201d This time\n18    IID was directly attacking the data center, but IID was not posting the data center\u2019s position on these\n19    issues. It was classic abuse by IID to provide false information using its government website and\n20    social media pages.\n21            156.    The next day, on December 11, 2025, the City of Imperial hosted its general data\n22    center workshop; making specific attacks on the data center. This workshop was over one year after\n23    Plaintiff went through three plans with the City. In effect, the City found no need to hold workshops\n24    when actual applications were before it. But somehow found it proper to hold a workshop when\n25    applications not before the City, but approved by the County who had jurisdiction, were approved.\n26    The coordinated conspiracy jumps off the pages as to timing of the workshops.\n27\n28\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                              Page 34\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26              PageID.35       Page 35 of\n                                                     52\n\n\n 1            157.    On December 13, 2025, Karin Eugenio provided a letter to the Editor in the Desert\n 2    Review and the Calexico Chronicle titled \u201cWhy I Oppose the Proposed Imperial Data Center By\n 3    Karin Eugenio, IID Director \u2013 Division 5\" and stated:\n 4            \u201cI represent Imperial, where families have built their lives around quiet\n 5            neighborhoods, nearby schools, and a sense of safety and wellbeing. That is why I\n              deeply understand the fear and frustration many residents are feeling about the\n 6\n              proposed data center in our community. Imperial is not opposed to progress. But\n 7            residents are rightly worried about what this project could mean for their homes,\n 8            their children, and their quality of life. They are asking fair and necessary questions:\n              Will this change our neighborhood forever? Will it strain our infrastructure? Will\n 9\n              the promised benefits truly reach the community that would bear the impacts? Those\n10            concerns deserve respect. As a public servant, my responsibility is not just to listen,\n11            but to advocate. While the Imperial Irrigation District is not the authority that decides\n              if or where projects are built -- that responsibility lies with Imperial County -- I\n12\n              believe it is my duty to speak up when a proposal raises serious concerns about\n13\n              ratepayers, reliability, and community well-being. Economic opportunity matters.\n14            Jobs matter. Growth matters. But growth without discretion can come at too high\n15            a cost. Development should enhance a community, not overwhelm it or make\n              residents feel unheard or unsafe. The people I represent are asking for care,\n16\n              transparency, and common sense. I believe they deserve nothing less.\u201d\n17\n18            158.    Eugenio\u2019s letter explicitly utilized her official title as \u201cIID Director for Division 5.\u201d\n\n19    This constitutes a strategic editorial by a sitting IID Director (and incoming Chair) signaling that the\n\n20    $10 billion data center pending before IID is unwelcome. This opposition appears motivated by\n\n21    political calculus rather than legitimate energy concerns, as the project would alleviate, not\n\n22    aggravate, rate pressures.\n\n23            159.    On December 24, 2025, the Desert Review published an article titled \u201cIID board\n\n24    moves to protect ratepayers amid interest in data centers.\u201d The article noted that the IID Board of\n\n25    Directors adopted a resolution establishing \u201cguideline principles\u201d for data centers. Director Eugenio\n\n26    was quoted stating: \u201cOur concern is for the overall well-being of our ratepayers by having proper\n\n27    parameters in place... We are not opposed to progress, but development should enhance the\n\n28    community...\u201d\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                              Page 35\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.36       Page 36 of\n                                                    52\n\n\n 1             CONSPIRACY TO EXTORT: COORDINATION WITH \u201cGREENMAIL\u201d OPERATIVES\n 2           160.    On November 12, 2025, Defendant Katherine Burnworth attended a meeting at the\n 3    Democratic United Group in El Centro where the data center was discussed publicly for the first\n 4    time. She was accompanied by Kristian Salgado, who subsequently authored multiple anti-data\n 5    center letters to various newspapers. Plaintiff recently discovered that Mr. Salgado works for, or in\n 6    concert with, Comite Civico Del Valle (\u201cCCV\u201d), a California non-profit corporation. CCV\u2019s\n 7    Executive Director, Jose Luis Olmedo Velez (\u201cLuis Olmedo\u201d), has an established history in Imperial\n 8    County of utilizing the CEQA process to halt development projects to extract financial settlements.\n 9           161.    Luis Olmedo\u2019s and CCV\u2019s \u201cGreenmail\u201d business model were exposed in a Desert Sun\n10    investigation in 2025 titled \u201cNonprofit sought $83 million ahead of lawsuit that stalled Hells Kitchen\n11    lithium project.\u201d The article detailed Olmedo\u2019s modus operandi:\n12           \u201cClosed-door negotiations over a long-stalled lithium project ... included a request\n             by the nonprofit\u2019s head for more than $80 million in payments over 30 years ... Luis\n13\n             Olmedo, executive director of Comite Civico del Valle, sought $2.75 million a year\n14           ... according to a confidential settlement document seen by The Desert Sun ...\n15           Olmedo said \u2018the $2.75 million annual community impact fee was \u2026 intentionally\n             crafted to be reasonable ... the proposed payments would total $83 million over\n16           three decades ...\u201d\n17\n             \u201c... after CTR declined to make the payments last year, Comite Civico del Valle ...\n18\n             sued rural Imperial County officials alleging that they and CTR violated CEQA ...\n19           After losing ... they challenged the defeat in appellate court ... [Olmedo] noted CEQA\n             challenges of large projects are common ... Riverside County on May 7 approved a\n20\n             $77 million payment ... in exchange for its support of a controversial hydropower\n21           project ... [CTR tried] to negotiate with [Olmedo] in spring 2024 to avoid the initial\n22           lawsuit ...\u201d\n\n23           \u201cCritics of Olmedo say the lengthy litigation has thrown a monkey wrench not just\n24           into CTR\u2019s project, but the widely acclaimed Lithium Valley ... As for criticisms that\n             the litigation is delaying the entire region\u2019s growth, [Olmedo] is unbowed, noting that\n25\n             state law allows anyone to challenge unfair or potentially harmful government actions\n26           ... he was aghast at what added up to at least an $83 million request, and told\n             Olmedo there was no way they could or would pay so much ... Olmedo wouldn\u2019t\n27\n             budge ... the ensuing lawsuit badly delayed a thoroughly vetted project that would\n28           bring hundreds of jobs, tax dollars and other benefits to the area ...\u201d\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 36\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26              PageID.37       Page 37 of\n                                                     52\n\n\n 1            162.    Public tax records confirm that CCV has secured over $22 million in grants over the\n 2    past five years. CCV has an extensive resume of using CEQA litigation as leverage to extract\n 3    payments. The ministerial approval of Plaintiff\u2019s data center represents an existential threat to this\n 4    business model because it eliminates the discretionary \u201chook\u201d required to launch CEQA litigation\n 5    and extort settlements.\n 6            163.    In 2022, California enacted Pub. Res. Code \u00a7 21169.17 (Assembly Bill 195) to curb\n 7    the abuse of CEQA settlements by private entities. The statute imposes a \u201cpublic benefit\u201d nexus on\n 8    settlements, requiring that funds be applied to \u201cprojects or programs that will produce environmental\n 9    benefits... within the geographic area of the project\u201d and mandating disclosure to the Attorney\n10    General to prevent \u201chush money\u201d agreements.\n11            164.    By engaging in litigation to collect funds that are statutorily mandated for public use,\n12    CCV acts not as a private litigant, but as a deputized environmental collector for the State, a \u201cPrivate\n13    Attorney General.\u201d Under the \u201cState Action\u201d doctrine, when a private entity performs a traditionally\n14    exclusive public function (assessing and collecting mitigation fees), its actions are fairly attributable\n15    to the State. Consequently, CCV is subject to the constitutional limitations of the Fifth Amendment.\n16            165.    On information and belief, Defendant Burnworth engaged in a parallel track of\n17    obstruction with Luis Olmedo and CCV. Following Plaintiff\u2019s efforts to enforce the City\u2019s zoning\n18    code and pursue ministerial approval in the County, Burnworth and Olmedo held multiple meetings\n19    to coordinate their opposition. Their shared objective was to force the ministerial data center into a\n20    discretionary CEQA process, thereby creating the leverage necessary for CCV to demand a\n21    settlement.\n22            166.    A recent newspaper article in KPBS by Kori Suzuki states that the \u201ccity also accused\n23    county officials in the suit of violating the California Environmental Quality Act by evaluating\n24    individual components instead of the project as a whole.\u201d\n25            167.    Threats and opposition at public hearings from CCV personnel--including Kristian\n26    Salgado and Gilbert Manzanarez--were coordinated with Defendants. Individuals associated with\n27    CCV appeared with uniform signage and utilized intimidation tactics against decision-makers. On\n28    information and belief, certain participants were compensated by CCV to amplify this opposition.\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                              Page 37\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.38       Page 38 of\n                                                    52\n\n\n 1           168.    Because the Defendants and CCV are acting under color of state law to enforce a\n 2    \u201csham\u201d requirement, their conduct is subject to the unconstitutional conditions doctrine.\n 3           169.    A demand to convert a vested ministerial project into a discretionary one solely to\n 4    extract fees bears no nexus to any legitimate land use impact. As the Supreme Court held in (Nollan\n 5    v. California Coast Commission, 483 U.S. 825, 837 (1987), where the condition is unrelated to the\n 6    impact, the demand \u201cis not a valid regulation of land use but \u2018an out-and-out plan of extortion.\u2019\u201d\n 7           170.    The City\u2019s Petition for Writ of Mandate (the \u201cSham Petition\u201d) is the vehicle for this\n 8    extortion. The Petition is founded on the objectively false claim that a Conditional Use Permit and\n 9    rezoning are required for a project on industrial land. Despite knowing the zoning is correct, the City\n10    filed the lawsuit to manufacture a dispute. This was confirmed when, notwithstanding Plaintiff\u2019s\n11    intention to file a motion for judgment on the pleadings, the City immediately demanded a settlement\n12    meeting. The lawsuit is a pretext to force a financial settlement in exchange for rights the Plaintiff\n13    already possesses.\n14           171.    EVIDENCE OF BAD FAITH AND MALICE. Defendants\u2019 refusal to process the ministerial\n15    application is malicious, not negligent. Defendants were repeatedly informed of the project\u2019s\n16    ministerial status, yet persisted in obstruction. Specific evidence of bad faith includes: (a) Repeated\n17    acknowledgments by City staff that the industrial zoning was compliant; (b) Detailed negotiations\n18    regarding reclaimed water and pipeline routing, which imply acceptance of the use; (c) Receipt of\n19    multiple memos articulating the \u201cas-of-right\u201d entitlement; (d) The City\u2019s sudden pivot to demanding\n20    a \u201ctext amendment\u201d while refusing to process a \u201csimilarity of use\u201d determination; and (e) The\n21    subsequent filing of the Sham Petition based on a \u201cfake rezoning\u201d theory.\n22           172.    CONSPIRACY TO DEPRIVE RIGHTS. The City\u2019s actions--orchestrating a misinformation\n23    campaign, collaborating with a known \u201cgreenmail\u201d operative, and filing a factually baseless lawsuit--\n24    demonstrate an arbitrary, punitive, and conspiratorial intent. Defendants have weaponized the CEQA\n25    process not for environmental protection, but to deprive Plaintiff of vested property interests and to\n26    facilitate a scheme of extortion in violation of 42 U.S.C. \u00a7 1983.\n27\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                             Page 38\n\f     Case 3:26-cv-00128-JLS-BJW       Document 1 Filed 01/09/26             PageID.39        Page 39 of\n                                               52\n\n\n 1                       MATRIX SHOWING COORDINATED MISINFORMATION\n 2\n       Date       Actor      Action\n 3     Nov 26     City       Website & Facebook posts: City \u201chas recently become aware\u201d the\n 4                           County is finalizing approval for a data center and \u201cbecause this\n                             project is unprecedented in its magnitude and use, the City Council\n 5                           feels it is critical to notify our residents\u201d and \u201cto empower\u201d residents\n 6                           to provide feedback against the data center\n\n 7     Nov 26     City       Contacting El Centro to block the Plaintiff\u2019s reclaimed water deal.\n       Nov 26     IID        IID launched public information on data center: \u201cmay result in\n 8\n                             environmental impacts to natural resources close to their location,\n 9                           particularly if not appropriately mitigated through California\u2019s\n                             Environmental Quality Act required compliance... IID requires:\n10\n                             Developers adhere to all environmental rules and regulations.\u201d\n11     Nov 28     IID        Instagram Concerned Imperial Residents. Karin Eugenio - IID\n12                           Director stated: \u201cIt is not a sound proposal. It\u2019s environmentally\n                             degrading, and would raise all of our energy rates.\u201d\n13\n       Dec 1      Senator    Senator Steve Padilla sent a letter to Imperial County\n14\n       Dec 4      City       City Filed \u201cSham\u201d Petition ECU00457 to block permits.\n15     Dec 4      KPBS       Senator Steve Padilla called for public review of data center\n16     Dec 5      IID        Schedules Public Workshop on Data Centers. \u201cThe workshop is part\n17                           of the District\u2019s ongoing commitment to transparency.\u201d\n       Dec 9      IID        Hosted general data center workshop; making specific attacks.\n18\n       Dec 10     IID        IID issued a statement following the community workshop about data\n19                           centers ... To ensure clear, factual information, IID provides the\n20                           following clarifications: IID has not approved or endorsed the project\n                             ... Technical studies do not equal approval ... Public claims that the\n21                           project poses no grid risk are not based on IID\u2019s findings ... Revenue\n22                           claims ... have not been reviewed or validated by IID.\u201d\n\n23     Dec 10     IID        Karin Eugenio wrote on Facebook Rants and Raves: \u201cI am the IID\n                             director for Imperial. We had a meeting last night at the IID\n24                           headquarters to discuss data centers ... IID is establishing extensive\n25                           criteria for any future developments, in this realm, to avoid projects\n                             that can potentially degrade our community fiscally and/or\n26                           environmentally... I am fighting every day to keep predatory\n27                           development out of our neighborhoods.\u201d\n\n28\n\n\n                                   VERIFIED CIVIL RIGHTS COMPLAINT                             Page 39\n\f     Case 3:26-cv-00128-JLS-BJW              Document 1 Filed 01/09/26              PageID.40        Page 40 of\n                                                      52\n\n\n 1     Date           Actor        Action\n 2     Dec 11         City         Hosted general data center workshop; making specific attacks.\n 3     Dec 12         El           Post on City website: \u201caware of information. . . related to the use of\n                      Centro       reclaimed wastewater. . . . no commitments or decisions have been\n 4\n                                   made regarding any proposed data center...\u201d\n 5     Dec 13         IID          IID Director Eugenio letter to the editor: \u201cunderstand the fear and\n 6                                 frustration many residents are feeling about the data center ...\n                                   residents are rightly worried about what this project could mean ...\n 7                                 when a proposal raises serious concerns about ratepayers, reliability,\n 8                                 and community well-being ... growth without discretion can come at\n                                   too high a cost. Development should enhance a community, not\n 9\n                                   overwhelm it or make residents feel unheard or unsafe ...\u201d\n10     Dec 15         City         Website & Facebook posts linking to sham litigation: \u201ccommitment\n11                                 of transparency and keeping our residents informed, the City of\n                                   Imperial has posted the petition\u201d\n12\n       Dec 18         City         Website & Facebook post linking 86-page Planning commission\n13                                 letter. The letter falsely claims rezoning and CUP are required.\n14     Dec 23         IID          IID press release adopting guideline principals for data centers\n\n15     Dec 29         City         Website & Facebook post linking objections to lot merger:\n                                   \u201cCity did not mislead the public concerning any substantive elements\n16                                 of the development\u201d Plaintiff \u201cseen fit to attack the City. Such\n17                                 attacks run counter to our efforts\u201d\n\n18\n                                    DAMAGES SUSTAINED BY THE PLAINTIFF\n19\n              173.    The damages sustained by Plaintiff are multifaceted and severe, comprising direct\n20\n      delay costs, unnecessary redesign expenses, and lost business opportunities. Plaintiff expended\n21\n      millions of dollars in engineering, architectural, and legal fees to prepare three separate site plan\n22\n      applications, technically complex studies: Traffic, Air Pollution, Soils Report, Phase I Environmental\n23\n      Report, Reclaimed Water Reports, Alta Survey, and Multiple Site Plans, and revised the site plans\n24\n      to appease the City\u2019s shifting and arbitrary demands. These costs were incurred for a project that the\n25\n      City had no intention of approving, representing a total loss of capital.\n26            174.    Plaintiff has secured letters of intent and preliminary agreements with a \u201chyperscale\u201d\n27    tenant to lease the facilities. The value of this lease agreement over the life of the project is estimated\n28\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                                Page 40\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26             PageID.41       Page 41 of\n                                                     52\n\n\n 1    in the billions of dollars. The City\u2019s intentional delays and public disparagement campaign have\n 2    jeopardized this relationship, threatening the loss of the entire income stream from the development.\n\n 3            175.    The City\u2019s tortious interference with the City of El Centro caused the loss of a secured\n\n 4    secondary water source, necessitates the identification and procurement of alternative, likely more\n\n 5    expensive, water sources, effectively increasing the project\u2019s long-term operational costs by millions\n\n 6    of dollars over the facility\u2019s life-span.\n\n 7            176.    In reliance on the City\u2019s initial confirmation in September 2024 that the data center\n      was a permitted use by right, Plaintiff invested over $1 million to secure approval for the $12 million\n 8\n      purchase for the 95-acres within the City of Imperial.\n 9\n              177.    On June 2, 2025, plaintiff wired the initial deposit to Webb, on July 14, 2025, the\n10\n      second payment and September 5, 2025, the third payment. These payments were made in direct\n11\n      reliance on the City\u2019s implied contract to sell reclaimed water and the City Engineer\u2019s assurance that\n12\n      the project was feasible and desired. By subsequently refusing to sell the water and interfering with\n13\n      the El Centro supply, the City rendered these expenditures entirely futile.\n14\n              178.    Defendant\u2019s Katherine Burnworth, Dennis Morita, Katie Turner, and Othon Mora\u2019s\n15\n      conduct, as described above, was intentional, malicious, fraudulent, and undertaken with a conscious\n16\n      and deliberate disregard of Plaintiff\u2019s rights. Defendant\u2019s Katherine Burnworth, Dennis Morita, Katie\n17\n      Turner, and Othon Mora knew, or recklessly disregarded the fact, that their actions were substantially\n18\n      certain to cause harm, yet proceeded in order to advance its own interests.\n19              COUNT 1 - VIOLATION OF PROCEDURAL DUE PROCESS (42 U.S.C. \u00a7 1983)\n20                 (Against defendants City of Imperial, Katherine Burnworth, Dennis\n                     Morita, Katie Turner, and Othon Mora, Jointly and Severally)\n21\n              179.    The previous paragraphs of this Complaint are incorporated into this cause of action\n22\n      by this reference as though fully set forth herein.\n23\n              180.    Defendants conduct gives rise to constitutional claims under 42 U.S.C. \u00a7 1983 which\n24\n      allows for the recovery of compensatory and punitive damages against individual officials who,\n25\n      acting under color of law, deprive Plaintiff of its federally protected rights.\n26\n              181.    Plaintiff seeks to vindicate its protected property rights and expose the underlying bad\n27\n      faith obstruction of the data center project.\n28\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                             Page 41\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26                PageID.42        Page 42 of\n                                                    52\n\n\n 1           182.    At all times relevant hereto, Defendants acted under color of state law to deprive\n 2    Plaintiff of rights, privileges, and immunities secured by the Constitution of the United States.\n 3    Defendants engaged in a pattern of verifiable misconduct, ranging from ignoring self-executing\n 4    municipal code provisions to retaliating against the exercise of property rights.\n 5           183.    Imperial\u2019s Site Plan Review procedure, codified at \u00a7 24.19.500, is a ministerial\n 6    process. It limits the City\u2019s authority to a technical verification of compliance with objective\n 7    standards, such as permitted uses, setbacks, height limits, and lot coverage. It does not grant\n 8    Defendants the discretion to subjectively evaluate the \u201cmagnitude\u201d or political desirability of a\n 9    project that complies with zoning ordinances.\n10           184.    Plaintiff possesses a legally protected property interest in the approval of its site plans.\n11    This interest derives from the mandatory language of the City\u2019s own ordinances. Specifically,\n12    Plaintiff holds a protected property interest in the strict enforcement of the 15-day review deadline\n13    prescribed by \u00a7 24.19.550. Under this statute, the City\u2019s failure to act within the statutory window\n14    results in automatic approval by operation of law.\n15    (a).   First Application: Deemed approved on March 19, 2025\n16    (b).   Second Application: Deemed approved on August 19, 2025\n17    (c).   Third Application: Deemed approved on October 16, 2025\n18           185.    Once these statutory deadlines had passed, the Plaintiff\u2019s entitlement to the permits\n19    vested. Defendants deprived Plaintiff of this protected property interest by refusing to acknowledge\n20    the ministerial status of the applications and by refusing to honor the deemed-approval mechanism.\n21    Instead of issuing the permits as required by law, Defendants arbitrarily treated the vested approvals\n22    as void, without providing Plaintiff notice or an opportunity to be heard regarding the revocation of\n23    these vested rights.\n24           186.    Defendants, acting under color of state law, deprived Plaintiff of its protected property\n25    interest through actions that were arbitrary, irrational, and undertaken in bad faith, including:\n26    (a).   Intentionally demanding the ministerial application be process under discretionary\n27           procedures in an effort to create public hearings and CEQA review;\n28    (b).   Intentionally allowing deadlines to lapse and then ignoring the legal consequences;\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                                 Page 42\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.43         Page 43 of\n                                                    52\n\n\n 1    (c).   Inventing new discretionary requirements (e.g., text amendments and conditional use\n 2           permits) for uses already permitted by right; and\n 3    (d).   Soliciting confidential information under false pretenses to interfere with third-party\n 4           contracts, as a means to block the entitlement.\n 5           187.    Defendants\u2019 actions violate Plaintiff\u2019s rights to Procedural Due Process as provided\n 6    by the Fourteenth Amendment to the United States Constitution. The City\u2019s refusal to follow its own\n 7    mandatory, non-discretionary statutes deprived Plaintiff of a multi-million dollar entitlement without\n 8    due process of law and is compensable under 42 U.S.C. \u00a7 1983.\n 9           WHEREFORE, Plaintiff prays for judgment against Defendants City of Imperial, Katherine\n10    Burnworth, Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally:\n11    A.     For compensatory damages against Defendants City of Imperial, Katherine Burnworth,\n12           Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally, in an\n13           amount to be determined upon trial of this action;\n14    B.     Defendant Katherine Burnworth\u2019s conduct constitutes oppression, fraud, and malice within\n15           the meaning of applicable law and justifies the imposition of punitive and exemplary\n16           damages. Plaintiff seeks punitive damages in an amount sufficient to punish Defendant\n17           Katherine Burnworth for her misconduct, to deter others from engaging in similar conduct\n18           in the future, and to promote respect for the Constitution and laws of the United States;\n19    C.     For costs of suit and reasonable attorneys\u2019 fees in accordance with 42 U.S.C. \u00a7 1988; and\n20    D.     For such other and further relief as this Court may deem just and proper.\n21\n                     COUNT 2 - FIRST AMENDMENT RETALIATION (42 U.S.C. \u00a7 1983)\n22                   (Against defendants City of Imperial, Katherine Burnworth, Dennis\n                       Morita, Katie Turner, and Othon Mora, Jointly and Severally)\n23\n             188.    The previous paragraphs of this Complaint are incorporated into this cause of action\n24\n      by this reference as though fully set forth herein.\n25\n             189.    Defendants\u2019 conduct gives rise to constitutional claims under 42 U.S.C. \u00a7 1983,\n26\n      which allows for the recovery of compensatory and punitive damages against individual officials\n27\n      who, acting under color of state law, deprive Plaintiff of its federally protected rights.\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                              Page 43\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.44       Page 44 of\n                                                    52\n\n\n 1           190.    The First Amendment guarantees the right to petition the government for a redress\n 2    of grievances. This right is broad and encompasses not only filing lawsuits but also applying for\n 3    government permits, communicating with public officials, criticizing government delays, and\n 4    advocating for one\u2019s business interests in public forums.\n 5           191.    Plaintiff engaged in clearly established protected activity by:\n 6    (a).   Insisting on strict compliance with the Imperial Municipal Code\u2019s ministerial review process;\n 7    (b).   Petitioning the County of Imperial for land use approvals after the City\u2019s obstruction;\n 8    (c).   Speaking at service club meetings to counter the City\u2019s false narrative in public forums; and\n 9    (d).   Threatening litigation regarding the City\u2019s delays and regarding conflicts of interest\n10           involving Z-Global with IID.\n11           192.    In response to this protected activity, Defendants took severe adverse actions designed\n12    to punish Plaintiff and chill the exercise of these rights. These actions included:\n13    (a).   Refusing to honor the mandatory \u00a7 24.19.500 Site Plan Review Procedure and the \u00a7\n14           24.19.550 \u201cdeemed approved\u201d status;\n15    (b).   Suddenly demanding a discretionary CEQA process and text amendments for a project that\n16           is permitted by right, solely to force Plaintiff into a regulatory morass;\n17    (c).   Distributing City-authored flyers containing false statements and posting hostile messages\n18           on the City\u2019s official social media pages to incite public opposition;\n19    (d).   Soliciting confidential documents to sabotage Plaintiff\u2019s water agreement with the City of\n20           El Centro; and\n21    (e).   Filing baseless lawsuits and administrative appeals against the County\u2019s approvals.\n22           193.    While the City possesses a general right to petition the courts, that right is not\n23    absolute when used as a weapon against a citizen. Defendants\u2019 litigation and administrative appeals\n24    against the County fall under the sham litigation exception to the Noerr-Pennington doctrine. These\n25    legal actions are \u201cobjectively baseless\u201d because the City lacks jurisdiction over County land use\n26    decisions, and they are subjectively motivated by a desire to harass the Plaintiff and drain its\n27    resources rather than a legitimate expectation of success on the merits.\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 44\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26             PageID.45       Page 45 of\n                                                    52\n\n\n 1            194.   The retaliatory motive is evidenced by the temporal proximity of the adverse actions.\n 2    The harassment campaign began immediately after Plaintiff asserted its rights under the City code\n 3    and moved the project to the County. The City was content to ignore the project until Plaintiff sought\n 4    redress elsewhere; once the County approval appeared imminent, Defendants escalated their\n 5    obstruction from passive delay to active tactics, including the smear campaign and the sham\n 6    litigation.\n 7            195.   Defendants\u2019 adverse actions--specifically the public disparagement, the interference\n 8    with the El Centro water contract, and the filing of a lawsuit--would chill a person of ordinary\n 9    firmness from continuing to engage in the protected activity. Indeed, the City\u2019s actions were\n10    calculated to force the Plaintiff to abandon the project entirely or submit to an extra-legal\n11    discretionary process.\n12            196.   Defendants\u2019 actions were substantially motivated by Plaintiff\u2019s protected conduct. But\n13    for Plaintiff\u2019s persistence in asserting its \u201cby-right\u201d status and its successful petitioning of the\n14    County, Defendants would not have engaged in this extraordinary campaign of interference.\n15            197.   The actions alleged above violate Plaintiff\u2019s rights under the First Amendment to the\n16    United States Constitution. Any violation of these rights is compensable under 42 U.S.C. \u00a7 1983.\n17            WHEREFORE, Plaintiff prays for judgment against Defendants City of Imperial, Katherine\n18    Burnworth, Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally:\n19    A.      For compensatory damages against Defendants City of Imperial, Katherine Burnworth,\n20            Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally, in an\n21            amount to be determined upon trial of this action;\n22    B.      Defendant Katherine Burnworth\u2019s conduct constitutes oppression, fraud, and malice within\n23            the meaning of applicable law and justifies the imposition of punitive and exemplary\n24            damages. Plaintiff seeks punitive damages in an amount sufficient to punish Defendant\n25            Katherine Burnworth for her misconduct, to deter others from engaging in similar conduct\n26            in the future, and to promote respect for the Constitution and laws of the United States;\n27    C.      For costs of suit and reasonable attorneys\u2019 fees in accordance with 42 U.S.C. \u00a7 1988; and\n28    D.      For such other and further relief as this Court may deem just and proper.\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 45\n\f     Case 3:26-cv-00128-JLS-BJW      Document 1 Filed 01/09/26      PageID.46   Page 46 of\n                                              52\n\n\n 1\n 2\n 3\n 4\n 5\n 6\n 7\n 8\n 9\n10\n11\n12\n13\n14\n15\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                                  VERIFIED CIVIL RIGHTS COMPLAINT                 Page 46\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26            PageID.47       Page 47 of\n                                                     52\n\n\n 1              COUNT 3 - EQUAL PROTECTION CLASS OF ONE CLAIM (42 U.S.C. \u00a7 1983)\n                   (Against defendants City of Imperial, Katherine Burnworth, Dennis\n 2                   Morita, Katie Turner, and Othon Mora, Jointly and Severally)\n 3           198.    The previous paragraphs of this Complaint are incorporated into this cause of action\n 4    by this reference as though fully set forth herein.\n 5           199.    The Equal Protection Clause of the Fourteenth Amendment protects individuals from\n 6    intentional and arbitrary discrimination, even if they do not belong to a protected class. Under the\n 7    \u201cClass of One\u201d theory established in Village of Willowbrook v. Olech, 528 U.S. 562 (2000), a\n 8    plaintiff states a claim by alleging they were intentionally treated differently from others similarly\n 9    situated and that there was no rational basis for the difference in treatment. As the Supreme Court\n10    held: \u201cThe allegations that this was \u2018irrational and wholly arbitrary\u2019 was enough to make an equal\n11    protection case.\u201d (Id. at 1075).\n12           200.    Plaintiff is similarly situated to other property owners and developers in the I-2\n13    Rail-Served Industrial Zone. Defendants routinely process site plans for these similarly situated\n14    entities ministerially under \u00a7 24.19.500. Specifically, the City Code and Defendants\u2019 past practices\n15    permit heavy industrial uses--including livestock sales, feed yards, bottling plants, cement product\n16    manufacturing, and lumber yards--to proceed by right or with minimal administrative review. For\n17    example, Vilore Foods, a 289,000 square foot warehouse, located at 2421 Vilore Way, in the City,\n18    and Alford Distributing, located at 344 Crown Court, in the City, are both large Industrial buildings\n19    approved under the ministerial site plan review procedure.\n20           201.    Despite Plaintiff\u2019s project being less intrusive than these permitted heavy industrial\n21    uses (producing less traffic, no retail foot traffic, and contained entirely indoors), Defendants\n22    intentionally treated Plaintiff differently. While similarly situated industrial applicants are granted\n23    permits through objective staff verification, Defendants singled out Plaintiff, demanding that it\n24    submit to a discretionary \u201cConditional Use Permit\u201d process, text amendments, and environmental\n25    reviews not required of others.\n26           202.    Defendants further demonstrated disparate treatment regarding the \u201cSimilarity of Use\u201d\n27    provision (\u00a7 24.19.200). Defendants have historically utilized \u00a7 24.19.200 to administratively\n28    classify unlisted uses as permitted when they are similar in character to listed uses. Plaintiff\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                            Page 47\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26             PageID.48       Page 48 of\n                                                     52\n\n\n 1    repeatedly requested Defendants to apply the similarity of use standard to the data center. Defendants\n 2    arbitrarily refused to exercise the similarity of use procedure, instead insisting on a legislative text\n 3    amendment which would take 6 to 9 months.\n 4            203.    There is no rational basis for this difference in treatment. It is irrational and wholly\n 5    arbitrary to require a lengthy discretionary review and legislative amendment for a low-impact data\n 6    center while ministerially approving high-impact uses like cement manufacturing or feed yards in\n 7    the same zone. The distinction was not based on any legitimate government interest, such as public\n 8    health or safety, but was motivated by a malicious intent to obstruct Plaintiff\u2019s project and retaliate\n 9    against Plaintiff\u2019s assertion of rights.\n10            204.    The actions alleged above violate Plaintiff\u2019s rights to Equal Protection as provided\n11    by the Fourteenth Amendment to the United States Constitution. Any violation of the Fourteenth\n12    Amendment is compensable under 42 U.S.C. \u00a7 1983.\n13            WHEREFORE, Plaintiff prays for judgment against defendants City of Imperial, Katherine\n14    Burnworth, Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally:\n15    A.      For compensatory damages against Defendants City of Imperial, Katherine Burnworth,\n16            Dennis Morita, Katie Turner, and Othon Mora, individually, jointly and severally, in an\n17            amount to be determined upon trial of this action;\n18    B.      Defendant Katherine Burnworth\u2019s conduct constitutes oppression, fraud, and malice within\n19            the meaning of applicable law and justifies the imposition of punitive and exemplary\n20            damages. Plaintiff seeks punitive damages in an amount sufficient to punish Defendant\n21            Katherine Burnworth for her misconduct, to deter others from engaging in similar conduct\n22            in the future, and to promote respect for the Constitution and laws of the United States; and\n23    C.      For costs of suit and reasonable attorneys\u2019 fees in accordance with 42 U.S.C. \u00a7 1988; and\n24    D.      For such other and further relief as this Court may deem just and proper.\n25    //\n26    //\n27\n28\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                             Page 48\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26            PageID.49       Page 49 of\n                                                    52\n\n\n 1                    COUNT 4 - MUNICIPAL LIABILITY (MONELL) (42 U.S.C. \u00a7 1983)\n                                 (Against defendant City of Imperial)\n 2\n             205.     The previous paragraphs of this Complaint are incorporated into this cause of action\n 3\n      by this reference as though fully set forth herein.\n 4\n             206.     Defendant City of Imperial is a municipality and a \u201cperson\u201d subject to suit under 42\n 5\n      U.S.C. \u00a7 1983. Under Monell v. Dep\u2019t of Soc. Servs., 436 U.S. 658 (1978), the City is liable for\n 6\n      constitutional deprivations caused by the implementation of its official policies, customs, or\n 7\n      practices, or by the decisions of officials with final policymaking authority.\n 8\n             207.     The constitutional violations alleged herein--including the denial of Procedural Due\n 9\n      Process, First Amendment Retaliation, and Equal Protection violations--were not the result of rogue\n10\n      actions by low-level employees. Rather, they were the direct result of deliberate decisions made by\n11\n      officials with final policymaking authority for the City regarding land use and code enforcement.\n12\n      Specifically:\n13\n      (a).   Planning Director Othon Mora: Possesses final authority over Site Plan Reviews and the\n14\n             interpretation of the Zoning Code. His decision to refuse to process the ministerial\n15\n             application and demand text amendments constitutes the official policy of the City.\n16\n      (b).   City Manager Dennis Morita: Possesses final administrative authority. His direct\n17\n             involvement in the meetings, his direction to withhold the \u201cwill-serve\u201d water agreement, and\n18\n             his authorization of the interference with the City of El Centro represent official municipal\n19\n             acts.\n20\n      (c).   City Council/Katherine Burnworth: The involvement of Council members and the use of the\n21\n             City\u2019s official social media channels confirm that the legislative body ratified the\n22\n             obstructionist strategy.\n23\n             208.     The City established and maintained an unconstitutional custom or usage of ignoring\n24\n      mandatory ministerial duties in favor of arbitrary discretionary review when politically expedient.\n25\n      Despite the clear language of the I-2 Rail-Served Industrial Zone permitting \u201cbusiness, professional,\n26\n      and research offices,\u201d the City adopted a policy of manufacturing \u201cdiscretion\u201d (via demands for\n27\n      CUPs, text amendments, and CEQA) to delay and obstruct Plaintiff\u2019s vested rights. This practice is\n28\n      so permanent and well-settled as to constitute a \u201ccustom or usage\u201d with the force of law.\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 49\n\f     Case 3:26-cv-00128-JLS-BJW             Document 1 Filed 01/09/26              PageID.50       Page 50 of\n                                                     52\n\n\n 1            209.    Furthermore, the public smear campaign on Facebook were not isolated incidents.\n 2    These were deliberate municipal actions ordered by senior City officials, printed with City resources,\n 3    and distributed by City employees during working hours. This concerted use of government\n 4    machinery to disparage a private applicant and incite public opposition constitutes an official policy\n 5    of retaliation ratified by the City\u2019s highest officials.\n 6            210.    The City, through its policymakers, had actual or constructive knowledge of the\n 7    constitutional deprivations being foisted upon Plaintiff and failed to take corrective action, thereby\n 8    ratifying the unconstitutional conduct.\n 9            211.    By failing to override the Planning Director\u2019s arbitrary refusal to follow the code, and\n10    by actively participating in the interference with the City of El Centro reclaimed water contract, the\n11    City Council and City Manager approved the unconstitutional acts.\n12            212.    As a direct and proximate result of the City of Imperial\u2019s official policies, customs,\n13    and ratified acts, Plaintiff has suffered significant damages, including the loss of use of its property,\n14    the cost of futile studies, the destruction of its contractual relationship with the City of El Centro,\n15    and impact to the potential economic benefit of the relationship between Plaintiff and the Hypercale\n16    Tenant valued in the hundred of million of dollars.\n17            WHEREFORE, Plaintiff prays for judgment against the City of Imperial as follows:\n18    A.      For compensatory damages against the City of Imperial in an amount to be determined upon\n19            trial of this action, which amount is estimated to exceed One Million Dollars;\n20    B.      For costs of suit and reasonable attorneys\u2019 fees in accordance with 42 U.S.C. \u00a7 1988; and\n21    C.      For such other and further relief as this Court may deem just and proper.\n22\n23            PLAINTIFF DEMANDS A TRIAL BY JURY ON ALL ISSUES SO TRIABLE\n24\n                                              LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n25\n26\n27    Date: January 9, 2026                   Sebastian Rucci (SBN 178114)\n                                              Attorney for Plaintiff\n28\n\n\n                                         VERIFIED CIVIL RIGHTS COMPLAINT                              Page 50\n\f     Case 3:26-cv-00128-JLS-BJW            Document 1 Filed 01/09/26            PageID.51       Page 51 of\n                                                    52\n\n\n 1                                             VERIFICATION\n 2    STATE OF CALIFORNIA )\n                          )\n 3    COUNTY OF RIVERSIDE )\n 4            I, Sebastian Rucci, declare as follows:\n 5            I, Sebastian Rucci, am the managing member of Imperial Valley Computer Manufacturing,\n 6    LLC, the entity which filed for the data center permits at issue. I have read the foregoing Verified\n 7    Complaint and know the contents to be true and that the same are true of my own knowledge, except\n 8    as to matters which are therein stated upon my information or belief, and as to those matters that I\n 9    believe it to be true.\n10            I declare under penalty of perjury, under the laws of the United States and under the laws of\n11    California that the foregoing is true and correct.\n12            Executed on January 9, 2026 at Riverside, California.\n13\n14    IMPERIAL VALLEY COMPUTER MANUFACTURING, LLC\n15\n16\n      Sebastian Rucci, managing member\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                                        VERIFIED CIVIL RIGHTS COMPLAINT                            Page 51\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1 Filed 01/09/26         PageID.52     Page 52 of\n                                                 52\n\n\n 1                                      TABLE OF EXHIBITS\n 2    Exhibit 1 Email to City Site Plans (1-17-25)\n      Exhibit 2 Email to City - Meeting Plans; Reclaimed Water (2-28-25)\n 3    Exhibit 3 City email - Site Plan Application (3-04-25)\n 4    Exhibit 4 Reclaimed Water Emails (3-07-25)\n      Exhibit 5 Site Plan Review Letter (4-04-25)\n 5    Exhibit 6 Letter to City Amended Plans (5-14-25)\n 6    Exhibit 7 City email Reclaimed Water (5-20-25)\n      Exhibit 8 Email to City on Zoning (5-30-25)\n 7    Exhibit 9 Email to City about County Zoning (6-03-25)\n      Exhibit 10 Email to City Copy of County Plans (6-04-25)\n 8    Exhibit 11 Email to City - As of Right Memo (6-06-25)\n 9    Exhibit 12 Email to City - Reclaimed Water Cost (6-17-25)\n      Exhibit 13 Email from City - Reclaimed Water Cost (6-17-25)\n10    Exhibit 14 Email to City - Reclaimed Water Cost (6-17-25)\n11    Exhibit 15 Letter to Imperial - Permitted Use (6-23-25)\n      Exhibit 16 Email to City - Data Center Permitted Use (6-23-25)\n12    Exhibit 17 City email - Path Forward (7-15-25)\n      Exhibit 18 City to email - Alternative Suggestions (7-18-25)\n13    Exhibit 19 Email to City - Revised Plans on Industrial (7-22-25)\n14    Exhibit 20 Email from City - Working on Plans (7-30-25)\n      Exhibit 21 Email from City - Reclaimed Water Report (8-14-25)\n15    Exhibit 22 Email to City - Reclaimed Water Site Plan (8-16-25)\n16    Exhibit 23 Email from City - Forwarding Site Plan to Engineer (8-18-25)\n      Exhibit 24 Email from City - Rejecting Site Plan on Industrial Zone (8-20-25)\n17    Exhibit 25 Email to City - Withdrawing Project (8-21-25)\n      Exhibit 26 Email from City - Continued Cooperation (9-03-25)\n18    Exhibit 27 County Letter - Data Center is Permitted Use (9-04-25)\n19    Exhibit 28 Email to City - Copies of Six Studies (9-09-25)\n      Exhibit 29 Email from City Attorney - Reclaimed Water Questions (9-18-25)\n20    Exhibit 30 Email to City - Reclaimed Water Answers (10-07-25)\n21    Exhibit 31 Email to City - Reclaimed Water Questions (11-06-25)\n      Exhibit 32 Email to City - Reclaimed Water (11-07-25)\n22    Exhibit 33 Email from City - Reclaimed Water emails (11-07-25)\n      Exhibit 34 Email to City - Reclaimed Water emails (11-07-25)\n23    Exhibit 35 Email from City - County Hearings (11-12-25)\n24    Exhibit 36 Email to City - No County Hearings (11-12-25)\n      Exhibit 37 Email from Tom to City of Imperial (11-26-25)\n25    Exhibit 38 Wholesale Market Proposal to IID (10-02-25)\n26    Exhibit 39 Email from IID Rejecting Proposal (10-14-25)\n      Exhibit 40 Email to Director Eugenio and Cardenas (10-14-25)\n27    Exhibit 41 Arbitration Statement (10-20-25)\n      Exhibit 42 Arbitration Statement Exhibits\n28    Exhibit 43 Email to IID Board - Arbitration Withdrawn and Case Close (10-22-25)\n\n                                     VERIFIED CIVIL RIGHTS COMPLAINT                      Page 52\n\f","ocr_status":1,"date_upload":"2026-01-10T23:19:22.993253-08:00","document_number":"1","attachment_number":null,"pacer_doc_id":"037022111069","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":1,"description":"Complaint","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739414/","id":464739414,"tags":[],"absolute_url":"/docket/72127384/1/1/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.116698-08:00","date_modified":"2026-06-24T14:26:47.680567-07:00","sha1":"8a98425f36a1c64bac21012226aa861f4d8c97dc","page_count":1,"file_size":312965,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.1_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.1.pdf","ia_upload_failure_count":null,"thumbnail":"recap-thumbnails/gov.uscourts.casd.839861/464739414.thumb.1068.png","thumbnail_status":1,"plain_text":"                Case 3:26-cv-00128-JLS-BJWCIVIL\nJS 44 (Rev. 03/24)                                                     DocumentCOVER     1-1 SHEET Filed 01/09/26 PageID.53 Page 1\n                                                                                       of  1\nThe JS 44 civil cover sheet and the information contained herein neither replace nor supplement the filing and service of pleadings or other papers as required by law, except as\nprovided by local rules of court. This form, approved by the Judicial Conference of the United States in September 1974, is required for the use of the Clerk of Court for the\npurpose of initiating the civil docket sheet. (SEE INSTRUCTIONS ON NEXT PAGE OF THIS FORM.)\nI. (a) PLAINTIFFS                                                                                          DEFENDANTS\n       IMPERIAL VALLEY COMPUTER MANUFACTURING,                                                              CITY OF IMPERIAL, a California municipal corporation\n       LLC, a California limited liability company\n   (b) County of Residence of First Listed Plaintiff Riverside                                             County of Residence of First Listed Defendant              Imperial\n                                (EXCEPT IN U.S. PLAINTIFF CASES)                                                                  (IN U.S. PLAINTIFF CASES ONLY)\n                                                                                                           NOTE:      IN LAND CONDEMNATION CASES, USE THE LOCATION OF\n                                                                                                                      THE TRACT OF LAND INVOLVED.\n\n   (c) Attorneys (Firm Name, Address, and Telephone Number)                                                 Attorneys (If Known)\n       Law Offices of Sebastian Rucci, P.C.; 16400 PCH, Suite\n                                                                                                                                      '26CV128 JLS BJW\n       212, Huntington Beach, CA 92649; Ph. 562-901-0199\nII. BASIS OF JURISDICTION (Place an \u201cX\u201d in One Box Only)                                       III. CITIZENSHIP OF PRINCIPAL PARTIES (Place an \u201cX\u201d in One Box for Plaintiff\n                                                                                                        (For Diversity Cases Only)                                    and One Box for Defendant)\n  1    U.S. Government               \u2716   3   Federal Question                                                                    PTF        DEF                                         PTF      DEF\n         Plaintiff                             (U.S. Government Not a Party)                      Citizen of This State          \u2716 1        \u2716 1      Incorporated or Principal Place      \u2716 4    \u2716 4\n                                                                                                                                                       of Business In This State\n\n  2    U.S. Government                   4   Diversity                                            Citizen of Another State            2          2   Incorporated and Principal Place           5         5\n         Defendant                             (Indicate Citizenship of Parties in Item III)                                                           of Business In Another State\n\n                                                                                                  Citizen or Subject of a             3          3   Foreign Nation                             6         6\n                                                                                                    Foreign Country\nIV. NATURE OF SUIT (Place an \u201cX\u201d in One Box Only)                                                                                     Click here for: Nature of Suit Code Descriptions.\n          CONTRACT                                                 TORTS                            FORFEITURE/PENALTY                       BANKRUPTCY                       OTHER STATUTES\n  110 Insurance                      PERSONAL INJURY                    PERSONAL INJURY              625 Drug Related Seizure             422 Appeal 28 USC 158             375 False Claims Act\n  120 Marine                         310 Airplane                      365 Personal Injury -             of Property 21 USC 881           423 Withdrawal                    376 Qui Tam (31 USC\n  130 Miller Act                     315 Airplane Product                  Product Liability         690 Other                                28 USC 157                        3729(a))\n  140 Negotiable Instrument               Liability                    367 Health Care/                                                     INTELLECTUAL                    400 State Reapportionment\n  150 Recovery of Overpayment        320 Assault, Libel &                  Pharmaceutical                                                 PROPERTY RIGHTS                   410 Antitrust\n      & Enforcement of Judgment           Slander                          Personal Injury                                                820 Copyrights                    430 Banks and Banking\n  151 Medicare Act                   330 Federal Employers\u2019                Product Liability                                              830 Patent                        450 Commerce\n  152 Recovery of Defaulted               Liability                    368 Asbestos Personal                                              835 Patent - Abbreviated          460 Deportation\n       Student Loans                 340 Marine                            Injury Product                                                     New Drug Application          470 Racketeer Influenced and\n       (Excludes Veterans)           345 Marine Product                    Liability                                                      840 Trademark                         Corrupt Organizations\n  153 Recovery of Overpayment             Liability                   PERSONAL PROPERTY                       LABOR                       880 Defend Trade Secrets          480 Consumer Credit\n      of Veteran\u2019s Benefits          350 Motor Vehicle                 370 Other Fraud               710 Fair Labor Standards                 Act of 2016                       (15 USC 1681 or 1692)\n  160 Stockholders\u2019 Suits            355 Motor Vehicle                 371 Truth in Lending              Act                                                                485 Telephone Consumer\n  190 Other Contract                     Product Liability             380 Other Personal            720 Labor/Management                 SOCIAL SECURITY                       Protection Act\n  195 Contract Product Liability     360 Other Personal                    Property Damage               Relations                        861 HIA (1395ff)                  490 Cable/Sat TV\n  196 Franchise                          Injury                        385 Property Damage           740 Railway Labor Act                862 Black Lung (923)              850 Securities/Commodities/\n                                     362 Personal Injury -                 Product Liability         751 Family and Medical               863 DIWC/DIWW (405(g))                Exchange\n                                         Medical Malpractice                                             Leave Act                        864 SSID Title XVI                890 Other Statutory Actions\n      REAL PROPERTY                    CIVIL RIGHTS                   PRISONER PETITIONS             790 Other Labor Litigation           865 RSI (405(g))                  891 Agricultural Acts\n  210 Land Condemnation            \u2716 440 Other Civil Rights            Habeas Corpus:                791 Employee Retirement                                                893 Environmental Matters\n  220 Foreclosure                    441 Voting                        463 Alien Detainee                Income Security Act              FEDERAL TAX SUITS                 895 Freedom of Information\n  230 Rent Lease & Ejectment         442 Employment                    510 Motions to Vacate                                              870 Taxes (U.S. Plaintiff             Act\n  240 Torts to Land                  443 Housing/                          Sentence                                                            or Defendant)                896 Arbitration\n  245 Tort Product Liability             Accommodations                530 General                                                        871 IRS\u2014Third Party               899 Administrative Procedure\n  290 All Other Real Property        445 Amer. w/Disabilities -        535 Death Penalty                 IMMIGRATION                           26 USC 7609                      Act/Review or Appeal of\n                                         Employment                    Other:                        462 Naturalization Application                                             Agency Decision\n                                     446 Amer. w/Disabilities -        540 Mandamus & Other          465 Other Immigration                                                  950 Constitutionality of\n                                         Other                         550 Civil Rights                  Actions                                                                State Statutes\n                                     448 Education                     555 Prison Condition\n                                                                       560 Civil Detainee -\n                                                                           Conditions of\n                                                                           Confinement\nV. ORIGIN (Place an \u201cX\u201d in One Box Only)\n\u2716 1 Original             2 Removed from                       3     Remanded from               4 Reinstated or             5 Transferred from      6 Multidistrict                     8 Multidistrict\n    Proceeding             State Court                              Appellate Court               Reopened                    Another District          Litigation -                      Litigation -\n                                                                                                                              (specify)                 Transfer                          Direct File\n                                         Cite the U.S. Civil Statute under which you are filing (Do not cite jurisdictional statutes unless diversity):\n                                         42 U.S.C. 1983\nVI. CAUSE OF ACTION Brief description of cause:\n                                         (1) Violation of Procedural Due Process; (2) First Amendment Retaliation; (3) Equal Protection Class of One Claim; and (4) Municipal Liability\nVII. REQUESTED IN                             CHECK IF THIS IS A CLASS ACTION                        DEMAND $                                    CHECK YES only if demanded in complaint:\n     COMPLAINT:                               UNDER RULE 23, F.R.Cv.P.                               10,000,000                                  JURY DEMAND:                 \u2716   Yes          No\nVIII. RELATED CASE(S)\n                                             (See instructions):\n      IF ANY                                                         JUDGE                                                                DOCKET NUMBER\nDATE                                                                   SIGNATURE OF ATTORNEY OF RECORD\n1/09/2026\nFOR OFFICE USE ONLY\n\n  RECEIPT #                     AMOUNT                                      APPLYING IFP                                    JUDGE                           MAG. JUDGE\n\f","ocr_status":2,"date_upload":"2026-01-10T23:32:18.916549-08:00","document_number":"1","attachment_number":1,"pacer_doc_id":"037022111070","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Civil Cover Sheet","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739415/","id":464739415,"tags":[],"absolute_url":"/docket/72127384/1/2/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.206689-08:00","date_modified":"2026-06-24T14:26:49.438871-07:00","sha1":"58331ec513f972817e3a31ffbfae64018640c2ba","page_count":5,"file_size":709971,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.2_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.2.pdf","ia_upload_failure_count":null,"thumbnail":"recap-thumbnails/gov.uscourts.casd.839861/464739415.thumb.1068.png","thumbnail_status":1,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-2   Filed 01/09/26   PageID.54   Page 1\n                                    of 5\n\n\n\n\n                 EXHIBIT 1\n             Email to City Site Plans\n                    (1-17-25)\n\f1/17/25, 5:06Case\n             AM   3:26-cv-00128-JLS-BJW RucciDocument         1-2\n                                              Law Mail - Initial       FiledSite01/09/26\n                                                                 Data Center                    PageID.55\n                                                                                 Plan Drawings and Videos               Page 2\n                                                                    of 5\n\n                                                                                       Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Initial Data Center Site Plan Drawings and Videos\n  2 messages\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                                  Fri, Jan 17, 2025 at 4:59 AM\n  To: Omora@cityofimperial.org, DDale@imperial.ca.gov\n  Cc: tom@dubosedesigngroup.com\n\n    Good Morning, Othon and David,\n\n    We are progressing with our data center project and wanted to share some initial drawings. I have attached the latest data\n    center site plan. We also have an alternative site plan with a much larger substation area (26 acres). It is still in its initial\n    drawings, so we are not sure which one Google will select, but your comments on any glaring issues would be\n    appreciated. Also attached are some 3D sketches.\n\n    The following email is separated due to size. It is a video of Data Center Site #1. Tom Duboise is doing site work on the\n    project and will soon have more detailed site plan drawings. I will keep you updated with additional videos as they are\n    created. But for now, our concept is being formulated, and your initial comments would be greatly appreciated. Tom and I\n    can come to you anytime that works best for you to talk about your initial observations.\n\n    Thank you.\n\n    Sincerely,\n\n    Sebastian\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n\n     3 attachments\n          Data Center (1-16-25).pdf\n          4421K\n          Data Center Alternative (1-16-25).pdf\n          6039K\n          Building Sketches (1-16-25).pdf\n          2299K\n\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                                  Fri, Jan 17, 2025 at 5:05 AM\n  To: Omora@cityofimperial.org, DDale@imperial.ca.gov\n  Cc: tom@dubosedesigngroup.com\n\n\n\n             3D Animation of Data Center (1-16-25).mp4\n\n    Attached is a video of Data Center Site #1 (the 95 acres in the City of Imperial)\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-a:r5429627064754945527&simpl=msg-a:r514044237298620\u2026   1/1\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-2   Filed 01/09/26   PageID.56   Page 3\n                                    of 5\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-2   Filed 01/09/26   PageID.57   Page 4\n                                    of 5\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-2   Filed 01/09/26   PageID.58   Page 5\n                                    of 5\n\f","ocr_status":1,"date_upload":"2026-01-10T23:32:37.778599-08:00","document_number":"1","attachment_number":2,"pacer_doc_id":"037022111071","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 1","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739416/","id":464739416,"tags":[],"absolute_url":"/docket/72127384/1/3/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.230570-08:00","date_modified":"2026-06-24T14:26:51.708656-07:00","sha1":"b8cd1c8a27f0b1aef75251fe1db0624031f2005b","page_count":3,"file_size":231792,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.3_2.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.3.pdf","ia_upload_failure_count":null,"thumbnail":"recap-thumbnails/gov.uscourts.casd.839861/464739416.thumb.1068_1.png","thumbnail_status":1,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-3   Filed 01/09/26   PageID.59   Page 1\n                                    of 3\n\n\n\n\n               EXHIBIT 2\n      Email to City - Meeting Plans;\n            Reclaimed Water\n                (2-28-25)\n\f             Case\n12/31/25, 2:24 AM 3:26-cv-00128-JLS-BJW                 Document\n                                                         Rucci Law Mail1-3     Filed 01/09/26\n                                                                       - Pre-Application                  PageID.60\n                                                                                         Meeting for Data Center         Page 2\n                                                                    of 3\n\n                                                                                        Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Pre-Application Meeting for Data Center\n  9 messages\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                               Fri, Feb 28, 2025 at 11:17 AM\n  To: Omora@imperial.ca.gov, DDale@imperial.ca.gov, communitydevelopment@imperial.ca.gov\n  Cc: Tom DuBose <tom@dubosedesigngroup.com>, Hector Casas <Hector@ruccilaw.com>, gary@ruccilaw.com\n  Bcc: Hector Cassas <HjCasas@icloud.com>, Gary Messina <gmessina5@gmail.com>\n\n    Good Morning, Othon and David,\n\n    We are finally ready to proceed with submitting for the data center. I've attached our site plan for the data center project\n    for Site #1\u2014the 95 acres at Imperial and Aten Road.\n    Please schedule a pre-application meeting at your convenience to discuss compliance and purchasing reclaimed water,\n    etc. I can update you at the meeting on our progress since our last in-person meeting.\n    In the following emails, building sketches and animation videos are attached. I separated them due to size.\n    Please let me know what day next week works best for you. We are excited to make a formal submittal after our meeting.\n    Thank you.\n\n    Sincerely,\n\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n\n          Data Center Site Plan (2-28-25).pdf\n          1320K\n\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                               Fri, Feb 28, 2025 at 11:18 AM\n  To: Omora@imperial.ca.gov, DDale@imperial.ca.gov, communitydevelopment@imperial.ca.gov\n  Cc: Tom DuBose <tom@dubosedesigngroup.com>, Hector Casas <Hector@ruccilaw.com>, gary@ruccilaw.com\n\n    Attached are building sketches and three-dimensional plans\n    [Quoted text hidden]\n\n\n     2 attachments\n          Building Sketches (2-09-25).pdf\n          5411K\n          Three Dimmension Plans (1-29-25).pdf\n          14769K\n\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                               Fri, Feb 28, 2025 at 11:19 AM\n  To: Omora@imperial.ca.gov, DDale@imperial.ca.gov, communitydevelopment@imperial.ca.gov\n  Cc: Tom DuBose <tom@dubosedesigngroup.com>, Hector Casas <Hector@ruccilaw.com>, gary@ruccilaw.com\n\n    Attached are three animations of the data center campus.\n    (1) Animation overlayed on drone footage,\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-a:r-7918776960841967214&simpl=msg-a:r629579460334391\u2026   1/6\n\f             Case\n12/31/25, 2:24 AM 3:26-cv-00128-JLS-BJW           Document\n                                                   Rucci Law Mail1-3     Filed 01/09/26\n                                                                 - Pre-Application                  PageID.61\n                                                                                   Meeting for Data Center               Page 3\n    (2) animation of building #1 (250 MW on 95 acres), and    of  3\n    (3) animation of all three contiguous buildings in the Imperial and Aten Road area.\n\n             Animation with Drone Footage (2-20-25).mp4\n\n\n             Animation Building No. 1 (2-09-25).mp4\n\n\n             Annimation All Three Buildings (1-29-25).mp4\n\n    On Fri, Feb 28, 2025 at 11:17 AM Sebastian Rucci <sebastian@ruccilaw.com> wrote:\n    [Quoted text hidden]\n\n\n\n  Yvonne Cordero <ycordero@imperial.ca.gov>                                                Fri, Feb 28, 2025 at 1:48 PM\n  To: Sebastian Rucci <sebastian@ruccilaw.com>, Othon Mora <omora@imperial.ca.gov>, David Dale\n  <ddale@imperial.ca.gov>\n  Cc: Tom DuBose <tom@dubosedesigngroup.com>, Hector Casas <Hector@ruccilaw.com>, \"gary@ruccilaw.com\"\n  <gary@ruccilaw.com>\n\n\n    Good Afternoon Mr. Rucci,\n\n\n    We look forward to working with your team on this exciting project.\u00ac I can arrange a pre-application\n    meeting for next week.\u00ac Our staff is available:\n    \u00ac \u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac Tuesday 3-5pm\n    \u00ac\u00ac \u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac\u00ac Thursday 8am-12pm and 3-5pm\n    Please advise of your team\u2019s availability and I will follow up with a meeting invite.\n\n\n    Best Regards,\n\n\n\n\n    PLEASE NOTE MY EMAIL ADDRESS HAS CHANGED\n\n\n\n\n    From: Sebastian Rucci <sebastian@ruccilaw.com>\n    Sent: Friday, February 28, 2025 11:17 AM\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-a:r-7918776960841967214&simpl=msg-a:r629579460334391\u2026   2/6\n\f","ocr_status":1,"date_upload":"2026-01-10T23:32:50.358033-08:00","document_number":"1","attachment_number":3,"pacer_doc_id":"037022111072","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 2","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739417/","id":464739417,"tags":[],"absolute_url":"/docket/72127384/1/4/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.251747-08:00","date_modified":"2026-06-24T14:26:54.864225-07:00","sha1":"3a42755c3e7da0935e5255b94774621c6d41bc83","page_count":4,"file_size":2084227,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.4_2.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.4.pdf","ia_upload_failure_count":null,"thumbnail":"recap-thumbnails/gov.uscourts.casd.839861/464739417.thumb.1068.png","thumbnail_status":1,"plain_text":"Case 3:26-cv-00128-JLS-BJW Document1-4 Filed 01/09/26 PagelID.62 Pagel\nof 4\n\nEXHIBIT 3\nCity email - Site Plan Application\n(3-04-25)\n\fCase 3:26-cv-00128-JLS-BJW Document1-4 Filed 01/09/26 PagelID.63 Page 2\nof 4\n\nThe Law Office of\nSebastian Rucci <sebastian@ruccilaw.com>\nSEBASTIAN RUCCI, ec. @\n\nSPR 25-03 IV Computer Manufacturing LLC\n\n1 message\n\nYvonne Cordero <ycordero@imperial.ca.gov> Tue, Mar 4, 2025 at 4:29 PM\nTo: Sebastian Rucci <sebastian@ruccilaw.com>, Hector Casas <Hector@ruccilaw.com>\n\nCc: Othon Mora <omora@imperial.ca.gov>, Lorena Galindo <Igalindo@imperial.ca.gov>, Tom DuBose\n<tom@dubosedesigngroup.com>\n\nGood afternoon,\n\nAttached please find the executed Planning Application for Site Plan Review 25-03 for your records.\n\nBest Regards,\n\nYVONNE CORDERO\nPLANNER\nyeordero@imperial.ca.gov\nCommunity Development Department\njoo S, Imperial Avenue, Suite 101\nImperial, CA 92251\n\n(760)955-9326\n\nPLEASE NOTE MY EMAIL ADDRESS HAS CHANGED\n\na Planning Application.pdf\n813K\n\fCase 3:26-cv-00128-JLS-BJW Document 1-4\n\nof 4\n\nPlanning\nApplication\n\nFiled 01/09/26 PagelD.64 Page3\n\nCommunity Development Department\n400 South Imperial Avenue, Suite 101\nImperial, CA 92251\n\nPhone (760) 355-1152 | Fax (760) 355-4718\n\nPermit Number\n\nYs) se PAO hae ere cel)\n\nApplicant: Imperial Valley Computer Manufacturing, LLC\n\nOwner Name(s):\n\nContact Person: Tom Dubose ( Authorized Agent)\n\nImperial Valley Computer Manufacturing. LLC\n\nMailing Address: 1065 West State Street, El Centro,CA - 92243\n\n\u2014 16400 PCH. Suite 212,\nMailing Address: Huntington Beach, CA 92649\n\nEmail: tom@dubosedesigngroup.com / annette@dubosedesigngroup.com\n\nEmail: sebastian@ruccilaw.com\n\nPhone: (760) 353-8110\n\nPhone: (760) 353-8110\n\nUL en\nAdministrative Review\nL_] Lot Line Adjustment\nL_] Parcel Map Waiver\nL_] Downtown Architectural Permit\n[_] Off-Site Improvements\n(_] Temporary Use Permit\n_] Temporary Use Permit for Mobile Food Facility\n_] Other\n\nCommission/Council Review\n\n[] Zoning & Code Text Amendment\n_] Zone Change / Pre-Zone\n\n[_] General Plan Amendment\n\nL_] Planned Unit Development\n\n_] Specific Plan / Specific Plan Amendment\nC1 Variance\n\n[_] Conditional Use Permit\n\n(_] Land Use Classification\n\n[_] Tentative Map\n\n_] Annexation\n\nOther _ Site Plan Review\n\npd xey (seme Aaiie)auitslule) a]\n\nProject Location (address):\n\nAssessor's Parcel Number(s):\n\n385 W. Aten Road, Imperial CA 92251\n\n044-220-035-, 049, -059, -065, -056\n\nExisting Zoning: _C-2\n\nParcel/Lot Size: 94.54\n\nProposed Zoning: C-2\n\nBuilding Sq Ft: TBD\n\nDetailed Project Description (attach additional sheets if necessary):\n\nPriliminary Site Plan Review for proposed Imperial Valley Data Center Campus.\n\nEvery application, request for permit, or request for a planning review or service procedure to the Community Development\nDepartment shall include a fee and deposit as prescribed herein. The department shall not accept or receive any such request\nwithout the proper fee, and no fee shall be waived by the department.\n\fCase 3:26-cv-00128-JLS-BJW Document1-4 Filed 01/09/26 PagelID.65 Page4\nof 4\n\nWTR Tete en\n\nThe Community Development Department, at the discretion of the Community Development Director, may use or employ outside\nindependent consultants to assist in processing applications, conduct special studies or provide expertise not available within the\ndepartment.\n\nThe cost for such consultants shall be a charge against the project and is in addition to the City\u2019s fees. As consultant fees are\npaid, the applicant may be required to maintain the deposit at a level determined by the Community Development Director.\nFailure to maintain the required deposit shall result in a cessation in the processing of the subject application. The City shall return\nthat portion of the deposit, if any, remaining at project completion. In accordance with City policy to ensure cost recovery, staff time\nspent on these projects will be tracked, and developers will be billed based on actual labor, material, equipment, and the indirect cost\nrate. The deposit amount will be maintained in a City Trust Fund account and used to pay for staff and consultant services on a time\nand materials basis. If the consultant's services amount exceeds the deposit, the applicant will be billed for the difference. The deposit\nmust be maintained in the full amount as directed by the Community Development Director.\n\nApplicant is responsible for any fees associated with the City of Imperial City Clerk\u2019s office and any department required for\nprocessing said application from the County of Imperial.\n\nFire Department Fees are paid and processed separately from the Community Development Department.\n\nMerce Celia ess\n\nApplicant and Owner agree, as part of and in connection with each and any of the application(s), to defend, indemnify, and hold\nharmless the City of Imperial (\u201cCity\u201d) and its officers, contractors, consultants, attorneys, employees and agents from any and all\nclaim(s), action(s), or proceeding(s) (collectively referred to as \u201cproceeding\u201d) brought against City or its officers, contractors,\nconsultants, attorneys, employees, or agents to challenge, attack, set aside, void, or annul:\n\na. Any approvals issued in connection with any of the above described application(s) by City; and/or\n\nb. Any action taken to provide related environmental clearance under the California Environmental Quality Act of 1970, as\namended (\u201cCEQA\u201d) by City\u2019s advisory agencies, boards or commissions; appeals boards or commissions; Planning Commission,\nor City Council. Applicant\u2019s indemnification is intended to include, but not be limited to, damages, fees and/or costs awarded\nagainst or incurred by City, if any, and costs of suit, claim or litigation, including without limitation attorneys\u2019 fees and other\ncosts, liabilities and expenses incurred in connection with such proceeding whether incurred by Applicant, City, and/or parties\ninitiating or involved in such proceeding.\n\nApplicant\u2019s defense and indemnification of City set forth herein shall remain in full force and effect throughout all stages of litigation\nincluding any and all appeals of any lower court judgments rendered in the proceeding.\n\nAfter review and consideration of all of the foregoing terms and conditions, Applicant, by its signature below, hereby agrees to be\nbound by and to fully and timely comply with all of the foregoing terms and conditions.\n\nExecuted at Wea eussile California on ,202\n\nApplicant _ Property Owner\n\u2014 +, (If different from Applicant)\n2\nBy: Signature: *\u00bb Tog Signature:\nai\nPrinted Name Annette Leon, Authorized Agent Printed Name oe i oo. ae ous sf ea\nTitle: Vice President, Dubose Design Group, Inc. Title: #A7G AG, Co\n\nThe undersigned hereby declare and certify that they are all the owners of the property described in this application and that the\ninformation stated above and on forms, plans and other materials submitted herewith in support of the application is true and correct\nto the best of our knowledge.\n\nApplicant Property Owner\n(If different from Applicant) hax Pea atachyr Lie\nFig Zerre| VeMey Ce mA cs\nBy: Signature: By: _ Signature: aa\n\u2014\u2014\u2014 os \u2018\nPrinted Name Annette Leon, Authorized Agent Printed Name ee wl: a ME et\n\nTitle: Vice President, Dubose Design Group, Inc. Title: LNG ace Bin 3 Siti\n\n","ocr_status":1,"date_upload":"2026-01-10T23:33:10.444396-08:00","document_number":"1","attachment_number":4,"pacer_doc_id":"037022111073","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 3","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739418/","id":464739418,"tags":[],"absolute_url":"/docket/72127384/1/5/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.272985-08:00","date_modified":"2026-01-14T02:38:15.469454-08:00","sha1":"d08f51df364bf555720775eb475863b5c82f0690","page_count":6,"file_size":390463,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.5_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.5.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-5   Filed 01/09/26   PageID.66   Page 1\n                                    of 6\n\n\n\n\n                  EXHIBIT 4\n            Reclaimed Water Emails\n                   (3-07-25)\n\f             Case 3:26-cv-00128-JLS-BJW\n3/5/25, 2:59 PM                                         Document     1-5- FW: Filed\n                                                          Rucci Law Mail               01/09/26ReportPageID.67\n                                                                              Title 22 Engineering                       Page 2\n                                                                   of 6\n\n                                                                                        Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  FW: Title 22 Engineering Report\n  1 message\n\n  David Dale <ddale@imperial.ca.gov>                                                                        Wed, Mar 5, 2025 at 1:26 PM\n  To: \"sebastian@ruccilaw.com\" <sebastian@ruccilaw.com>\n  Cc: Christopher Kemp <ckemp@imperial.ca.gov>\n\n\n    Sebastian,\n\n\n\n    As I see it, we can do the Title 22 Report in two different ways. You can contract directly with Webb (see below) or deposit\n    $30k with the City. Either way will work. The contract directly with Webb may work better since I may have to get legal to\n    draft an agreement, and that may take some time.\n\n\n\n    I have attached the WWTP report and water quality sampling data.\n\n\n\n\n    David Dale, PE, PLS\n\n    Public Services Director\n\n    City of Imperial\n\n    420 S. Imperial Avenue\n\n    Imperial, CA 92251\n\n    760-355-3336 direct\n\n\n\n\n    From: Brian Knoll <brian.knoll@webbassociates.com>\n    Sent: Friday, November 1, 2024 5:44 PM\n    To: David Dale <ddale@imperial.ca.gov>; Shane Bloomfield <shane.bloomfield@webbassociates.com>; Justin Logan\n    <justin.logan@aquaeng.com>\n    Cc: Chris Kemp <ckemp@cityofimperial.org>; Jenell Guerrero <jguerrero@imperial.ca.gov>\n    Subject: RE: Title 22 Engineering Report\n\n\n\n\n      CAUTION: This email originated from outside the City of Imperial. Do not click links or open attachments\n      unless you recognize the sender and know the content is safe.\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-f:1825791016809060904&simpl=msg-f:1825791016809060904   1/4\n\f             Case 3:26-cv-00128-JLS-BJW\n3/5/25, 2:59 PM                                          Document     1-5- FW: Filed\n                                                           Rucci Law Mail               01/09/26ReportPageID.68\n                                                                               Title 22 Engineering                         Page 3\n    David                                                           of 6\n\n\n    We have the original design report (Attached) for the Plant Upgrade project that has some of the background information to complete\n    the Title 22 Engineer\u2019s report. This would be a good starting point. Some of the information not contained would be:\n\n            Update of influent flows and characteristics\n            discussion of redundancy and operation\n            Controls, alarms, and diversions\n            Distribution system, land use, containment, and operations (assume this would be fairly simple if it is only one user)\n\n\n\n    The previous Title 22 Reports we have done with similar PDR level information have been in the $15-25K range but did not include\n    distribution. I would assume this one will be in the range of $30k.\n\n\n\n    An additional item that will be need to addressed is validating the UV system and the onsite bioassay test. I am not sure what the cost\n    of that test are but it needs to be factored into the planning. I assume it would take us about 8-12 weeks to complete the report. Tasks\n    outside our control that could extend the schedule would be influent water quality sampling/data gathering and the UV validation.\n\n\n\n    If this seems reasonable and the applicant would like to move forward, we can prepare a detailed proposal.\n\n\n\n    Let me know if you would like to proceed.\n\n\n\n    Thank you.\n\n\n\n\n                                       Brian Knoll, PE\n                                       Chief Operations Officer\n\n\n                                       T (951)248-4279 | C (951)830-3389\n                                       E brian.knoll@webbassociates.com\n                                       3788 McCray St | Riverside, CA | 92506\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-f:1825791016809060904&simpl=msg-f:1825791016809060904       2/4\n\f             Case 3:26-cv-00128-JLS-BJW\n3/5/25, 2:59 PM                                         Document     1-5- FW: Filed\n                                                          Rucci Law Mail               01/09/26ReportPageID.69\n                                                                              Title 22 Engineering                       Page 4\n                                                                   of 6\n    From: David Dale <ddale@imperial.ca.gov>\n    Sent: Monday, September 23, 2024 1:45 PM\n    To: Shane Bloomfield <shane.bloomfield@webbassociates.com>; Brian Knoll <brian.knoll@webbassociates.com>\n    Cc: Chris Kemp <ckemp@cityofimperial.org>; Jenell Guerrero <jguerrero@imperial.ca.gov>\n    Subject: Title 22 Engineering Report\n\n\n\n    Brian,\n\n\n\n    Last week, the City Council approved the (5) \u201cOn-Call\u201d engineering firms. Webb is one of our On-Call engineering firms.\n\n\n\n    A proposed solar power plant has approached the city to use recycled water for nonpotable uses - construction and dust\n    control. We need a Title 22 Engineering Report to determine if the wastewater plant can meet Title 22 requirements for\n    water quality, any additional sampling, the cost of necessary improvements, Title 22 permits, timeframes, and any other\n    requirements.\n\n\n\n    Can you provide a ballpark cost estimate to prepare the report? The recycled water user requested it to determine if they\n    want to go that route. If they agree to cover the costs, we will request a proposal on a task-order basis. The city might\n    request the report regardless of the needs of this particular user since it is becoming more likely that recycled water will\n    be needed in the near future.\n\n\n\n    Please see the following link:\n\n\n\n    Guidelines for the Preparation of an Engineering Report for the Production, Distribution and Use of Recycled Water\n    (ca.gov)\n\n\n\n    If you have any questions, please get in touch with me.\n\n\n\n    David Dale, PE, PLS\n\n    Public Services Director\n\n    City of Imperial\n\n    420 S. Imperial Avenue\n\n    Imperial, CA 92251\n\n    760-355-3336 direct\n\n\n\n\n     6 attachments\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-f:1825791016809060904&simpl=msg-f:1825791016809060904   3/4\n\f             Case 3:26-cv-00128-JLS-BJW\n3/5/25, 2:59 PM                                         Document     1-5- FW: Filed\n                                                          Rucci Law Mail               01/09/26ReportPageID.70\n                                                                              Title 22 Engineering                       Page 5\n                                                                   of 6\n          Imperial CWSRF Report 9 SEP 2016 DRAFT.pdf\n          21251K\n          2024 Priority Pollutants Testing Results J185193-1 UDS Level 2 Report Final Report.pdf\n          1490K\n          2025-02-03 WC-825 M-926 RSW-002 Effluent Nutrients Imperial WWTP Final Report.pdf\n          891K\n          2025-02-05 Imperial WWTP Copper and Bis 2-ethylhexyl Phthalate Summary Final Report.pdf\n          1306K\n          2025-02-05 WC-839 Imperial WWTP BODTSS Oil Final Report.pdf\n          864K\n          2025-02-24 M-997 Imperial WWTP Final Report.pdf\n          839K\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-f:1825791016809060904&simpl=msg-f:1825791016809060904   4/4\n\f             Case 3:26-cv-00128-JLS-BJW\n3/7/25, 8:35 PM                                        Document     1-5- FW: Filed\n                                                         Rucci Law Mail               01/09/26ReportPageID.71\n                                                                             Title 22 Engineering                     Page 6\n                                                                  of 6\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  FW: Title 22 Engineering Report\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                  Fri, Mar 7, 2025 at 8:35 PM\n  To: David Dale <ddale@imperial.ca.gov>\n  Cc: Christopher Kemp <ckemp@imperial.ca.gov>, Brian Knoll <brian.knoll@webbassociates.com>\n\n    Good Evening David,\n\n    I spoke with Brian from Webb Associates. He is very sharp and has a great memory. I will secure a proposal to have\n    Webb do the engineering work to secure approval for the City to sell Google reclaimed water.\n    Thank you for forwarding the information. I'll keep you posted as we move forward. Thank you.\n\n    Sincerely,\n\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n\n    On Wed, Mar 5, 2025 at 1:26 PM David Dale <ddale@imperial.ca.gov> wrote:\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r3679854045516454853&simpl=msg-a:r367985404551645\u2026   1/1\n\f","ocr_status":1,"date_upload":"2026-01-10T23:33:31.125804-08:00","document_number":"1","attachment_number":5,"pacer_doc_id":"037022111074","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 4","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739419/","id":464739419,"tags":[],"absolute_url":"/docket/72127384/1/6/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.294722-08:00","date_modified":"2026-01-14T02:35:12.662217-08:00","sha1":"944d14001bb717004013dbbfe8809cc41c50fb75","page_count":7,"file_size":311023,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.6_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.6.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-6   Filed 01/09/26   PageID.72   Page 1\n                                    of 7\n\n\n\n\n                   EXHIBIT 5\n             Site Plan Review Letter\n                    (4-04-25)\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-6          Filed 01/09/26        PageID.73         Page 2\n                                                of 7\n\n\n                                                                                                  CITY COUNCIL\n                                                                                             James Tucker \u2013 Mayor\n                                                                               Ida Obeso-Martinez \u2013 Mayor Pro-Tem\n                                                                                  Katie Burnworth \u2013 Councilmember\n                                                                                 Robert Amparano \u2013 Councilmember\n                                                                                   Stacy Mendoza \u2013 Councilmember\n\n                                                                                                      CITY CLERK\n                                                                                                 Kristina M. Shields\n\n                                                                                                  CITY MANAGER\n                                                                                                   Dennis H. Morita\n\n                                                                                                 CITY ATTORNEY\n                                                                                                   Katherine Turner\n\n\n\nApril 4, 2025\n\n\nImperial Valley Computer Manufacturing, LLC\n16400 PCH, Suite 212\nHuntington Beach, CA 92649\n\nRE: SPR 25-03 Imperial Valley Data Center Campus\n\nDear Mr. Sebastian:\n\nThe City of Imperial has reviewed the site plan submitted for the above-referenced project.\nOur Development Review Committee has reviewed your proposed site plans and has\nsubmitted the following departmental comments.\n\nGENERAL\n\n   1. The project consists of the development of Data Center, Battery Storage buildings and a\n      substation to be constructed on APN 044-220-035, 044-220-049, 044-220-059, 044-\n      220-065 and 044-220-066.\n\n   2. Upon preliminary review of the site plan, the City of Imperial acknowledges that the\n      project may have potential environmental considerations requiring further evaluation.\n      At this stage, an Initial Study has not been conducted, and no determination has been\n      made regarding the necessity of an Environmental Impact Report (EIR) or other\n      environmental documentation under the California Environmental Quality Act (CEQA).\n      However, given the project's scale and characteristics, various environmental factors\u2014\n      such as power demand, water consumption, hazardous materials management, traffic\n      impacts, air quality, fire safety, noise, aesthetics, and landscaping\u2014may warrant\n      additional analysis. As the project progresses through the review process, the City may\n      require technical studies, including but not limited to a traffic impact analysis, water\n      supply assessment, air quality study, noise study, and fire hazard evaluation, to assess\n      potential impacts and determine appropriate mitigation measures, if necessary.\n\n\n\n\n    400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-6          Filed 01/09/26        PageID.74        Page 3\n                                              of 7\n\n  3. The submitted site plan does not clearly indicate the land use and zoning designation\n     for the project site, and commercial and industrial zoning use data are not listed. While\n     the applicant has stated that the intended use is a data center, this use is not explicitly\n     listed in the city's zoning code, nor is the substation. Therefore, clarification is required\n     to determine whether the proposed uses align with existing zoning regulations or if the\n     project will necessitate a General Plan Amendment, Rezoning, and Zoning Text\n     Amendment. Additionally, a comprehensive list of all project components and their\n     respective land use classifications should be provided to ensure consistency with the\n     city's zoning requirements. Furthermore, commercial frontage along SR-86 should be\n     reserved for retail uses to allow for future retail development. To enhance site\n     planning and minimize visual and operational impacts, the substation should be\n     located at the rear (east) of the project site, while the data center should be positioned\n     on the west side to provide a buffer and shield the substation from public view.\n     Additionally, retention basins should be placed on the east side of the project site,\n     ensuring they are not visible from SR-86, maintaining an aesthetically cohesive\n     streetscape along the corridor.\n\n  4. Provide complete building dimensions, height and total square footage for all proposed\n     structures. Show required and proposed setbacks consistent with applicable zoning\n     regulations.\n\n  5. Provide direct access to the site from Wall Road and show all ingress/egress points and\n     types of improvements proposed at the intersection of SR86 and Wall Road.\n\n  6. Provide proposed roadway improvements along Aten Road and SR86- Wall Road to\n     accommodate project-related traffic, including but not limited to a deceleration lane,\n     dedicated entrance lane, or other necessary modifications to ensure safe and efficient\n     site access and circulation. Coordination with the City\u2019s Engineering Division may be\n     required.\n\n  7. Clearly identify all existing and proposed utility easements on the site plan, including\n     public utility access.\n\n  8. If the project is proposed in phases, include a phasing plan and timeline indicating the\n     order and scope of construction activities.\n\n  9. Include parking calculations and a detailed parking layout showing the number of\n     spaces required and provided.\n\n  10. Identify water and sewer connection points and how they will connect to existing\n      public infrastructure.\n\n  11. Please existing and propose fire hydrants.\n\n  12. Show location and design of a trash enclosure that complies with city standards.\n\n\n\n\n  400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-6          Filed 01/09/26        PageID.75        Page 4\n                                              of 7\n\n  13. All improvements within the public right-of way shall be designed and built according\n      to City standards and specifications and submitted for review with an encroachment\n      permit.\n\n  14. The project shall comply with all other applicable State and City regulations,\n      ordinances and resolutions.\n\n  15. Pursuant to Section 24.19.595 of the City of Imperial\u2019s Municipal Code, this Site Plan\n      Review shall become null and void if not exercised within one year.\n\n  16. All utility connections shall be designed to coordinate with the architectural elements\n      of the site so as not to be exposed except where necessary. Pad-mounted transformers\n      and/or meter box locations shall be included in the site plan with an appropriate\n      screening treatment. Power lines and overhead cables shall be installed underground.\n\n  17. The building shall be designed to minimize energy consumption requirements, and\n      may include but not necessarily be limited to, the following conservation measures:\n         a. Cogeneration;\n         b. Eave coverage for windows;\n         c. Double-glazed windows;\n         d. Earth berming against exterior walls;\n         e. Greenhouses;\n         f. Deciduous shade trees\n\n  18. Front and street side yards shall be landscaped. Said landscaping shall consist\n      predominantly of drought-tolerant low-maintenance plant materials. The proposed\n      landscaping shall be permanently maintained in a healthy and thriving condition, free\n      from weeds, trash, and debris. A landscaping plan consistent with MWELO is required\n      for the City\u2019s review and approval. All landscaped areas shall be maintained in a clean,\n      neat, and healthy condition whether the building is occupied or vacant. Maintenance\n      shall include proper watering, fertilizing, weeding, removing litter, and replacement of\n      plants when necessary.\n\n  19. The noise level emanating from any commercial use or operation shall not exceed five\n      decibels (as defined in the Occupational Safety and Health Act of 1970) above the\n      ambient lever of the area measured at the property line.\n\n  20. All ground-mounted mechanical equipment, including heating and air conditioning\n      units, and trash receptacle areas, shall be completely screened from surrounding\n      properties by use of a wall or fence or shall be enclosed within a building. Structural\n      and design plans for any required screening under the provisions of this section shall\n      be approved by the Community Development Director or Building Official.\n\n  21. All roof appurtenances including, but not limited to air conditioning units, and\n      mechanical equipment shall be shielded and architecturally screened from view from\n      on-site parking areas and adjacent public streets.\n\n\n\n\n  400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-6          Filed 01/09/26        PageID.76        Page 5\n                                              of 7\n\n  22. The project shall require an approved building permit prior to commencing any work\n      at the project site. Provide the following electronic submittals with the building permit\n      application:\n\n         a. Building plans prepared by a professional designer for the Building Official\u2019s\n            review and approval. Plans should include MEPs and calculations, underground\n            utilities, landscape plans, green code notes, accessibility sheets and notes,\n            structural calculations, geotechnical reports, truss calculations, and energy\n            calculations.\n\n  23. Construction documents submitted for review shall be designed based on the 2022\n      California Building Codes, including the 2022 Building Efficiency Standards and the\n      2022 California Green Code.\n\n  24. A construction water management plan shall be required and provided prior to the\n      issuance of a building permit.\n\n  25. Prior to any building permit being issued, a grading permit from the Engineering\n      Division shall be obtained.\n\n  26. Building permits will not be issued for any new construction related to the project until\n      development impact and capacity fees are paid before final inspection.\n\n  27. Any water, sewer, and storm-drain systems onsite shall be maintained by the\n      development and not by the City. Any future tie-ins to the onsite system shall first\n      require a building permit. Any future work or maintenance of the onsite utilities shall\n      be performed by a licensed contractor.\n\n  28. Irrigation, building, and fire backflow preventers shall be required and a plan depicting\n      their location is necessary for review and approval by the Public Services Department.\n\n  29. All required off-street parking spaces shall be designed, located, constructed, and\n      maintained to be fully usable during workday periods or as needed by the use of the\n      premises. With the exception of providing parking for a minimum of five (5) bicycles\n      and one (1) motorcycle, vehicle parking requirements on the provided site have been\n      met. Bicycle parking facilities shall be a stationary storage rack or device designed to\n      secure the frame and wheel of the bicycle. The motorcycle space shall be clearly\n      marked and appropriately spaced to prevent automobile usage.\n\n  30. ADA and motorcycle parking spaces shall be located within 100 feet of an entrance to\n      the facility.\n\n  31. All parking facilities shall be maintained in good operating condition for the duration of\n      the building\u2019s use and shall not be used for any storage or repair of vehicles or\n      equipment.\n\n\n\n\n  400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-6          Filed 01/09/26        PageID.77        Page 6\n                                              of 7\n\n  32. All parking facilities shall have lighting designed and installed so as to confine direct\n      rays to the site. Parking lot lights shall be a maximum height of eighteen (18) feet from\n      the finished grade of the parking surface and directed away from all property lines.\n\n  33. An accessible pathway shall be provided to the facility entrance from the public right-\n      of-way.\n\n  34. Parking areas shall be separated from structures by either a raised concrete walkway\n      or landscaped strip, preferably both.\n\n  35. The required parking spaces must be designated on concrete or asphalt and shall be\n      designed in accordance with 24.13 of the City of Imperial\u2019s Municipal Code. All\n      drivable areas shall be paved with concrete or asphalt.\n\n  36. Enhanced paving shall be provided at a minimum depth of ten feet at the primary\n      vehicular driveway entrance, immediately behind the street right-of-way line to the\n      development.\n\n  37. In compliance with Senate Bill 1383, State regulation, and the City of Imperial\u2019s\n      procurement requirement, the applicant shall integrate compost and mulch from a\n      CalRecycle-certified composter in all landscaped areas. Proof of eligible compost\n      supplier must be submitted to the City prior to the issuance of a Certificate of\n      Occupancy.\n\n  38. In compliance with Senate Bill 1383, the proposed fast food restaurant will be subject\n      to the law\u2019s requirement and the City\u2019s monitoring of recycling organic waste by\n      subscribing to the organics collection service, providing an organic waste receptacle\n      for customers to dispose of their organic waste with identifying signage, educating staff\n      about proper recycling disposal, conducting inspections for contamination and\n      donating excess edible food.\n\n  39. Section 140.10 of the 2022 California Energy Code requires the installation of PV solar\n      with a battery backup for all new commercial construction projects. PV solar plans\n      must be included during the building permit submittal process.\n\n  POLICE DEPARTMENT\n\n  40. Security precautions such as sufficient lighting, security cameras, or other crime\n      prevention measures shall be required.\n\n  41. An enclosed, lockable trash enclosure shall be required.\n\n  42. The proposed use and associated structures shall not interfere with existing or future\n      public safety radio communications, including those used by police, fire, and\n      emergency services. The applicant may be required to coordinate with the City\u2019s public\n      safety departments to ensure there is no signal disruption.\n\n  PUBLIC SERVICES DEPARTMENT\n\n\n  400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\fCase 3:26-cv-00128-JLS-BJW                  Document 1-6           Filed 01/09/26     PageID.78        Page 7\n                                                   of 7\n\n\n\n    43. A precise grading plan is required.\n\nPlease review and address the items above before resubmitting the site plan. If you have any\nquestions or if we can be of any further assistance, please do not hesitate to contact our office.\n\nSincerely,\n\n\n\n\nOthon Mora MCM, CBO\nCommunity Development Director\n\ncc: Deputy Fire Marshal Andrew Loper, Imperial County Fire Department\n    Chief Aaron Reel, Imperial Police Department\n    Captain Max Sheffield, Imperial Police Department\n    David Dale, Public Services Director\n    Cody Cole, Building Inspector II\n\n\n\n\n     400 SOUTH IMPERIAL AVENUE, SUITE 101 \u2022 IMPERIAL, CA 92251 \u2022 TEL (760) 355-3840 \u2022 WWW.CITYOFIMPERIAL.ORG\n\f","ocr_status":1,"date_upload":"2026-01-10T23:38:03.468114-08:00","document_number":"1","attachment_number":6,"pacer_doc_id":"037022111075","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 5","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739420/","id":464739420,"tags":[],"absolute_url":"/docket/72127384/1/7/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.312588-08:00","date_modified":"2026-01-14T02:35:14.065496-08:00","sha1":"d5d2419afb2c1dee3af8ce3fe9a4485a0cff8211","page_count":27,"file_size":4437247,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.7_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.7.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelD.79 Pagel\nof 27\n\nEXHIBIT 6\nLetter to City Amended Plans\n(5-14-25)\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelID.80 Page 2\nof 27\n\nIMPERIAL VALLEY COMPUTER MANUFACTURING, LLC\n16400 Pacific Coast Highway, Suite 212\nHuntington Beach, CA 92649\nPhone: (562) 901-0199\nFax: (562) 249-6910\nEmail: Sebastian@RucciLaw.com\n\nMay 14, 2025\n\nOthon Mora, Community Dev. Director (OQMora@Imperial.CA.gov)\n\nDavid Dale, Public Services Director (Ddale@Imperial.CA.gov)\n\nMichael Bracken (Michael @dmgeconomics.com)\n\nAndrew Loper, Deputy Fire Marshal (AndrewLoper@co.Imperial.CA.us)\n\nChief Aaron Reel, Imperial Police Department (AReel @ CityofImperial.org)\n\nCaptain Max Sheffield, Imperial Police Department (MSheffield @CityofImperial.org)\nCody Cole, Building Inspector II (CCole @ CityofImperial.org)\n\nYvonne Cordero (Y Cordero @Imperial.CA.gov)\n\nTom Dubose (Tom @DuboseDesignGroup.com)\n\nCITY OF IMPERIAL\nAttn: Othon Mora, Community Dev. Director\n400 South Imperial Avenue, Suite 101, Imperial, CA 92251\n\nRe: SPR 25-03 Imperial Valley Data Center Campus\nDear Director Mora:\n\nAlong with this letter, I've attached a PDF file of revised plans. The 17-page plans\ninclude a parking plan, conceptual landscaping, grading plan, architectural elevations, and\n\nmore. I will soon submit updated video animations of the proposed Data Center projects.\n\nREVISED PLANS PROVIDE FULL COMPLIANCE\nThe City\u2019s comments are addressed within the new 17-page plan set, which includes:\n\nC-1 Title Sheet C-7 Retail Parking C-13 Alta Survey\nC-2 Site Plan (Part 1) C-8 Grading (Part 1) C-14 Alta Survey Notes\nC-3 Site Plan (Part 2) C-9 Grading (Part 2) C-15 Architectural Plans\n\nC-4 Utility Plan (Part 1) C-10 Road Improvements | C-16 Construction Details\n\nC-5 Utility Plan (Part 2) C-11 Landscape (Part 1) C-17 Construction Notes\n\nC-6 Data Center Parking | C-12 Landscape (Part 2)\n\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelD.81 Page3\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 2\n\nThe new plan set comprises 17 pages which show the required and proposed\nsetbacks, direct access to the site directly across Wall Road, existing and proposed utility\neasements are shown, water and sewer connection to existing public infrastructure is\nprovided, existing and proposed fire hydrants are identified, location and design of a trash\nenclosure is identified [see C-2 Site Plan (Part 1) and C-3 Site Plan (Part 2)]. Deceleration\nlanes are provided [see C-10 Road Improvements]. Parking calculations with a detailed\nparking layout are provided [see C-6 Data Center Parking and C-7 Retail Parking].\nProposed grading of the development [see C-8 Grading (Part 1) and C-9 Grading (Part 2)].\nThe Notes in the plans confirm compliance with the comments provided in the Site Plan\nReview letter dated April 4, 2025 (SPR 25-03 -- IV Data Center Campus).\n\nWe provided an 8-foot landscaped wall along the perimeter of the property. [see C-11\nLandscape (Part 1) and C-12 Landscape (Part 2)]. We have reduced the prior battery storage\nfrom 500 MWhr to 100 MWhr. At capacity, this provides 20 minutes of battery storage. [see\nC-2 Site Plan (Part 1) and C-3 Site Plan (Part 2)]. We included an 8-foot concrete wall\naround the battery storage. In effect, we have two walls surrounding the battery storage. We\nincluded a 25-foot landscape strip to buffer the project from the people traveling to the area.\n\nCOMMERCIAL FRONTAGE ALONG SR-86 IS PROVIDED\n\nPer the City\u2019s request, we provided commercial retail buildings along SR-86 to buffer\nthe Data Center development. The proposed commercial building is 213 feet deep, which\nmatches the depth of Sunbelt Rentals, and it is about 1,800 feet long. This provides more\nthan 8 acres of commercial space to buffer the view of the Data Center. The proposed uses\nwill include office spaces, retail stores, service establishments, and wholesale businesses,\noffering services to residents of the City and the surrounding area.\n\nDATA CENTER IS A PERMITTED USE IN THE INDUSTRIAL ZONE\n\nThe City\u2019s zoning designation for the land comprises three zones: C-1 Commercial\nNeighborhood Zone, C-2 Commercial General Zone, and I-2 Rail Served Industrial Zone.\n\nThe Data Center building is situated on land zoned I-2, which permits \u201cBusiness,\nprofessional, and research offices\u201d as a permitted use by right in the I-2 Zone. (Imperial\nZoning Ordinance \u00a7 24.07.120 sub. C.4; Services in the I-2 Industrial Zone).\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelD.82 Page4\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 3\n\nThe Land Use plan designates the Data Center site as Gateway South which provide\nin part as follows: \u201cThis area includes the area along Highway 86, south of the airport. . .\nThis area has the potential to enhance the local economy, provide needed services and\nemployment opportunities, and serve as a gateway to the City. The Gateway South Character\nArea is intended to: \u00a2 Provide distinctive architecture and attractive streetscape * Provide a\nmixture of retail commercial shopping opportunities \u00a2 Permit large format retail * Foster job\ngrowth through light industrial and professional office.\u201d (Land Use pg. 14-15).\n\nSUBSTATION AND BATTERY STORAGE\nARE PERMITTED ACCESSORY USES IN COMMERCIAL ZONES\n\nThe Substation and Battery Storage are located on land zoned commercial, providing\nthat \u201cAccessory structures and uses located on the same site as a permitted use\u201d are\npermitted by right in the C-1 and C-2 zones. (\u00a7 24.05.120 subsection E. Accessory Uses in\nCommercial Zones).\n\nThe Zoning Code includes the following definitions: \u201cACCESSORY BUILDING\nshall mean a building, part of a building, or structure, which is incidental or subordinate to\nthe main building or use on the same building site.\u201d (\u00a7 24.01.180 Definitions).\n\u201cACCESSORY USE shall mean a use incidental, related, appropriate and clearly\nsubordinate to the main use of the lot or building, which accessory use does not alter the\nprincipal use of such lot or building.\u201d (/d.)\n\nThe Substation and Battery Storage are permitted uses by right in the C-1 and C-2\nZones because they are uses and structures that are incidental, subordinate, and related to the\nmain building, the Data Center. The substation and Battery Storage are located on the same\nbuilding site as the Data Center, which is a permitted use in the I-2 Zone.\n\nThe City\u2019s EIR which is part of the General Plans states in part: \u201cThe electrical\ndemand from new commercial and industrial uses cannot be assessed at this time due to the\nfact the exact types of commercial and industrial uses are presently unknown. The additional\ndemand for electricity is significant and will require the IID to construct additional\nsubstations and electrical distribution lines between 1992 and the year 2015.\u201d (EIR pg. 45).\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelD.83 Page5\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 4\n\nIMPACT FEE CALCULATION\n\nWe included a note stating that building permits will not be issued until development\nimpact and capacity fees are paid, prior to the final inspection. Our initial calculation for the\nimpact fees, using the Data Center Building size of 570,000 SF and the Commercial\nBuilding size of 105,000 for a total of 675,000 square feet, are as follows: Administrative\nFacilities = $452.56 (per 1000 SF) = 675 x 452.56 = $305,478; Fire Facilities = $253.57 (per\n1000 SF) = 675 x 253.57 = $171,160; Law Enforcement Facilities = $495.05 (per 1000 SF)\n= 675 x 495.05 = $334,158; Circulation Facilities = $86.99 (per ADT) = 80 x 86.99 =\n$6,959; Library Facilities = $0; Park Facilities = $0. Total Impact Fees = $817,756.\n\nSITE PLAN REVIEW FOCUSES MAINLY ON AESTHETIC DESIGN PRINCIPLES\n\nThe Site Plan Review Procedure, \u00a7 24.19.500, provides in part that the \u201cCity of\nImperial finds that a Site Plan Review process supports the implementation of the Imperial\nGeneral Plan.\u201d (\u00a7 24.19.510 sub. B). The quality of commercial, and industrial \u201chas a\nsubstantial impact upon the visual appeal, environmental soundness, economic stability, and\nproperty values of the City. This Section is not intended to restrict imagination, innovation\nor variety, but rather to focus on design principles which can result in creative imaginative\nsolutions for the project and quality design for the City.\u201d Ud.)\n\nThe purpose of the Site Plan Review Procedure is as follows: \u201cRecognize the\ninterdependence of land values and aesthetics and provide a method by which the City may\nimplement this interdependence to its benefit.\u201d (\u00a7 24.19.510 sub. B.1). \u201cEncourage the\norderly and harmonious appearance of structures and property within the City along with\nassociated facilities, such as but not limited to signs, landscaping, parking areas, and streets.\u201d\n(\u00a7 24.19.510 sub. B.2). \u201cMaintain the public health, safety and general welfare, and property\nthroughout the City.\u201d (\u00a7 24.19.510 sub. B.3). \u201cAssist private and public developments to be\nmore cognizant of public concerns for the aesthetics of development.\u201d (\u00a7 24.19.510 sub.\nB.4). \u201cReasonably ensure that new developments . . . do not have an adverse aesthetic,\nhealth or any kind of adverse effect on adjoining properties, or the City in general.\u201d (\u00a7\n24.19.510 sub. B.5). \u201cEnsure that the proposed development complies with all of the\nprovisions of the Zoning Ordinance and the General Plan.\u201d (\u00a7 24.19.510 sub. B.6).\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelID.84 Page6\u00e9\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 5\n\nSITE PLAN REVIEW CRITERIA\n\n\u201cPrior to the construction of any building or structure on any lot within the I Zones,\na Site Plan Review is required.\u201d (\u00a7 24.07.130). \u201cPrior to the construction of any building or\nstructure on any lot within the C Zones a Site Plan Review is required.\u201d (\u00a7 24.05.130).\n\nThe Site Plan Review Procedure, \u00a7 24.19.500, provides that a \u201cSite Plan Review\napproval shall be required prior to the issuance of any building permit for . . . commercial\nor industrial establishments . . .\u201d (\u00a7 24.19.520). \u201cAny applicant for a building permit for .\n.. the establishment of commercial or industrial, uses ... shall submit\u201d site plan, conceptual\nlandscaping, grading and drainage plan to the Director of Planning for review. (\u00a7\n24.19.530).\n\nThe site plan review procedure is concerned with the visual appeal, the appearance\nof structures and the aesthetics of development. (\u00a7 24.19.510). \u201cThe Director shall review\nand evaluate development plans for conformance with the site plan review standards and\ncriteria set forth in the pertinent sections of the Zoning Ordinance. (\u00a7 24.19.540 sub. A).\nThis requires the Director to review of the plans to determine conformance with the Property\nDevelopment Standards in the I Zones (\u00a7 24.07.140) and the C Zones (\u00a7 24.05.140).\n\nIn the Industrial Zone, the Special Performance Standards (\u00a7 24.07.140) require\nthe Director to determine that the provided setbacks are proper (\u00a7 24.07.130 sub. B.1-2).\nThat \u201cthree foot high landscaped earthen berm\u201d are provided if the industrial project is\nlocated next to residential zoned property. (\u00a7 24.07.130 sub. B.3). That the streetscape\npermit \u201cparking\u201d in the \u201csetback areas to help buffer adjoining parcels from one another.\u201d\n(\u00a7 24.07.130 sub. B.4). That reciprocal ingress and egress, circulation and parking\narrangements are provided to \u201cfacilitate ease of vehicular movement between adjoining\nproperties and to limit superfluous driveways.\u201d (\u00a7 24.07.130 sub. B.5).\n\nIn the Industrial Zone, the Performance Standards (\u00a7 24.07.140) require the\nDirector to determine from the submitted plans that setbacks are landscaped with \u201cdrought\ntolerant, low maintenance plant materials and shall be irrigated by automatic sprinklers.\u201d (\u00a7\n24.07.140 sub. A). All ground mounted HVAC units and trash receptacle areas shall be\n\u201ccompletely screened from surrounding properties by use of a parapet, wall or fence.\u201d (\u00a7\n24.07.140 sub. B). Pad-mounted transformers and meter boxes shall be appropriately\nscreened. (\u00a7 24.07.140 sub. C). \u201cAll light sources shall be shielded in such a manner that no\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelID.85 Page7\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 6\n\nlight is visible from streets or adjoining properties.\u201d (\u00a7 24.07.140 sub. D). No use shall\ncreate changes in temperature or direct glare that extend beyond the site boundaries. (\u00a7\n24.07.140 sub. E). \u201cAdequate emergency sprinklers and smoke detectors shall be installed.\u201d\n(\u00a7 24.07.140 sub. F). No noise from the site shall exceed five decibels above the ambient\nlevel of the area at the property line. (\u00a7 24.07.140 sub. G). No odor detectable beyond the\nsite boundary is permitted. (\u00a7 24.07.140 sub. H). Radioactive materials are prohibited. (\u00a7\n24.07.140 sub. I). Site shall not generate recurrent ground vibration. (\u00a7 24.07.140 sub. J).\nNo air emissions darker than No. | on the Ringelman Chart from Information Circular 7718\nby U.S. Bureau of Mines are permitted. (\u00a7 24.07.140 sub. L). Outdoor storage areas shall\nbe entirely enclosed by solid masonry walls 8 feet high to adequately screen view from the\nexternal boundaries of the property. (\u00a7 24.07.140 sub. M).\n\nIn the Commercial Zone, the Performance Standards (\u00a7 24.05.140) require the\nDirector to determine from the submitted plans that front and street side yards are landscaped\nwith \u201cdrought tolerant low maintenance plant materials.\u201d (\u00a7 24.05.140 sub. A). Six foot\nmasonry wall separates the commercial use from any residential zone. (\u00a7 24.05.140 sub. B).\nNo noise from the site shall exceed five decibels above the ambient level of the area at the\nproperty line. (\u00a7 24.05.140 sub. D). All ground mounted HVAC units and trash receptacle\nareas shall be \u201ccompletely screened from surrounding properties by use of a parapet, wall\nor fence.\u201d (\u00a7 24.05.140 sub. E). \u201cAll roof appurtenances including, air conditioning units,\nand mechanical equipment shall be shielded and architecturally screened from view from\nonsite parking areas and adjacent public streets.\u201d (\u00a7 24.05.140 sub. F). \u201cReciprocal ingress\nand egress, circulation and parking arrangements shall be required to facilitate the ease of\nvehicular movement between adjoining properties.\u201d (\u00a7 24.05.140 sub. G). \u201cAll light sources\nshall be shielded in such a manner that no light is visible from streets or adjoining\nproperties.\u201d (\u00a7 24.05.140 sub. H). Pad-mounted transformers and meter boxes shall be\nappropriately screened. (\u00a7 24.05.140 sub. I). Outdoor storage areas shall be entirely enclosed\nby solid masonry walls that are at least 6 feet high to screen the view of the outdoor storage\nareas. (\u00a7 24.05.140 sub. J). \u201cBuildings shall be located on the site to provide adjacent\nbuildings adequate sunlight for solar access.\u201d (\u00a7 24.05.140 sub. K).\n\nTECHNICAL STUDIES AND MITIGATION WILL BE PROVIDED\nThe Site Plan Review comment letter dated April 4, 2025 stated: \u201cAs the project\n\nprogresses through the review process, the City may require technical studies, including but\nnot limited to a traffic impact analysis, water supply assessment, air quality study, noise\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelID.86 Page8\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 7\n\nstudy, and fire hazard evaluation, to assess potential impacts and determine appropriate\nmitigation measures, if necessary.\u201d We agree to comply with any request from the City for\n\u201ctechnical studies\u201d such as \u201ctraffic impact analysis, water supply assessment, air quality\nstudy, noise study, and fire hazard evaluation, to assess potential impacts and determine\nappropriate mitigation measures, if necessary.\u201d We have included a note to this effect on the\nSite Plan.\n\nWe also agree with the April 4, 2025 Site Plan Review letter that \u201cgiven the project\u2019s\nscale and characteristics, various environmental factors--such as power demand, water\nconsumption, hazardous materials management, traffic impacts, air quality, fire safety, noise,\naesthetics, and landscaping--may warrant additional analysis.\u201d\n\nWe agree that future studies may be requested, and may require mitigation; however,\nwe respectfully disagree that a Site Plan Review may require an Environmental Impact\nReport (EIR) under CEQA, as noted in the April 4, 2025 Site Plan Review letter comment\nthat \u201cthe project may have potential environmental considerations requiring further\nevaluation. At this stage, an Initial Study has not been conducted, and no determination has\nbeen made regarding the necessity of an EIR or other environmental documentation under\nthe CEQA.\u201d\n\nEIRs are only required for \u201cdiscretionary projects.\u201d (Cal. Pub. Res. \u00a7 21080 sub. (a)).\nThis applies to General Plan amendments, among other things. EIRs are not required for\n\u201cMinisterial projects\u201d (Cal. Pub. Res. \u00a7 21080 sub. (b)(1)) such as Site Plan Review with\na use that is permitted as of right under the Zoning Ordinance. Cal. Code Regs. \u00a7 15268\nprovides that \u201c(a) Ministerial projects are exempt from the requirements of CEQA... (b)...\nthe following actions shall be presumed to be ministerial: (1) Issuance of building permits.\u201d\n\nThe agreement to provide technical studies and an EIR under CEQA is entirely\ndifferent. The Site Plan Review Procedure is ministerial in nature. There is no requirement\nfor an EIR under the Site Plan Review procedure. The Site Plan Review Procedure is\nintended \u201cto focus on design principles\u201d (\u00a7 24.19.510 sub. B), and our revised plans have\nmet all Property Development Standards in the I Zones (\u00a7 24.07.140) and the C Zones (\u00a7\n24.05.140). Additionally, the proposed uses are permitted as of right, and by design, such\nuses comply with the Zoning Ordinance and General Plan, both of which were approved by\nthe City with a detailed EIR.\n\fCase 3:26-cv-00128-JLS-BJW Document1-7 Filed 01/09/26 PagelD.87 Page9Q\nof 27\n\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 8\n\nThe City\u2019s EIR which is part of the General Plan provide in part as follows: \u201cThe\ndevelopment of the project area with new residential, commercial and industrial uses is not\nanticipated to cause significant impacts to water quality.\u201d (EIR pg. 25-33). \u201cNew industrial\nuses will most likely be light industrial type uses . . . These type of uses should not be\ndetrimental to public health and safety.\u201d (EIR pg. 54). \u201cMitigation Measures To Protect\nVisual Resources (a). Require developers of projects to submit landscaping plans and to\nprovide appropriate landscaping for all new projects, thereby improving the visual aesthetics\nin the General Plan area. (b). Enforce the height limits as contained in the zoning ordinance.\n(c). Require appropriate screening of Commercial and Industrial projects in order to improve\nvisual aesthetics of these projects. Screening should consist of solid masonry walls, dense\nlandscaping, or a combination thereof.\u201d (EIR pg. 59-60).\n\nThe City\u2019s EIR in the General Plan provides in part the following about mitigation:\n\u201cZoning Ordinance contains performance standards for industrial uses that prevent uses\nwhich cause smoke, excessive noise, vibration, dust, wastes or other pollution which could\nbe hazardous to human health. These standards should mitigate the health and safety\nconcerns related to the development of industrial uses.\u201d (EIR pg. 55). \u201cThe following\nmitigation measures will be implemented by the City to ensure protection of the public\nhealth and safety within the General Plan area: (a). Enforce the performance standards\ncontained in the Zoning Ordinance when new industrial uses are established.\u201d (EIR pg. 57).\n\nBy complying with the Property Development Standards in the I Zone (\u00a7 24.07.140)\nand the C Zone (\u00a7 24.05.140) the plans comply with the mitigation measures identified in\nthe City\u2019s EIR; hence, there is no requirement for an independent EIR because the Data\nCenter use and Substation and Battery Storage are accessory structures which comply with\nthe existing Zoning Ordinance, and General Plan, including the EIR prepared by the City.\n\nThe ministerial aspects of the Site Plan is also apparent from the fifteen day limit for\nSite Plan Review: \u201cThe Director shall have the authority to approve, deny or modify\napplications for Site Plan Review. Within fifteen (15) days of the date that application is\ndeemed complete by the Director, the Director shall approve, conditionally approve, or\ndisapprove the application, or shall request the applicant to revise said applications. Failure\nof the Director to act within fifteen (15) days shall be deemed approval of the application\nunless the applicant shall consent to an extension of time.\u201d (\u00a7 24.19.550 Action by Director).\n\fCase 3:26-cv-00128-JLS-BJW Documenti1-7 Filed 01/09/26 PagelD.88 Page 10\n\nof 27\nMay 14, 2025 SPR 25-03 Imperial Valley Data Center Campus Page 9\n\nWe agree with the request for \u201ctechnical studies\u201d and \u201cappropriate mitigation\nmeasures, if necessary,\u201d as the project progresses. However, the Site Plan Review Procedure,\nwhich focuses primarily on design principles, including aesthetics, is ministerial. Since our\nbuilding use is permitted as of right in the Zoning Ordinance and General Plan, approval of\nthe Site Plan is appropriate. Since the revised plans comply with all Site Plan Review\nrequirements, they should be approved as submitted, subject to further review, including\ntechnical studies and possible mitigation measures, in the future as needed.\n\nThank you.\n\nSincerely,\n\nSebastian Rucci\n\fTar OH ase\n\n5 Sons Sew : \u2018\ned +] \u201c30nd ua i Alri\nty\n\nMFEmSZo aa] YO \u201cWIS SO ALD\na2 _SNdWWo HSINS9 VIVO AD TIVA TwItadiAll\n\nfO I3SHS XSCNI WL |- aie ieee pst [nunca || mara, S>\n\nSHY TMOTEe AO AGINIIKS aha! WA OSAGHricl#] ama) a SM OGRSY \u2122! | Loy SOGSE TancUoON\n\nC da a fair Mot Sot on tren on 9 afd ee Sen end op asa ns\n\nSaLON NOWONMISNOD-213 AST Tee iti mera Heh IrLapen Sos est nope NaN! Sun ee aS SE\n\nS1V130 NOWONHLSNOD-St5 = t | 7 Ol sec 2) pares Qpeudands oy pep oy ee pe Soe pope 1H PY\n\n- a Let I ol EBL. eorusaebeiad Bocuylpee ne epzcem temeay ae = Ppa\n\nN\u00a5ld WHRIDSUMOBW WhLd3ONGD-S15 = a Sa SS yt Se ar RAL <2 oF 50 9 anal Bo yn mae\n\n- oe pe a are OL pears oe] [pS esrsireas oepeee] pe woe erases pee ecacin|\n\nB == Saas Gia: a . a = 1 ls | So ld WM GFL eee Bee ceppe tecrelps poe eeoe eee eee Wk EBA\n\nWing) Pensa Cpemomrrae [ree [SE [ SEP oy [TEP ierimbs peepee pe N SescrORpOT\n\name pa Ty, Ca FL ee sp a pees sabre yo sem og seams! eryparrmaaren\n\nrc) Uh LHWd) MWd Sd VoSoOMyT - \u201ceh (ta) PE, 9g PY Bue apendecou. epee pee wie yA pos peel yg gee\n\n\u2014 (L LaWd)) Mad Sd VSS oN - NYT LIS | i CEE TE ee et te eee eet ne eee\n\nGhia tNaW oH bb ep rr Fear: Psp pes pn secon cpap [fee Coane wen\n\nld LNAWSANORd S6 OVO SLyLsS-015 CY GS ost eet A Sevsonn med asnismes acy eS! opieep, qe odes ae\n\noO (tkWd) Awd SNIWHS - 65 | pre Ops ep Ya indo reap ieee [SIRES Sep eR SepISISp ok TFSI AY BIE Coe | SD RE\na 2: SB smmeeey Pop, peyote =) \u2018amy a5 8\n\na\nqa\n\nAb thd) Nwd SMIOWHS - 83_\nPL gINSS TWIGY HOS NWTd SND \u00a5d- 29\nWING) Wivd HOS Nid SNou\u00a5d - $5\n\nUd mc caer ascend) ap po errepermny pas\nMas ners Uoembepes og (Pray Fy pT Are pepo ay PNM AIRES 3 [PTY\n\n~ OS AVM SIVIS\n\n1 t nH\n@iu\u00a5d) N\u00a5ld ALMLN-53 eee ee een arene Te LEE\neet a. VcUUTRSnELS Po ESE SCS ed PT STA LT CT A) Poel an ere\ntO (L avd) NWId ALMLL > #3 Sr TOL Hl Pm 9 Anpeny ane age panded oeoey sop oN\n2 avd Wid SUS - \u00a39 fo ee orton faq Gedo\u2019 op re ee op ye eazy eee ag see Ee OM ee\n(pene ree Say may Sean ONG \u201cLy HH RT LET A Iren 29 Pee ee sap ae pre apd\nMt Tava MWTd SUS - 22 | ae ema a ea ne ae een ers eee oe\n- an ames p Fp SUD PPE FT oy, urraore 2) neal n=\nO ____ E35 XSON1 SILL bo a ee eee ee ee oe oe eee\nI XJQGNI 1SSHS is. ay is te \u201ctebe oe Sar i, Wassoed Sedans em Seems AE mie te\n[}enpe steam opremasce prea Pam aN yy Hd PARES Prrmeaall pe LY HS OL acc ee: Be\nSratonree Gy pean!) 3 phe we NERA OMAN Aly CAMS MAT, TI\nTt Pokey oe SE peg eee POR ogE toy SEP oy domi ep Sep foe LORE\n+ 6 aaequg fumes jail) ye GnS) py pA ap Ee YePE| afi\nTee eee cope a) iene\nit\u2019 enone prs ee ee Se a ae\n\nOE\n\nSo :\nene Papal ey oe fous zi\n\n7\" =y\n\ni\npes camped emcee: Aeperary,\npeep pope er ee rE HL\nSoyisous;\nJSSLIWE\n\nNOLLYWSOANI DNINGZ\n\nent 1-/\n\nOa (Trig placards Money Um 2y,, \u00a9 i Spoon! HOS GL we F ApS MBE RL HG ML\n\nMeL sOeE\n\u00a7 eee Bez yyediey po ae) pana ay OL a ee ap\n1) dire attr 10 Beppe Gre 0 UO ep Mer cope Pi, pee ee ey\nUng Rg 8 eee pa Ne ay ae on is ie Beret ee pO VOTER I et ou,\u201c\n\nWHEL) WAS We es\n\nSAN tr] Snes Set Pestaneaadl wt aA ere]\nHing aq re ap epg Se ep GO pepeey aie oy Lon pe ONES ey Pi RIT]\ncL py a ROMAN oa Seema ES See pean \u201ceer een pee ae\nay areseg eee 2-5 pet [oon of tf et need on aes dei per ote LL oy\n\nUrry Sempre\n20 ey me go se pelpeed op A em Sp ee Gee ey SI 9 PE Sa\n\n\u2018boeken. uae agp DO Pe 1 Pewee Oey tt pon aie Rey Aa PSE URES HL, 7\n\n{yy PRUE) PI PO HT\n\u00a7 peep Furerz pepe pe Miya gy eH [J ty mje & su ouatea! \u20ac we aay]\nPeyssseieau 3 peasessg) seine Gpomget \u00b0F). emt | my Pom tas Pome wy pVSRNRNICY PERE SLL OS\n\npar eo Hearn nite\n2A Jo amber pee a aR SS STEP oe ipmaoee uMONSe Je YORE pum more Wail spe eA\nPe ory he em ree) Set eee Sem air Hag Sulliewist) pene \u201cRrpremead \u201cBa ydnd 40)\nSHEN Poms pre omer sophie Rape dpe pooeciigl \u00a9 oe SENG I ER ALL\n\n\"20-CV-POL2EF JUS- BIW |_|] Do\n\nteg Peatipe f-) ep eg Se OED Lot\nbona See pass pe Gg) eee 21 a0 ae i en epee \u00a9 oe Jeg pS\n\nVINNOAITVO \u201cIWIN JO ALO Sg ee eee\n\nSOdNVO AHLNYHO VIVO AX TIVA IVIdddWNI\n\ndVW NOWYOOT\n\nCase\n\n\fTHe ay 7 \u2122\n\u2018/\navo , ese ees Ce area inte\nHSA [a Es SNOIaAga\n| 4G AHS st : TG SNR Ta oe\n\u201cleah : = i==an\nonl WOT Sadi 7 URS SORT aE\nLOAEDOSES ASTIVA Ty i (Sue? 2 EE: SIU Way wie Winy OUST\nel ena HeINSo \u00a5LVo ais Sadi nts pot sees rss juss ump\nais | |) scare\n-\u2014 3) cy 5 au\n5 eal! \\ \u2018 eee a a\nSuneng uy Ur\noes a ama \u201cme ins ep in proves sara sgn reo\na seaistes | \u2014\u2014}\u2014 = = his ne eeee reas =\nTid kame! \u2014a = \u2014 Jp \u201cUmuins TUR\n| Sea Gane uLena =. = \u2014\\ c| f seen ra Uhiraitiptceades\nWML oMspoe | | URE | ssGor sore un hota aa\n3 1 SRR T BOUL aa ou as\noO Pr a a SRP per ery os aan) oto hs Fe\nOo) ee ae Ger OF + bea = \u2018Spanos =e enc) A uns ima\nCaer teas ura = | Suopy mewEsEy a Waa. 2 \u201csass 9 soups summit Sve #) Se\na {Hor als we woe = ath t um pave snorESC \u201cul Das se sereg seer ste\ni Lara Bes = RHE a ey it 3 Emg 1p) \u201cSwope\no- Sar senalae aie | a Ree Sepenates 7\u201d 8 Pr ames Pau age arenes eat =\nDee \u201caep ayes A 2 | ial yee aoa pase \u201c\nQO Se = Eoumie2 sedan ag) po poe 1see \u00a2 [ a f | | , eae\naN ad wou \u2014\u2014 an an 107 DE oo cj] ; SeauOZ 5 spmpums gout\n\u2014 HNOLWED MLSE | sie op aay . VNISVd e 3 a 2 | 7 et sessed amen saad fr mae\noes ee eee | \u00bb~  NOLLNSLSY ei) te | Seer tiemreeess en\noO MeOH 3s ae =e Be paoymensoeg dimnn 10 0 r eo al | = @), TH | Sas pecs sb ea a le I Th\n~~ ae me \u2014\u2014 al - - IG 0LiOWd SINDIVASTS cs ' } a >: , | =| | Seas Smee IE eae -\noO) ewe nue \u2014\u2014_\u2014\u2014 \\ at) 1 Fe at are ae eee\nOr ee ASL: a i 7 | SR PA SEU oH wot Rw\na aie in| === | a peer atic tere\n\u2014 2ae35 Jeelieys \u00a5an | \u2014\u2014 \u201cs[= SEEBAOD wT] SS 7 i ane Ne eg nescooud\noO aA Se ee ea Meret in aepien [ | ai 2a oe as EEN a ED he\noO a eae a a \u2014 sane 116 = \"ely wT a ee a] 7 | en eo or ss\nIAN aie ace | \u2014 fa jaa beet S | ; funces \u2018Cumul jusouns\neons Teebae ec lgae aheptine aie \u2018 = aes aun Comes ses\n= aan 7 OE} S T= By iS i WW y TuRUoIaND pronan Guu 203\niL \u201cONRSAT | any Smpong = ony kell ; LL inna tonah oe\nLL dor] | SAT eee,\n(any tng - ray = aA} wr] Ce py oN MB iar ilies ana ae\n\u201c203 age rag} Jo] eM nee famo Ming ququeg) senor\nfiom Ws ' \u201cino 29 er moe Ago\n| Sung 2 Sune papnau Wz puss\n= wi SF = the magus ued mq, aared founda ona\nRN 2 NOI = Wie 5 (\u201c | 2 BAR ES US BE KU ee\nUW 3587 OOL = FP eT \\ im Bb See pees ata a eee\n4 SIPEG METH ahi Tn \\ |e a pa pau 2a mys semuanans ie\n\u2018GNGAOUVd ALYadOud \u201cSocal \\ ( (om) CTE ={| |z ESE\nhind EO PER aps 0 INODOo0D a Se et iae ighae tantereeniaett aetna\naan: RS See es | BOAO ell pi aus\n; Guomthac tatnn sae PT : = = ANT | paral 2 er Sa oy Your sar Sen\nae (eT \u20180 encagmy any paambony Sxpe%po5 og TOON LO CARE a *NSn ater sro Ae a aan ace \u201c\nowt : g = | a USES Mice\nig sie WT = WI n fl 39 FUE aE\ng \u2014 COIS 309 aeaiee O00 -\u2014 Paucar vopsds\n: oe } \\ 000 prin te\nQO tf hare oD. OUT \u201c1-9 8 SET = PW OT DOO VISSL OO! Lens \u2018ge eae ne acaee eee\nEe te Fear ea] eee \u2014- THK mn UTM aos Soe eee\na t= 1) 107] REEL TE hs STAHL LU . SUpENE SUES 2 oS UarrEE] ay\n\u2014\u2014 a= pears pe | (on Doonoom ( See 3\n= ] [ aaah\n= Sa OL = Dees PEAS oOo OOOO f 8 Ze aatureat Seats sansa\n1 : caine ree 4 | = JUMW 009 Ssad = a # Sea agin Geek caer ees\na med ee = mn NOOOooLOAon \u201c1 16 ty eee a\n4 onan s = \\gmmmm) \u2018gaan? 7) 3} | | 5 Seo aee\nsare =A eT - \u201cst = ? z \u2018Rum aki aut anliera\nco =TPey Fup : = 1S i tater eee eee cae e\nae 107] GEO = AS FOV. 5 ured Susana sun paacuide um aumios nye paul\nN \u00a309 = a2emaa03, aan WAALS q et oy cad pared Suara ee\neT \u2014Pedes yang ASU a ae i} athe aan\nWes C] = EGG BL we ee os eae BAe eek po AY DS\n-suorpen pend\n\u2014nl 2 Fe A ns ps\naL JOsENE EASURLEE uF Paseo/ Cen\noS \u2014\u2014\u2014\u2014\neat \u201cif\n\n\foN ae\n\nTaEDoSe va YO \u201cWiad JO ALIS a ees | eae\n;\n\nae ShidWO 44 1NS9 VIVO ASTIVA TWIsSalil =e oon.\n\nSau ae pete (Le\n\nsaree: oe :\nue a avd tha i\n\nSo Obes SHL ty edd Sele\n\nGO] Zdd NVId AUIS |armemfl\n\n\u2014 sate] as | wn ee oS pobe) Uoeeiay ng ) ae\nPaaiie noose 20 GaSWENa 43 cE CGNGGaae| awe] on SHED | uw ance cian\noO = = =\nJ \\ | i Sg Nl i a ee et pa te Ne til ete citealakd\nrst Sf erp ene = ee ST a +\u2014\u2014= \u2014\u2014T i e = $ SS = aro F 4 it SS ; hag'H'd\na FINS AN. OZ 2 i ANS Ma Ore eC = : INES AY OFe a \u2014\u2014\u2014\u2014\u2014\u2014\u2014\n707\n\nNIiVad WalNao NIV IVaINa0 a her at\n\ni F 1 | = | i : =\nSS SN NA CE =j\u2014\u2014 gw 4 lze 4 T\n\u2014\u2014 Le Aa 4\nEM B= | mi \u00e9 BS | |\n~, eh e th va\u2014\n\nEA we = \u2014\u2014\u2014_\u2014_\u2014_\u2014\u2014- \u2014 pS i\nae \\ \\ = Ss 4H] |\n\u201c _ baua4 ya ==ae | |r a\n\nor\nJet\n\n|\n\n4\nLanny\n==\nU in\n\u2014\u2014\u2014} i -\n\niow LE]\n\nSNS. it\n\na\n\n\u00a5- 9019 1WVvla4y\nUJ\ni\n\nGUBlaH Sf) 45 o00'Se\n\ncn py ect\n4 - = = oF -\n\n\u00a9 y bona SS) : : = : |\nBe woeHuse-Aiaseuo Fe MNO eet || a)\n: YALN3A9 VLVd a : spate : ay iq\n\npauias\nLL\"\n\n0\na\n\n\\ te | \u00a2\n\u20181 (Gk Ls\na0 '\\, jaws Phi i a ib\n\u2018 r=) adoas puis = op\nH rat ion oh\n\nFTA ii ag\nre\n=\n\n(74heH joe) 45 oo0\"se\n\n\\\n\u2018 0th\n\n= SWNWL wav \\\nA re PN Os\n\n\u00e9 hoy | i\n# SF Ne hy Baua4 Wie\u2014.\nOM 4e\u2014., se 4\n\n|\nNM a a 4 i \\ \\ Z han j\n\n|\nf\n\nOle\n\nG01 28-JLS\n\n-CV-\n|\n@- 907198 lvlay\n\nfl\nU\nfn\n\n6\n\n\u2014Casay3-2\nos\nmo\n_ 7\nHe | \u2014*\n\u201chy e\nI\n|\na\n\n98 AVMHDIH ALVIS _\n\nV.LS.\n\n\f{te CES as eivHonga | Serv abet ha \u2018oe Ste\n\n\\OEDOSZD owl 4 TIAA AO) ALD\n\ne\n8\n\nSfidiWWD H4ALN33 Vi AATIVA Tita\n\naie - ava ag i OG\n\na | bid NW1d ALTIULA 2 ee Sea \u2018a fae Se eee eae\noO ay | yi\noO 2 te | |\nBL L a! || vor\nN leas i = Eat {ru = PB an as it I VM\no Hn More Osta | ae oo r | = i x 1 7 a 3\na eee 2) SD SINT ye or tans\noO LH LGNLE MLSS | + ce =| ! | |\noS ae = : ee aaa ate MONE\nou en doves1ae aie Sy 4 i ih Ale ! | , | SORIA eNOS\nSpares ain atin | \u2014\u2014\u2014\u2014\u2014- 4 a. SS il | HO 308 Move\nx eciarirees wciisea| ve | o0'6e6 AT Log = |,2 x\nN 7 ilies | apace VNISVa \u00e9 aos: 1 | IG) |\nd er a | L NOILLNSLaY 4 (ez |\n2 FUCUM DML ae aa = & I oO | |\noo MFT BOLE OMLBIS | \u2014\u2014\u2014nial eS \u2014 \u2014 rm * =c : = = G) | i ry\noO Meo Pee aH | \u2014\u2014\u2014hil\u2014\u2014 a & \u2018 2 \u2018 L + lov [Se |\nOo GE LS ONES = We es i =, oO il | linet j +\n@ [Sas cinen pee wa | \u2014\u2014hrs\u2014\u2014_ \u201c a - - \u2019 lane! | eaunZ | SREPUERYS SIUBUUOLS\n= Son Malye. ONLEEG | \u2014\u2014wee Ma i FOr LO bz \u00a7 \u2018seu0z 5 spmpurs\niL ai aie | \u2014\u2014a\u2014 | i | oe SOc \u00a7) Pwo\ndarrChies Geddes JOP] quaudopanag\nMUNASaT -- | ApuNWUUOD au Aq paxcudde\n2g Pys uogIes SiWy JO suorSsincud\ny i ahs LT 3u) Jepun Bumaais pasinbas AUB Joy\ni | a ubiESp (eran Buapyir a\nS + | Byoaen Aq saquedoid GupuNOUns wow\n3 dl \u00ab \u2018 oh pousans Ajayayiiuea 4\nE peo uapy Guopy juswases AYN OO OL P , (am ail rm 2 a= \u2018iki tin pon ean Cee:\n3 adie: 4 \\y OONOONOINNO |OONOCOONNOO | z vie se pur Ougeoy Cuppy ycuxdns\naye}s Guo uawiases Ayo }OO4 OL E\nOe om (A | (saz | spun\n= pi [apt TXXE on 091 oy | \u201cayqissod cuayan puncuuepun payey}Sul\n5 a ES EE \\2 | \u2018TIAOOUOOO NOOO i PSYIEIEUI 2q EUS SxqEO PEaUsAAO\nOf) | 248 payeso) uswases ApgN ol OL 1 ae 1 rf UE Saul Jai quaLUzag GuUsais\nLe | | UDODO000000) (OUC0U00000) i aeudouide ur yu ued ys any\n\u201d *CS0IA0Ud S1LNSWAS VA | __JUMIN 009 SS3e tl Ul PAPNPUI aq EYE SUOTFEIO] XOq ayoU\n5 on pon a 25 Sth sects ngeae\nx DONO, OO By 88 2\nSat ay De paubisap oq feys suDgs9uU09 ABIqN fy\noO a\noO WSLSAS) (ADVHOLS ie) Se\n> ADUYANA Sa = 2 es hei penises seen cnc\n\u00a9 \u201csa : me 219 JO SOURUATUIEU 10 YOM auTATY\no \"SEE . Auy \u201cued buipyng @ annbeu yeay jeys\nN 43 = i LENEKS SYSUO By 0} SU-aN aunyry Ku\no ee . a5 Sai }\u2014N\u00a5S,9. ka \u201cRip 8up Aq Jou pue uauxdojansp ayy\n8 ee \u2014\u2014\u2014 oie Spb as 3 * lanes Hie ane Spey :\n\u00a9 = _ VOR NLY eee es oe\nO Ss \"S4LON NWid ALIN\n\ni Cha . aH\n\n\fNiVad WaLlNao\n\nNIVHO TWalNa>\n\nre-zoREo mw) YO Wagan JO Alo Sea se rons [area a ae ae ara \u2014\u2014a\nea eae ae \u2018 a 5 a aro\nShai) HEINSO VIVO AS TIVA WISI = = sigs \u2014 en es sy ie a ca\nSeiya a i\u2018\nSO! Z 1d NVId ALMA == e coe >\n: ia arom do Sees SL ey See dee aac an pac Uf em, *\nCay SNL SINE LISNOO SNGASNISNE 1 suite a OBST wis SSSR Sa Go = ee Be pee aaa\na = ee 10s MC 3, | \u00a2 :\n= et ASA Ge \u2014 t . Sea tian \u2018 Lh teat\neo ae af eT Gp Se 233 }\u00a2\u20144 -_\u2014 $y iT aie\n\na hee A,\n\nn\u00e9e\n\n-JLS-BJW Docum\n\n\u00a9\n\nN\na= yh\nCayvos\na\n\n>\n\n2\n\n\u00a9\n\nN\n\noO\n\n@\n\nY\n\n\u00a9 *\nO\n\nMl\n\nMI 0Sz\nuy bs 000'02g\njUBIeH YU S\u00a2e - Alois BUC\n\nYSLN3ao0 VLVd\n\nHOM\n\n2\n\ni \u2014\n2 eg > oi j |\n(on. Lge\" fs\nain ] or % aI\n\u201ce -O5U84 UB | Tel = |\n\n@ {\n\nE\n\na) \u00a2 Far he\n\n7\n\n2\n\n2\n\nU\ni\n\nV-90719 TVLadY\n\nOUBIPH 6) 4S oo0'se\n\n|\no\n, | 1\n\\ MI OSz - AX0\u20acZ 4 \u2018 1\nme NOILWLSENS 8 5 et ||\n3 OMLOATS 7 a Ney\n2 J |\n4 Weel |\nay 1 ar\nioe |\na= For OEM\neoue, iF \\| -|2o i\nana WUE z\n: + i Hb\na q ae \u2018alt T) \\\nbP 4, 2S 5 - 7\n\n\fVO-EaDSea ow] Wo WIAA) 40 ALIS\n2 == Sidi HaINSO VIVO AS TIWA TWIdaclAll\n\nONDUVd YALNSO VIVO\n\nSo Le ane cy ee TAR WSS Poon, weet MS b ie\n\nSOTRsMOo FlryeaT) ft\naT LH A\nfe?)\n\n7\ncet ace | der nde oh rei ae | i] oe E,\nTange ao Gua rar bara resey et |e anes SEER NEDO\n\n0 ROMS SHO eed Be\n\n\u00a9) 3H\n\nPa\n\n\u201cNRE re 2 Repos so eee\n(nm us eDir 9So)o mm cre jc ro ag Op Se eg OUP ae meee Booed\n= pee Ree PS oy\nmr ap jo SE poy pool = \u2018Bupued pe ao\n\naR \u2018Woe Cr re Te go me\nst ]apTe o Peodep eg og apes oper on oeLp oun Seam eg pro weg Gupued pp i\nmo iia foo ire fi Amgen 2 Serer ee eee ep eG pe eS\nC) Tog ae OO ae Gf amma oe om we De peLeMS pu pepe! oe eg pyE SUN BORE\nta] ptm ew wwagere: mgETs 5 Psa 0 PL ee ORC Sa ara mm tt\nSh bets ses o ae aro : ppd 3 peared \u2018wu Sage\nVes stelle\ni area\nOo : Be 0) Hue SRE a oti SE\nOF a ia | se tll IE : E bee\n4 i \u2014 ae 7 - 3 5. \u00a9 gTOASHOLOM st\n\u00a9 bE ott ean Sth isan nto sti tN St\nOF 8 we lee 31 & ee \u201cTeg Reema aoe etree iaoe epee aree eee eal\nfo = wehet epee 4 Te ag a tevlal al E ae 2a ae WU mpm uss ecacie oe Bae Sem pe NE CUR By LT\na ae = ae f Ses we a) eran a g yale OFTOON TH Re A) ML PUN mena Se\nL. ae \u201cI i Me + \u2014 ea, ey RIS AY PL I SA PL PL OP Ry\n| a I; a a aE a RS i eth ess te aes fer ont ees jieminciprascraen baeeetiar orien eed tpeirreee rented res\n\u2014 == Be a enti, (Boe ogeintae TO Su poy pO LORS LR 8 Bo uN pedir me BR yt\nTARORV CE Re reyes coy see pe pe pe a FR\nB fee pent a paar cemnneencee aes\n\u00a9 = HOG MEM ited or\ntS fe Seep aa pei\nWeghn 2 manuen ys pe\nOo sje emma gw re nPop NUN aD RHO CT HE pune Se\nDorn FG BU PRA E 1 RTu BRUCE GOR Wee BLEEP eT\niO SLOW OMLLNOTT CRY DeaaYDSONWT OREM\nDNIAAVd adtNAD ViIVG nee:\ni\u2014 ares SUG 2 OPW LO FP TC RSS ae BU,\nLL twOSNEH\ni 4\n\nu bs 000/045 S15.) Was => id nicer eee,\nYHIBH 1 GE - Alo}S eu \u00e9\n\naaLNao VLVd\n\n! ater\n| mepuione praid 5) peoede Lppckedte pow pears Ape os pCR EZ\n| TARGET Pe Beep suai vance epee epee 2 pec be ag FR ea A ECE\n\num Dep Sp apOG eee pel eee ep py LCC ope oR BUA\ntoaceo et\n@ Gg eg cy moe on ey Ue pe ego rs Bo eo Gt\nPe REC ne BD emunbeg eon apes mT\nneoech 9 = pepanig Suppes maison,\n\nULE Gg Spear Bang mec aE FE\nSlLOn ONY CHOW? Ontieed DAD OL On\n\nLoading Herth \u2014\nParking Spuce\n\nmA mg jo pa mL,\n\nBurma 7 selinep comer cen elec ogee ey pe eeegry Boge elog \u201cTL\n\neth\n9G pemerp pees eg pe moeds enoney eiog opr per Buran cL\n\n|\n|\n|\n| eevee\n|\n|\n|\n\nNT APL <\not oy\n\nSN\naf\nEy\nt OF\n\u00a9\n. ye\n=, hogs\nbans\n| ALP\neee\n| bly\n| PLL\nal a\n||\nLU\n||\nLU\nmL\nLI\na4\nBft Wall\n\nay\ni \u2014 | x a wos buna wag,\n\u2018ey PT ol) WO Dee De ve\noe oz} te z Z C , : vm pj = Farrag Suns So,\nfo a 1 [aca ca aal| Dial ] aa [its ail eo ie \u2014 nal (aay =i] OOrie aes oy Pa\n== Doo Si . ao aes\nPa. Se 2 \u2014 a nl a | ea =, =| = Tl = 7\nGroat 2S \u2014| | potter al tt . = 02 Fa - \u2014_ oe a eet _\u2014\u2014\u2014\u2014 _\u2014\u2014_ ene eh we\n2 2. \u2014 \u2014 Peet ae fo a el \u2014 a ll et a eh tl 7) are ME OC, UW OY Se Ee\noot ee \u2014|_ ee ma te \u2014\u2014 =>, Se. a) \u2014|\u2014, ~\u2014S _\u2014 wrcere expand Seccierpen 7) = peng ess PHOS oH\n= -\u2014 \u2014 org Pao ocd a ms \u2014 \u2014o oo ae oy raed sl 4 =\" lay | See eee ne ee\nal C5 (i /2= he aE. ac = Ae le a a = PA fer YOU TL be munpcen wens read mao ane\no Riecee| || (eee aie eeee ee leat | | hg |e poeestemmet || (Cee comme || eee eel , |\ni te 5 => eid\nPaes) ae ar ce, fa eee | el i) ar ft = 0S} | ca peenems pi papa pega Pao oy pee eons Copa Pam\n1 Oz! ps oe a ag -- 4 rt Oe a ry \u2018 = cH fegpaiaure o fobs pot apa jo sored we pee ep gm\n| \u2014 Leama \u2014\u2014_| {a \u2014 [ \u2014| act eed Ld ed ue (ue pet | dame RR PTE Us PRR AUS ae Peg pa BL\n[he al [isa mall [iam \u2014 [Fo ii IpZ-} tie] [aban = 1 fe al [Fan Sr] pam ag Bao YW IgG Sa wey Sako EY\noo et i \u2014 i Se I a a -\u2014\u2014'r \u2014 \u2014 ee \u2014 =| = 4.4 | ee ee ee ae ee\nL\u2014\u2014\u2014 \u2014\u2014 Jo \u2014| Jo ye : 2\n\u201c3 rho = a \u2014\nx [oy +. th\n\n\\\n|\na\n\n| \u2018rece ors pkey eee cartes\n= (near Keren LO OEE Fe Si oeriey mace Decem b\n. LDA ONY SROGW NITY 2 ORD ELINID WYO\n\n\fToDOOSeS om) YD \u201cWean| do Allo Tp ae tesvRrned | tas) ca Eon Eau ee aa le\nI |_ SNidiWW3 MENS VIVO ASTIVA TWISSdil = So etre See BA TH Ths\ntoi yoo ae i\" \"ara = i\nZO] OND HALNSO \u201cIVY coer scraa noes ps it ia ii SS eit eee\nT1335 : Oe00Se oO SSaNRING +a] Ta daioeaae] ae [ae SHO aH =| Lette Jshes awrimentiew\nnh WOT et @ ee\n\n4\n\u2014 = (PS Cy. RA OO PL PP as RI OP\n\nding adpospuct }cz\u2014\u2014 = PA SURI ACH me st pee\n\nts ~; bese cure nga wr pappead s py mE LOGE CH AC A\n\n. \" _ 5 a 2 URSME Of WE De PSTD Pe Pepa! OW we UN ESTE ET\n\nz= \u201c< x wer\u2019 zz \u2014 nz a. mace\u2019 cf pas egg acs Ca oe \u201camr ime Buepese LG TEE\n= se = i Ac = rye =F -\u2014 oP) vopeatuc: agen emu) SeuBeme ec RE EE PU BR\n\neno Supine Jorma pm iad sno pus pom anaedng io pe Prem mG\n\npert \u2018Wie Fe RAS arc wa ES Bae \u201cA ETD\n\nou Par pum percones Beagy esmy os wees, Cpe py aS Th HT\n\n| | | | || } | Pac Sm ARTS HIS ATS AY al Ae OP LS\n\n(wif \u00a5 | | Ii al Se erties i oak ee eee ae ae\neee ah eo ee a aman =\n\nduis adpaspuoy 7yGz-\u2014s, |\n\ngonds Bupoy\n\n; 3) Reddesypuny\narp. Ha ly [CLARE LE LLL\n|\n\n| GuBIeH .sc) 4S OOO'Se\n\n(46is} a. 4s oo0's\u00a2 Sete neces\n\n[I 9-9q1\u00a2 Tie @-9019 1VLaY Ree\n\n5 fey sue pees ee an a eas ae aa, =\n\nSOG Te eT) Mae os eee ne\nAu ss a a nc ee eg os ae geg eesy\n\noan pas Ae\ni jee eter tion Cee) wan EU Pe\n\nFiled 01/09/26\n\ncela a 40 wee pe ay\nAU 0 PRES op Te Cp A\n\nRN Chet Pa A Bs Rd VS fy LT)\nPrGuae: ly btem rece) roars) er p meomrea ety eee\n\nSY OPW OTL RoE ep ey pepe ey oy Spoon pare\npum cediom es yma mcede Sechapemy py pecdermumy) UopeDyee pum Shops\n\nwomced\n\nTao ers AG cep ORE UNC en Ary ey oS\nS45 ) DWwos  PRENEET Pep PROG Og Ld Lye Ly Te\n\n\u2014_ NV'Id DNIVYVd ULNA TIVLIN \u201ceee\n\n\u2014an 4 (Dmg wordy Ape a ables ges eet\n\n\u2014s m7 ep pee OEE ee Gece oe pS\noS : ding adasspuoy 4yS6z\u2014\u2014 04 4a \u2014\u2014~\n\n\u2018 r oe a\nduns adosspuny 1czZ\u2014\u2014, aqua] ve = 5 fa Le hes, pain monn cm eee\n\nPapo : = =e \u2014 ear i ae Oe \u2018uty a Z, ; S: LOS SND Lok vt\nant Sirah ne (ul alaTest\n\n(46i9H sc) 4S oon0's\u00a2\n\nV-9d1\u00a2d yin i\n\nelf,\n\n\u2014\u2014 98 AVMHOI VIS\n\nDocument\ni\ni\n3\na\ni\nAl\n\n|\n\n|\n\naa\"\n\nRBA ES = PRP! TRUS\nAner oo et 2 On Get eg cep Ba oF\n\nweeding = pean Baas Sp\nweoeds a CT) PERO re) ro og) ae oe Be mA, Of\n\ni\netth\nce\n\njettatze) = Parking Spa\n\nrecede j= peprasiy denpey aera\nCom arhet ee fermen po = meme ir wey | a boyy dea\n\nee G\u00a2) 4S 000\"Ge Ut\n-9d0 14 WWlsay\n\nrecrea depp! pekherperg bt = Pepe) weedy peice | jE,\n(ee po cet 2) ee oe ay roe epee om See)\n\nParking Space\n\na\n\nay ra eee 1PM otc \u201cTye pein weedy Sane, i\n\nTrask Area \u2014 Leading Ai\n\nSCL EET WD PI el HLA TEV\n\naah Ared\u2014 Loading Berth\n\n= Hues SRA\n\na : Swine\nTsseOLot\n\na = SNE\nreo\nee a oN\na 3 |\nTie : Ra \u2014 SS le my re ae\n\u2014 =\n\n= Oo ee aS ee\n\n\u2014 \u2014 aN TIvise\n\nDwi)\ni\n=i]\n\n\u2014\n2\na\n-\nre\n= 20\"\nf\u2014\n+20 = 24\na Fy\nS\nce\naaa\n\nCase 3-26-Cv-00128-JL5-BIW\n\n\fSUG lal ar SoM aaa\n\nMrmoszo owl WO ISA A Sn on rate pistes.\nna] _SNdWVD HSINSD VIVO ASTIVA Tits ie sug) SS see wa ui\nSy\n\nae 1A patie\nse i - iw :\nBD) LI NW 1d ONIGVHO | screeners en\nran. i 30 MOIGdTG FHL WSN Gea Ud\ne ONISINVETNSNOD SMMaININ 37 3 es ae | we ee |\n\nDash CHOOEe JO BGENoI nee TA Cee) aia] SNOVGY ) ec Sowers: omen\noO oe = JF ; fc nm iS | T \u2018\nOo. \\E Tire Sd Tore sd \\ ora aly | IH\n\u00a5 = 3 a i i a FS Pt |\noO) G \u2018 | ht | Td Hewes cravat | \u2014\u2014\u2014}\u2014\u2014\n0 Lor rede = ELE ee ote, \u2018Gye fd \\ a Re & ae dqvoud 2MIE AE AEND Seals | \u2014 gy y\u2014\n\u2014 xf See i ~ ef e : 1 | i ANN StL ose | ae ot icl\u2014\noO UoBastee Soerue kia) ee owe so fe Ii iT ave d [seus sane nice ?\n? Lea hoes mia t bie al 1 i \u2018| 8 TIVM, nets Rls ove \u00a34\neel | | =\nOS oe oS a | | i I i | Leer aa MLSE te\n7 teria ie Gad, je Ree eel a\n\"a } al | LGA: aa\nA Les | | | Nn ASE sh\nSy eS m P ue \u201cerases MAL onan [-\u2014\u2014\nTare SJ \\ b+ a arises op uted | |\n~~ . ie a7 r a iH | =\nD opee6 ASIA 108} i = i eR | ae\n| | wee los | orear\naj I v\u00a5 NISVa | | se |2 mio |) ii | | | a aa oats | |\noO es NOILNS134 orb = \\ oo | | ! Lil} \\ MPIC He eke Ba ar\n5 By o O ! Sore ql | i [hae ast: eansicl | nana \u2014\n7aedT wate b { @l | | | F \\ ee we pads was | \u2014\u2014 AL \u2014\n\u2014_ 4 i, i eee3S Eee SMILES | \u2014\u2014hed i -\u2014\niL @ NISV@ NOLLN3134 ery cect Weir taal | | \u2014\u2014\u2014\u2014\nS5OVNIVHO I SX? gre ol a] | | obra 1| Be t 300 Lew aise | \u2014--\u2014a a \u2014 |\nMe z|: | | i 31 slew ae Az\nny Ne ae a 3!) | afl 1 int Javunnad Ligases\nN il Ly | ONaSaT\nwe LWW Oude a oe woos are \\ove dl cr roa StS ==i}ir Lh\no Paste = wee | |} LP -|NAS \u00a2 Hy Wa al\n: sa tor = [iy |\nrene oP\na \u201c ary Sd F\n\u00a5 5 3\u2014\u2014_____ Rese W\u00a51S0 ST1WMS\n\nOh es\nan\n\n=a ln bee al\n| Tora zt [reat\n\nWome gat hy a \u2014 sk % 3\nShp a \" i\nTaia\n\nSLE Tal et\u201d\n\nV NISV8 NOLLNSLSa\nSDVNIVHO\n\nah t,\na\nos\nuy\n|| iL\noy\nfl th\n\"\nA a\n\ncu | 1\ney\n\na OO\n\noe lea\n\n\u00b026-CV-00128-JLS-BJW Document 1-7\n\n| as nae\nae 2d JOUR OTL Ww OLOHDoOF\n-SNOF 00014\neS\n\u2018wonsedsul jpoy auogeg pied cue sacy eden\n1 pUE pedwi usuidoeAeD jQuN pelud ap oy payEu\n\nBursq yuwed Buippng AUe oy Joug \u201c\u2018yuwed Buipyng\n2 jo SOUeNss! 229 c40ud pepwicud pue pauiniau\n29 \u00a7EYS UM WeWeDeuEU Ie UOROTySuOD y\n\n\fOM\n\ntoemaczs of WO WHS 40 ALD Le EES earns | ph aoe cthier Le\n| _ SNdIWW'D HSINSS WIVO ASTIVA TWIidSdiill nt \u201caed \u2014\u2014 \u201cam dive ais iw am\n\na) ce ee\nSu eco a *\n6 id NVild SONIC veO =a Rens :\nBD wi it coi lc ae id oa J 40 wpRMRGaTe GHL WRGHA tReet Gea = \u2014\nasf rete ws | Mn ee Os PE Loa \\ on eae =\n\u2018 \u201cINI SUNYLTNSNOD SNMTANISN IT a qeocde Jo GGENIONS =o i\n\nsas] Sk CSAOddd\u00a5) ao] SAOKRa\n\nDisa\ni i \u2014\u2014\u2014= a =e ee ee = T\nOy 0s I\nPos SL fr rr eres SSS EE pos 3011\n= NEIYHG JVWHENIO. \u2014_ == == = -NIVHC IWHINS9 Se = oh a2)\n; \u2014\u2014 = = = 7 \u00a5\n3 = a 7 = = = ae = == \u2014 = \u201clt\na; - i ina Ue : = Hi aS So el a\nPore cll\n| \u2018 eee |\n. \u00a5 us \\. F5re al\n\\ Gra Aaa penne | ZoPe dl = SOR al SFA\n\\ nUINSTEy | f\n\\i Pores dl b : oo a ours di\n\\ Fare ar |\ncS rere di a mo\neee Bo } \\fpeere et\nBe \u00bb Sei\n; \\ |o\nBon Pore db Sr ti rr\nBr wave al a aR \u2018i\noa OO'Sr6 45 ~: | g |\n&, %, \\ Tae a fae al TORE alt =\n3 esr dt NOILVLSENS ears lat, 3 \\)] te\noO 4 a = E \u2018 j |\na oa6 al dIMLOATS ate | Ne\n\\ a casa Coe . 4 a x | Pia |)\nyore al ore ape d ,\nS Fore d = m |\noa \u2122 ac Ti ac |\n; ore 1 =I\n\u201d) b eo. { BBP hel\n5 2 A als Wolly lal\n: Fore al \u00a396 dl lac 25 Tet I\n\u00a9 oS |\nN | @ \\ PuPe el\nOo fe orb Sd \u2018 ore ra | | @ Pra] |\nB /Eore Sd o Leb \\ BinFe rill\noO | = Soro =a | i\nowe ah fe |\n\u201c (eon SS ay a ars |\no | EVE SA WF ee a iS. iy\nYn a lek | |\n\u00ae | Se 7 a iT] ms ti\nO Y Y | | TSHre ee\n2 i\n\n\fio-zn0829 cal vo \u201cWisaanl 40 ALD ae TON a on 33H oe, i\n\nse SNdWWO HSINAD WiVO ASTIVA TWidsdiNl avg Sag i iz Gp ee\n\n~ a)\n\n6t9| \u00a2 INANSAOHdNI CVOH kanes patel emameoeel | anen >\n\nDiscus TuOIae a0 HaSNIONa agus Te Ooeady | a NOISPSH | WuoTh Jakes cnet\n\u00a9\nou\n\n\u2018Pammbar aq Amen morsLAg] SULBEMIeTY \u00a2_ ANS a YL WoQeMpMO} \u2018Woe\nBUR 552008 a5 MRD GPs POR ages Smsoe 04 SHOWED Ipou Anessasen Faye Io aoe]\nSXTLDMS PSVENPSP FUE] LONER EIep & STIPN ET TEN PAE Ieond aepOTMOIE\n\nee ee PRESSE eK Oe emery in ere ee Movies E\n> ' costa mea i We ?S3.LON TWHINa9\n& 98 AW ETONA eh de> OL SLNHWHAOUdAT GVO\n\n\u2014- ] = O o\u2014 ae a 2 pr == . nee = i \"ie . y\noO JOM 144 \u2014 | dys. adpospuny ae 3 dis sdosspup] 1\u00a2Z ih\nSELL TTL AR LLL) | tele LULL LLL LLL belle eT\ni (4ubley se) 4s oao\u2018E\u00a2S g GQuYSieH co) 4S O00'SE\nre Se. OJd018 WVLlsaa 3 qd-901\u00a24 IIVLlaa\na\n-_ |\n\nTy) Tee ae\n\na | TT TTT WT TTT\n\n-BJW gyDocumen\n\nTT eels |\n\nnN =\n\u2014\u2014\u2014\u2014\u2014 Ss = Ts, _\u2014 = \u2014 \u2014\u2014\nis | See 4 9G \u2014\u2014 |) (\u2014Bulddiis may \\\nSs \u2014\u2014 \u2014 in \u2014 a = = _ \u2018salen \u2018Dg 10 _ebpy Bunsixy _\nee SS Se - = 1 :\ni ey a a\nOo / Burdduis ree \\ \\ Burddizs\no Bulysey \\ c \\\u2014 Bushey\n3 S ee | \\ LUBWSeADYy 2o ebpy Gulsicg -\n\u00b0 ed _._ Spe es\n\u00a9 OHS0d OTIS HAN OF \u00a9 CHStd GiidS dW OF jOSl=,. \u201831voS\n\n\fWHEDOSED av] FO THAI JO ALIS Ti Gas aAnewae [aera\nim ior ees g am\n\nae ON SSH\n\nSNdiWWw'o HS.N32 WLW ASTIWA TWwitSallll = ==\n\nHO}, Ld NW Td SdVOSCNV] escent eees\n\nF EaWerns a i\n: - @\nfk\")\n\nge SN a alee Se emi] ae |! An oe oe pets itr ) a \u2014\nGettds a0 seAlona\n\nar\neal AB CGSOHdc | apo] a SOB has \"8 | Err SOLES OWnce EON]\n\ne\n\nHs\n\nPa\n\nff\n\n\u2014\u2014 qe : 5 =H\ni . Sy s\n\n\u2014=ayo9 yxy\n\nes 8\nle |\nSell\nLittl\n\nava of aoa\n\ntas 4 -- 7 he\ntha = of\nPty fe\na 2\n\u2018Smet a\n\nSOH \u20183 \u2018D.eTRoW.\n\n2 |\n\n\u201c\nBij\nSpeke w Fog Pe eae ae\n=\n\n5\n\u2014\u2014\n\nPagelD.99\ni\n\nOM HE\u2014\n\nVNISVE\nNOLLNS134\n\n\u201cay aiataeee\u201d |\n\ni\n\nSSOP\n| TRS 0) SOILS STW poe \u2018ster adesepary\nIre wi Sorpoeee Sarma \u201cSores \u201cyp aegsTueySat\n\n| _ paw Suyeree \u2018cquenodan03 at poe ase womeTmn ayy 70\n| 3g 10 Ng \u201cSPHEIN [YS aMPAyTs BIOMED ear yy\n\ndujy5 asdnsspul] 4c? 7\n\n\u2014\n\n\u201cTT\u00a5VM SLSHONOD\n\ni hts Hae, PLCs\n\\ | (OM ue 7h 4 ,\n\n\\ Ny avoieciy\nyy irae\n\\ snlaw3\n\\\u2014aashv\n2 SS\nayn Ta\n\n(iblaH GE) 4s ooo'Ss\n\n30-9079 WWLay\n\nFiled 01/09/26\neeee ee naa\n\nHOTTA EEL P39 1\n\n\u201cED Fp 01 PaUIIQHS 2q [TeqS BEATE\nATE DOES Poe ade EPI] ead yD\nSTL AEM ATES O} PANE 2q [RYs swdespIT \u201cYG\n\nrom U8\n\nOM He\n\n~~~ 98 RYMHDIH SLVIS\n\ncA\n\n| (ss07 [ spEpOES\nanmeMMOgad VOFL Lore \u00a7 \u201cSeung > Spreparys aauemnarra\n\n* | po | Ed Worl 0c \u00a7 Pad Sumg peuaduyy yo AnD) suessesed\n| t SOuay \u201cAuuaye redodd apy Ion peys soe TATE PY\n\n|\n\ni\n\nom\n\n*\n\nae]\n\nwt\n\npat3e4 to pardn330 51 SoM aM eqFeTEA MOTTEpINOD Agu EET\nPRE EST \u201cUREYD @ OT PEDTEIGIEIN aq EYE FeamE pede 3=pury\n\nTY Teaoudde poe sauian \u00a9, A077 amp nog parmbal & OLA\nTL aaystsmos Dep donde aspary ysLgep PIE YEEH \u201cSpee\n\n\\ ( oT mmm)\n1 4 | fogooonoanno) loonooononog\n\nHao\nJOUOT00 DUUGUUL\n\nmg TXX\u00a2 HOVdVOSW VISaLl O9F\n\na Ee eT\n\nTey aay WoyrpaNs SMA puE AgTeey ew PANETT\nAqmedramed aq [fey Smdeagaey pasedord aqy, \u2018speuazem\nTony somenamen-mo] ToETEpO-yEnup 70 AEM pend\nISSO POE Pte PUE] 34, [TEE FMEA apis ANS PUR ITOTY \u201cGg\n\na\n\nLaaa2t aman\nWha Naa\n\n(OM\n\nSouednsag Jo eqeIG HIE} BO aTENEsT aB 02 LOTT\note Ait 2tp 01 pauTIgns 2q iM weypddne podmos qqrs y= jo\nros JO \u201cSta padeaspary Te m reeds papesspbagey\n\nPMOL (IM Pur jsodino apuiaeyM TEYS SMGeIspuE ayy, p\n\ndls SdVOSONV'] LOO G2\n\nmono noponononoy\n\nJUMW 009 SSAa\n\nWOE Wa WoOONA al FHSOr\n\nsqmeTodmns peyesmt AtEm ayy soy sumed wertaxepdar yt\nJOOP By TENE mmetads TOneSTON Te Fo eda \u201ceIaNTALITET\nTHEA POE STINE JOT PAAMOTTE 51 LOI STURM, PETIT\nAR SPITE TBISAE MONUSTN arp Fo WOMENS (eT OPT ET FT\n\u00a7) (SUN par Sinqap \u201cspasm Moy aay, woqIpIOD FIAp PAE\n\nSEW HIdvo YOMGGNSTHNA |SS\u00a5#9 STIHNAN Ole\n\nWNOSTHS SALWSONIHSS | Shilowa Thies | BF\n\naocaH | Aqnyeay er deg Por palesLn aq [eys seem padeospuey yy\n\nFHuyOOuOW Snou Tae MeN =\n\nToot EVs 9) SMG ete} ayn}\n\nPAE POg SPL DUT g WAT YIU ge Ag seare TEINS\n\nToo pareredes aq PUR Tee durgoed 01 weep AyEM\n\nSpA YIM TY CTENIOS [TRUS POE Fey f JO DOMED eprsoT\nTMI \u00a2 SAY [ETS SPAT pede Tsp yoy aura TT \u201cZ\n\nWAWSINSAY SWS INWla 480 NaS\n\nADYANS| |AYALIVE\n\ndijig edpaspuay] figz\n\nWOTMAHOORaT | \u00abABONWe SeMaL | &\n\nwy\n4\n4\nsi]\nPNELHACZNYNOY SMeyoWAS Wve Ngo * | (VePOOL ET #7 8) \u201cSsMRA ap 207 eno? apETE aplaord\n\n3 \u2014 \u2014\u2014s suo 01 PaIEIO] 0: aq TREY Ban pres \u201cseords Sugred \u00a2 Arata 20\nSRN TWOINVLOS SWWN NOWAOD | ogRAs \u2014_ = - - euessa papiwoad 30 [Teys \u201csuoneIgeds ry ied San Mores Cp aug.\n\nCase 3:26-cv-00128-JLS-BJW Document 1-7\n\nOQNSO3 71 SdVOSONY 1]\n\n\fFO-EDOSES mw) WSS JO _AlI Te: Sa ane ain SS\nhe |_ Sd WWD HSINSD VIVO ASTIVA WIHSdil BE a / ing Se Se = \"Ee mun\nBOW\u2019 Id NVId JdVOSCNV | saesseeee | oman moe = ? eS\n\u00a9 SHS Cateas Jo eGaNOn xd te Ga Se ee ee\nFt\nNIVHO WHLNso NIVHO TWHINSD AP ae ie, ml (\nOo \\\neS at Pg Is LOA ve eee |\nx = \u2014\u2014 All it\nDM UB \u2014\nBy}\ngnua4 ijg\u2014\u2014\" ,\na Nisvd \u2018| Sj ==\nOLLN3S134 5 ex eS\nAe) Sl BS\n2a We\u2014 a) em\nie) oF :\n=] wl |=\nduys \u00ae) So |e |\nadosspuo =e ; |\n4 a \u00e9 = 70) \u00e9 = | ji,\n\u2018 \u2014 a i \u2014\nha ere \"| ae E SY ||| |\nSl y bs o00'02S h Ma Esai |\niS 1UBI8H U Se - Alo}S BU \\ MN OSz - AA0EZ Ay a) ES ||!\nS E =\n\\ ee my = =e |\nOS YaLN3O VLVG - ee | acme 8 || | |\n5 Ves = DIdLoOs1S a evo, =\n5D \\o 2 +) 4 Se =\noO \\ tt m a -| =\u2014_ =\nO % : = oa\n> ds ls 28 E\n+> ad paspupq el ea 4 = | ly\noA : wsz \u2014) Jel Se, = |\n! t Sa i\n4 \u2018 *| =I, ;\n5 * 21\u00b0O\\2 Sq |i,\nOBi#=,, | | j2QF |\nios ) ale FE = Ih\n4 ajpg sauDIsiUud\u2014, = E =\n\u00a9 Gay Ca |\nCc q x Sh i\n\n\f0 7 Get) HS He eee Lee 2 9\n\nae\n\n4d Fo nT TO We EAL\n\nLee PU Bd \"So eae\n\n2\u00b090 UH MOLDS I) OM LE a ee De LT\n\nOa Lie\n\nef el 2) Se HS A ee ee\n\nUe A 0 0 Le dd\n\nBose eopes & a\n\nSME 2 gL al SL\n30 eee\n\nTet Boe te\n25 FHL i LAT Ze ie CR\n\neek CO SAS \u201cDO \u201ca a So\n4 Tee Ps Sc a i sed dO HL oe\n\n@ @ @\n\n\" Fe a tds\nFATT Hite GHL 4S AoIGEHal Md SHE cd Sheds ter Waa\n\nale\n\nCase 3:26-cv\n\ng\n3\n=\n\u2018\n\n\u00e9S aL | 9G a\n\nfe) tee 4m cote Shr ete one UAT Eade tes ere\n\nr= lth\n\nSeine | eo Wied) 40 ALI ge fey eo Hare aly a7 ere HAAR LTA Tele od Cet] Wel i poten nea Facial Pw ed mie ane 2 eu pat ease\nShao HSINSO VIVO ASTIVA Tyidadii v2 40 SLVLS \"IWRGeN| 40 ALNNOO SHL Ni VAY CALYNOdMOONINN tee] a Se\naS NY ONT CWES \u201cSPL Y SSL L SS LOVHL 40 NOUMOe \u00a5 SNIAa She |\nI Sa\nDiaais dVW ASAWNS WIV SLL ONW1 SASN camel! ste tS\noO Asiainl oogu\n2 ay 2) SnIPRBe SLi. eo.peM\neae Sane a =) fe) Gone weedy Sn) fee Tre ky 2 Sa ae) nate\nSehr eres a oak ie te) o il ur a ey | ok 28 >, :\n\u201cSOASASIS -LAYLINSNOD 3 = \u2014\u2014 i\n= Oki= Jb aa\nCure oe\ndog wg ere ree\noD \u2018MSSNIDNS SHSd0 ASO Sesh\no\n\u00a9\noO\n\u00a9\nN\n\u2014\no\noO\n\u2014\nod -\u2019\noO @E\u2014t Nel .\ni + ak\nO A a geo Hf. TEE oa aw La f\n3 oo SAOTTA AnGs ULrTe : te eid ; a\n= a eye oe un Speen go0=0\u00e92-\"90 May uf ee\nLL SO Feel 20 Kaeo a\nWAL 2D TAL Me\u201c\n500 A CCT La ET [f\nMN Spots as tL Het ee Se\nMN AC) TMC (CUSIOG TA SM Ad WAT Te\nrN siege, MMRES TRG an sacoas \u201cwlan\nSER. \u201cHist HRAGLGS Mi) Biv l Joe Led\noe 80 CEM SIGEISE ON a i EDT GC if)\n~ O (Bee Tires os be gts \u2018\nCc are one Ta Ay HT CEE [9 a\nOo nics rial in Ea == Web ler Waid eas ated deta 5) inseam Uy) iy hee SLUR. Aen bal aa wen linea\n- poe em Gd He te A fe) \u201ctage le get a\nE ae \u2014 = aS Si ee avers de tence we ab ata ip) \u201d . i. = CaS er aaeaea ne\na aaaies = Soom AM GLE Ff ee \u2014 LE ame Te Ae a [FS hw Pe) oes aera He) cL A0,00.286\nOP GENE es Sen He da LL) A a acl aa Of NOLS Jc ? ioe) Gore OF NOWSas Jo\n\u00a9 awrwa cage 9 \u2014\u2014\u2014te\u2014\u2014- poet eh. or te 5 ofl oN ; i +L AN\nQa ee od Swit \u2014 \u00a9 \u2014 6 Gs ee a be * \u00e9 | 5\nwm Ee ten EM yg cam veneer ie nena meu A . | .\n> BM sutuves ~ aa A arent Gare oh IY be Wann oy, CC) iM avn\nco\nry\nao\n1\nOy Be 2 aL A a a eek a Sine Wd | Td SOE BO LH TG \u201cns Wer haS 2.6 ed SA ars ae\nPS oe oe ed bd ee ed ote ce TOE pm ee a ae 2S) ir] Frets aeecdon tn) OPEN SEAT F\n\u00a9 od hoe Sed ia Siri iagi eae wits 198 iol Wild Eye ote) le HL od ot |) \u2018 a\nN eve ee radi pel Cis a all cola eH He ds eco ai |e eK hay ed ee ae @ | Hz\nAE Se RD VME ck SeeME Ld Seine peat as ower we @ | a=\nS 2 vo a me i Ee ie See Sica a ae inn at ala Sod LTRs | oe @ *a\n\n(EDOL 36,2008\nS\n\n\fWenhoeES a | 9 WHS ao ALIS Sait FO \u201cCELLINES ALyOo TT OMEN GG) GTTNA TeeaoM ca Cony cil a ipa = me eae Aa Haar gene sree ne one\nShido YaLNaD VLC AaTIVA Tvidadiil WO 40 SLVIS \u201cWHE 40 ALNNOD SAL Mi Way\u00a5 CSLYMOdHOONING \u2014\u2014 . 2 Seo artes lk gs Hd ae aan el a\nHO Nv NE We'S \u201cSel HSS 2 \"99 LOWHL 40 NOWLYOd \u00a5 SNIGE bent an an casas\nSS LON AS Auns VLIW 990-022-Wrr0 CNY S90-0\u00a2\u00a2-h0 \u2018650-0\u00a22-rr0 'SPO-0e0-Pr0 \u2018Se0-02z-7P0 SNd\u00a5 HOA | 2stsueuimsxo> onan 7\nQuays AVA ASABNS VUTV SLL ONVT SdSN\n\u00a9 AMOS Tey do AA Feed Pee fine ee ate LE tS LHI IL Jo 1g Seed leet A WAFER aces Local ime ae ete tid eel\noO [=o Se sot ap ater an py Be aa ear aba Hole ue pr Seeman toa ae a\nne PAB Sm NEES Hee ee are ees\n\nsn ea SEE eee eee t ss eps ap aegis ee, dt\nva oe SSE Se eae | Mea dn aii Pai eal ere ae ee a ere\n\n2 We atom an ee so ene i A Sea oS mans ak lo aa ala cero ol ae 1 SST SAT |\n\n= cinders A CL A J eG Tay BO Oy SENN, | ee TAT MAES Sagp OPEN! PUL AD eee Le OLB CQTEL WOT PT Lo SQL YB Seo SBM ue LR LL MMR th CRE RCC TL, RL SLI LL\na een 6) Us edo ea \u2018ate rub JO oe does ees ide Dene =H load FEST RL\n(ie Sf ea Oy WEL Tie a cL ov Ge Oe UA nee pia Uso et aT all \"Sever ot tbo Hi sa cabana aoiecreln SUM aD Ge one) Od\nAusCERT aS ROLLY SM A AMO SATS SM SH ee 2 NS Le Bea LA ae ea Sd a gauges) ee a jeer\nTints Taba SE med Sa Fea orm aie oh aM ne rs i\nom Se A GARSTANG yA rs a a oe Ena anti Se a oteeras oe nee) US Oe We een to ewe MMe TL isl ar ae rea abi! ait Sal SESS\nSRL SA EY CN TA ad A A SA AL Oa ES Oo ca STR Te ed banca ge ae aac \u00b0 ST ee aE oT\nSTRESS ADR OE ee * Ie eds Se ae\nSd GT Teed Epes eesti alee SAL JP llebesig) eegs HL \u201cro ICA paper rane Ge ee mu au sited lee ee ries\n[rindi Parting ara ot GRD len Bt Dy ee ee eee eT ten ot beens a ae\nDress] cereale \u201cTr od weaned os an ae soe | \u2018OLAACMLL asia sh cr Cah ve Se ey Tid RA Te pve OL\noe a)uL Y) LAA ae acre, ss ane LE SPL la RT ay enROeT Ot Ira\na7 ee TS YU es Se\nom, Biber Lr rt ics\nee ne ee au ee ee ie ee\nat\nwa ate A () AIG Boe wD PL\nHits date 3 ost saan od A os AHL Gh decd Be Lee oh eed be a\nAes Fp hme ARN PMN EM eT ete Ld coe Spy ra Sa a eae rea cee Sd ore i\ned The el arg) ie en, AOE Pa BD eh MAAS arn \u201cA\nALITA BPI seca lw ono am at man TSS sacs PMMA HMI engin ear.\n\nSpa se Ae uiiiee Gear * aaa: fugue ase fd wi Gere aN HS aL HAN ones 2 ean a eee Fe ee oe i\nEES Ee eee ee plea aes ramet\n\na\na\n. + SM Snr Des AME ASH} eee ye UW Gi aI aa a bagel dt fed\n2 4 A TR GO eee Me Gener ee em Ty eines edd 051M \u2018Lilac te ca ie ato sea eee\n\u00a5 ee an ae 2) Bie Ay PC aT\n4 sian eta gL TEE Te on\n7 Soy th Tek Srna eed Tu roe mr ace Sa eT VR kd EER ye Se er ee eee a ee ae ee eee eee soca] en LE ec \u201cSR arvom \u201cAM coe be SLTL eT ab Heit ay WI SiR CT SL\n-_ 0 eee |S LG ee a coy CRE A ER Ae Lire ef a ie LLL CERT HR ASO CECE A aC Td MAL ESOT TS. AAA SIL ee (aes ce] vier Sed\nhs Ter AGS TU Or] CARTe Gd SHESE RL Srl ne, Ao cae sors mee F Be eee abe SAWN Thu EO SSQREON Obey ok Be sea Gf BoA Se OF A oe ST RD Se A te ro ao RT Se\n7? Meee 2 ae 0 ee ee a Te) oe | ie ae Sota Tor SHEA aca ere i slate ak tm eer douee titr a fant\n57) Soe ee les aT eis] SL SCAT AROMATIC 4 OM SRALARLL Mae MAE \"Lane ST TTR, 9 | OH WN, rt Daa [iat ie] Sane aria ae SWE SU i\node Linon fA oe STL RE nd ke Mets nde SU a go 1 \u2018Peed 6 os BL own ome oT pe eT Ce ates Ee] ove A Lom Ler \u201cPiura LL a GGT Ma oer em\nae ae ' carbene tert faure ee] an amare prea ues ekocne 9 GEE de eae\n+O ee Erreur: eo Lorry MRE DAL 4 OM Se Pape ji'grn a ata sun aoa ak peg fo ween aa a Sant apes\nche am = a eee a: a ae sea ae\na CE id Shchetdielen Bata ach PL a ah Sree 2 yy \u2018OVIDis Tria a OPER eo oe Sa LL Je Deceeeas  Gainel mae eek oar Ua Od sieeieey comets et Rekeeeion ay aac\nbie ED MEAN SLL SAT od ee\nEe sea ws max PMN ren se TUTE Rees Ma Se Sete My rica 2 ada Erreriith) ket ole ie Chief: Halen hl etn\n5 WOLSES OG J Sr A Et Preu, MWS Oe ce R  f ig) ate-areansttt ial quail oe\nSe SCY ECAC SR CUT) ce Me \u201cRY SO TAH ee A Lg ec er ML YT TL Par ate PB ee eT gis ote Dy\nO emit ssa 2 eee od} eae Mul kdtidanee on ier SRT Ta RM, ML SIT I Ay YG AMA TR ane Sa \u201cSL Ly\noO ES Rove coos cece) CR TM TS, SY Tae ts wee SGD LL I eri ity SA | Tne Sore\nY epeee Pedy peek Sitar cutser tee ter Deuwe cere 4 ue) Ree SA ee ee Se oe \u201caie? es\nQ | ee Se Seiaa0 Sy COMO LSAT se 5 RE ret ea\nal a al ion A \u201c) Sear (hae sasees une) err Lm Le Te) ey ey SS = Die MM Boer AE\nat \u2018 En y Se at es Bees (Demure coker Fel) Sono go as ar ek MT A Been ay Cwm mr era AR \u201cle Sa A pe ae = Oe Sore eT\nZ \u201cay te is Sraad dl Praeas | paeeials Pe ora Lana a rote Tg AAPM PR La\nen Cr ane, a Arn MTS ere a A SS) TI 27 \u2018Aiki EMG ae\n~ see Uk Te \u201cWied ebidly a Saea, au. q sent \u00e9\ncrap Sean a crete Tmo os ome ay arenas Roa \u201cSY REST ere es mtd ov ep eh, IST LO An OR A) ke \u201cWhe \u201cead ube |\n5 2 % ered kl OLA cme wt Tie San te ek 1 oe eo DOOR RIE etd We CI TIL Oe Dd MS ec Ae ST\nmM! ie \u2018SCT Sh OAS ls LTO SSRIS on oe CR EE Ae OTE ead r AL\ni Mave\u00bb Sa! nT HER aca nc 2 et nF) gM BB a 8\nSra Me] hd Los aT ACHTHLAL vt tre mega err Be Cpe wedge operas ge DT Ae de ee A Lee Ae \u201cAMR MSM PS ed Smee ACS RL \u201cTs Lov a Ld LL CUS,\nsuse wae 5) 2 A Tre CTS SA LO AL DA OT LL Tadeo WAS EF a CE\n> f fat sony asta de 2a oer oe 4 GAL HN ETI as ale a ate Hee uk meee eb eos el ee ae \u201crisdint it aoe series: SAUL at Gobo aL At Ar asd \u201cC08 LT Ho oi Ges an HO eC\n1 DA A Rend soa (howe oe ee 9D apy ICG ee Ade ee Poa Gees am Un 46 EL Toa valnedtes Wenane y'sa ato aie cee oe ont BESTE a APL Ss\nre ee ee end capsdiie bees eRe tua ae nae) AT toe eee \u2018gmeac} er TR. i) aa aaah om wae a\nRS Se a}\n\u201cI as eT Deana of ee cn\u2019 Ss hk Oh i ore ba en se\na ees | onc bd Sool ae aa Or aot Bi Ad A oe dd oto Ma Si cence eo ie vig aioe iat i aed dan on ean a a doc a sual,\na Th Gore = eo 7 SU HOH a Soe a Soy 3 GA STG LO cd GP ee EEA OL BL Led OH ee das Os Le Se TL ee ee\nSCT So ev LH OCEITING: SLA kt ey TOR ALI ie OTT SM RATES T\nS GES SEA) Foe Ge SE) SPRL OT HL Se Led Terr ase Je ed de AME eter Re a mV cA a SP 6 Dew (Bie eR dese 3H ab Ses oe iva Gore ae Fee Sateen or ama a ceey Oat Ane LAT beers aM\n1 Goel Lal alee THY Cleary clos Tend: 2 Pee Ge 1 sea ea a ee ee ee ee SEH at EO\n> Jwos OF. iSsW NDA ce 2 YM BY ETE SE OME OFS) MO RY IL FST\n~ia of 1 (mee La MO A x\u201d ta\nhae al oa t z Seal Som CORT HL 3) DRA sui ova Od erm Ins es SL eee mene Cee Oi Ea AT \u201cTh a\nll \u201cwa Jag 7 Anca hr ugha Ea Ge ue ne oe and \u201cWL Reco Sa cong \u00a9 Gers! 4 eae FL al cpanel su\nSRT LL PEL , Sores LSMUn Gaia oo =\npepe pn a ep awe a pe ao ee oe re Lia aie) ab pie steal Cao cave) Ud or dekaoes aera: Vo nant mem Cae Fue\naL Ue ee rs neers we ATT oe De ee ome oe Ty Sm Om gen Ia] 7 CE ONO A I Te es\n= fet uanas eae taeda ane ner ac am oe ree waar ym ase a are Ee a\n\nAid Satie ie OLE, CLEA.\n\nlsat Sm\nSod a Sn LN re: Rowtlme dp Sede oe A fo ee olen Wee sere oo 00 eel Aas a Pd at\nGomer ceanon ai 28 I cera = # aria woo ag BE TE Lae mega Pat Ska a\n\nGU a Den LP alll ei it ey Tu\n\n2\nEe wae sds) eae 2 Ue Sed Mest-N oN cm epee ant Teo a aed ve coe WH Biv ant TS Ls A Ke a eH onan TRI AE\nHe Wl\n= ha ong EeorenG-i0er \u201cHamer Ce al ml) Looe Fem ea aT\noma WD \u201cere alen iPA Wa san ee eared ae iL caiecuen sonore FM a? EW Pe 2s a\nEy HATES SAT eit, Hate ty as DP raed an of pbs ak ap i ak rece ba he\ntae eee z=! a Gece @ a 2 FHL GL af Ue BeBe ee Ge a\na aoa A 6 SL eatty : :\nBade FL Lar owe rs Chesed ae mane EBs he aM] Sea THI ile an Slee 0 < ended eae ce\nML HDR Gere CRGHEOS LG TOE SAG ee BAe) US Ald WA SU Ge a ee ate ord \u201ca RO aes Pe er\neye ome ALOOD SUNY AME * NOTE, er OWS TY TERDENTUS SLL TERS COT, at FR om wel WI\nMH ee CACM ee ene Lead a Soda LO rt = Sie aaa ere 22 ues die eee ae\n\n\f= 7 o Bs = StaE tO \u00a2\nDy Go 3 zm\nyes serve cresersenursrrrsemaa se]\n\u00ae \u201cDAL SLAY LTNSNOD SMESaNSNS 31\nTSH\n\n\fS IW1S0 NOILONYLSNOO\n\nDAL SLAW LTSNOS SNM 21\n\nLiRmODeET il Wo \u201cWIMSdA 40 Alo LW DHE Ee PHHAHSAae | SEaE PS aso eit On 23'S\" oo aoe eniaaie: ig\nmel SOANVO USNS VIVO ASTIVA TWISdil en \u2018ug 2 sy hat ai i a:\nete ween a i \u2018,\na9 sa \u00ae\nSUMED ye Oe ee WA | 430 S0BbGerrs FHI 0a) Gees Sle *. s\n\nSee es |e ee i ike -\n\nCModge JO waMon\n\nThA GAOeday] aia] ae SwShae\n\nPagelD.104\n\nRe oS KS\n\n\u00a9 Tae ae : Tate aa aa aca ae was See ae\nOo MSG TTS BA iE SWRLSO S\u00a5DOTT L5YHL THIS? NOLPHRIGM A SPSSSh INRA Sai UGG NGUPTTEN ales AERA\n\n4, &\nco\n5 ian a Tit Mi TERS ASG iE Bree ae tals a oe Sve nee ea) a ee sm a Ur\noO af\n= a\na\nOo |\nLL\n\nya =]\nepee =r\nsae | a ea\neo] a\nrs = =a\nSpr 7\nsee [oe co\nLone ay en\n= = \u00abCream\nTe\naa os as Eh 2d\nBet] oe\naa - a a5 Oh wl\nae 2\n=a r\na =\na7 =\njan ts\nTe ae =\nas =a\nCae ~_ =\nsr a ero\n= i\n= = aes\n- +\n= cow [Gece\na \u201car\n\u201cae | mm] Ta\nMs ee) eee | a |e\nae\n\nSavioa'Ge Os ia Wi a GH Fed os\n\naL\nSG IGHVPAR MIRAI! YAMS \u201cCMAN?\n\nWe\n\nCase 3:26-cv-00128}JLS-BJW Document 1-7\n\neS em oe\n\nWSO SSL SSeS ot\n\nee A dom 00 de som om ee RR Be\n\nWLI MR AGIS SOI Do\n\nes See Alm = eo oP ae\n\nHG AGL Gv aati Sot\n\n\fae] FO \u201cTSN! JO ALD EI Ree Te ene Ope\n\nTs Tae) ee GUA Tee Poe oo aH eu (ie\n4 eae in VAT gee fren are amen ar ee\n=a _SNidiWWO YSINAS \u00a5iVO ASTIVA TWH os aaa \u2018Mid a \u2018aura ua ie\nBeye J\nAIO nn 2 \u00ae\nWUD Jerry SEROUS rE AO DHDEGer SHI edn )) ewes tvs atte\nHe (odds 40. saab aN aH Tha GSAGHdd | ae] ae SAO hde Lem SOS cep eon\n3 AN Loe a ope [pete a\nBie ecraat scents sre cconean.cae blood sn ane See Sarasota eae or\nBia Ye ITC PEs es of mT 9 ae |e Ap SoREETS ay 7m. oy EAL, yea ap OPP My) A ee ao we \u2014\ncae \u201cLE EVI ad cys oj ge secant Se peep any, ky elie lef arm epee pope Fe eatin ei eter pn pepe nents or etka ee ame vec tennis Fe de eer n eect teen NE ee re amin tiaes eee mae\nroman! po ae ow FORAY CRAP a cc A res oe ete ee ee Say As a eed open, pe gp a, ay ay my ne my mee oy RPE ORY ATA WALA EL Tae ee ae Se et ap NEU St PRN In eR DUP pe] ae Mardy ci MINN YR Paw BASH HR) ALTE\noy pe seep poe ng. amare cae alizyeeeas ey iv i : 5\nb eon a aia, i me paptacal og jpepe ea pamip} saab) seo ary pede ew pam pnp acest praca peaplay ae poms Sa seve teen fs Rin em ol = 1 PRI PAL ASR EKA: PU eS NCR! RL USES ML CALLS GL\nPa mactpcmeocds une , eubtfoagtmenta si] dal Sp cama pA YRS YPM PE oy GU TE pT je agp jo ompane poppy ieee peuvent ay os ay yc) cy see pds Sp aN LTE Ty pe coco parma og poutis pur fexkeeg pe wg Ay ;\n1 su wera sh omen emer Senupiy gpaency me ye pe ge er ee epee poy Teen ee rari ee anand ee aes mene eee eeenen eed Fayees oy pep peed ope qe cee erp mormaces p rcice ideale in oe eee snaciin Famarhios\nSa pone mane mbes aed aces eee ct poe tba shies ony SER Re ee ee ee = Be en eet ae aes Ae ae ae ERTS NEARS MLM FO LL AS RAT\npa oe De jo Re ony TLE GR Py pie copped sendy oy A ONY BEDS a eee Ue oh entceh ecew net ee nee a eee gy my pooper oy fpampe jarscla mec epic ogpiae serpy pee je dks gr hres je PaO 0] RTPA GOT BLISGOEAG] wd MR, I) R/O) [a mG] Lp OPT\n2g [Pepe vig Re Shape adie amaogy ree oenanal eal pee mf un mca amy, edad yo mrp fy NAAT SL FTP PL SL Ye EA FE PTO OE aaa io ae aie, aba deal ura in ulhaie aber SESGET MST RRC #2\nCana ee RN UONEEN \u00bb . epeiantiandouiincian tenciisitooe Se eee sree ore aed Gee eo oe rey Ser eemaRting eeempene Cems bos beni ere poet > ma iesigaien a\n= Spee 99 TPs, 999 CG a i St tec San) peep a ried imc aye FER Gee EE, 1 iat\nRep cermers era oncaey a strewn ees Sarin ainaieaeaen te, fe ers see rm | So ecsnttucier haben mieeemeatich anion uit eee 6 ee a es neh eel a mmerics\nret eee rete arrirere a nminn poy Serre ereernl ii rwmmenta sae \u2018 peep ny paurabas rh epee \u2018permet ek wet ile on late ee a A papper\u2019 mOWpAr Pow wv Eric) ou a POY MAAR EAD yes MORAL) carve Burm cUr\nGc cmeeicg yee poyepapain omluno tmteta es a eee ee Le ee eee map 2s ppm emrcmuerdras ier, pe pape Caress wARsep Se Pea TPT] ATMA: ALS SSO PR SOT] \u2018aye pacose = nlicreap potsreiors ay owes fia pai anne gareeetg ar \u2018yynatiad S08 new BPO 09 foul ERIS. bof Maps me 0 ORERL MEN APEC! (eye TReEECR\n4 Se Seer rp en iT. See ee pounds 6 Ee eee tr ae oe oe See Pennine komen Sopa esters ap ees DR PR RPA ges pew stun ian) emo sank res seis inc eat\n= a 1 Gitaiog oy og 7] sige es wel eh ay eae ee gp apy oy fom tay inp Heap) paid umm) J | Hi 3\nae ag soe phi Fx SER ara ae fare ae oe ated amieae eit =a om com ope ee Types eco ayo Nope aE ERT Sb\nSteen pop amecce aes a Peete (Tae) od jog, amp og pep ep re on ay poy tp hd arson! altos TEAS rE ee eee rites teas Bepreu Sym oy ERA En GM SER BART\npeg RE ere gg PO Ppa] (PLAY ge ope pecans ar eres! =a = site\n\u2018oak peg SO) og [PE gM a MRED PoP og crm fa ep, sea a a a a ee EL, A Sa el a PSS I eee ee sapere ohguh escape\u2019 tes Seas hon Sars? Um oF Oa acre sree\nSe en eae meet oe eee ee ee ag TE efour Ep ay oy Sa TR PR FST oy Pe ly ay gin EE pe SFL ETL egg coum sent wees ae ped Rote CRS PORIELLNIN kau, USI Tea me] (RRS ICP LTE CO RRR 1p] RL BE\nir. 25 gE ote p. TPL soul plo pee io oy ae ee 0 eam a aa Me SAR HN Te en as Slane ass eee a SATE EN OE eg Cee Pee ay SD Be Oy pr uo Bump eee) pe Sum omemD: hae\nIE padiops om ope sua Page of ET 0 oe). a Py seymarn L a\nabe a rae -- hs) hope ee ee toch ee anes Bare Spee ey) Pe ay 2g a UI YY ER TF Aegan pip sii pil oa kp 27 2 Sees Bap peel ag pee epee Cee yy NOURI ENGo ad ELL\n~~ Sed abet anna Pe Pa AN es \u2018aac prep edie py gm, Reeypey og ey peeceais pew Repeny y serge po ee ecdon  quewe\na mary gue in seqopdiaro age poyes bey oy pep Roiel per i OER empempe py preceeded ey pyar pot ka poy Mcrae) pre ont poh. cy ks aa aay ba apy ered \u201cpies pods: femme aeyog appar\neanetiae mens area ope) pr ey By Sure Baas of hagucaoy om eon a) 5 ee aces ance mpeperenseaivat eas To dios FET po FRIY rove re oy ey ips eeprnialoea ng tars ef TPE LL oz oon Te math Gate ati tan ike nay -kakeairpus eerai vaca\nenti nt famed x Ay pial hy fr oomteoe poet) we dy pe te 3 [PER | ee ey Sie 2 a en pm ereoy Vag rare act ep cca. empha po nce poe Cee ay TS pe PE ces yp oy ofa ens peri: joe TTS\nPepa eye) Sey ify paral og) om ERY art mp re (on A ee laa ful pte oes ei arcs users etre eared on eames narahe in sie Genet aoe Bead rout Weal ont os ban oie sires proee aie pee oe\nperewuise: arenes \u201cep mow \u2018= ety rear sani aco) sae sega robe \u2018sumtacauciii ann eopimpints pearpeoge oP A SOLA Moe Ae ee . SEE SUS EHC SLR oR en LOD Lo\nets Saar 1 ah Sg te, om (ey pes Me men oy ama, po pts) pepe coe oat at \u201cLees 7 = ero = * (pola tg nj poaiad cnn ode cae yy Tapa GT ONLIGAL 8 ms \u201d me oe\nSr Ck Can APS EGULAEL ESO. | < aor eaien BUM Cotto Dou nied gee eal raen pots nga nee por rca peeebete ear tig eet Wasi See en or cranes\nFREE ERCP GL Ly ro Part: TW a ee Ha epee jogs te menses uk ga aS eck Ades =i ba\nees ome eke pias oe ee Pores my vwngame = Bituctaruicn a 4 ce cee ron penudaten birparrn: entiecana me aepreynmnpall men ay RaenTeeee eae Le Se a a ee pee a Se pe ee i Pe ee eel eet pee eae eed pation i ir\nate ee ee cee 7 My) yan: sappy PIR TYE \u00a7 ee, aay pq ey ey pe Aub ay ER Pop ay pats cen Ip carapace pcsamceay eR Pen) Gun\nLo pe Ta ee meray yaa pope FOIL A se 7a ray, Hemaanme UnIEDC wast ee i A. lnjes favialyies Dinara Fo WEI Subp aman ope alDageicee ae SCRE AED\nee ee re ee ees ppedigna aay pagmisss aw ay qeeye tcoeciiars ay peutronns owl qe mean oy ees ele gore, ep ee ed oy EP eget rupcasel dames,\npet a ee ied MAT MI\u00a5EL? ba 4 ee Be re gy \u201cpemeadegaap yma] al pe PY RN Po A EN, S| ALA SF ene pepelcees oy spams Se pes ser Ses Bu) penne vod Mammen vecloemeap foe RT UL 7 party\nao, pe EMPTY Pe ==] Te Sere 1g peel anne ey Sey eee peg yy eel te Fie Pe jo CO PL ep a a IOC a Pe\n5 yp yet ye en tena ee peed cpaneabn ap og dg ay om \u2018Se sr sum sr cee osm Po Ft eam a erent cena mE aan iiieceeirl\n\u00ab ape Ap ag de ermace ety my ep PER SE ony TERETE ong Ae PORT wy | ESTA i. Apu peed\nxR Sane Sateen gr ree eal oar a See ance dala aaa eg te ere ies a eal mgoyol soy oe pa Ee Pe oT Oot aT aes areca rare cy matin nae ful maser pie\nMm Se eee St ee ie eae oe cee ee oy perp ay (peer me ary fp et momar) caGpUSeT pe APR, oT Uy eT Sj pp sLUEA FMb=| Ace {OM 6 Ruan fae fae MCS Run Moms FNS a0 SALVE SE\nN \u2018capi pom fakes ao) poms tej kd mpm argnas \u201cedaeres Prorey ayes m is paeRS: pam ay pep Been pede Re PE YY Pe pe : ene\nhi ee Sepa eps RE a eT Sy PREabSp os pera pate adel: sous ye Woyrantion mbapaey Aes ify x ucpyamcbes agp mepiat y yp ae ae see ree eS ce ep ite ee ape et Thy YD SSeS Ong way mI MRD Ges WORRY\npaul pe py goes feeey tp, Wiggers tanks te nee woe Wem e Ss Am Maerker gio, ade oma fo Mroeemios \u2018Apeicm) fie dames Rump wp, ac emerald) cual jo ay Sere Gee ey) PORN ype ede EP aT ny So Ae TEN pe EL mG] PD POU CE PS\nWALLS Y apis samen ba Leng She) de dna) paw ended re acy comy oo eve Teanay PR argnan dear pr uoemaoule eog expt ow poymug mw ag pom eye mp cod Beppe Yona my ay cae Bry cena. 1 feta or ba ascompe  cdoye ple pegs pee ot) =aRm 1 amequectep \u201cegeD ES SA] PemUpE an (SHOOTS! Pe Wee Pow ame\nees Ro pce. pe Yer 2 hie a ey pop ol oP a po ee JO OE) ETRE NY SACLE gp ey ee se gee ewe Bo ope on peel age) Ba af ua ay ea\naa a dap) panpes samnets irene Speen po omy pond Hoearernion Bale en ee ee eee ee oes PAP ATOR Fn EER Tea TUNSLAD UCS RISES oS TLRS ROAR\n0) Py) Em PRLS RR AAR ps oT om doi epeteeds Boeewiie pee apie mp iy _dopeajliow Fore og, pa Pere ase 06: [RN RETIN UpTar> fo rpg eno, ania ie hee RR \u00a5\nSang |EpTay ARES occ! pom ty Puen eo ser bmmpesiftiios, pbicpe paatio) agi pe in. FEE Cpe ay ope ne ee TY eo pe ee] os om ue fs a, Paeel jo peda om fate Lemme ange ieciogaer mg 7a 20 Suefe fameot ag yn\ncee ea TINE FS Ty ee ET pe pean og pep eal gear hop om PEs i eps pc pp blero il fg Sasa apf mag Papen ee ay) oe eae ee a em icp ans GLC RaNeNG. iets peewee pewr ire purrd aroui=s\npe ae ey 1g EO] AO Tg ey el fo ae cm ean ag fp fi re ELC] FALE Ream) poe iach dl Que Hemi it ee se \u2018Pom Pith a reve Sniegret ieee ppp Pum Sear, ae Coe ETT CU mTOR gD Tae) AG my OAS Ay | U\nTid aap fos toes op oy pe ery odd ty eres poifiaiio 2 Pa a Ce a Sem so peg Ss aah eee Be epee doe Sees Te po a) ip] eee ey ROLF AW ORE AYO ST ee ee eRe EU SE IR AM] BE I EM I PRY\nFES a) EY TY TSE a cama jst Rigg ea popes ubuntu orgy pe frm af Pn ye oe aon (Eo fom Sa | ebil ces MD PE ig paeSs oy pa RUN oot Bape pieced trade Seon sue\nae ee eee eee ee aineeacp pen eee oy epee po ioe pty joo amy ep, Akh ary pe pyre (pam, eves ane seer eee heave 4 uerpmiace Dance ee fhe grt ay soa og 16 nase Hamp MRS ae wT PG SAD aN\nGas urteens: po yo, pee Hey poses meg a Meh ed midi ee os] emt \u201cpio Aelia jo pom :RENMRNE CP GR SAIN pay Ec vag) plea erp cco perme ee EE a UE oP pa \u2018m tan) rpicdipimlsy Ailes po Herp fy) og dine apiioge ay an Sen) OPEN FUN) eM aS Cee AED ap A] RASA io\nSOY ME EWS) FS cep ere ages 2 sere cep Je mie te pe tem ste peg tp tiie mcald h )ERPGIE: a SRST ge EO PENNS wp peemedes pm peaeemena Spe WeETRARW CREA UY TY re rt a ee, per ee See pe Oe pete bb te beeen es [ele os eres ee aE eT Eb\nery etpSSpU PRON Ley Ep Jo ES [| segs a orcas aA pee Sep ert ID Or Sa ape Aig 5 tes (reg GO eee nig ale eine ein Sa a Pee Jef pei eta ae piece eens epee \u00a9 eee eae\nfy Paemsop ee orgie compipromls omy ig pepOE orLmepE = aay oe ppm, pee a fp pee enfaat | oa | owe am rae pene ore oy Tear SMGTewa! i 4g fap Bou my ve peewee 3p Ryo Pe II hy pmanpmpeim ep p pambep omt gtmee, g|e med ptmed (yy) Pama 7]. eS oe ey\nme pepe pape afd oe on py, feo Agebop moj cay Lamy oon ak fos erpemcdaion aatpemed oxy poysmmbaion Peg FE eg oe ou peqeasbe pao Bey Seen ger 1 sapere ona ere a nee aay 2 ped Pm mpeiweic] | 'ffeeniplueiai, ppg Ser) eres og] Ad) fae oD LES! OR [OO] RD\nCOPA Ce Ry RT) PCH SY FON 2g PE No ee a Sune poe Ga ae Spek ssi gal peak en i foe SS cpr AAT Bi;goe a ud ar pa ae ee eee ay an eT, Ge ae 8) &] RS 6 eT Uy OR OP, yy\nNgeSesy beds pap yy a macpemS pYTaMyS GEPSLOROP: aay; sey opuiiqes pacers wane spel po pey ascibe ogy pe ay eee og, See at meee seg, 7T ay Roe oe oot ee ng Domed oun GPE\u201d per aercma poet\nBg pee aerps ogy pds geepe oad ty xp jkr Son ang eon at ete call omc 28,9) = pardons os rm 25 FRE BL Wad PUP SUSE ET 2 01 Pe A a, Sl EM AR EL ee RY SE\nPes pooper poscad Sinpey Eee) egy PU ey em one om ee ot aye ep eed pe \u2018pare oer a de PN ny re |SITE RP NP MITRE PN ENNIO = A at element seen fis retigtemtany: PE Ry oo Do oe Bo oo eS GORE Pe wh\nFay ree 1) INT a Tove ON NTA 6 Sse oe rein reece cae ere Sf sh Smee Ie Fan pr lel mi cd Zee PLY Heateascgaton Wahoo aah: ee ed gay pce pet apples ang pat ees epee\nmu peor aap Sa ay ky poe poy AGEL Op fg [ARRON Pan oy Aa OR PTO poy CN oe poe iy pum och a ea an snare! pur wary Wreke RINE nace GU a ee ee RS we\nPL ed arp crm gy EY FFT igs emp ale fo Se 7 ers MA ct\" pean pogges Srpcmp allo toy on TER pL rye came eSkancay pean ode scape ampere pA SORE \u201ca reece ae ee ee peas ety peeiel RARE] RAR RRC LAJOR OE CO i CBO RA \u201cALAN SCR ATT\npep og elds Se ne (yey ced cope oy peepereay oq Pap aru; 2] SpE [Ap py inion ew fry) eee apace pouass: pen ran| Uy morte pM Jo ee P|\u201c uy Bocees samme org Any pyres po PPE oe |e a ars, eo SCA ee ace SUT KORT ROPE IRS BCAA LER Au PA\nBas Wem mp 2g prea weep ead wep PTET] a] Se Pee Fo ee Eh a ee \u201cED Pee Uae gee aoepareoe oe adel uence en pepe ee pope oy ype onl orp rye py TaRoec PE sar A LA aR YN 2 SY AS) PE GP MTNA, ft aT And Sa mS fa AAR OS LN ES A MA Io] Ok pa eS |\nEO scpeney so apr SaTRLLR YPN, oy YSU pelo acy rato fo acy) ERGY om Jo ANE wot pi SF Ue PT IAT ANS \u201cLoe ee oy Reape peel se ower gees \"apes pera je ap TM, Spo fp PAN pS eye pens Bocas oy Lemon vw pam\na mapped jo menged) areas jo yelp oreo Pe ma a pa pg opmearay TMM Eg pm pp arm La \u201cese ay Meany Pe on te og fe Hep Ue oe ad dy poppe inapes 2ag o 3g Se Se ee ee Ti PR A RE po OED oe Ts Phy pea\nay oO we PRY og FRC ieeepeTU ea ep | | |S aa ] ing al ere ara ar a pe eg en oR oy) oo PES oy \u00a32 a RO Pe ee RU ee) a Se Pe SS UR\npores PAI oo ag elo we Ee) rua Yea en aT ae easy oy Rees (yoy) ky see poy pe eg pe oll op cuy ETyET Aang, J mR LAN] RETO Pe gm LT LIT PY I I pe CD\nsua aq st sorry oes punci\u00ae horace anand pom afc se oy me gy Ee eee pape ee npg reliras aarp ApEn Supa oe ACRE CU RR A ROR we ped UE\nQSprs# pos a pombe qi med ya ee gore per eho dee ee gee ge. ete popvciel og pom wanes pathy) | poy Aat> ot dy ponder page epitaep ag pRinigge png oy pea elena amp ban et ac a me oom Sen Burpee yy RE Pom sora em pT COTN ayy oy BRUNE poe pT\nep Mone dprprderpe tia locorigzues ry inurl Che pln dopeme Se remy ope gw paced ag. fpmpe iia! ucooimlis 3g Fr ng egy om cp ay ye my pe eure PRY SP TERY Oe \"LOE ae ee data uti oe fn \" app \"ees RINGS ONPOMTESONT FE\nve ala Fe parecormn 34, Aan aaepurrs Pe a a amy py Fee og ew MIC Liste) Li mpegs AA ST meme: ype pe a SECON FE |RME mUP ay PP CMR ae) emg pee manakis or gp aperre; cje pepe Ares my rye\nTet es ee Se ante t et geet able Me pee Saar Aa Fy sesame peat [el epee\u2019 ted te le ep ay] Je] | a oy) ep emp os oe ep rp enemas Lp BU OL Hate Pam ene ALS\nCy ae aa eee FANE 25 fy pepdaie oq, TR TS. CD GI -PPS  [erbo pepe nA TEAL: ee ae (POP! ey Re ROY TY SRR oa a EES > Sains ah pier JO Dee elle a Ay ae Pe eee pS ep Spo) ae, Pa) SUC aR] UCT my\nfeta: ee eee Sr ee oe le ee ee ees ohn = SD YAY i esa mea Jo eal Og Leg nian Sm ipl ight ay fr SOP BE, Sa OGLE WO RS I\nom 2 ee Pa ay EE ag | evo; ETE = {pC PE ore Aon: map ny [Tin pie op santos peal oi; pais Palaver pet ey Feed jot omen oy pence jo ope Oye ay a Pm peo ODE \"FEN UOgNG]EMp UOPEENS ALE EAL TES USSG mem TE Beato\naye dae ap kn armen Sa Poe Sen Se ree eee eet seer 5 ine pi tn em Ptr al op fe tsrpm Jo ag AN | Se aaat croncl ce Fae Sean ee ae LOE OUR Men | IDO, oe ee\nWHE oy colmmitiofies iti peyiapairs \u2018eda \u201ceperdencis \u2018tinal = a Une apies AR SY AY A TR. SEN] PEPLT] A GACT) \u201cRTPI. LTS a elites joo Eas OS ey SE OD Ll ROL aes Le\nRES IT SS pean Pees et ee es eee er siseegjenia \u00a34 poyeantin Wqpofg Hy mee opi ppm og pptiye \u2018mime Spe dane espe ea ow Pan elec et aoe Sea aap pita ae paces\nnob PTA LENE ot jet fen ze uyymAsercn ep Feo ep ar om pr op poppy. \u00a9 ordey po ps a oily Apemap popsmuunn sistas eantdlepe pascd pee co shen: pe rag: pte patemy) TtW, en tapers pm 2g pep geese ome panels epum pooumoess pompraory SUR nae) MEO RAG CUM Rey REIS\nSectise perso a evn oyna yf scp np jo ua Sed epee mm a rad tg ey op [fy PEARRAL Wanye Busmiefecs ou fea Paes en aie gmp add ope ay en. ee aoe oy ay ae ae jem pel strain] apr pe Com Fay Rapoys Seay ep UE PR Ty Teer ous Fangoey qo Bue Tey\npy ey Fy par reer pe Gp ep oy pie om ssa) ay a] Las aT pum cL eo ups pana) neg alain TD REE van renege adel Af) PUTTY | OG PEP od oe A ce Ps ee eb pee ped Ren emp im peep ue Mop ome on ao UR Meet! re ered peo Ame eg Jy Apert secur\nFp ASeg |e KLE oD TY EPI |] ARTES a7 pee ojos peeks pe ch), pedo feo pope pe gee ay jo ueoeruenas op oy cuca pe Ae ye PE 2 SRS YE ei ay) oo em BaD RMON IFS EHOONGS SL TL\nSNP ian trey MSU PA PLETE pense Ay i bet Nets Se eee Weis pciezow [ap pope! emery pon ere Seiplinc it pamlans span Beverguimpins pn cy imnens Soaoemh nse\n(pepe sunbope pot ean, quand prom Posten oe day Zh )-3 Mace po Am gr EA oop ogee my ue pep achd ogee sec po ype tel op tee oy oy pe eT oakyy (ie ian ese pe, at amp cee ay a fuga mn ogee 1 Pema OY ney ey oe\ncalip orpowses aqea; [een ct Aeoaer ipa equ a eae ate ee eens ee ate roe ot Sere armies Lay Bl Mermagecs diep jhe an oped \u2018papell ert ng 4 Arse Ceaey poten es Beppe tees kan ot preteens oval NT Ee Tape OA RL IOS (ny RU Oe) A PSUR! Ue\npinay bopeaccy y payny (arpa |) tama, neers om etaytaataty ayo ed poy po) pe pod py op mecprmgmeds Cy. bow) epmmampy plat Meta | any Gey uectineny\u2019 rr thatasnyace were pom oak Coye.9) pT PLA mp Ramm Pe ny A rem eng, petty, uanpecleyy m o RNG  T\nx\u20ac}jerna: [rs curmnsezes See AS By Se ES Ye ESE a ea UR ESI SPECE Tits ap go +? Sey clams pee ee oll mee ep Rep oe EE apap ee ae a ae es Sey oe panne einery: iy Somme Bune 5 jo eMenTPR a DRE 2 Winkie pas Linordem. en\n\u00a5i 7\ni\u201c\nas \u00a5\n\naa ane ee 1 mains + WR MeS Gn TM Wee \"HORERIVE =\n\n","ocr_status":1,"date_upload":"2026-01-10T23:38:29.750156-08:00","document_number":"1","attachment_number":7,"pacer_doc_id":"037022111076","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 6","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739421/","id":464739421,"tags":[],"absolute_url":"/docket/72127384/1/8/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.350490-08:00","date_modified":"2026-01-10T23:57:52.599519-08:00","sha1":"","page_count":3,"file_size":225937,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":8,"pacer_doc_id":"037022111077","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 7","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739422/","id":464739422,"tags":[],"absolute_url":"/docket/72127384/1/9/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.369412-08:00","date_modified":"2026-01-10T23:57:52.610076-08:00","sha1":"","page_count":2,"file_size":126868,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":9,"pacer_doc_id":"037022111078","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 8","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739423/","id":464739423,"tags":[],"absolute_url":"/docket/72127384/1/10/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.387411-08:00","date_modified":"2026-01-10T23:57:52.621194-08:00","sha1":"","page_count":3,"file_size":142797,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":10,"pacer_doc_id":"037022111079","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 9","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739424/","id":464739424,"tags":[],"absolute_url":"/docket/72127384/1/11/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.404863-08:00","date_modified":"2026-01-10T23:57:52.632915-08:00","sha1":"","page_count":3,"file_size":210345,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":11,"pacer_doc_id":"037022111080","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 10","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739425/","id":464739425,"tags":[],"absolute_url":"/docket/72127384/1/12/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.423902-08:00","date_modified":"2026-01-10T23:57:52.645323-08:00","sha1":"","page_count":35,"file_size":291197,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":12,"pacer_doc_id":"037022111081","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 11","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739426/","id":464739426,"tags":[],"absolute_url":"/docket/72127384/1/13/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.444212-08:00","date_modified":"2026-01-10T23:57:52.656036-08:00","sha1":"","page_count":2,"file_size":126532,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":13,"pacer_doc_id":"037022111082","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 12","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739427/","id":464739427,"tags":[],"absolute_url":"/docket/72127384/1/14/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.461895-08:00","date_modified":"2026-01-10T23:57:52.680405-08:00","sha1":"","page_count":2,"file_size":129785,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":14,"pacer_doc_id":"037022111083","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 13","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739428/","id":464739428,"tags":[],"absolute_url":"/docket/72127384/1/15/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.479780-08:00","date_modified":"2026-01-10T23:57:52.690972-08:00","sha1":"","page_count":5,"file_size":142685,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":15,"pacer_doc_id":"037022111084","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 14","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739429/","id":464739429,"tags":[],"absolute_url":"/docket/72127384/1/16/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.497066-08:00","date_modified":"2026-01-10T23:57:52.701100-08:00","sha1":"","page_count":7,"file_size":92341,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":16,"pacer_doc_id":"037022111085","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 15","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739430/","id":464739430,"tags":[],"absolute_url":"/docket/72127384/1/17/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.515407-08:00","date_modified":"2026-01-10T23:57:52.711171-08:00","sha1":"","page_count":2,"file_size":110790,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":17,"pacer_doc_id":"037022111086","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 16","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739431/","id":464739431,"tags":[],"absolute_url":"/docket/72127384/1/18/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.571764-08:00","date_modified":"2026-01-10T23:57:52.724970-08:00","sha1":"","page_count":3,"file_size":228172,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":18,"pacer_doc_id":"037022111087","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 17","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739432/","id":464739432,"tags":[],"absolute_url":"/docket/72127384/1/19/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.589567-08:00","date_modified":"2026-01-10T23:57:52.735157-08:00","sha1":"","page_count":3,"file_size":119799,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":19,"pacer_doc_id":"037022111088","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 18","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739433/","id":464739433,"tags":[],"absolute_url":"/docket/72127384/1/20/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.608202-08:00","date_modified":"2026-01-10T23:57:52.745226-08:00","sha1":"","page_count":4,"file_size":933595,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":20,"pacer_doc_id":"037022111089","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 19","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739434/","id":464739434,"tags":[],"absolute_url":"/docket/72127384/1/21/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.627489-08:00","date_modified":"2026-01-10T23:57:52.755410-08:00","sha1":"","page_count":2,"file_size":218119,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":21,"pacer_doc_id":"037022111090","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 20","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739435/","id":464739435,"tags":[],"absolute_url":"/docket/72127384/1/22/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.645174-08:00","date_modified":"2026-01-10T23:57:52.765464-08:00","sha1":"","page_count":2,"file_size":168484,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":22,"pacer_doc_id":"037022111091","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 21","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739436/","id":464739436,"tags":[],"absolute_url":"/docket/72127384/1/23/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.663521-08:00","date_modified":"2026-01-10T23:57:52.775340-08:00","sha1":"","page_count":3,"file_size":201148,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":23,"pacer_doc_id":"037022111092","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 22","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739437/","id":464739437,"tags":[],"absolute_url":"/docket/72127384/1/24/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.681400-08:00","date_modified":"2026-01-10T23:57:52.785449-08:00","sha1":"","page_count":2,"file_size":143535,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":24,"pacer_doc_id":"037022111093","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 23","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739438/","id":464739438,"tags":[],"absolute_url":"/docket/72127384/1/25/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.699185-08:00","date_modified":"2026-01-10T23:57:52.815936-08:00","sha1":"","page_count":3,"file_size":266457,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":25,"pacer_doc_id":"037022111094","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 24","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739439/","id":464739439,"tags":[],"absolute_url":"/docket/72127384/1/26/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.717538-08:00","date_modified":"2026-01-10T23:57:52.834083-08:00","sha1":"","page_count":2,"file_size":135782,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":26,"pacer_doc_id":"037022111095","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 25","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739440/","id":464739440,"tags":[],"absolute_url":"/docket/72127384/1/27/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.735849-08:00","date_modified":"2026-01-10T23:57:52.847728-08:00","sha1":"","page_count":2,"file_size":106888,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":27,"pacer_doc_id":"037022111096","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 26","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739441/","id":464739441,"tags":[],"absolute_url":"/docket/72127384/1/28/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.753792-08:00","date_modified":"2026-01-10T23:57:52.858533-08:00","sha1":"","page_count":3,"file_size":191707,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":28,"pacer_doc_id":"037022111097","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 27","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739442/","id":464739442,"tags":[],"absolute_url":"/docket/72127384/1/29/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.771850-08:00","date_modified":"2026-01-10T23:57:52.869478-08:00","sha1":"","page_count":2,"file_size":154825,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":29,"pacer_doc_id":"037022111098","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 28","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739443/","id":464739443,"tags":[],"absolute_url":"/docket/72127384/1/30/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.790663-08:00","date_modified":"2026-01-10T23:57:52.880363-08:00","sha1":"","page_count":2,"file_size":125395,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":30,"pacer_doc_id":"037022111099","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 29","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739444/","id":464739444,"tags":[],"absolute_url":"/docket/72127384/1/31/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.809417-08:00","date_modified":"2026-01-10T23:57:52.892250-08:00","sha1":"","page_count":2,"file_size":117807,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":31,"pacer_doc_id":"037022111100","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 30","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739445/","id":464739445,"tags":[],"absolute_url":"/docket/72127384/1/32/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.827639-08:00","date_modified":"2026-01-10T23:57:52.902448-08:00","sha1":"","page_count":2,"file_size":138691,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":32,"pacer_doc_id":"037022111101","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 31","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739446/","id":464739446,"tags":[],"absolute_url":"/docket/72127384/1/33/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.844902-08:00","date_modified":"2026-01-10T23:57:52.930403-08:00","sha1":"","page_count":2,"file_size":133153,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":33,"pacer_doc_id":"037022111102","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 32","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739447/","id":464739447,"tags":[],"absolute_url":"/docket/72127384/1/34/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.863341-08:00","date_modified":"2026-01-10T23:57:52.977211-08:00","sha1":"","page_count":2,"file_size":119340,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":34,"pacer_doc_id":"037022111103","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 33","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739448/","id":464739448,"tags":[],"absolute_url":"/docket/72127384/1/35/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.882709-08:00","date_modified":"2026-01-10T23:57:53.012097-08:00","sha1":"","page_count":2,"file_size":119835,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":35,"pacer_doc_id":"037022111104","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 34","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739449/","id":464739449,"tags":[],"absolute_url":"/docket/72127384/1/36/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.901182-08:00","date_modified":"2026-01-10T23:57:53.022955-08:00","sha1":"","page_count":2,"file_size":138815,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":36,"pacer_doc_id":"037022111105","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 35","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739450/","id":464739450,"tags":[],"absolute_url":"/docket/72127384/1/37/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.918580-08:00","date_modified":"2026-01-10T23:57:53.035104-08:00","sha1":"","page_count":2,"file_size":107841,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":37,"pacer_doc_id":"037022111106","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 36","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739451/","id":464739451,"tags":[],"absolute_url":"/docket/72127384/1/38/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.937713-08:00","date_modified":"2026-01-10T23:57:53.046045-08:00","sha1":"","page_count":3,"file_size":209147,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":38,"pacer_doc_id":"037022111107","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 37","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739452/","id":464739452,"tags":[],"absolute_url":"/docket/72127384/1/39/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.971889-08:00","date_modified":"2026-01-10T23:57:53.058598-08:00","sha1":"","page_count":7,"file_size":215302,"filepath_local":null,"filepath_ia":"","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"","ocr_status":null,"date_upload":null,"document_number":"1","attachment_number":39,"pacer_doc_id":"037022111108","is_available":false,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 38","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739453/","id":464739453,"tags":[],"absolute_url":"/docket/72127384/1/40/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:11.993519-08:00","date_modified":"2026-01-14T02:35:29.643862-08:00","sha1":"4c912edbf2c57a9c16ecb37ce94daa5930ae6cb4","page_count":4,"file_size":268934,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.40.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.40.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-40   Filed 01/09/26   PageID.227   Page 1\n                                     of 4\n\n\n\n\n               EXHIBIT 39\n          Email from IID Rejecting\n          Wholesale Market Proposal\n                 (10-14-25)\n\f           Case\n10/14/25, 10:00 AM3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail             1-40\n                                                   - Proposal for         Filed\n                                                                  Temporary Supply01/09/26        PageID.228\n                                                                                   of Load from CAISO Wholesale Market Page 2\n                                                                   of 4\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Asbury, Jamie <jlasbury@iid.com>                                                           Tue, Oct 14, 2025 at 9:05 AM\n  To: Sebastian Rucci <sebastian@ruccilaw.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"wstrumpfer@gmail.com\" <wstrumpfer@gmail.com>\n\n\n    Dear Mr. Rucci:\n    Thank you for your recent energy service option proposal for the Imperial Valley\n    Computer Manufacturing, LLC data center project (Project). IID appreciates your\n    efforts to advance this initiative. However, the proposed service plan does not\n    comply with the IID Open Access Transmission Tariff (OATT). The IID OATT aligns\n    with the Federal Energy Regulatory Commission (FERC) regulations, specifically\n    Order No. 888, issued in 1996, which mandate non-discriminatory access to\n    transmission systems and standardized interconnection processes to ensure grid\n    reliability and fairness. These rules govern all interconnections to IID\u2019s transmission\n    system, including IID-owned facilities. The OATT ensures equitable treatment for all\n    interconnection requests, and IID is obligated to adhere to this standardized process\n    without exception.\n    The OATT requires project developers to secure sufficient transmission capacity to\n    serve wholesale loads within IID\u2019s network transmission system. Your reference to\n    Network Integration Transmission Service, Section 30.6, appears to be a\n    misinterpretation, as the OATT mandates arranging necessary transmission capacity\n    for your Project from a generation source to the load. Currently, over 3,000 MW of\n    transmission service reservations have been submitted and are being analyzed by\n    the IID, primarily for battery energy storage systems. These reservation requests are\n    in queue for access to the California Independent System Operator (ISO) system at\n    two separate inter-tie points with the IID. Most of these reservations are tied to\n    projects with executed generator interconnection agreements and approved\n    environmental entitlements. Short-term transmission service is available through\n    IID\u2019s Open Access Same-time Information System (OASIS) on a daily or weekly\n    basis, subject to securing capacities through a \u201cfirst come-first serve\u201d process.\n    It is critical to distinguish between wholesale and retail services in this context.\n    Wholesale services, governed by the OATT and FERC regulations, involve the\n    transmission of energy across IID\u2019s system to serve large-scale loads, such as your\n    data center, typically delivery of energy to other utilities or entities. These services\n    require adherence to standardized interconnection and transmission reservation\n    processes to ensure non-discriminatory access to the grid. In contrast, retail services\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094   1/3\n\f           Case\n10/14/25, 10:00 AM3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail             1-40\n                                                   - Proposal for         Filed\n                                                                  Temporary Supply01/09/26        PageID.229\n                                                                                   of Load from CAISO Wholesale Market Page 3\n\n    involve the direct sale and delivery ofof energy\n                                              4\n                                                     to end-use customers, such as\n    residential or commercial consumers, and are managed under IID\u2019s retail tariffs,\n    which are separate from OATT requirements.\n    Your Project, as proposed, is a large-scale load seeking interconnection to IID\u2019s\n    transmission system, falls under wholesale services and must comply with OATT\n    protocols. IID is legally obligated to treat all wholesale interconnection requests\n    equitably, and we cannot circumvent these processes, as they are rooted in FERC\n    mandates and industry standards for maintaining grid stability. Any generation\n    impacting the Bulk Electric System must undergo rigorous studies to ensure grid\n    reliability, consistent with industry standards for which IID is accountable.\n    The feasibility study for your Project identifies available capacity at the proposed\n    point of interconnection to IID\u2019s transmission system, marking the initial step in the\n    interconnection process. However, upon review of your interconnection application,\n    we noted the omission of critical generator data. This omission constitutes a material\n    modification, requiring reanalysis that includes the 300MW of behind the meter\n    generation. This step is critical, as your proposed data center will interconnect to\n    IID\u2019s Bulk Electric System, a vital component of the western electric grid.\n    To proceed with your amended request, IID will require (at a minimum) the following:\n         1. An   updated interconnection application, including dynamic gas generation\n            models in GE PSLF format.\n         2. A transmission service application specifying the generating facility\u2019s point of\n            interconnection to the data center\u2019s load point of interconnection. This must be\n            submitted via IID\u2019s OASIS platform, which manages transmission service\n            requests in accordance with FERC orders. Upon submission, your request will\n            be assigned a queue position and reference number for study purposes.\n         3. Generation interconnection request queue information designating the\n            generation as a network resource serving your network load, accompanied by a\n            written letter from the generation project owner confirming the transmission\n            network configuration.\n         4. If a new generator interconnection application is required, the next study cycle\n            opens in January 2026.\n    Your Project\u2019s development involves multiple phases, including load and generation\n    planning. While environmental permitting is critical, securing transmission capacity\n    and energy access is equally essential. Should your Project necessitate upgrades to\n    IID\u2019s transmission network to serve a specific location, your organization is\n    responsible for the associated environmental permitting of those facilities.\n    IID supports your data center Project and is committed to facilitating the\n    interconnection process within the framework of FERC and OATT requirements.\n    Upon receipt of the requested information, we will diligently process your application\n    in accordance with OATT study timelines. For further assistance or to submit the\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094   2/3\n\f           Case\n10/14/25, 10:00 AM3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail             1-40\n                                                   - Proposal for         Filed\n                                                                  Temporary Supply01/09/26        PageID.230\n                                                                                   of Load from CAISO Wholesale Market Page 4\n                                             of 4\n    required materials, please contact Mrs. Lauren Olivo, Manager of Energy Business &\n    Regulatory Compliance Programs at (760) 482-3448 or lolivo@IID.com.\n    Best regards,\n\n\n\n\n                                Jamie L. Asbury\n                                General Manager\n                                IMPERIAL IRRIGATION DISTRICT\n                                333 E Barioni Blvd, Imperial CA 92251\n                                (760) 339-9477 | email: jlasbury@IID.com\n                                Mobile (760) 791-7471\n\n\n\n    The foregoing electronic message, together with any attachments thereto, is confidential and may be legally privileged against disclosure other than to the\n    intended recipient. It is intended solely for the addressee(s) and access to the message by anyone else is unauthorized. If you are not the intended recipient of\n    this electronic message, you are hereby notified that any dissemination, distribution, or any action taken or omitted to be taken in reliance on it is strictly\n    prohibited and may be unlawful. If you have received this electronic message in error, please delete and immediately notify the sender of this error.\n\n    From: Sebastian Rucci <sebastian@ruccilaw.com>\n    Sent: Thursday, October 2, 2025 10:32 AM\n    To: Asbury, Jamie <jlasbury@IID.com>\n    Cc: Smelser, Matthew H <mhsmelser@IID.com>; Rodriguez, Paul <prodriguez@IID.com>; Hamilton, Timothy L\n    <TLHamilton@IID.com>; Gutierrez, Noe R <NRGutierrez@IID.com>; Ambriz, Jose-Said <JAmbriz@IID.com>; Martinez,\n    Jesus <jamartinez@IID.com>; Garcia, Matthew <msgarcia@IID.com>; Sampedro, Daniel <dsampedro@IID.com>; Olivo,\n    Lauren <lolivo@IID.com>; Carl Stills <cestills@sbcglobal.net>; Tom DuBose <tom@dubosedesigngroup.com>\n    Subject: Proposal for Temporary Supply of Load from CAISO Wholesale Market\n\n\n\n\n     [CAUTION] This email originated from outside of the IID. Do not reply, click on any links or open any attachments\n     unless you trust the sender and know the content is safe.\n\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094                                  3/3\n\f","ocr_status":1,"date_upload":"2026-01-10T23:57:55.534948-08:00","document_number":"1","attachment_number":40,"pacer_doc_id":"037022111109","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 39","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739454/","id":464739454,"tags":[],"absolute_url":"/docket/72127384/1/41/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:12.022729-08:00","date_modified":"2026-01-14T02:35:43.993048-08:00","sha1":"65e4d7f53d34509e24014612ec92ff57761ccd47","page_count":2,"file_size":175371,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.41_1.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.41.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-41   Filed 01/09/26   PageID.231   Page 1\n                                     of 2\n\n\n\n\n               EXHIBIT 40\n         Email to Director Eugenio\n       and Cardenas seeking meeting\n                 (10-14-25)\n\f           Case\n10/14/25, 2:16 PM 3:26-cv-00128-JLS-BJW              Document\n                                                     Rucci Law Mail - 1-41    Filed\n                                                                      330 MW Data     01/09/26\n                                                                                  Center                 PageID.232\n                                                                                         Project in Imperial County     Page 2\n                                                                   of 2\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  330 MW Data Center Project in Imperial County\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                              Tue, Oct 14, 2025 at 11:32 AM\n  To: kseugenio@iid.com, aacardenas@iid.com\n  Cc: Tom DuBose <tom@dubosedesigngroup.com>, Carl Stills <cestills@sbcglobal.net>\n\n    Dear Directors Eugenio and Cardenas,\n\n    We would like to appear at a meeting of the board to discuss our $10 billion data center project (we also emailed Director\n    Dockstader for this request). We met with the IID after our last email to you, and we listened carefully to the IID\u2019s\n    concerns about risk and submitted a proposal specifically designed to address their concern (Email #1). Today, we\n    received a response from the IID rejecting our efforts (Email #2). We responded with an email seeking a meeting (Email\n    #3).\n\n    The email today states that we have misrepresented our application and must reapply (\u201cupon review of your\n    interconnection application, we noted the omission of critical generator data\u201d). This statement is made one year after we\n    engaged the IID for this project. One year ago, we provided a load injection analysis from Powers Engineer showing that\n    capacity exists for our load on the S-Line and R-Line. We have progressed through multiple studies from the IID, all of\n    which have confirmed that our large load did not impact the S-Line or the R-Line.\n\n    We have just been informed, one year after we started, that we must reapply because the same generators that have\n    been on our plans for over a year are at issue. The fact is that at no time were the backup generators tied to the grid; they\n    never have been and never will. Similarly, the onsite batteries are not exporting to the grid. We are simply a large load,\n    and that is how our applications have been submitted, received, processed, and approved by the IID. We are at a loss to\n    understand why backup generators, not tied to the grid, require a re-application to the IID, one year after multiple studies\n    have been processed.\n\n    We have submitted a proposal that allows IID to serve this load (Email #1). This proposal poses no risk to the IID and is\n    expected to generate at least $22 million in annual revenue. The proposed AI data center represents a $10 billion\n    investment in the Imperial Valley, offering substantial economic and technological benefits to the region. We're asking for\n    the opportunity to present to the IID board at an open meeting, allowing them to consider our proposal and the numerous\n    benefits it brings to the Valley and the IID.\n\n    Sincerely,\n\n    Sebastian\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n    [Quoted text hidden]\n\n\n     3 attachments\n          Email #3 Email to IID Seeking Meeting (10-14-25).pdf\n          142K\n          Email #1 Wholesale Market Proposal to IID (10-02-25).pdf\n          175K\n          Email #2 Email from IID Rejecting Proposal (10-14-25).pdf\n          228K\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r1351513092457241206&simpl=msg-a:r135151309245724\u2026   1/1\n\f","ocr_status":1,"date_upload":"2026-01-10T23:57:36.279256-08:00","document_number":"1","attachment_number":41,"pacer_doc_id":"037022111110","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 40","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739455/","id":464739455,"tags":[],"absolute_url":"/docket/72127384/1/42/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:12.040373-08:00","date_modified":"2026-01-14T02:35:22.006956-08:00","sha1":"fed781a16bead2ac47a73aebfc55ed03a92e88a0","page_count":20,"file_size":424718,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.42_2.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.42.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-42   Filed 01/09/26   PageID.233   Page 1\n                                    of 20\n\n\n\n\n                   EXHIBIT 41\n                Arbitration Statement\n                     (10-20-25)\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42      Filed 01/09/26     PageID.234      Page 2\n                                               of 20\n\n\n 1    Sebastian Rucci (SBN 178114)\n 2    LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n      16400 Pacific Coast Highway, Suite 212\n 3\n      Huntington Beach, CA 92649\n 4    Tel: (562) 901-0199\n 5    Cell: (330) 720-0398\n      Fax: (562) 249-6910\n 6\n      Sebastian@RucciLaw.com\n 7    Attorney for claimant IVCM\n 8\n 9\n10\n                    AMERICAN ARBITRATION ASSOCIATION\n11\n      Imperial Valley Computer Manufacturing, LLC )\n12                                                ) Case No.\n13                  Claimant,                     )\n            vs.                                   ) CLAIMANT\u2019S ARBITRATION\n14\n                                                  ) STATEMENT\n15    IMPERIAL IRRIGATION DISTRICT                )\n16    (General Manager, Jamie Asbury)             )\n                                                  )\n17\n                    Respondent.                   )\n18                                                )\n19\n                     IMPERIAL VALLEY COMPUTER MANUFACTURING LLC\n20\n                             ARBITRATION STATEMENT AGAINST\n21             IMPERIAL IRRIGATION DISTRICT (General Manager, Jamie Asbury)\n22\n             This arbitration is initiated under IID\u2019s Open Access Transmission Tariff \u00a7 12.2:\n23\n      \u201cExternal Arbitration Procedures: Any arbitration initiated under the Tariff shall be\n24\n      conducted before a single neutral arbitrator\u201d who \u201cshall conduct the arbitration in accordance\n25    with the Commercial Arbitration Rules of the American Arbitration Association.\u201d\n26\n27           COMES NOW Imperial Valley Computer Manufacturing, LLC (\u201cIVCM\u201d), for its\n28    statement of claims against the Imperial Irrigation District (\u201cIID\u201d) , states as follows:\n\n\n                                                 Page 1\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42       Filed 01/09/26     PageID.235       Page 3\n                                               of 20\n\n\n 1                 1 - INTRODUCTION TO IMPERIAL VALLEY 330 MW DATA CENTER\n 2           1.1     IID OVERVIEW: IID is a public power utility governed by a five-member Board\n 3    of Directors and headquartered in Imperial County, California. IID is the third largest public\n 4    power utility in California. IID operates the electric transmission system within its balancing\n      authority area. IID\u2019s system includes interstate transmission lines that operate within and\n 5\n      beyond its balancing authority area.\n 6\n 7\n             1.2     NATURE OF THE DISPUTE: This arbitration arises from IID\u2019s violations of\n 8    IVCM\u2019s rights under IID\u2019s governing rules and regulations. Specifically, IVCM alleges that\n 9    IID, through the actions and decisions of its General Manager, Jamie Asbury, has unlawfully\n10    interfered with IVCM\u2019s access to electric power transmission and operations services\n11    necessary for the development of IVCM\u2019s 330 MW AI Data Center in Imperial County,\n12    California. IID\u2019s conduct has directly and materially harmed IVCM\u2019s business operations and\n      the broader economic development interests of Imperial County. IID\u2019s refusal to provide or\n13\n      facilitate services for the 330 MW AI Data Center undermines regional economic\n14\n      development, violates IVCM\u2019s rights under IID\u2019s regulatory framework, and constitutes\n15\n      arbitrary and discriminatory conduct inconsistent with IID\u2019s obligations as a public utility.\n16\n17           1.3     THE 330MW AI DATA CENTER PROJECT : The 330 MW AI Data Center\n18    proposed by IVCM represents a transformative infrastructure project with long-term benefits\n19    to Imperial County and the State of California. The project entails a capital investment\n      approaching $10 billion, and is designed to establish Imperial County as a premier hub for\n20\n      artificial intelligence computing, digital infrastructure, and renewable energy integration. The\n21\n      Data Center is projected to generate millions in recurring tax revenues, create over 1,500\n22\n      construction jobs providing significant employment opportunities in the trades and\n23    supporting local economic recovery. Upon completion, the project will have 100 permanent\n24    employees across operations, technology, and maintenance functions, while indirectly\n25    supporting additional employment in logistics, hospitality, security, and technology services.\n26\n27           1.4     FISCAL IMPACT AND TAX REVENUE: The 330 MW AI Data Center will provide\n      a one-time sales tax benefit of $72.5 million, which will directly support county services and\n28\n      infrastructure. Annual real property taxes of $18.75 million, with an additional $10 million\n\n                                                  Page 2\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26    PageID.236      Page 4\n                                              of 20\n\n\n 1    in personal property taxes each year. These revenues will materially enhance funding for law\n 2    enforcement, municipal services, education, and other essential public programs. Through\n 3    the purchase of 330 MW of electric power from IID, the project will provide over $22\n 4    million in net annual revenue to IID. These funds will directly benefit IID\u2019s ratepayers and\n      contribute to grid modernization, transmission reliability, and community reinvestment.\n 5\n 6\n             1.5    SIGNIFICANCE FOR IID AND IMPERIAL COUNTY: The 330 MW Data Center will\n 7\n      be the largest data center by power capacity in California, positioning Imperial County as a\n 8    key hub for AI, and related technology. The Data Center will catalyze investment in clean\n 9    energy, advanced computing, and attract technology firms seeking low-latency connectivity,\n10    renewable power access, and data infrastructure clustering, thereby diversifying the region\u2019s\n11    tax base and fostering an ecosystem of innovation, education, and workforce development.\n12\n             1.6    JAMIE ASBURY\u2019S ACTIONS IMPACT ON IMPERIAL COUNTY: Imperial County has\n13\n      a population of approximately 179,091 residents, of which 82 percent identify as Hispanic\n14\n      and 23.3 percent live below the poverty level. Given the region\u2019s elevated unemployment and\n15\n      poverty rates, IID\u2019s General Manager, Jamie Asbury\u2019s obstruction of a $10 billion economic\n16    development project constitutes a substantial deprivation of opportunity and public benefit,\n17    particularly where such actions contravene IID\u2019s established rules and procedures.\n18\n19                 2 - POWER ENGINEERS INJECTION STUDY FOR DATA CENTER #1\n             2.1    LAND ACQUISITION: In early October 2024, IVCM secured control of\n20\n      approximately a dozen contiguous parcels of industrially zoned land in Imperial County,\n21\n      California. The parcels are situated adjacent to the IID\u2019s 230 kV S-line and 92 kV R-line,\n22\n      making them uniquely suitable for large-scale data-center development. The contiguous\n23    acreage allows for the construction of three individual, yet integrated, data centers\n24    comprising a unified campus.\n25\n26           2.2    CONSULTANTS HIRED: Following the acquisition, IVCM retained professional\n27    consultants -- including electrical, civil, and environmental engineers -- to initiate the\n      processes for land-use approval, reclaimed-water service, backup generation permitting,\n28\n      fiber-optic connectivity, and electrical-supply interconnection with IID.\n\n                                                 Page 3\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26     PageID.237      Page 5\n                                              of 20\n\n\n 1           2.3    INITIAL CONTACT WITH IID: On October 15, 2024, IVCM held its first meeting\n 2    with IID to discuss the proposed AI Data Center Campus project. During this meeting, IID\n 3    advised that applications for new loads exceeding 34.5 kV must be submitted with its\n 4    16-page form titled \u201cCustomer Project Application for Services of 34.5 kV and Above.\u201d\n\n 5\n             2.4    FOLLOW-UP MEETING WITH IID: On October 28, 2024, IID\u2019s transmission\n 6\n      planning engineers met with IVCM to discuss the technical parameters of the proposed\n 7\n      data-centers. Later that same day, IID emailed IVCM a Transmission Customer Service\n 8    Proposal, attaching the 16-page \u201cCustomer Project Application for Services of 34.5 kV and\n 9    Above.\u201d (See IID\u2019s published form: https://www.iid.com/power/new-construction)\n10\n11           2.5    ENGAGEMENT OF POWER ENGINEERS: IVCM engaged Power Engineers, a\n12    nationally recognized transmission-planning and electrical-engineering firm, to assist with\n      the electrical issues of the data-center project. Power Engineers recommended initiating a\n13\n      load-injection analysis to determine the available capacity of the 230 kV line under varying\n14\n      load conditions.\n15\n16           2.6    POWER ENGINEERS LOAD INJECTION STUDY: On November 15, 2024, IVCM\n17    authorized Power Engineers to feasibility study of the 230 kV S-Line. The scope of work\n18    included analyzing IID\u2019s transmission system\u2019s capacity to accommodate incremental\n19    data-center loads and to identify any operational or reliability constraints within IID\u2019s bulk\n      electric system.\n20\n21\n             2.7    LOAD-INJECTION STUDY FINDINGS: On December 4, 2024, Power Engineers\n22\n      transmitted to IVCM a memorandum entitled \u201cLoad Injection Analysis--IID 230 kV S-Line\n23    and 92 kV R-Line\u201d (attached hereto as EXHIBIT 1). The memorandum concluded:\n24       \u2022   Summer load capacity (230 kV S-Line): 557.8 MW\n25       \u2022   Winter load capacity (230 kV S-Line): 823.1 MW\n26       \u2022   Summer load capacity (92 kV R-Line): 108.3 MW\n27       \u2022   Winter load capacity (92 kV R-Line): 99.8 MW\n      These findings demonstrated that IID\u2019s existing transmission infrastructure possessed ample\n28\n      thermal and contingency capacity to accommodate the proposed IVCM Data Center load.\n\n                                                 Page 4\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26       PageID.238    Page 6\n                                              of 20\n\n\n 1\n 2\n 3\n 4\n 5\n 6\n                    3 - IID FEASIBILITY STUDY FOR 250 MW DATA CENTER #1\n 7\n             3.1    FEASIBILITY STUDY APPLICATION: On December 13, 2024, IVCM emailed IID\n 8    the Power Engineers Load Injection Memorandum. On January 17, 2025, IVCM submitted\n 9    an application to IID for a data center campus consisting of 250 MW, 150 MW, and 100 MW\n10    facilities on three contiguous lots. The submission included the following materials:\n11       \u2022   Power Engineers Load Injection Memo\n12       \u2022   IID Project Application for a system impact study on the 230 kV S-line\n         \u2022   One-Line Diagram, EPC Project Model, and DYD Composite Load Model\n13\n         \u2022   Project site plan, site location, and site control documentation\n14\n15\n             3.2    MEETING WITH IID. On January 28, 2025, IID\u2019s Transmission Planning,\n16    Resource Planning, Customer Operations, and Environmental Compliance departments met\n17    with IVCM to discuss the data center project. During the meeting, IID suggested conducting\n18    a sensitivity analysis (feasibility study) to evaluate the project\u2019s viability by considering\n19    various load scenarios on the 230 kV S-line to determine the maximum load that could be\n      supported without requiring transmission system upgrades.\n20\n21\n             3.3    SENSITIVITY ANALYSIS APPLICATION: On February 10, 2025, IID emailed\n22\n      IVCM a Sensitivity Analysis application, requesting IID to study 500, 250, 200, and 150 MW\n23    load scenarios on the 230 kV S-line. (attached as EXHIBIT 2). IID emailed a sensitivity\n24    study agreement to perform the study. IVCM asked for clarification on the references to the\n25    Generator Interconnection Process (GIP). On February 11, 2025, Lauren Olivo, replied that\n26    IID would remove all GIP references, clarified that the project does not fall under the GIP.\n27\n28\n\n\n                                                 Page 5\n\f     Case 3:26-cv-00128-JLS-BJW       Document 1-42      Filed 01/09/26     PageID.239     Page 7\n                                             of 20\n\n\n 1           3.4    SENSITIVITY STUDY AGREEMENT BY IID: On March 3, 2025, IID sent IVCM\n 2    a Feasibility Study Agreement for the sensitivity analysis. IVCM executed the agreement. On\n 3    March 11, 2025, IID emailed a fully executed Feasibility Study Agreement (EXHIBIT 3).\n 4\n             3.5    PAYMENT FOR STUDY: On March 4, 2025, IID provided a cost letter estimating\n 5\n      $50,000 for the feasibility study. IVCM approved the amount and requested wire\n 6\n      instructions. IID responded with an invoice and wiring details. On March 5, 2025, IVCM\n 7\n      emailed proof of a $50,000 wire transfer to IID\u2019s Chase Bank account.\n 8\n 9           3.6    IID FEASIBILITY STUDY RESULTS: On May 22, 2025, IID issued its Feasibility\n10    Study Report evaluating the 500, 250, 200, and 150 MW load cases on the 230 kV S-line\n11    (attached as EXHIBIT 4). The report provided detailed results for all requested load\n12    conditions and multiple generation/loading configurations. Key findings included:\n         \u2022   No thermal violations for the 150, 200, and 250 MW load scenarios.\n13\n         \u2022   No voltage exceedances or deviations observed at any buses under those scenarios.\n14\n15\n16\n17\n18\n19                 4 - IID SYSTEM IMPACT STUDY FOR 250 MW DATA CENTER #1\n20           4.1    MEETING TO DISCUSS FEASIBILITY STUDY RESULTS: On May 29, 2025, IID\n      Transmission Planning Engineers met with IVCM to review the findings of the previously\n21\n      completed Feasibility Study Report. Following the discussion, IVCM confirmed its intent to\n22\n      proceed with a System Impact Study (SIS) for a 250 MW data center interconnecting to the\n23    230 kV S-line at Aten Road (referred to as Data Center #1).\n24\n25           4.2    SYSTEM IMPACT STUDY AGREEMENT EXECUTION: On June 3, 2025, IID\n26    provided IVCM with a System Impact Study Agreement for the proposed 250 MW data\n27    center at the 230 kV S-line interconnection point. An executed copy of the agreement was\n      emailed back to IID the same day. Subsequently, on June 12, 2025, IID transmitted to IVCM\n28\n      an executed System Impact Study Agreement for Data Center #1 (attached as EXHIBIT 5).\n\n                                                Page 6\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26     PageID.240      Page 8\n                                              of 20\n\n\n 1           4.3     IID SYSTEM IMPACT STUDY REPORT BY IID: On July 25, 2025, IID issued its\n 2    System Impact Study Report for Data Center #1 (attached as EXHIBIT 6). The study\n 3    evaluated the 250 MW interconnection under a range of system conditions and contingencies.\n      The results demonstrated the following:\n 4\n         \u2022 No thermal violations were identified within IID\u2019s transmission system.\n 5       \u2022 Project did not cause any voltage exceedances or deviations at any monitored buses.\n 6       \u2022 No transient stability violations were observed under any simulated contingencies.\n 7       \u2022 The study concluded: \u201cStudy results show that this project can be deemed feasible.\u201d\n 8\n 9\n10\n11\n12\n                     5 - SYSTEM IMPACT STUDY FOR 80 MW DATA CENTER #2\n13\n             5.1    SUBMISSION OF SYSTEM IMPACT STUDY APPLICATION: On March 5, 2025,\n14    IVCM submitted a completed System Impact Study (SIS) application for an 80 MW data\n15    center located on Aten Road in Imperial County. The submission package included:\n16       \u2022 Power Engineers Load Injection Memo\n         \u2022 80 MW Data Center Application for the 92 kV R-line (attached as EXHIBIT 7)\n17\n         \u2022 One-Line Diagram, EPC project model, and DYD composite load model\n18\n         \u2022 Project site plan, site location, and site control documentation\n19\n20           5.2    AGREEMENT TO PROCEED AND STUDY COST: On April 10, 2025, IVCM and IID\n21    agreed to proceed directly with an 80 MW System Impact Study on the 92 kV R-line, without\n      conducting a preliminary sensitivity analysis. IID issued a cost letter estimating $50,000 for\n22\n      the study, which IVCM approved. Subsequently: On May 8, 2025, IID emailed an invoice\n23    for $50,000 for the study. On May 9, 2025, IVCM emailed proof that the $50,000 wire\n24    transfer had been successfully sent to IID\u2019s Chase Bank account.\n25\n            5.3    EXECUTION OF SYSTEM IMPACT STUDY AGREEMENT: On April 3, 2025, IID\n26\n      emailed IVCM a System Impact Study Agreement for the 80 MW data center. An executed\n27\n      copy was promptly returned by IVCM, and on April 15, 2025, IVCM emailed IID a fully\n28    executed System Impact Study Agreement for Data Center #2 (attached as EXHIBIT 8).\n\n\n                                                 Page 7\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26    PageID.241     Page 9\n                                              of 20\n\n\n 1           5.4    IID SYSTEM IMPACT STUDY RESULTS: On September 23, 2025, IID issued its\n 2    System Impact Study Report for Data Center #2, evaluating the 80 MW load interconnection\n 3    on the 92 kV R-line (attached as EXHIBIT 9). The study concluded that: \u201cThe Project can\n 4    be deemed feasible with some transmission infrastructure upgrades. The following upgrades\n      must be installed in the new IVCM substation: one static var device rated 75 MVAR,\n 5\n      configured in three switching blocks of 25 MVAR each, for reactive power support and\n 6\n      voltage stability.\u201d The reactive power equipment is to be done at the new IVCM substation.\n 7\n 8                    6 - IID FACILITY STUDY FOR 250 MW DATA CENTER #1\n 9           6.1    INITIATION OF FACILITY STUDY: On July 31, 2025, representatives from IID\n10    Transmission Planning and Resource Planning met with IVCM to discuss the status of the\n11    pending data center applications. Later that day, IID confirmed via email that:\n12\n             \u201cThe system impact study was approved and IID will proceed to perform the\n13\n             facility study for the 250 MW Imperial Data Center Campus #1. We estimate\n14\n             a time frame of 6 weeks to complete the study.\u201d\n15\n16    This communication formally initiated the Facility Study phase for Data Center #1, following\n17    the completion and approval of the System Impact Study.\n18\n19\n20\n             6.2    BOTH LOADS, 250 MW AND 80 MW ON SAME PARCEL: On August 1, 2025,\n21\n      IVCM emailed IID, that it wanted to proceed with both loads, 250MW and 80 MW, entirely\n22\n      at the Clark and Aten Road location in the County of Imperial. The email attached the latest\n23    development plans, which included the data center, substation, BESS, and backup generators.\n24\n25           6.3    APPLICATION OF REMAINING STUDY FUNDS: On August 8, 2025, IID informed\n26    IVCM that approximately $38,876 remained unspent from the System Impact Study budget.\n27    IID engineering staff estimated that this remaining amount would be sufficient to cover the\n      Facility Study effort, eliminating the need for an additional payment at that time.\n28\n\n\n                                                 Page 8\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42      Filed 01/09/26    PageID.242      Page\n                                            10 of 20\n\n\n 1         6.4    POSTPONEMENT OF FACILITY STUDY: On August 22, 2025, IID sent an email\n 2   to IVCM stating that: \u201cIID management [Jamie Asbury] has requested to cancel the\n 3   meeting today due to the need to have some internal conversations before being ready to talk\n     about power supply. I will reschedule the meeting as soon as I get a green light.\u201d This\n 4\n     delayed discussions regarding power supply arrangements and interconnection logistics.\n 5\n 6\n 7\n 8           6.5  EXECUTION OF FACILITY STUDY AGREEMENT: On September 2, 2025, IID\n     emailed IVCM a Facility Study Agreement for the 250 MW Data Center #1 interconnection\n 9\n     at the 230 kV S-line. IVCM executed the agreement and returned a signed copy to IID on\n10   September 3, 2025. On September 16, 2025, IVCM received a fully executed Facility Study\n11   Agreement for Data Center #1 (attached as EXHIBIT 10).\n12\n              7 - IID\u2019S GENERAL MANAGER\u2019S ILLEGAL DELAY OF FACILITY STUDY\n13\n            7.1    SUSPICIOUS CANCELLATION OF MEETING: On August 22, 2025, while traveling\n14   to a meeting with IID resource planning, IVCM was informed that the meeting was canceled\n15   by upper management. This was the first time IVCM was made aware that IID\u2019s general\n16   manager, Jamie Asbury, was targeting the data center for delay. By that time, IVCM\n     completed all required technical studies with each one demonstrating technical feasibility.\n17\n18\n             7.2   FURTHER DELAY AND CONFLICT OF INTEREST: On September 4, 2025, IVCM\n19   was informed in a meeting by IID staff that its facility study project was being delayed\n20   because upper management, Jamie Asbury, instructed the engineering staff to prioritize six\n21   projects from Z-Global and to put everything else aside. On Sept 8, 2025, IID emailed IVCM\n     that IID \u201ccannot start work on the subject facility study until probably November 2025.\u201d\n22\n23           7.3   On July 31, 2025, IID confirmed via email that: \u201cThe system impact study was\n24   approved and IID will proceed to perform the facility study for the 250 MW Imperial Data\n25   Center Campus #1. We estimate a time frame of six weeks to complete the study.\u201d The\n     facility study was due September 15, 2026.\n26\n27\n28\n\n\n                                               Page 9\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26     PageID.243      Page\n                                            11 of 20\n\n\n 1          7.4    OATT \u00a719.4 requires that, upon completion of the System Impact Study, a\n 2   Facility Study Agreement must be issued within 30 days and completed within 60 days. See\n 3   OATT \u00a7 19.4 (\u201cUpon receipt of an executed Facilities Study Agreement, the Transmission\n 4   Provider will use due diligence to complete the required Facilities Study within a sixty (60)\n     day period.\u201d). The Facility Study Agreement was due on September 15, 2026.\n 5\n 6          7.5     PREFERENTIAL TREATMENT OF Z-GLOBAL PROJECTS: The facility study was\n 7   delayed because six projects from Z-Global were moved ahead by General Manager Asbury.\n 8   Upon information and belief, it is alleged that Jesse Montano, a former IID manager, and\n 9   now the head at Z-Global in Imperial, met Jamie Asbury on September 4, 2025 and asked her\n     to priority Z-Global\u2019s projects. Jamie Asbury was fully aware this violated IID rules and\n10\n     regulations, the OATT and that this would delay the data center project and illegally provided\n11\n     preferential treatment to Z-Global\u2019s projects.\n12\n13          7.6    COMMUNICATION WITH IID\u2019S BOARD: Concluding that IID General Manager\n14   Jamie Asbury was acting to derail the data center project to benefit Z-Global. On September\n15   8, 2025, IVCM sent emails to IID Board Members Eugenio, Cardenas, and Dockstader,\n     expressing concerns about the recent project delays and actions of General Manager Asbury\n16\n     and requested a meeting. On September 11, 2025, IVCM emailed Jamie Asbury seeking: \u201cAn\n17\n     opportunity to meet and discuss\u201d the data center project.\n18\n19           7.7     DISCRIMINATORY PREPAYMENT BY JAMIE ASBURY: On September 16, 2025,\n20   General Manager Jamie Asbury met with IVCM and raised several objections to the data\n21   center. First, she stated that IID could not provide the 330 MW load without a prepayment\n     of 15 years of electric fees. This amounted to $4 billion in prepayment. She stated that the\n22\n     330 MW load presented risk to IID. The request for prepayment of $4 billion violates IID\u2019s\n23\n     rules and regulations. The OATT provides in \u00a7 11 as follows: \u201cCreditworthiness: For the\n24   purpose of determining the ability of the Transmission Customer to meet its obligations\n25   related to service hereunder, the Transmission Provider [IID] may require reasonable credit\n26   review procedures. This review shall be made in accordance with standard commercial\n     practices.\u201d The demand to prepay 15 years of services is in direct violation of the OATT, it\n27\n     is not reasonable, and not in accordance with standard commercial practices. The demand to\n28\n     prepay 15 years of service is patently discriminatory as it has never been applied to anyone.\n\n\n                                               Page 10\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42       Filed 01/09/26     PageID.244      Page\n                                             12 of 20\n\n\n 1          7.8    IVCM WHOLESALE SUPPLY PROPOSAL: Following the meeting, IVCM met with\n 2   consultants to discuss proposals to mitigate the risk which IID General Manager Jamie\n 3   Asbury stated. On October 2, 2025, IVCM emailed General Manager Asbury a proposal to\n 4   temporarily supply energy on a short-term basis through CAISO Day-Ahead and/or\n     Real-Time markets (attached as EXHIBIT 11). The proposal removed any risk to IID, by\n 5\n     offering a cost-plus revenue structure compensating IID for: Scheduling coordinator services;\n 6\n     OATT transmission rate; and Administrative markup. IVCM estimated the arrangement\n 7\n     would generate over $22 million per year in positive revenue for IID.\n 8\n 9          7.9    IID REJECTION AND MISREPRESENTATION ALLEGATION: On October 14, 2025,\n10   IID General Manager Jamie Asbury informed IVCM in an email that she had rejected the\n11   wholesale supply proposal (attached as EXHIBIT 12). The email also alleged that IVCM\u2019s\n12   interconnection application contained a misrepresentation: \u201cUpon review of your\n     interconnection application, we noted the omission of critical generator data.\u201d She stated that\n13\n     IVCM would have to restart the entire application process. It was clear that Jamie Asbury\n14\n     was trying to delay and obstruct the data center.\n15\n16          7.10   IVCM RESPONSE PROJECT IS RECONFIGURED IMPROPERLY: Also, on October\n17   14, 2025, IVCM responded to IID General Manager Jamie Asbury disputing the allegation\n18   of misrepresentation, stating that she was mischaracterizing the project and objecting to IID\u2019s\n19   refusal to advance the project, and refusal to supply power, or consider the wholesale supply\n20   proposal (attached as EXHIBIT 13). IVCM asserted that the project had been pending before\n     IID for over a year, that backup generators were not and had never been tied to the grid, and\n21\n     that this configuration was accurately disclosed in all submitted materials. IVCM reiterated\n22\n     that IID\u2019s position unfairly obstructed its ability to secure power and violated the OATT.\n23\n24          7.11   IID EMAIL RESTATING ILLEGAL RECONFIGURATION OF PROJECT: On October\n25   17, 2025, IID General Manager Jamie Asbury emailed IVCM restating her reconfiguration\n26   of the data center submittals and restating that \u201cIID analyzes all generators, even behind the\n27   meter resources, to ensure our base cases are accurate and have all scenarios identified and\n     mitigated. There is no way to avoid the study process outlined in the tariff.\u201d (EXHIBIT 13).\n28\n\n\n                                                Page 11\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42       Filed 01/09/26     PageID.245      Page\n                                             13 of 20\n\n\n 1          7.12   IVCM REPLY TO MISSTATEMENTS: IVCM responded on October 17, 2025,\n 2   clarifying the procedural record of IVCM\u2019s data center project, to correct several factual and\n 3   procedural misstatements recently raised in the email, and to request IID\u2019s prompt\n 4   completion of its contractual obligations under the OATT (attached without exhibits as\n     EXHIBIT 15). The email confirmed that the data center project has no transmission\n 5\n     component and that her late-stage misrepresentation are unsupported deviation from over a\n 6\n     year of technical and procedural consensus by IID\u2019s staff.\n 7\n 8                   8 - FACILITY STUDY DELAY AND DISPARATE TREATMENT\n 9          8.1    FACILITY STUDY PROCEDURES: Pursuant to OATT \u00a7 19.4 \u201cIf a System Impact\n10   Study indicates that additions or upgrades to the Transmission System are needed to supply\n11   the Eligible Customer\u2019s service request\u201d the project will proceed to a System Impact Study.\n12   All IID studies confirmed feasibility, with no thermal, voltage, or stability violations (see\n     EXHIBITS 1, 3, 6, 9). Hence, it is questionable if a facility study is actually required. If it\n13\n     is required, the data center project completed all required technical studies with each study\n14\n     demonstrating technical feasibility with no system violations, hence, the facility study should\n15\n     be easy to complete. Pursuant to the OATT upon receipt of an executed Facilities Study\n16   Agreement, IID will complete the Facilities Study within 60 days.\n17\n18          8.2    UNEQUAL TREATMENT AMONG APPLICANTS BY GENERAL MANAGER ASBURY:\n19   On July 31, 2025, IID stated via email that the facility study would proceed and that IID\n\n20   estimated \u201ca time frame of six weeks to complete\u201d or September 15, 2025. On September 4,\n     2025, General Manager Asbury instructed staff to prioritize six projects from Z-Global and\n21\n     to put everything else aside, including the data center facility study. Because upper\n22\n     management prioritized six projects, which we later concluded were associated with\n23   Z-Global. This directive contradicts IID\u2019s previous written commitment and constitutes\n24   unequal treatment among applicants. The delay, despite technical clearance, is\n25   inconsistent with the OATT\u2019s due diligence requirement and undermines confidence in IID\u2019s\n26   impartial administration of its tariff obligations.\n27\n            8.3    IMPROPER 15-YEAR PREPAYMENT REQUIREMENT: During the meeting of\n28\n     September 16, 2025, General Manager Asbury said that IID could not provide power service\n\n                                                Page 12\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26     PageID.246      Page\n                                            14 of 20\n\n\n 1   unless IVCM prepaid for 15 years of electricity. This amounts to $4 billion and is not found\n 2   anywhere in the OATT. On the contrary OATT \u00a711 mandates only \u201creasonable credit review\n 3   procedures in accordance with standard commercial practices.\u201d The 15-year demand is\n 4   therefore unsupported, commercially unreasonable, and discriminatory under the OATT,\n     FERC, and federal law.\n 5\n 6\n            8.4    NON-NEUTRAL ADMINISTRATION OF IID'S TARIFF OBLIGATIONS: Also, on\n 7\n     August 22, 2025, General Manager Asbury canceled a meeting with the resource department.\n 8   The email stated: \u201cIID management [Jamie Asbury] has requested to cancel the meeting\n 9   today due to the need to have some internal conversations before being ready to talk about\n10   power supply.\u201d This further delayed this process. When combined with project\n11   reprioritization in favor of Z-Global, these actions collectively suggest non-neutral\n12   administration of IID\u2019s tariff obligations.\n\n13\n                          9 - RETALIATION AND PROCEDURAL VIOLATIONS\n14\n            9.1    ATTEMPT TO PRECLUDE STAFF ACCESS: On October 17, 2025, General\n15\n     Manager Asbury replied that she believed that the allegations in the prior email were serious\n16   and because litigation was mentioned, IVCM could no longer contact staff. (attached as\n17   EXHIBIT 16). This email is the standard play book by General Manager Asbury to further\n18   delay the project.\n19\n20          9.2    IVCM REPLY TO DENIAL OF ACCESS TO STAFF: IVCM responded on October\n     17, 2025, that IVCM\u2019s statement of intent to exercise its rights under OATT \u00a712.3 does not\n21\n     preclude it from communicating with IID staff. General Manager Asbury\u2019s actions are\n22\n     inconsistent with both the OATT and the First Amendment, and directly obstruct the ongoing\n23   development of a $10 billion data center project that satisfied every technical and procedural\n24   requirement before IID. (attached as EXHIBIT 17). OATT\u2019s \u00a7 12.2(External Arbitration\n25   Procedures) specifically exist to resolve disagreements while allowing the applicant to\n26   continue working with staff in good faith.\n27\n            9.3    DENIAL OF ACCESS CONSTITUTES RETALIATION: General Manager Asbury\u2019s\n28\n     directive obstructs a live project and represents government retaliation for protected speech.\n\n                                               Page 13\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42       Filed 01/09/26     PageID.247      Page\n                                            15 of 20\n\n\n 1   IID is a public agency, and IVCM has a First Amendment right to petition IID regarding\n 2   grievances, including the right to assert its intent to seek remedies before FERC, federal, or\n 3   state courts. General Manager Asbury has no legal basis to obstruct the data center project\n 4   or deny communication with IID\u2019s personnel carrying out the IID\u2019s technical obligations.\n\n 5\n                                       CAUSES OF ACTION\n 6\n        COUNT 1 - VIOLATION OF IID OPEN ACCESS TRANSMISSION TARIFF\n 7\n       (Against Respondent Imperial Irrigation District and General Manager Jamie Asbury)\n 8          10.1    Claimant realleges and incorporates by reference all preceding paragraphs of\n 9   this Statement of Claim as though fully set forth herein.\n10          10.2    IID's Open Access Transmission Tariff (\"OATT\") imposes binding obligations\n11   to provide non-discriminatory, transparent, and timely interconnection service to any eligible\n12   customer meeting the technical and procedural requirements of the tariff.\n            10.3    IID's own studies-including the Feasibility Study (May 22 2025) and System\n13\n     Impact Study (July 25 2025)-confirmed that Claimant's proposed 250 MW and 80 MW\n14\n     data-center loads were technically feasible and caused no violations of voltage, thermal, or\n15\n     stability limits.\n16          10.4    Notwithstanding these findings, IID-acting through its General Manager, Jamie\n17   Asbury-unlawfully suspended the Facility Study phase and cancelled previously scheduled\n18   engineering meetings on August 22 2025, citing \"management review,\" without any technical\n19   or tariff-based justification.\n            10.5    IID's conduct constitutes a violation of OATT \u00a7\u00a7 3.4, 7, and 8, which require\n20\n     IID to process interconnection requests on a fair, non-preferential, and timely basis.\n21\n            10.6    IID further violated its obligation under \u00a7 12.1 (\"Dispute Resolution and\n22\n     Arbitration\") by using administrative delay and internal obstruction in place of the required\n23   transparent tariff procedures.\n24          10.7    As a direct and proximate result, Claimant suffered economic damages, project\n25   delays, and the loss of financing opportunities for the 330 MW Imperial Valley AI\n26   Datacenter campus.\n27\n28\n\n\n                                               Page 14\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42       Filed 01/09/26     PageID.248       Page\n                                             16 of 20\n\n\n 1      COUNT 2 - BREACH OF CONTRACT (FACILITY STUDY AGREEMENT)\n 2                        (Against Respondent Imperial Irrigation District)\n 3          11.1   Claimant executed, and IID subsequently countersigned a written Facility Study\n 4   Agreement for the 250 MW Data Center #1 interconnection on the 230 kV S-line.\n            11.2   IID's System Impact Study having been completed and approved, the Facility\n 5\n     Study Agreement obligated IID to commence and complete the Facility Study within six\n 6\n     weeks, using remaining study funds already paid by Claimant.\n 7\n            11.3   IID breached that agreement by refusing to begin or complete the Facility\n 8   Study, cancelling the August 22 2025 meeting, and diverting engineering resources to\n 9   unrelated projects under the direction of General Manager Asbury.\n10          11.4   IID's refusal to perform was willful and without lawful excuse, constituting a\n11   material breach of contract.\n12          11.5   As a result, Claimant incurred significant damages, including sunk costs,\n     carrying charges on land and equipment, loss of third-party investment, and impairment of\n13\n     project financing.\n14\n15\n      COUNT 3 - ARBITRARY AND CAPRICIOUS CONDUCT / DISCRIMINATION\n16                               UNDER PUBLIC UTILITY LAW\n17              (Against Respondent Imperial Irrigation District and Jamie Asbury)\n18          12.1   IID is a public power utility organized under the California Water Code and\n19   is obligated to operate in a non-arbitrary, transparent, and non-discriminatory manner\n     consistent with California Water Code \u00a7 20532 and public-utility principles.\n20\n            12.2   Respondent Asbury's unilateral cancellation of the Facility Study, and her\n21\n     directive to prioritize Z-Global projects ahead of Claimant's, constitutes arbitrary and\n22\n     capricious administration of IID's public duties.\n23          12.3   Such conduct constitutes unlawful discrimination between similarly situated\n24   applicants and an abuse of discretion inconsistent with IID's charter and statutory obligations.\n25          12.4   Claimant seeks declaratory and injunctive relief compelling IID to perform its\n26   ministerial obligations in good faith and to cease discriminatory interference with Claimant's\n27   project.\n\n28\n\n\n                                                Page 15\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42      Filed 01/09/26     PageID.249      Page\n                                             17 of 20\n\n\n 1          COUNT 4 - TORTIOUS INTERFERENCE WITH CONTRACTUAL AND\n 2                          PROSPECTIVE BUSINESS RELATIONS\n 3            (Against Respondent Jamie Asbury, Individually and in Official Capacity)\n 4           13.1   Claimant had valid contractual relationships with IID under the executed study\n     agreements and prospective business relationships with project investors and technology\n 5\n     partners dependent on IID's timely completion of those studies.\n 6\n             13.2   Respondent Asbury, with knowledge of those relationships, intentionally\n 7\n     interfered by directing IID staff to delay and suspend work, issuing retaliatory emails to\n 8   Claimant, and reassigning engineering resources to unrelated projects.\n 9           13.3   Such interference was done with malice, motivated by favoritism toward\n10   competing consultants and animus toward Claimant's lawful requests for tariff-compliant\n11   treatment.\n12           13.4   As a direct and proximate result, Claimant sustained measurable economic\n     harm and reputational injury.\n13\n14\n                    COUNT 5 - DECLARATORY AND EQUITABLE RELIEF\n15\n              (Against Respondent Jamie Asbury, Individually and in Official Capacity)\n16\n             14.1   An actual controversy exists between Claimant and Respondents regarding the\n17\n     parties' respective rights and obligations under IID's OATT and the executed interconnection\n18\n     agreements.\n19\n             14.2   Claimant is entitled to declaratory and equitable relief determining that IID's\n20\n     technical studies confirm project feasibility and compelling IID to perform its remaining\n21\n     ministerial duties.\n22\n             WHEREFORE IVCM prays for judgment against IID as follows:\n23\n     (1).    A declaration that IID General Manager, Jamie Asbury, violated the OATT by not\n24\n             processing the facility study in accordance with procedures provided for in the OATT.\n25\n     (2).    A declaration that IID General Manager, Jamie Asbury, violated the OATT by\n26\n             requiring non-grid-connected backup generators to apply for interconnection.\n27\n     (3).    A declaration that IID General Manager, Jamie Asbury, violated the OATT by\n28\n             requiring a prepayment of electricity for 15 years to secure a service agreement.\n\n                                                Page 16\n\f     Case 3:26-cv-00128-JLS-BJW        Document 1-42      Filed 01/09/26     PageID.250     Page\n                                            18 of 20\n\n\n 1   (4).   A declaration that IID General Manager, Jamie Asbury, violated the OATT by\n 2          attempting to preclude access to staff for informing her that her violations permit\n 3          arbitration of that dispute accordance with procedures provided for in the OATT.\n 4   (5).   A declaration that IID General Manager, Jamie Asbury, violated the OATT by giving\n 5          preference to Z-Global for its project and thereby delaying the data center project.\n 6   (6).   A declaration that IID General Manager, Asbury, violated the OATT by denying a\n 7\n            service agreement upon completion of a system impact study with no impacts.\n 8\n     (7).   An ORDER mandating that IID to finalize the facility study immediately;\n 9\n     (8).   An ORDER that non-grid-connected backup generators are not required to apply for\n10\n            interconnection; and\n11\n     (9).   An ORDER mandating IID to issue a letter confirming IID's commitment to serve the\n12\n            data center load.\n13\n14\n                                        Respectfully submitted,\n15\n16                                      LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n17\n     Date: October 20, 2025\n18\n19                                      Sebastian Rucci (SBN 178114)\n                                        Attorney for complainant IVCM\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                                               Page 17\n\f     Case 3:26-cv-00128-JLS-BJW         Document 1-42      Filed 01/09/26   PageID.251   Page\n                                             19 of 20\n\n\n 1                  ATTORNEY'S CERTIFICATE OF SERVICE BY E-MAIL\n 2          I, Sebastian Rucci, CERTIFY that I am an active member of the State Bar of\n 3   California and am not a party to this cause. My business address is 16400 Pacific Coast\n 4   Highway, Suite 212, Huntington Beach, CA 92649.\n 5\n 6\n            I FURTHER CERTIFY THAT on October 20, 2025, the ARBITRATION\n 7\n     STATEMENT was served electronically on IID's General Counsel, Wayne Strumpfer at\n 8\n     wkstrumpfer@iid.com. The transmission was complete and without error and I did not\n 9\n     receive an electronic notification to the contrary.\n10\n11                                       LAW OFFICES OF SEBASTIAN RUCCI, P.C.\n12\n     Date: October 20, 2025\n13\n14                                       Sebastian Rucci (SBN 178114)\n15                                       Attorney for complainant IVCM\n\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\n27\n28\n\n\n                                                Page 18\n\f     Case 3:26-cv-00128-JLS-BJW       Document 1-42      Filed 01/09/26    PageID.252     Page\n                                           20 of 20\n\n\n 1                                    TABLE OF EXHIBIT\n 2\n     Ex. 1 Load Injection Memo by Power Engineer (12-04-24)\n 3\n 4   Ex. 2 Application for Sensitivity for Data Center #1 (4-15-25)\n 5   Ex. 3 Feasibility Study Agreement by IID for Data Center #1 (3-11-25)\n 6\n     Ex. 4. Feasibility Study Report by IID for Data Center #1 (5-22-25)\n 7\n 8   Ex. 5 System Impact Study Agreement for Data Center #1 (6-12-25)\n 9\n     Ex. 6 System Impact Study Report by IID for Data Center #1 (7-25-25)\n10\n     Ex. 7 Application for System Impact Study for Data Center #2 (3-05-25)\n11\n12   Ex. 8 System Impact Study Agreement by IID for Data Center #2 (4-28-25)\n13\n     Ex. 9 System Impact Study Report by IID for Data Center #2 (9-23-25)\n14\n15   Ex. 10 Facilities Study Agreement by IID for Data Center #1 and #2 (9-03-25)\n\n16   Ex. 11 Email to Jamie Asbury - Wholesale Market Proposal (10-02-25)\n17\n     Ex. 12 Email from Jamie Asbury - Rejecting Proposal and Reconfiguring Project (10-14-25)\n18\n19   Ex. 13 Email to Jamie Asbury - Project is Being Reconfigured Improperly (10-14-25)\n20   Ex. 14 Email from Jamie Asbury - Illegal Reconfiguration of Project (10-17-25)\n21\n     Ex. 15 Email to Jamie Asbury - Identifying Misstatements (10-17-25)\n22\n23   Ex. 16 Email from Jamie Asbury - No Contact With Staff (10-17-25)\n24\n     Ex. 17 Email Response to Jamie Asbury - Rejecting Retaliatory Request (10-17-25)\n25\n26\n27\n28\n\n\n                                              Page 19\n\f","ocr_status":1,"date_upload":"2026-01-10T23:39:21.350048-08:00","document_number":"1","attachment_number":42,"pacer_doc_id":"037022111111","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 41","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739456/","id":464739456,"tags":[],"absolute_url":"/docket/72127384/1/43/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:12.059962-08:00","date_modified":"2026-01-14T02:35:25.681744-08:00","sha1":"0503b13c273cfa139cdd5d7da16a6bc8cfda62af","page_count":132,"file_size":18050128,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.43.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.43.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-43   Filed 01/09/26   PageID.253   Page 1\n                                    of 132\n\n\n\n\n                EXHIBIT 42\n       Arbitration Statement Exhibits\n                 (10-20-25)\n\f     Case 3:26-cv-00128-JLS-BJW       Document 1-43      Filed 01/09/26     PageID.254   Page 2\n                                             of 132\n\n\n 1    TABLE OF EXHIBIT\n 2\n      Ex. 1 Load Injection Memo by Power Engineer (12-04-24)\n 3\n 4    Ex. 2 Application for Sensitivity for Data Center #1 (4-15-25)\n 5\n      Ex. 3 Feasibility Study Agreement by IID for Data Center #1 (3-11-25)\n 6\n 7    Ex. 4. Feasibility Study Report by IID for Data Center #1 (5-22-25)\n 8\n      Ex. 5 System Impact Study Agreement for Data Center #1 (6-12-25)\n 9\n10    Ex. 6 System Impact Study Report by IID for Data Center #1 (7-25-25)\n11\n      Ex. 7 Application for System Impact Study for Data Center #2 (3-05-25)\n12\n13    Ex. 8 System Impact Study Agreement by IID for Data Center #2 (4-28-25)\n14\n      Ex. 9 System Impact Study Report by IID for Data Center #2 (9-23-25)\n15\n16    Ex. 10 Facilities Study Agreement by IID for Data Center #1 and #2 (9-03-25)\n17\n      Ex. 11 Email to Jamie Asbury - Wholesale Market Proposal (10-02-25)\n18\n19    Ex. 12 Email from Jamie Asbury - Rejecting Proposal and Reconfiguring Project (10-14-25)\n20\n      Ex. 13 Email to Jamie Asbury - Project is Being Reconfigured Improperly (10-14-25)\n21\n22    Ex. 14 Email from Jamie Asbury - Illegal Reconfiguration of Project (10-17-25)\n23\n      Ex. 15 Email to Jamie Asbury - Identifying Misstatements (10-17-25)\n24\n25    Ex. 16 Email from Jamie Ashbury - No Contact With Staff (10-17-25)\n26\n      Ex. 17 Email Response to Jamie Ashbury - Rejecting Retaliatory Request (10-17-25)\n27\n28\n\n\n                                            Page 12 of 12\n\fCase 3:26-cv-00128-JLS-BJW                Document 1-43        Filed 01/09/26      PageID.255         Page 3\n                                                 of 132\n\n                                                                                                   POWER ENGINEERS, INC.\n                                                                                         1060 MAITLAND CENTER COMMONS\n                                                                                                               SUITE 110\n                                                                                                   ORLANDO, FL 32751 USA\n\n                                                                                                      PHONE   321-214-3800\n                                                                                                        FAX   321-214-3899\n\n\n\n\n                                                                                   MEMORANDUM\n\n          DATE:      December 4, 2024\n\n          TO:        Sebastian Rucci\n                     Imperial Valley Computer Manufacturing\n          C:         Hector Casas (IVCM)\n                     Christopher Nicolai (POWER-SAN)\n                     Jeff Varness, P.E. (POWER-PHX)\n                     PW 0255861_0000.1.2\n                     24-0151-12712\n\n          FROM:      Christopher Goulet, P.E. (POWER-ORL)\n\n          SUBJECT:   0255861_0000           IVCM Data Center Load Injection Analysis\n\n\n                MESSAGE\n\n\n          Sebastian,\n\n          POWER has analyzed Imperial Valley Computer Manufacturing\u2019s (IVCM) potential data center\n          sites in Imperial County, California to determine potential load capacity at each site as well as to\n          provide a high-level cost estimate for potential system upgrades. One Point of Interconnection (POI)\n          was a tap of the 230 kV S-Line between El Centro 230 kV Substation and Imperial Valley 230 kV\n          Substation. The other POI was the Central 92 kV Substation. Study assumptions were as follows:\n\n                x    The identified POIs were studied up to 1,100 MW loading under N-1 and N-1-1\n                     contingency scenarios to determine their maximum load serving capabilities.\n                x    Contingencies were created by compiling all transmission lines or transformers within 7\n                     buses of each POI.\n                x    A distribution factor cutoff of 3% was utilized to remove any non-significant results.\n                x    The WECC 2027 Heavy Summer and Heavy Winter planning base cases were used.\n                         o No additional generation, system upgrades, or path stressing was considered.\n                x    Generation was dispatched from Imperial Irrigation District (IID), San Diego Gas &\n                     Electric (SDGE), Arizona Public Service (APS), Salt River Project (SRP), and Southern\n                     California Edison (SCE) to the POIs.\n                         o This dispatch was chosen to reflect system wide generation growth as well as to\n                              represent large queued generation projects near IID\u2019s system boundaries.\n\n\n\n\n      ORL 24-0151-12711 0255861_0000 (2024-12-04) CK\n\fCase 3:26-cv-00128-JLS-BJW                Document 1-43             Filed 01/09/26         PageID.256              Page 4\n                                                 of 132\n\n         MEMORANDUM                                                                             POWER ENGINEERS, INC.\n\n\n\n\n                                                             POI Site Map\n\n\n\n\n        Please refer to Table 1 for load injection analysis results.\n\n                                    TABLE 1: IVCM LOAD INJECTION ANALYSIS RESULTS - 2027\n                                     SUMMER N-1               SUMMER N-1-1         WINTER N-1           WINTER N-1-1\n                   SITE\n                                    CAPACITY [MW]             CAPACITY [MW]       CAPACITY [MW]        CAPACITY [MW]\n            230 kV S-LINE TAP             557.8                   342.0                 823.1                528.9\n             CENTRAL 92 kV\n                                          108.3                    83.5                 99.8                 60.2\n              SUBSTATION\n\n        If desired, upgrades to local grid infrastructure can allow higher load injection than shown in\n        Table 1. The high-level cost estimate provided below is based on values across the country and is\n        not inherently specific to interconnections in California.\n\n        Please note that rebuilding 92 kV transmission lines cost around $1,500,000 per mile 1 at present.\n        Substation expansion costs are utility dependent and can vary significantly, as such, these costs\n        are not included in the below cost estimate.\n\n        230 kV S-Line Tap\n        Network upgrade cost to interconnect 750 MW: $13,350,000\n\n        Central 92 kV Substation\n        Network upgrade cost to interconnect 150 MW: $33,000,000\n\n\n        Christopher Goulet, P.E. (POWER-ORL)\n\n        1\n             https://cdn.misoenergy.org/MISO%20Transmission%20Cost%20Estimation%20Guide%20for%20MTEP24337433.pdf\n\n            ORL 24-0151-12711 0255861 0000 (2024-12-04) CK                                                   PAGE 2 OF 2\n\f                                Load\u0003Capacity\u0003of\u0003IVCM\u0003Sites\u0003\u0372\u00032027\n                       Summer\u0003N\u03721\u0003      Summer\u0003N\u03721\u03721\u0003      Winter\u0003N\u03721\u0003      Winter\u0003N\u03721\u03721\u0003\nSite                   capacity\u0003[MW] capacity\u0003[MW]         capacity\u0003[MW] capacity\u0003[MW]\n230\u0003kV\u0003S\u0372Line\u0003Tap                 557.8              342.0            823.1             528.9\nCentral\u000392\u0003kV\u0003Sub                 108.3               83.5             99.8               60.2\n\nCapacity\u0003before\u0003upgrades\u0003to\u0003existing\u0003facilities\u0003using\u0003WECC\u0003transmission\u0003planning\u0003base\u0003cases\n                                                                                                                Case 3:26-cv-00128-JLS-BJW\n                                                                                                                 of 132\n                                                                                                          Document 1-43\n                                                                                                                Filed 01/09/26\n                                                                                                                PageID.257\n                                                                                                                Page 5\n\n\n\n\n    ORL 24-0151-12712 0255861 0000 (2024-12-04) CG                                               REV. A\n                                                                            1\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43   Filed 01/09/26   PageID.258   Page 6\n                                    of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43   Filed 01/09/26   PageID.259   Page 7\n                                    of 132\n\fCase\nIID-792\u00033:26-cv-00128-JLS-BJW\n         5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                    Document 1-43         Filed 01/09/26      PageID.260       Page 8\n                                            of 132\n\n\n                                   SYSTEM PLANNING\n                  IID SYSTEM IMPACT STUDY DATA REQUIREMENTS\n\n$\u0003W\\SLFDO\u00036\\VWHP\u0003,PSDFW\u00036WXG\\\u0003LQFOXGHV\u00033RZHU\u0003)ORZ\u000f\u00037UDQVLHQW\u00036WDELOLW\\\u000f\u00033RVW\u00107UDQVLHQW\u0003\n6WDELOLW\\\u000f\u0003DQG\u00036KRUW\u0003&LUFXLW\u0003$QDO\\VLV\u0011\u0003'HSHQGLQJ\u0003RQ\u0003SURMHFW\u0003FKDUDFWHULVWLFV\u0003,,'\u00036\\VWHP\u00033ODQQLQJ\u0003\nPD\\\u0003UHFRPPHQG\u0003H[SDQGLQJ\u0003RU\u0003UHGXFLQJ\u0003WKH\u0003VFRSH\u0003RI\u0003WKH\u0003VWXG\\\u0011\u0003\n\n,,'\u0003XVHV\u0003WKH\u0003ODVW\u0003YHUVLRQ\u0003RI\u0003G.E. PSLF\u0003VRIWZDUH\u0003DSSURYHG\u0003E\\\u0003:(&&\u0003WR\u0003SHUIRUP\u00033RZHU\u0003)ORZ\u000f\u0003\n7UDQVLHQW\u00036WDELOLW\\\u0003DQG\u00033RVW\u00107UDQVLHQW\u00036WDELOLW\\\u0003DQDO\\VHV\u0011\u0003)RU\u0003WKH\u00036KRUW\u0003&LUFXLW\u0003DQDO\\VLV\u0003WKH\u0003ODWHVW\u0003\nYHUVLRQ\u0003RI\u0003ASPEN VRIWZDUH\u0003ZLOO\u0003EH\u0003XVHG\u0011\u0003\u0003\n\nPower Flow (project\u2019s data)\n3OHDVH\u0003SURYLGH\u0003WKH\u0003IROORZLQJ\u0003LQIRUPDWLRQ\u0011\u0003 $GGLWLRQDO\u0003VKHHWV\u0003RU\u0003GRFXPHQWV\u0003FDQ\u0003EH\u0003DGGHG \u0003\n\n   \u0014\u0011 3URMHFW\u00031DPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n                     IMPERIAL DATA CENTER CAMPUS\n      :KDW\u0003LV\u0003WKH\u0003QDPH\u0003RI\u0003WKH\u0003SURMHFW\"\u0003 SOHDVH\u0003SURYLGH\u0003WKUHH\u0003GLIIHUHQW\u0003DOWHUQDWLYH\u0003QDPHV\n\n           D\u0011 $OWHUQDWLYH\u0003\u0014\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n           E\u0011 $OWHUQDWLYH\u0003\u0015\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n           F\u0011 $OWHUQDWLYH\u0003\u0016\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n       Note:\u0003,I\u0003WKH\u0003QDPH\u0003RI\u0003WKH\u0003SURMHFW\u0003UHSUHVHQWV\u0003D\u0003SRWHQWLDO\u0003FRQIOLFW\u0003IRU\u0003,,'\u00b6V\u0003VWDII\u000f\u0003,,'\u0003ZLOO\u0003\n       VXJJHVW\u0012UHTXHVW\u0003D\u0003QHZ\u0003QDPH\u0003IRU\u0003\\RXU\u0003SURMHFW\u0003WR\u0003SUHYHQW\u0003WKH\u0003SRWHQWLDO\u0003FRQFHUQ\u0011\u00037KLV\u0003LV\u0003QRW\u0003\n       LQWHQGHG\u0003WR\u0003FUHDWH\u0003DQ\\\u0003OHJDO\u0003RU\u0003FRPPHUFLDO\u0003LVVXHV\u0003RQ\u0003WKH\u0003GHYHORSPHQW\u0003RI\u0003\\RXU\u0003SURMHFW\u0011\u0003\n\n   \u0015\u0011 3URMHFW\u00032QH\u0010/LQH\u0003'LDJUDP\u0003DQG\u00033URMHFW\u00036LWH\u00033ODQ\n      3OHDVH\u0003SURYLGH\u0003D\u0003VLPSOLILHG\u0003RQH\u0010OLQH\u0003GLDJUDP\u0003DQG\u0003VLWH\u0003SODQ\u0003LQ\u0003 3') \u0003RI\u0003WKH\u0003IDFLOLW\\ LHV \u0003WR\n      EH\u0003VWXGLHG\u0011\n\n   \u0016\u0011 3URYLGH\u0003D\u0003*RRJOH\u0003(DUWK\u0003PDS\u0003 \u0011NP]\u0003ILOH \u0003ZLWK\u0003JHRJUDSKLFDO\u0003ORFDWLRQ\u0003RI\u0003WKH\u0003QHZ\u0003SURMHFW\n      UHTXLULQJ\u0003,,'\u0003VHUYLFH\u0011\n\n\n   \u0017\u0011 :LOO\u0003WKLV\u0003SURMHFW\u0003EH\u0003FRPSOHWHG\u0003LQ\u0003SKDVH\"\u0003<HV\u0003        1R\n      ,I\u0003<HV\u000f\u0003SURYLGH\u0003D\u0003GHVFULSWLRQ\u0003DQG\u0003HVWLPDWH\u0003WLPHOLQHV\u0003IRU\u0003HDFK\u0003SKDVH\u0011\n\n   \u0018\u0011 3URYLGH\u0003SURRI\u0003RI\u0003VLWH\u0003FRQWURO\u0011\n\n   \u0019\u0011 3URYLGH\u0003WKH\u0003LQ\u0010VHUYLFH\u0003GDWH\u0003IRU\u0003WKH\u0003WRWDO\u0003FRPSOHWLRQ\u0003RI\u0003WKH\u0003SURMHFW\u0003RU\u0003SHU\u0003SKDVH\u0011\n\n             01/01/2027\n       'DWH\u001d\u0003BBBBBBBBBBBBBBB\n\n\n\n\n                                                                                                    3\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43   Filed 01/09/26   PageID.261   Page 9\n                                    of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.262   Page\n                                  10 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.263   Page\n                                  11 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.264   Page\n                                  12 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.265   Page\n                                  13 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.266   Page\n                                  14 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.267   Page\n                                  15 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.268   Page\n                                  16 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.269   Page\n                                  17 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.270   Page\n                                  18 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.271   Page\n                                  19 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.272   Page\n                                  20 of 132\n\fCase 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.273   Page\n                                  21 of 132\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43      Filed 01/09/26   PageID.274     Page\n                                     22 of 132\n                                                         FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                     IMPERIAL IRRIGATION DISTRICT\n                        Feasibility Study Agreement\n                    Imperial Valley Computer Manufacturing, LLC\n\n          THIS AGREEMENT is made and entered into this 11th day of March,\n   2025 by and between Imperial Valley Computer Manufacturing, LLC, a company\n   organized and existing under the laws of the State of California and registered to\n   do business in the state of California (\"Interconnection Customer\"), and the\n   Imperial Irrigation District an irrigation district organized under the Water Code\n   of the State of California, (\"Transmission Provider\"). Interconnection Customer\n   and Transmission Provider each may be referred to as a \"Party\" or collectively as\n   the \"Parties.\"\n\n                                         RECITALS\n\n         WHEREAS, Interconnection Customer is proposing to develop a Facility\n   or capacity addition to an existing Facility consistent with the submitted\n   documentation by Interconnection Customer or its authorized representative on\n   January 17, 2025; and\n\n         WHEREAS, Interconnection Customer desires to interconnect the Facility\n   with Transmission Provider\u2019s Transmission System; and\n\n          WHEREAS, Interconnection Customer has requested Transmission\n   Provider to perform an Interconnection Feasibility Study to assess the impact of\n   interconnecting the proposed Facility to the Transmission Provider\u2019s System;\n\n         NOW, THEREFORE, in consideration of and subject to the mutual\n   covenants contained herein the Parties agree as follows:\n\n             1.0    When used in this Agreement, unless otherwise defined herein,\n                    terms with initial capitalization shall have the meaning\n                    specified in the Transmission Provider\u2019s Distributed\n                    Generations Interconnection Process which Interconnection\n                    Customer acknowledges it has reviewed.\n\n             2.0    Interconnection Customer requests that Transmission Provider\n                    prepare an Interconnection Feasibility Study consistent with the\n                    terms of this Agreement.\n                                                                                    1\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW     Document 1-43      Filed 01/09/26     PageID.275     Page\n                                    23 of 132\n                                                         FEASIBILITY STUDY AGREEMENT\n\n\n\n\n            3.0   The scope of the Feasibility Study shall be subject to the\n                  assumptions set forth in the Customer Project Application.\n\n            4.0   The Feasibility Study shall be based on the technical\n                  information provided by Interconnection Customer in the\n                  Interconnection Request. Transmission Provider reserves the\n                  right to request additional technical information from\n                  Interconnection Customer as may reasonably become necessary\n                  consist with Good Utility Practice during the course of the\n                  Feasibility Study. If, after the designation of the Point of\n                  Interconnection, Interconnection Customer modifies its\n                  Interconnection Request, the time to complete the Feasibility\n                  Study may be extended.\n\n            5.0   The Feasibility Study report shall provide the following\n                  information:\n\n                        -    identification of any thermal overload or voltage limit\n                             violations resulting from the interconnection or, when\n                             Clustering     is    used,    resulting    from     the\n                             interconnections of the group of Generating Facilities\n                             studied in the cluster;\n\n                        -    a description and non-binding, good faith estimate of\n                             the cost and time to construct facilities projected to be\n                             required to interconnect the Generating Facility to the\n                             Transmission System or Distribution System, or,\n                             when Clustering is used, to interconnect of the group\n                             of Generating Facilities studied in the cluster, and to\n                             address the identified short circuit, instability, and\n                             power flow issues.\n\n            6.0   Concurrent with the execution of this Agreement,\n                  Interconnection Customer shall provide a deposit of $50,000 for\n                  the performance of the Feasibility Study.\n\n                  Upon receipt of the Feasibility Study Transmission Provider\n                  shall charge and Interconnection Customer shall pay the actual\n                  costs of the Feasibility Study.\n                                                                                    2\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43       Filed 01/09/26     PageID.276      Page\n                                     24 of 132\n                                                          FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                  Any difference between the deposit and the actual costs of the\n                  study shall be paid or refunded to Interconnection Customer as\n                  appropriate.\n\n            7.0 Each Party makes the following representations, warranties and\n                   covenants:\n\n               (a) Good Standing. Interconnection Customer is duly organized,\n                   validly existing and in good standing under the laws of the state\n                   in which it is organized, formed, or incorporated, as applicable;\n                   that it is qualified to do business in the state or states in which it\n                   is located, and that it has the corporate power and authority to\n                   own its properties, to carry on its business as now being\n                   conducted and to enter into this Agreement and carry out the\n                   transactions contemplated hereby and perform and carry out all\n                   covenants and obligations on its part to be performed under\n                   and pursuant to this Agreement.\n\n               (b) Authority. Interconnection Customer has the right, power and\n                   authority to enter into this Agreement, to become a Party hereto\n                   and to perform its obligations hereunder. This Agreement is a\n                   legal, valid and binding obligation of such Party, enforceable\n                   against such Party in accordance with its terms, except as the\n                   enforceability thereof may be limited by applicable bankruptcy,\n                   insolvency, reorganization or other similar laws affecting\n                   creditors' rights generally and by general equitable principles\n                   (regardless of whether enforceability is sought in a proceeding\n                   in equity or at law).\n\n               (c) No Conflict. The execution, delivery and performance of this\n                   Agreement does not violate or conflict with the organizational\n                   or formation documents, or bylaws or operating agreement, of\n                   the Party, or any judgment, license, permit, order, material\n                   agreement or instrument applicable to or binding upon such\n                   Party or any of its assets.\n\n               (d) Consent. Interconnection Customer has sought or obtained, or\n                   in accordance with this Agreement will seek or obtain, each\n                   consent, approval, authorization, order, or acceptance by any\n                                                                                       3\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW       Document 1-43      Filed 01/09/26   PageID.277       Page\n                                      25 of 132\n                                                          FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                     Governmental Authority in connection with the execution,\n                     delivery and performance of this Agreement, and it will provide\n                     to any Governmental Authority notice of any actions under this\n                     Agreement that are required by Applicable Laws and\n                     Regulations.\n\n         8.0   Miscellaneous\n\n                a.       Binding Effect. This Agreement and the rights and\n                        obligations hereof, shall be binding upon and shall inure\n                        to the benefit of the successors and assigns of the Parties\n                        hereto.\n\n                b.      Conflicts. In the event of a conflict between the body of\n                        this Agreement and any attachment, appendices or\n                        exhibits hereto, the terms and provisions of the body of\n                        this Agreement shall prevail and be deemed the final\n                        intent of the Parties.\n\n                c.      Rules of Interpretation. This Agreement, unless a clear\n                        contrary intention appears, shall be construed and\n                        interpreted as follows: (1) the singular number includes\n                        the plural number and vice versa; (2) reference to any\n                        person includes such person's successors and assigns but,\n                        in the case of a Party, only if such successors and assigns\n                        are permitted by this Agreement, and reference to a\n                        person in a particular capacity excludes such person in\n                        any other capacity or individually; (3) reference to any\n                        agreement (including this Agreement), document,\n                        instrument or tariff means such agreement, document,\n                        instrument, or tariff as amended or modified and in effect\n                        from time to time in accordance with the terms thereof\n                        and, if applicable, the terms hereof; (4) reference to any\n                        Applicable Laws and Regulations means such Applicable\n                        Laws and Regulations as amended, modified, codified, or\n                        reenacted, in whole or in part, and in effect from time to\n                        time, including, if applicable, rules and regulations\n                        promulgated thereunder; (5) unless expressly stated\n                                                                                      4\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43     Filed 01/09/26    PageID.278       Page\n                                       26 of 132\n                                                           FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                         otherwise, reference to any Attachment is to an\n                         Attachment to this Agreement; (6) \"hereunder'', \"hereof',\n                         \"herein\", \"hereto\" and words of similar import shall be\n                         deemed references to this Agreement as a whole and not\n                         to any particular Section or other provision hereof or\n                         thereof; (7) \"including\" (and with correlative meaning\n                         \"include\") means including without limiting the\n                         generality of any description preceding such term; and\n                         (8) relative to the determination of any period of time,\n                         \"from\" means ''from and including\", \"to\" means \"to but\n                         excluding\" and \"through\" means \"through and\n                         including\".\n                    d.   Entire Agreement. This Agreement, including the\n                         assumptions in the Customer Project Application,\n                         constitutes the entire agreement between the Parties\n                         with reference to the subject matter hereof, and\n                         supersedes      all   prior      and    contemporaneous\n                         understandings or agreements, oral or written, between\n                         the Parties with respect to the subject matter of this\n                         Agreement.      There   are     no   other    agreements,\n                         representations, warranties, or covenants which constitute\n                         any part of the consideration for, or any condition to,\n                         either Party's compliance with its obligations under this\n                         Agreement.\n\n               e.        No Third-Party Beneficiaries. This Agreement is not\n                         intended to and does not create rights, remedies, or\n                         benefits of any character whatsoever in favor of any\n                         persons, corporations, associations, or entities other than\n                         the Parties, and the obligations herein assumed are solely\n                         for the use and benefit of the Parties, their successors in\n                         interest and, where permitted, their assigns.\n\n               f.        Waiver. The failure of a Party to this Agreement to insist,\n                         on any occasion, upon strict performance of any\n                         provision of this Agreement will not be considered a\n                         waiver of any obligation, right, or duty of, or imposed\n\n                                                                                       5\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW    Document 1-43      Filed 01/09/26   PageID.279       Page\n                                   27 of 132\n                                                       FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                     upon, such Party.\n\n                     Any waiver at any time by either Party of its rights with\n                     respect to this Agreement shall not be deemed a\n                     continuing waiver or a waiver with respect to any other\n                     failure to comply with any other obligation, right, duty of\n                     this Agreement. Termination or Default of this\n                     Agreement for any reason by Interconnection Customer\n                     shall not constitute a waiver of Interconnection\n                     Customer's legal rights to obtain an interconnection from\n                     IID. Any waiver of this Agreement shall, if requested, be\n                     provided in writing.\n\n               g.    Headings. The descriptive headings of the various\n                     Sections of this Agreement have been inserted for\n                     convenience of reference only and are of no significance\n                     in the interpretation or construction of this Agreement.\n\n               h.    Multiple Counterparts. This Agreement may be executed\n                     in two or more counterparts, each of which is deemed an\n                     original but all constitute one and the same instrument.\n\n               i.    Amendment. The Parties may by mutual agreement\n                     amend this Agreement by a written instrument duly\n                     executed by the Parties.\n\n               j.    Modification by the Parties. The Parties may by mutual\n                     agreement amend the Attachments to this Agreement by\n                     a written instrument duly executed by the Parties. Such\n                     amendment shall become effective and a part of this\n                     Agreement upon satisfaction of all Applicable Laws and\n                     Regulations.\n               k.    No Partnership. This Agreement shall not be interpreted or\n                     construed to create an association, joint venture, agency\n                     relationship, or partnership between the Parties or to impose\n                     any partnership obligation or partnership liability upon\n                     either Party. Neither Party shall have any right, power or\n                     authority to enter into any agreement or undertaking for, or\n\n                                                                                   6\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43      Filed 01/09/26     PageID.280     Page\n                                     28 of 132\n                                                          FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                       act on behalf of, or to act as or be an agent or\n                       representative of, or to otherwise bind, the other Party.\n\n\n         9.0    Assignment. This Agreement may be assigned by a Party only with\n                the written consent of the other Party; provided that a Party may\n                assign this Agreement without the consent of the other Party to any\n                Affiliate of the assigning Party with an equal or greater credit\n                rating and with the legal authority and operational ability to satisfy\n                the obligations of the assigning Party under this Agreement; and\n                provided further that the Interconnection Customer shall have the\n                right to assign this Agreement, without the consent of the other\n                Party, for collateral security purposes to aid in providing financing\n                for the generating unit, provided that the Interconnection Customer\n                will require any secured party, trustee or mortgagee to notify the\n                other Party of any such assignment. Any financing arrangement\n                entered into by the Interconnection Customer pursuant to this\n                Article will provide that prior to or upon the exercise of the secured\n                party's, trustee's or mortgagee's assignment rights pursuant to said\n                arrangement, the secured creditor, the trustee or mortgagee will\n                notify the other Party of the date and particulars of any such\n                exercise of assignment right(s). Any attempted assignment that\n                violates this Article is void and ineffective. Any assignment under\n                this Agreement shall not relieve a Party of its obligations, nor shall\n                a Party's obligations be enlarged, in whole or in part, by reason\n                thereof. Where required, consent to assignment will not be\n                unreasonably withheld, conditioned or delayed\n\n         10.0   Equipment Release Disclaimer. Transmission Provider\u2019s Feasibility\n                Study shall not be construed as confirming or enclosing the design,\n                or as any warranty of safety, durability, reliability or suitability of\n                Interconnection Customer\u2019s Generating Facility or installation\n                thereof for any use, including the use intended by Interconnection\n                Customer.\n\n         11.0   All notices, requests, demands, and other communications required\n                or permitted under this Agreement shall be in writing, unless\n                otherwise agreed by the Parties, and shall be delivered in person or\n                                                                                     7\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43     Filed 01/09/26    PageID.281      Page\n                                     29 of 132\n                                                        FEASIBILITY STUDY AGREEMENT\n\n\n\n\n                sent by certified mail, postage prepaid, by overnight delivery, or by\n                electronic mail or electronic facsimile transmission with an original\n                sent immediately thereafter by postage prepaid mail, and properly\n                addressed as follows:\n\n                When delivered to Transmission Provider:\n\n                Energy Contracts\n                IMPERIAL IRRIGATION DISTRICT\n                333 Barioni Blvd.\n                P.O. Box 937\n                Imperial, CA 92251\n                Email: Energycontracts@iid.com\n\n                When delivered to Interconnection Customer:\n\n\n                Address: 16400 Pacific Coast Highway, Suite 212\n                City, State, Zip code: Huntington Beach, CA 92649\n                Email: Sebastian@RucciLaw.com\n\n\n\n         12.0   Either Party may, from time to time, change its representative or\n                address for the purpose of notices to that Party by a similar notice\n                specifying a new representative or address, but no such change\n                shall be deemed to have been given until such notice is actually\n                received by the Party being so notified.\n\n         13.0   This Agreement may be assigned and, if so assigned, the\n                Agreement, and the rights and obligations thereof, shall be binding\n                upon and shall insure to the benefit of the successors and assigns of\n                the Parties hereto.\n\n         14.0   This Agreement may be executed in two or more counterparts, by\n                facsimile signature or an e-mail of a PDF signature, each of which is\n                deemed an original but all constitute one and the same instrument.\n\n         15.0   The Parties may, by mutual agreement, amend this Agreement by a\n                written instrument duly executed by the Parties.\n                                                                                    8\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW           Document 1-43    Filed 01/09/26    PageID.282     Page\n                                          30 of 132\n                                                            FEASIBILITY STUDY AGREEMENT\n\n\n\n\n            16.0     This Agreement is subject to Transmission Provider\u2019s Tariff, as may\n                     be amended from time-to-time.\n\n           IN WITNESS THEREOF, the Parties have caused this Agreement to be\n   duly executed by their duly authorized officers or agents on the day and year\n   first above written.\n\n\n   Imperial Irrigation District\n\n   Signature:\n   Print\n   Name:           Jesus Martinez\n\n   Title:          Sup. Gen. Planning and Engineering\n   Date:           3/11/2025\n\n\n   Imperial Valley Computer Manufacturing, LLC\n\n   Signature:\n   Print\n                   Sebastian Rucci\n   Name:\n   Title:          Managing Member\n\n   Date:           March 5, 2025\n\n\n\n\n                                                                                       9\n   BUSINESS & REGULATORY COMPLIANCE PROGRAMS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547\n\fCase 3:26-cv-00128-JLS-BJW     Document 1-43      Filed 01/09/26   PageID.283   Page\n                                    31 of 132\n\n\n\n                                                                    VERSION: DRAFT\n                                                                       MAY 22, 2025\n\n\n\n\n                             IMPERIAL VALLEY COMPUTER\n                     MANUFACTURING LLC, (DATA CENTER #1)\n                                        FEASIBILITY STUDY\n\n                                                         TRANSMISSION PLANNING\n\n\n 5/22/2025   IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)         6\n                                   FEASIBILITY STUDY\n\fCase 3:26-cv-00128-JLS-BJW              Document 1-43         Filed 01/09/26        PageID.284        Page\n                                             32 of 132\n\n\n\n\n EXECUTIVE SUMMARY\n\n The Imperial Irriga on District (IID) received a request from Imperial Valley Computer Manufacturing LLC\n (Customer) for the interconnec on of their Imperial Data Center Campus (Project) in the Imperial Valley.\n The facility\u2019s proposed Point of Interconnec on (POI) to the IID System is at the 230kV \u2018S\u2019 line between\n IID\u2019s El Centro switching sta on (ECSS) and SDG&E\u2019s Imperial Valley substa on. As part of this feasibility\n study, IID evaluated the interconnec on of di\ufb00erent load scenarios at 150 MW, 200 MW, 250 MW, and\n 500 MW to assess poten al system impacts and infrastructure requirements. Commercial Opera on\n Date (COD) is planned to be in service by January 2027.\n\n IID\u2019s Transmission Planning Department performed a high-level feasibility study to evaluate the poten al\n impact of integra ng this Project into the IID transmission system. The study included power flow\n (steady-state) analysis to iden fy any thermal viola ons caused solely by the addi on of this load.\n Note: IID assumed that the majority of the power required to serve this load would be imported. IID\n currently does not have the capability to reliably support a large-scale load requiring con nuous 24-hour\n service. As such, this report does not represent a commitment by IID to serve the requested load.\n\n\n\n\n 5/22/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                            7\n                                       FEASIBILITY STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43         Filed 01/09/26       PageID.285        Page\n                                            33 of 132\n\n\n\n PROJECT DESCRIPTION\n The proposed Project consists of a large-scale data center campus, upwards of 500MW, that is to be\n placed in a land parcel near the 230kV \u2018S\u2019 line between IID\u2019s El Centro switching sta on and SDG&E\u2019s\n Imperial Valley substa on, which will serve as the POI for the Project. The Project had an assumed power\n factor of 0.95. The Figures 1, 2, & 3 below indicate the single line diagram, geographical loca on, and\n site plan of the Project.\n\n\n\n\n                                  FIGURE 1: PROJECT SINGLE LINE DIAGRAM\n\n\n\n\n                              FIGURE 2: PROJECT GEOGRAPHICAL LOCATION\n 5/22/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                           8\n                                         FEASIBILITY STUDY\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43          Filed 01/09/26   PageID.286   Page\n                                       34 of 132\n\n\n\n\n                                   FIGURE 3: PROJECT SITE PLAN\n\n\n\n\n                              IVCM DATA CENTER BREAKDOWN\n               MW             MVAR                        MVA                PF\n             150MW           49MVAR                     158MVA              0.95\n             200MW           65MVAR                     210MVA              0.95\n             250MW           82MVAR                     263MVA              0.95\n             500MW          164MVAR                     526MVA              0.95\n                        TABLE 1: PROJECT BREAKDOWN PER LOADING SCENARIO\n\n\n\n\n 5/22/2025     IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)             9\n                                     FEASIBILITY STUDY\n\f  Case 3:26-cv-00128-JLS-BJW              Document 1-43          Filed 01/09/26       PageID.287        Page\n                                               35 of 132\n\n\n\n    STUDY DATA ASSUMPTIONS AND METHODOLOGY\n    Various base cases were developed for this assessment with the intent to cover all cri cal opera ng\n    scenarios, and to document all poten al impacts that could be caused by the implementa on of the\n    Project. No queue genera on was included unless the project has an executed Generator\n    Interconnec on Agreement (GIA), a Power Purchase Agreement (PPA), or a Tolling Agreement with the\n    IID and the project is in accordance with sec on 4.0 of IID\u2019s Planning Standards. Distribu on projects\n    were included with either an executed Joint Power Agreement (JPA) or system impact studies were\n    finalized. The base cases were developed to represent the Heavy Summer opera ng condi ons and the\n    early Spring opera ng condi ons. For the early Spring assessments, an early Spring me frame of 0600-\n    0800 was analyzed.\n\n    Table 1 below lists the WECC approved base cases that were used to model the IID system for steady-\n    state analysis:\n\nWECC Seed Case             PSLF Base Case Name                                   Description\n                                         Heavy Summer Peak Scenarios\n                   27HS_IVCM_Peak_pre.sav                   2027 Heavy Summer without Project (pre-case)\n                   27HS_IVCM_150MW_Peak.sav                 2027 Heavy Summer with Project (150MW)\n  25HS4a.sav       27HS_IVCM_200MW_Peak.sav                 2027 Heavy Summer with Project (200MW)\n                   27HS_IVCM_250MW_Peak.sav                 2027 Heavy Summer with Project (250MW)\n                   27HS_IVCM_500MW_Peak.sav                 2027 Heavy Summer with Project (500MW)\n                                    Heavy Summer Solar Reduced Scenarios\n                   27HS_IVCM_Solar_Reduced_pre.sav          2027 Heavy Summer without Project (pre-case); 20% solar\n                   27HS_IVCM_150MW_Solar_Reduced.sav 2027 Heavy Summer with Project (150MW); 20% solar\n  25HS4a.sav       27HS_IVCM_200MW_Solar_Reduced.sav 2027 Heavy Summer with Project (200MW); 20% solar\n                   27HS_IVCM_250MW_Solar_Reduced.sav 2027 Heavy Summer with Project (250MW); 20% solar\n                   27HS_IVCM_500MW_Solar_Reduced.sav 2027 Heavy Summer with Project (500MW); 20% solar\n                              Light Spring Early Morning Solar Reduced Scenarios\n                   27LSP_IVCM_Solar_Reduced_pre.sav         2027 Light Spring without Project (pre-case); 40% solar\n                   27LSP_IVCM_150MW_Solar_Reduced.sav 2027 Light Spring with Project (150MW); 40% solar\n 26LSP1Sa.sav      27LSP_IVCM_200MW_Solar_Reduced.sav 2027 Light Spring with Project (200MW); 40% solar\n                   27LSP_IVCM_250MW_Solar_Reduced.sav 2027 Light Spring with Project (250MW); 40% solar\n                   27LSP_IVCM_500MW_Solar_Reduced.sav 2027 Light Spring with Project (500MW); 40% solar\n                                   TABLE 2: SUMMARY OF BASE CASES ANALYZED\n\n   The GE PSLF version 23.0.8.2 so ware was used to analyze the pre and post Project study cases, with\n   respect to the North American Electric Reliability Corpora on (NERC) revised NERC TPL-001-5.1 standard,\n   reflec ng the use of P0-P7 outage categories and the corresponding WECC system performance criteria.\n   GE PSLF was also used to check for system performance criteria viola ons in each of the post-Project\n   cases when comparing to the corresponding pre-Project case. GE ProvisoHD was u lized to accumulate\n   the power flow results in order to facilitate the comparison between pre and post Project cases. The base\n   cases developed are designed to reflect the IID electrical system via loads, resources, topology and\n   condi ons expected when the project starts opera on. While it is impossible to study all the IID\n   transmission system flows and genera on levels during all seasons, these pre-Project base cases\n   represent extreme genera on and transmission flows that will poten ally expose any transmission\n   constraints at the POI. However, the IID cannot guarantee that the Project can operate at its maximum\n   ra ng year-round without impac ng the transmission system, during mes and seasons not studied.\n\n    5/22/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                           10\n                                         FEASIBILITY STUDY\n\fCase 3:26-cv-00128-JLS-BJW              Document 1-43         Filed 01/09/26        PageID.288        Page\n                                             36 of 132\n\n\n Steady State Con\u019fngency Analysis:\n The assessment considered all of IIDs credible single and mul ple con ngencies, as well as the most\n severe mul ple con ngencies within the IID system. External con ngencies that are known to cause the\n most severe impacts to the IID transmission system were analyzed also. The scope of the steady-state\n analysis consisted of thermal, voltage magnitude and angle di\ufb00erence viola ons. The full suite of NERC\n standard TPL-001-5.1 con ngency sets, P1-P7, was analyzed.\n\n\n STUDY RESULTS AND CONCLUSION\n\n The Imperial Irriga on District (IID) conducted a high-level feasibility study for the proposed Project at\n various loading levels, with the POI located on the 230kV 'S' Line between IID\u2019s El Centro substa on and\n SDG&E\u2019s Imperial Valley substa on. The study evaluated mul ple loading and genera on scenarios for\n the Project\u2019s target year, using Heavy Summer and Light Spring cases. Below are the findings and results\n for each loading scenario:\n\n 150 MW load\n     x Results showed there were no thermal viola ons in IID\u2019s transmission system under P0-P7\n       con ngencies. Project did not cause any buses to experience voltage exceedances or\n       devia ons.\n\n 200 MW load\n     x Results showed there were no thermal viola ons in IID\u2019s transmission system under P0-P7\n       con ngencies. Project did not cause any buses to experience voltage exceedances or\n       devia ons.\n\n 250 MW load\n     x Results showed there were no thermal viola ons in IID\u2019s transmission system under P0-P7\n       con ngencies. Project did not cause any buses to experience voltage exceedances or\n       devia ons.\n\n 500 MW load\n     x Thermal and voltage viola ons were found under the following outage:\n       - P1: Loss of 230kV \u2018S\u2019 Line between 230kV Imperial Valley Substa on and 230kV IVCM\n          Substa on.\n\n     x   The outage men oned above shows the Project poses a significant risk of voltage collapse due\n         to its heavy reliability on imported power and the limited transmission capacity of IID\u2019s system\n         to support such demand. In order to avoid this risk and for the project to be feasible, a new\n         independent 230kV circuit from Imperial Valley Substa on to IVCM Substa on will be needed.\n\n Please note that this is based on high-level assump ons and does not represent the final results of the\n study, as conceptual models and designs were used to verify that the proposed maximum output at the\n point of interconnec on is feasible.\n\n\n\n\n 5/22/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                           11\n                                       FEASIBILITY STUDY\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43       Filed 01/09/26     PageID.289      Page\n                                       37 of 132\n                                                                           IID-693 (10-08)\n                                                        SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                      IMPERIAL\u0231IRRIGATION\u0231DISTRICT\u0231\n                        System\u0231Impact\u0231Study\u0231Agreement\u0231\n                               Imperial Data Center #1 - 250 MW\n                                                 \u0231\n            THIS\u0231AGREEMENT\u0231is\u0231made\u0231and\u0231entered\u0231into\u0231this\u02313rd\u0231day\u0231of\u0231June,\u02312025\u0231\n   by\u0231 and\u0231 between\u0231 Imperial\u0231 Valley\u0231 Computer\u0231 Manufacturing,\u0231 LLC,\u0231 a\u0231 company\u0231\n   organized\u0231and\u0231existing\u0231under\u0231the\u0231laws\u0231of\u0231the\u0231State\u0231of\u0231Delaware\u0231and\u0231registered\u0231to\u0231\n   do\u0231 business\u0231 in\u0231 the\u0231 state\u0231 of\u0231 California\u0231 (\u0208Interconnection\u0231 Customer\u0208),\u0231 and\u0231 the\u0231\n   Imperial\u0231Irrigation\u0231District\u0231an\u0231irrigation\u0231district\u0231organized\u0231under\u0231the\u0231Water\u0231Code\u0231\n   of\u0231 the\u0231 State\u0231 of\u0231 California,\u0231 (\u0208Transmission\u0231 Provider\u0208).\u0231 Interconnection\u0231 Customer\u0231\n   and\u0231Transmission\u0231Provider\u0231each\u0231may\u0231be\u0231referred\u0231to\u0231as\u0231a\u0231\u0208Party\u0208\u0231or\u0231collectively\u0231as\u0231\n   the\u0231\u0208Parties.\u0208\u0231\n            \u0231\n                                              RECITALS\u0231\n\n           WHEREAS,\u0231 Interconnection\u0231 Customer\u0231 is\u0231 proposing\u0231 to\u0231 develop\u0231 a\u0231\n   Generating\u0231 Facility\u0231 or\u0231 generating\u0231 capacity\u0231 addition\u0231 to\u0231 an\u0231 existing\u0231 Generating\u0231\n   Facility\u0231 consistent\u0231 with\u0231 the\u0231 Interconnection\u0231 Request\u0231 submitted\u0231 by\u0231\n   Interconnection\u0231Customer\u0231dated\u0231January\u023117,\u02312025;\u0231and\u0231\n\n          WHEREAS,\u0231 Interconnection\u0231 Customer\u0231 desires\u0231 to\u0231 interconnect\u0231 the\u0231\n   Generating\u0231 Facility\u0231 with\u0231 Transmission\u0231 Provider\u2019s\u0231 Transmission\u0231 System\u0231 or\u0231\n   Distribution\u0231System;\u0231and\u0231\n\n          WHEREAS,\u0231 Transmission\u0231 Provider\u0231 has\u0231 completed\u0231 a\u0231 Scoping\u0231 Meeting\u0231\n   with\u0231Interconnection\u0231Customer;\u0231and\u0231\n\n          WHEREAS,\u0231 Interconnection\u0231 Customer\u0231 has\u0231 requested\u0231 Transmission\u0231\n   Provider\u0231 to\u0231 perform\u0231 an\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231 to\u0231 assess\u0231 the\u0231\n   impact\u0231of\u0231interconnecting\u0231the\u0231Generating\u0231Facility\u0231to\u0231the\u0231Transmission\u0231System\u0231or\u0231\n   Distribution\u0231System.\u0231\n\n         NOW,\u0231 THEREFORE,\u0231 in\u0231 consideration\u0231 of\u0231 and\u0231 subject\u0231 to\u0231 the\u0231 mutual\u0231\n   covenants\u0231contained\u0231herein\u0231the\u0231Parties\u0231agree\u0231as\u0231follows:\u0231\n\n             1.0     When\u0231used\u0231in\u0231this\u0231Agreement,\u0231unless\u0231otherwise\u0231defined\u0231herein,\u0231\n                     terms\u0231 with\u0231 initial\u0231 capitalization\u0231 shall\u0231 have\u0231 the\u0231 meaning\u0231\n                     specified\u0231in\u0231the\u0231Transmission\u0231Provider\u2019s\u0231Tariff.\u0231\n\n                                                                                         1\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43        Filed 01/09/26      PageID.290       Page\n                                     38 of 132\n                                                                           IID-693 (10-08)\n                                                        SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n             2.0   Interconnection\u0231 Customer\u0231 requests\u0231 that\u0231 Transmission\u0231 Provider\u0231\n                   prepare\u0231 an\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231 consistent\u0231\n                   with\u0231 Section\u0231 7\u0231 of\u0231 the\u0231 GIP\u0231 in\u0231 accordance\u0231 with\u0231 the\u0231 Tariff.\u0231 At\u0231\n                   Transmission\u0231 Provider\u2019s\u0231 option,\u0231 Interconnection\u0231 Customer\u2019s\u0231\n                   Interconnection\u0231 Request\u0231 may\u0231 be\u0231 studied\u0231 serially\u0231 or\u0231 in\u0231 a\u0231 cluster\u0231\n                   with\u0231 Interconnection\u0231 Requests\u0231 submitted\u0231 by\u0231 other\u0231\n                   Interconnection\u0231Customers.\u0231\n\n             3.0   The\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231 will\u0231 be\u0231 based\u0231 upon\u0231\n                   the\u0231results\u0231of\u0231the\u0231Scoping\u0231Meeting\u0231and\u0231the\u0231technical\u0231information\u0231\n                   provided\u0231 by\u0231 Interconnection\u0231 Customer\u0231 in\u0231 the\u0231 Interconnection\u0231\n                   Request,\u0231 subject\u0231 to\u0231 any\u0231 modifications\u0231 in\u0231 accordance\u0231 with\u0231\n                   Sections\u0231 4.4.1\u0231 and\u0231 7.2\u0231 of\u0231 the\u0231 GIP.\u0231 When\u0231 Clustering\u0231 is\u0231 used\u0231 to\u0231\n                   perform\u0231 the\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study,\u0231 the\u0231\n                   Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231 also\u0231 will\u0231 be\u0231 based\u0231 upon\u0231\n                   the\u0231 results\u0231 of\u0231 Scoping\u0231 Meetings\u0231 and\u0231 technical\u0231 information\u0231\n                   provided\u0231 by\u0231 other\u0231 interconnection\u0231 customers\u0231 in\u0231 their\u0231\n                   Interconnection\u0231 Requests,\u0231 subject\u0231 to\u0231 any\u0231 modifications\u0231 in\u0231\n                   accordance\u0231with\u0231Sections\u02314.4.1\u0231and\u02317.2\u0231of\u0231the\u0231GIP.\u0231Transmission\u0231\n                   Provider\u0231 has\u0231 the\u0231 right\u0231 to\u0231 request\u0231 additional\u0231 technical\u0231\n                   information\u0231 from\u0231 Interconnection\u0231 Customer\u0231 that\u0231 Transmission\u0231\n                   Provider\u0231 determines\u0231 is\u0231 reasonably\u0231 necessary,\u0231 consistent\u0231 with\u0231\n                   Good\u0231 Utility\u0231 Practice,\u0231 during\u0231 the\u0231 course\u0231 of\u0231 the\u0231 Interconnection\u0231\n                   System\u0231Impact\u0231Study.\u0231\u0231Upon\u0231request\u0231by\u0231Transmission\u0231Provider,\u0231\n                   Interconnection\u0231 Customer\u0231 shall\u0231 provide\u0231 such\u0231 additional\u0231\n                   information\u0231to\u0231Transmission\u0231Provider\u0231within\u0231seven\u0231(7)\u0231Calendar\u0231\n                   Days.\u0231\u0231\n\n             4.0   Transmission\u0231 Provider\u0207s\u0231 non\u022cbinding,\u0231 good\u0231 faith\u0231 estimate\u0231 for\u0231\n                   the\u0231 time\u0231 of\u0231 completion\u0231 of\u0231 the\u0231 Interconnection\u0231 System\u0231 Impact\u0231\n                   Study\u0231 is\u0231 December\u0231 2024\u0231 and\u0231 Transmission\u0231 Provider\u0207s\u0231 non\u022c\n                   binding,\u0231 good\u0231 faith\u0231 estimate\u0231 of\u0231 the\u0231 cost\u0231 for\u0231 completing\u0231 the\u0231\n                   Interconnection\u0231System\u0231Impact\u0231Study\u0231is\u0231$50,000.00.\u0231\n\n             5.0   If\u0231 Interconnection\u0231 Customer,\u0231 or\u0231 any\u0231 other\u0231 interconnection\u0231\n                   customer\u0231 with\u0231 an\u0231 Interconnection\u0231 Request\u0231 in\u0231 the\u0231 same\u0231 study\u0231\n                   cluster\u0231 as\u0231 the\u0231 Interconnection\u0231 Customer\u2019s\u0231 Interconnection\u0231\n                   Request,\u0231 modifies\u0231 its\u0231 designated\u0231 Point\u0231 of\u0231 Interconnection,\u0231\n                                                                                          2\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43        Filed 01/09/26     PageID.291       Page\n                                     39 of 132\n                                                                          IID-693 (10-08)\n                                                       SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                   Interconnection\u0231 Request,\u0231 or\u0231 the\u0231 technical\u0231 information\u0231 provided\u0231\n                   therein\u0231 is\u0231 modified,\u0231 the\u0231 time\u0231 to\u0231 complete\u0231 the\u0231 Interconnection\u0231\n                   System\u0231 Impact\u0231 Study\u0231 may\u0231 be\u0231 extended.\u0231 Similarly,\u0231 if\u0231 the\u0231\n                   Interconnection\u0231Request\u0231of\u0231another\u0231interconnection\u0231customer\u0231is\u0231\n                   withdrawn\u0231 from\u0231 Transmission\u0231 Provider\u2019s\u0231 queue\u0231 or\u0231 removed\u0231\n                   from\u0231 the\u0231 cluster,\u0231 the\u0231 time\u0231 to\u0231 complete\u0231 the\u0231 Interconnection\u0231\n                   System\u0231Impact\u0231Study\u0231may\u0231be\u0231extended.\u0231\u0231\n\n             6.0   Following\u0231the\u0231completion\u0231of\u0231the\u0231Interconnection\u0231System\u0231Impact\u0231\n                   Study,\u0231 the\u0231 Transmission\u0231 Provider\u0231 shall\u0231 provide\u0231 an\u0231\n                   Interconnection\u0231System\u0231Impact\u0231Study\u0231 report\u0231to\u0231Interconnection\u0231\n                   Customer.\u0231 Subject\u0231 to\u0231 the\u0231 confidentially\u0231 provisions\u0231 of\u0231 Section\u0231\n                   13.1\u0231 of\u0231 the\u0231 GIP,\u0231 this\u0231 report\u0231 shall\u0231 provide\u0231 the\u0231 following\u0231\n                   information:\u0231\n\n                   \u0010 identification\u0231 of\u0231 any\u0231 circuit\u0231 breaker\u0231 short\u0231 circuit\u0231 capability\u0231\n                     limits\u0231 exceeded\u0231 as\u0231 a\u0231 result\u0231 of\u0231 the\u0231 interconnection\u0231 or,\u0231 when\u0231\n                     Clustering\u0231is\u0231used,\u0231as\u0231a\u0231result\u0231of\u0231the\u0231interconnections\u0231 of\u0231the\u0231\n                     group\u0231of\u0231Generating\u0231Facilities\u0231studied\u0231in\u0231the\u0231cluster;\u0231\n\n                   \u0010 identification\u0231 of\u0231 any\u0231 thermal\u0231 overload\u0231 or\u0231 voltage\u0231 limit\u0231\n                     violations\u0231 resulting\u0231 from\u0231 the\u0231 interconnection\u0231 or,\u0231 when\u0231\n                     Clustering\u0231is\u0231used,\u0231resulting\u0231from\u0231the\u0231interconnections\u0231of\u0231the\u0231\n                     group\u0231of\u0231Generating\u0231Facilities\u0231studied\u0231in\u0231the\u0231cluster;\u0231\n\n                   \u0010 identification\u0231 of\u0231 any\u0231 instability\u0231 or\u0231 inadequately\u0231 damped\u0231\n                     response\u0231 to\u0231 system\u0231 disturbances\u0231 resulting\u0231 from\u0231 the\u0231\n                     interconnection\u0231 or\u0231 when\u0231 Clustering\u0231 is\u0231 used,\u0231 resulting\u0231 from\u0231\n                     the\u0231 interconnections\u0231 of\u0231 the\u0231 group\u0231 of\u0231 Generating\u0231 Facilities\u0231\n                     studied\u0231in\u0231the\u0231cluster;\u0231and\u0231\n\n                   \u0010 a\u0231 description\u0231 and\u0231 non\u022cbinding,\u0231 good\u0231 faith\u0231 estimate\u0231 of\u0231 the\u0231\n                     cost\u0231and\u0231time\u0231to\u0231construct\u0231facilities\u0231projected\u0231to\u0231be\u0231required\u0231\n                     to\u0231 interconnect\u0231 the\u0231 Generating\u0231 Facility\u0231 to\u0231 the\u0231 Transmission\u0231\n                     System\u0231or\u0231Distribution\u0231System,\u0231or,\u0231when\u0231Clustering\u0231is\u0231used,\u0231\n                     to\u0231interconnect\u0231of\u0231the\u0231group\u0231of\u0231Generating\u0231Facilities\u0231studied\u0231\n                     in\u0231 the\u0231 cluster,\u0231 and\u0231 to\u0231 address\u0231 the\u0231 identified\u0231 short\u0231 circuit,\u0231\n                     instability,\u0231and\u0231power\u0231flow\u0231issues.\u0231\n\n                                                                                         3\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43        Filed 01/09/26      PageID.292       Page\n                                     40 of 132\n                                                                           IID-693 (10-08)\n                                                        SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n             7.0   When\u0231 the\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231 report\u0231 is\u0231\n                   provided\u0231 to\u0231 Interconnection\u0231 Customer,\u0231 Transmission\u0231 Provider\u0231\n                   shall\u0231 invoice\u0231 Interconnection\u0231 Customer\u0231 for\u0231 the\u0231 actual\u0231 costs\u0231 of\u0231\n                   the\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study,\u0231 including\u0231\n                   Transmission\u0231Provider\u2019s\u0231administrative\u0231costs,\u0231if\u0231any,\u0231that\u0231are\u0231in\u0231\n                   excess\u0231 of\u0231 the\u0231 applicable\u0231 deposit\u0231 amount\u0231 paid\u0231 previously\u0231 by\u0231\n                   Interconnection\u0231Customer\u0231in\u0231accordance\u0231with\u0231Section\u02313.3.1(b)of\u0231\n                   the\u0231 GIP.\u0231 Interconnection\u0231 Customer\u0231 shall\u0231 pay\u0231 such\u0231 invoice\u0231\n                   within\u0231thirty\u0231(30)\u0231Calendar\u0231Days\u0231of\u0231its\u0231receipt\u0231of\u0231the\u0231invoice.\u0231\n\n             8.0   Transmission\u0231 Provider\u2019s\u0231 Interconnection\u0231 System\u0231 Impact\u0231 Study\u0231\n                   shall\u0231not\u0231be\u0231construed\u0231as\u0231confirming\u0231or\u0231endorsing\u0231the\u0231design,\u0231or\u0231\n                   as\u0231any\u0231warranty\u0231of\u0231safety,\u0231durability,\u0231reliability\u0231or\u0231suitability\u0231of\u0231\u0231 \u0231\n                   Interconnection\u0231 Customer\u2019s\u0231 Generating\u0231 Facility\u0231 or\u0231 installation\u0231\n                   thereof\u0231 for\u0231 any\u0231 use,\u0231 including\u0231 the\u0231 use\u0231 intended\u0231 by\u0231\n                   Interconnection\u0231Customer.\u0231\n\n             9.0   This\u0231Agreement\u0231shall\u0231be\u0231interpreted\u0231and\u0231enforced\u0231in\u0231accordance\u0231\n                   with\u0231 the\u0231 substantive\u0231 and\u0231 procedural\u0231 laws\u0231 of\u0231 the\u0231 State\u0231 of\u0231\n                   California.\u0231All\u0231actions\u0231or\u0231proceedings\u0231arising\u0231in\u0231connection\u0231with\u0231\n                   this\u0231 Agreement\u0231 shall\u0231 be\u0231 tried\u0231 and\u0231 litigated\u0231 exclusively\u0231 in\u0231 State\u0231\n                   court\u0231 located\u0231 in\u0231 the\u0231 County\u0231 of\u0231 Imperial,\u0231 California\u0231 and/or\u0231\n                   Federal\u0231 court\u0231 located\u0231 in\u0231 the\u0231 County\u0231 of\u0231 San\u0231 Diego,\u0231 California.\u0231\u0231\n                   The\u0231 aforementioned\u0231 choice\u0231 of\u0231 venue\u0231 is\u0231 mandatory,\u0231 thereby\u0231\n                   precluding\u0231the\u0231possibility\u0231of\u0231litigation\u0231between\u0231the\u0231Parties\u0231with\u0231\n                   respect\u0231 to\u0231 or\u0231 arising\u0231 out\u0231 of\u0231 this\u0231 Agreement\u0231 in\u0231 any\u0231 jurisdiction\u0231\n                   other\u0231 than\u0231 that\u0231 specified\u0231 in\u0231 this\u0231 section.\u0231 Each\u0231 Party\u0231 hereby\u0231\n                   waives\u0231any\u0231right\u0231it\u0231may\u0231have\u0231to\u0231assert\u0231the\u0231doctrine\u0231of\u0231forum\u0231non\u0231\n                   conveniens\u0231 or\u0231 a\u0231 similar\u0231 doctrine\u0231 or\u0231 to\u0231 object\u0231 to\u0231 venue\u0231 with\u0231\n                   respect\u0231 to\u0231 any\u0231 proceeding\u0231 brought\u0231 in\u0231 accordance\u0231 with\u0231 this\u0231\n                   section,\u0231 and\u0231 stipulates\u0231 that\u0231 the\u0231 State\u0231 court\u0231 located\u0231 in\u0231 Imperial\u0231\n                   County,\u0231 California,\u0231 and/or\u0231 a\u0231 Federal\u0231 court\u0231 located\u0231 in\u0231 the\u0231\n                   Counties\u0231 of\u0231 Imperial\u0231 and\u0231 San\u0231 Diego,\u0231 respectively,\u0231 California,\u0231\n                   shall\u0231have\u0231in\u0231personam\u0231jurisdiction\u0231and\u0231venue\u0231over\u0231each\u0231of\u0231them\u0231\n                   for\u0231 the\u0231 purpose\u0231 of\u0231 litigating\u0231 any\u0231 dispute\u0231 or\u0231 proceeding\u0231 arising\u0231\n                   out\u0231 of\u0231 or\u0231 related\u0231 to\u0231 this\u0231 Agreement.\u0231 \u0231 Each\u0231 Party\u0231 hereby\u0231\n                   authorizes\u0231service\u0231of\u0231process\u0231sufficient\u0231for\u0231personal\u0231jurisdiction\u0231\n\n                                                                                          4\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43        Filed 01/09/26      PageID.293       Page\n                                       41 of 132\n                                                                            IID-693 (10-08)\n                                                         SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                    in\u0231any\u0231action\u0231against\u0231it\u0231at\u0231the\u0231address\u0231and\u0231in\u0231the\u0231manner\u0231for\u0231the\u0231\n                    giving\u0231of\u0231notice\u0231as\u0231set\u0231forth\u0231in\u0231this\u0231Agreement.\u0231\n\n             10.0   Interconnection\u0231 Customer\u0231 shall\u0231 at\u0231 all\u0231 times\u0231 indemnify,\u0231 defend,\u0231\n                    and\u0231 save\u0231 Transmission\u0231 Provider\u0231 harmless\u0231 from,\u0231 any\u0231 and\u0231 all\u0231\n                    damages,\u0231losses,\u0231claims,\u0231including\u0231claims\u0231and\u0231actions\u0231relating\u0231to\u0231\n                    injury\u0231 to\u0231 or\u0231 death\u0231 of\u0231 any\u0231 person\u0231 or\u0231 damage\u0231 to\u0231 property,\u0231\n                    demands,\u0231 suits,\u0231 recoveries,\u0231 costs\u0231 and\u0231 expenses,\u0231 court\u0231 costs,\u0231\n                    attorney\u0231 fees,\u0231 and\u0231 all\u0231 other\u0231 obligations\u0231 by\u0231 or\u0231 to\u0231 third\u0231 parties,\u0231\n                    arising\u0231 out\u0231 of\u0231 or\u0231 resulting\u0231 from\u0231 Transmission\u0231 Provider\u2019s\u0231\n                    performance\u0231 of\u0231 its\u0231 obligations\u0231 under\u0231 this\u0231 Agreement\u0231 on\u0231 behalf\u0231\n                    of\u0231 \u0231 Interconnection\u0231 Customer,\u0231 except\u0231 in\u0231 cases\u0231 where\u0231\u0231\n                    Transmission\u0231Provider\u0231is\u0231solely\u0231negligent.\u0231\n\n             11.0   Transmission\u0231 Provider\u0231 shall\u0231 not\u0231 be\u0231 considered\u0231 to\u0231 be\u0231 in\u0231 default\u0231\n                    of\u0231 the\u0231 provisions\u0231 of\u0231 this\u0231 Agreement\u0231 if\u0231 delays\u0231 in\u0231 or\u0231 failure\u0231 of\u0231\n                    performance\u0231 shall\u0231 be\u0231 due\u0231 to\u0231 uncontrollable\u0231 forces,\u0231 the\u0231 effect\u0231 of\u0231\n                    which,\u0231 by\u0231 the\u0231 exercise\u0231 of\u0231 reasonable\u0231 diligence,\u0231 Transmission\u0231\n                    Provider\u0231 could\u0231 not\u0231 avoid.\u0231 The\u0231 term\u0231 uncontrollable\u0231 forces\u0231 shall\u0231\n                    mean\u0231 any\u0231 event\u0231 which\u0231 results\u0231 in\u0231 the\u0231 prevention\u0231 or\u0231 delay\u0231 of\u0231\n                    performance\u0231by\u0231Transmission\u0231Provider\u0231of\u0231its\u0231obligations\u0231under\u0231\n                    this\u0231 Agreement\u0231 and\u0231 which\u0231 is\u0231 beyond\u0231 the\u0231 control\u0231 of\u0231\n                    Transmission\u0231Provider.\u0231The\u0231term\u0231uncontrollable\u0231forces\u0231includes,\u0231\n                    but\u0231 is\u0231 not\u0231 limited\u0231 to,\u0231 fire,\u0231 acts\u0231 of\u0231 God,\u0231 flood,\u0231 earthquakes,\u0231\n                    storms,\u0231 lightning,\u0231 epidemic,\u0231 pandemic,\u0231 war,\u0231 riot,\u0231 civil\u0231\n                    disturbance,\u0231 sabotage,\u0231 inability\u0231 to\u0231 procure\u0231 permits,\u0231 licenses,\u0231 or\u0231\n                    authorizations\u0231from\u0231any\u0231state,\u0231local,\u0231or\u0231federal\u0231agency,\u0231or\u0231person\u0231\n                    for\u0231any\u0231of\u0231the\u0231supplies,\u0231materials,\u0231accesses,\u0231or\u0231services\u0231required\u0231\n                    to\u0231be\u0231provided\u0231by\u0231Transmission\u0231Provider\u0231under\u0231this\u0231Agreement,\u0231\n                    strikes,\u0231 work\u0231 slowdowns,\u0231 or\u0231 other\u0231 labor\u0231 disturbances,\u0231 and\u0231\n                    judicial\u0231 constraint.\u0231 The\u0231 provisions\u0231 of\u0231 this\u0231 section\u0231 shall\u0231 not\u0231 be\u0231\n                    interpreted\u0231 or\u0231 construed\u0231 to\u0231 require\u0231 Transmission\u0231 Provider\u0231 to\u0231\n                    prevent,\u0231settle,\u0231or\u0231otherwise\u0231avoid\u0231a\u0231strike,\u0231work\u0231slowdown,\u0231or\u0231\n                    other\u0231 labor\u0231 action.\u0231 Transmission\u0231 Provider\u0231 shall\u0231 give\u0231 timely\u0231\n                    written\u0231 notice\u0231 to\u0231 Interconnection\u0231 Customer\u0231 describing\u0231 the\u0231\n                    circumstances\u0231 of\u0231 uncontrollable\u0231 forces\u0231 which\u0231 prevent\u0231 the\u0231\n                    fulfillment\u0231 of\u0231 obligation\u0231 of\u0231 this\u0231 Agreement.\u0231 Transmission\u0231\n                    Provider\u0231shall\u0231give\u0231timely\u0231written\u0231notice\u0231to\u0231the\u0231Interconnection\u0231\n                                                                                            5\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW       Document 1-43        Filed 01/09/26       PageID.294       Page\n                                      42 of 132\n                                                                            IID-693 (10-08)\n                                                         SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                    Customer\u0231 that\u0231 the\u0231 uncontrollable\u0231 forces\u0231 which\u0231 prevented\u0231 the\u0231\n                    fulfillment\u0231 of\u0231 obligations\u0231 of\u0231 this\u0231 Agreement\u0231 are\u0231 no\u0231 longer\u0231\n                    present\u0231and\u0231work\u0231has\u0231resumed\u0231on\u0231those\u0231obligations.\u0231\n\n             12.0   Each\u0231Party\u0231makes\u0231the\u0231following\u0231representations,\u0231warranties\u0231and\u0231\n                    covenants:\u0231\u0231\n\n                       12.1 Such\u0231 Party\u0231 is\u0231 duly\u0231 organized,\u0231 validly\u0231 existing\u0231 and\u0231 in\u0231\n                           good\u0231 standing\u0231 under\u0231 the\u0231 laws\u0231 of\u0231 the\u0231 state\u0231 in\u0231 which\u0231 it\u0231 is\u0231\n                           organized,\u0231formed,\u0231or\u0231incorporated,\u0231as\u0231applicable;\u0231that\u0231it\u0231\n                           is\u0231qualified\u0231to\u0231do\u0231business\u0231in\u0231the\u0231state\u0231or\u0231states\u0231in\u0231which\u0231it\u0231\n                           is\u0231 located,\u0231 and\u0231 that\u0231 it\u0231 has\u0231 the\u0231 corporate\u0231 power\u0231 and\u0231\n                           authority\u0231to\u0231own\u0231its\u0231properties,\u0231to\u0231carry\u0231on\u0231its\u0231business\u0231as\u0231\n                           now\u0231 being\u0231 conducted\u0231 and\u0231 to\u0231 enter\u0231 into\u0231 this\u0231 Agreement\u0231\n                           and\u0231 carry\u0231 out\u0231 the\u0231 transactions\u0231 contemplated\u0231 hereby\u0231 and\u0231\n                           perform\u0231 and\u0231 carry\u0231 out\u0231 all\u0231 covenants\u0231 and\u0231 obligations\u0231 on\u0231\n                           its\u0231 part\u0231 to\u0231 be\u0231 performed\u0231 under\u0231 and\u0231 pursuant\u0231 to\u0231 this\u0231\u0231\n                           Agreement.\u0231\n\n                       12.2 \u0231Such\u0231 Party\u0231 has\u0231 the\u0231 right,\u0231 power\u0231 and\u0231 authority\u0231 to\u0231\n                           enter\u0231into\u0231this\u0231Agreement,\u0231to\u0231become\u0231a\u0231Party\u0231hereto\u0231and\u0231\n                          to\u0231perform\u0231its\u0231obligations\u0231hereunder.\u0231\u0231This\u0231Agreement\u0231is\u0231\n                          a\u0231 legal,\u0231 valid\u0231 and\u0231 binding\u0231 obligation\u0231 of\u0231 such\u0231 Party,\u0231\n                          enforceable\u0231 against\u0231 such\u0231 Party\u0231 in\u0231 accordance\u0231 with\u0231 its\u0231\n                          terms,\u0231except\u0231as\u0231the\u0231enforceability\u0231thereof\u0231may\u0231be\u0231limited\u0231\n                          by\u0231 applicable\u0231 bankruptcy,\u0231 insolvency,\u0231 reorganization\u0231 or\u0231\n                          other\u0231 similar\u0231 laws\u0231 affecting\u0231 creditors\u0207\u0231 rights\u0231 generally\u0231\n                           and\u0231 by\u0231 general\u0231 equitable\u0231 principles\u0231 (regardless\u0231 of\u0231\n                           whether\u0231 enforceability\u0231 is\u0231 sought\u0231 in\u0231 a\u0231 proceeding\u0231 in\u0231\n                           equity\u0231or\u0231at\u0231law).\u0231\n\n                       12.3 The\u0231 execution,\u0231 delivery\u0231 and\u0231 performance\u0231 of\u0231 this\u0231\n                          Agreement\u0231 does\u0231 not\u0231 violate\u0231 or\u0231 conflict\u0231 with\u0231 the\u0231\n                           organizational\u0231 or\u0231 formation\u0231 documents,\u0231 or\u0231 bylaws\u0231 or\u0231\n                           operating\u0231 agreement,\u0231 of\u0231 the\u0231 Party,\u0231 or\u0231 any\u0231 judgment,\u0231\n                          license,\u0231 permit,\u0231 order,\u0231 material\u0231 agreement\u0231 or\u0231 instrument\u0231\n                          applicable\u0231 to\u0231 or\u0231 binding\u0231 upon\u0231 such\u0231 Party\u0231 or\u0231 any\u0231 of\u0231 its\u0231\n                          assets.\u0231\n\n                                                                                            6\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW       Document 1-43        Filed 01/09/26     PageID.295       Page\n                                      43 of 132\n                                                                           IID-693 (10-08)\n                                                        SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                       12.4 The\u0231 Party\u0231 has\u0231 obtained\u0231 each\u0231 consent,\u0231 approval,\u0231\n                          authorization,\u0231order,\u0231or\u0231acceptance\u0231by\u0231any\u0231Governmental\u0231\n                          Authority\u0231in\u0231connection\u0231with\u0231the\u0231execution,\u0231delivery\u0231and\u0231\n                           performance\u0231 of\u0231 this\u0231 Agreement,\u0231 and\u0231 it\u0231 will\u0231 provide\u0231 to\u0231\n                           any\u0231Governmental\u0231Authority\u0231notice\u0231of\u0231any\u0231actions\u0231under\u0231\n                           this\u0231 Agreement\u0231 that\u0231 are\u0231 required\u0231 by\u0231 Applicable\u0231 Laws\u0231\n                           and\u0231Regulations.\u0231\n\n         13.0   All\u0231notices,\u0231requests,\u0231demands,\u0231and\u0231other\u0231communications\u0231required\u0231\n                or\u0231 permitted\u0231 under\u0231 this\u0231 Agreement\u0231 shall\u0231 be\u0231 in\u0231 writing,\u0231 unless\u0231\n                otherwise\u0231agreed\u0231by\u0231the\u0231Parties,\u0231and\u0231shall\u0231be\u0231delivered\u0231in\u0231person\u0231or\u0231\n                sent\u0231by\u0231certified\u0231mail,\u0231postage\u0231prepaid,\u0231by\u0231overnight\u0231delivery,\u0231or\u0231by\u0231\n                electronic\u0231mail\u0231or\u0231electronic\u0231facsimile\u0231transmission\u0231with\u0231an\u0231original\u0231\n                sent\u0231immediately\u0231thereafter\u0231by\u0231postage\u0231prepaid\u0231mail,\u0231and\u0231properly\u0231\n                addressed\u0231as\u0231follows:\u0231\n\n         \u0231      When\u0231delivered\u0231to\u0231Transmission\u0231Provider:\u0231\n\n         \u0231      Energy\u0231Contracts\u0231\n         \u0231      IMPERIAL\u0231IRRIGATION\u0231DISTRICT\u0231\n         \u0231      333\u0231Barioni\u0231Blvd.\u0231\n         \u0231      P.O.\u0231Box\u0231937\u0231\n         \u0231      Imperial,\u0231CA\u023192251\u0231\n         \u0231      Email:\u0231Energycontracts@iid.com\u0231\n\n                When\u0231delivered\u0231to\u0231Interconnection\u0231Customer:\u0231\n\n         \u0231      Imperial\u0231Valley\u0231Computer\u0231Manufacturing,\u0231LLC\u0231\n         \u0231      16400\u0231Pacific\u0231Coast\u0231Highway,\u0231Suite\u0231212\u0231\n         \u0231      Huntington\u0231Beach,\u0231CA\u023192649\u0231\n         \u0231      Email:\u0231sebastian@ruccilaw.com\u0231\u0231\n         \u0231\u0231\n   \u0231\n         14.0   Either\u0231 Party\u0231 may,\u0231 from\u0231 time\u0231 to\u0231 time,\u0231 change\u0231 its\u0231 representative\u0231 or\u0231\n                address\u0231for\u0231the\u0231purpose\u0231of\u0231notices\u0231to\u0231that\u0231Party\u0231by\u0231a\u0231similar\u0231notice\u0231\n                specifying\u0231 a\u0231 new\u0231 representative\u0231 or\u0231 address,\u0231 but\u0231 no\u0231 such\u0231 change\u0231\n                shall\u0231 be\u0231 deemed\u0231 to\u0231 have\u0231 been\u0231 given\u0231 until\u0231 such\u0231 notice\u0231 is\u0231 actually\u0231\n                received\u0231by\u0231the\u0231Party\u0231being\u0231so\u0231notified.\u0231\u0231\n\n                                                                                          7\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW           Document 1-43     Filed 01/09/26     PageID.296      Page\n                                          44 of 132\n                                                                             IID-693 (10-08)\n                                                          SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n             15.0    Where authorized in accordance with Section 4.3 of the GIP, this\n                     Agreement may be assigned and, if so assigned, the Agreement,\n                     and the rights and obligations thereof, shall be binding upon and\n                     shall insure to the benefit of the successors and assigns of the\n                     Parties hereto.\n\n             16.0    This Agreement may be executed in two or more counterparts, by\n                     facsimile signature or an e\u022cmail of a PDF signature, each of which is\n                     deemed an original but all constitute one and the same instrument.\u0231\u0231\n\n             17.0    The Parties may, by mutual agreement, amend this Agreement by a\n                     written instrument duly executed by the Parties.\n\n             18.0    This Agreement is subject to Transmission Provider\u2019s Tariff, as may\n                     be amended from time\u022cto\u022ctime.\u0231\u0231\u0231\n\n           IN WITNESS THEREOF, the Parties have caused this Agreement to be\n   duly executed by their duly authorized officers or agents on the day and year\n   first above written.\n\n\n   Imperial Irrigation District\n\n   Signature:\u0231 \u0231\n   Print\n   Name:            Jesus Martinez\n\n   Title:\u0231          \u0231 Sup. Gen. Sys. Planning and Engineering\n\n   Date:\u0231           \u02316/12/2025\n                      \u0231\u0231\u0231\u0231\u0231\n\n\n\n\n                                                                                          8\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43    Filed 01/09/26    PageID.297      Page\n                                       45 of 132\n                                                                        IID-693 (10-08)\n                                                     SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n   \u0231\n\n   Imperial\u0231Valley\u0231Computer\u0231Manufacturing,\u0231LLC\u0231\u0231\n\n   Signature:\u0231 \u0231\n   Print\u0231\n               Sebastian\u0231Rucci\u0231\n   Name:\u0231\n   Title:\u0231     Managing\u0231Member\u0231\n\n   Date:\u0231      June\u02313,\u02312025\u0231\n                                            \u0231\n\n\n\n\n                                                                                     9\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW     Document 1-43      Filed 01/09/26   PageID.298   Page\n                                    46 of 132\n\n\n\n                                                                    VERSION: DRAFT\n                                                                       JULY 25, 2025\n\n\n\n\n                             IMPERIAL VALLEY COMPUTER\n                     MANUFACTURING LLC, (DATA CENTER #1)\n                                  SYSTEM IMPACT STUDY\n\n                                                         TRANSMISSION PLANNING\n\n\n 7/25/2025   IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)          1\n                                 SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                               Document 1-43                    Filed 01/09/26                  PageID.299                 Page\n                                                              47 of 132\n\n\n\n  TABLE OF CONTENTS\n  1.      Executive Summary ........................................................................................................................... 4\n  2.      Project Description............................................................................................................................ 5\n  3.      Study Data Assumptions and Methodology ..................................................................................... 7\n       3.1 Base Cases and Assumptions .......................................................................................................... 7\n       3.2       Methodology ............................................................................................................................. 8\n          3.2.1         ^\u019a\u011e\u0102\u011a\u01c7\u0003^\u019a\u0102\u019a\u011e\u0003\u0012\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190.................................................................................... 8\n          3.2.2 Transient Stability Analysis ....................................................................................................... 8\n          3.2.3 Post-d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u037eZ\u011e\u0102\u0110\u019f\u01c0\u011e\u0003D\u0102\u018c\u0150\u015d\u0176\u037f ............................................................................. 10\n          3.3.1         Power Flow Modeling ..................................................................................................... 10\n          3.3.2 Dynamic Models .................................................................................................................... 11\n          \u03ef\u0358\u03ef\u0358\u03ef\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0003D\u017d\u011a\u011e\u016f\u015d\u0176\u0150 ....................................................................................... 11\n       3.4 System Upgrades/Mitigations....................................................................................................... 12\n  4. Study Criteria...................................................................................................................................... 12\n       4.1 NERC Reliability Standards ............................................................................................................ 12\n       4.2 WECC Reliability Criteria ............................................................................................................... 12\n       4.3 Steady State Study Criteria ........................................................................................................... 12\n          4.3.1 Normal Overloads .................................................................................................................. 13\n          4.3.2 Emergency Overloads ............................................................................................................ 13\n          4.3.3 Voltage Criteria....................................................................................................................... 14\n       4.3 Transient Stability Data ................................................................................................................. 14\n          4.4.1 Bus Voltage ............................................................................................................................. 14\n          4.4.2 Bus Frequency ........................................................................................................................ 16\n       4.5 Reactive Margin Criteria ............................................................................................................... 16\n  5. Study Results ....................................................................................................................................... 16\n       5.1 Power Flow Analysis:..................................................................................................................... 16\n          5.1.1 (2027) Heavy Summer Peak ................................................................................................... 17\n          5.1.2 (2027) Heavy Summer Peak Solar Reduced 20% ................................................................... 17\n          5.1.3 (2027) Light Spring Solar Reduced 40% ................................................................................. 17\n       5.2 Transient Stability Analysis ........................................................................................................... 17\n          5.2.1 (2027) Heavy Summer Transient Stability Results.................................................................. 17\n          5.2.2 (2027) Heavy Summer Solar Reduced Transient Stability Results.......................................... 17\n          5.2.3 (2027) Light Spring Solar Reduced Transient Stability Results ............................................... 17\n       5.3 Post Transient Stability and Reactive Power Margin: Heavy Summer ......................................... 17\n 7/25/2025             IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                                                                       2\n                                           SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                             Document 1-43                     Filed 01/09/26                 PageID.300                  Page\n                                                            48 of 132\n\n\n  6.   Conclusion ....................................................................................................................................... 18\n\n\n\n\n 7/25/2025           IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                                                                        3\n                                         SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-43           Filed 01/09/26        PageID.301         Page\n                                              49 of 132\n\n\n\n1. EXECUTIVE SUMMARY\n\n d\u015a\u011e\u0003/\u0175\u0189\u011e\u018c\u015d\u0102\u016f\u0003/\u018c\u018c\u015d\u0150\u0102\u019f\u017d\u0176\u0003\u0018\u015d\u0190\u019a\u018c\u015d\u0110\u019a\u0003\u037e//\u0018\u037f\u0003\u018c\u011e\u0110\u011e\u015d\u01c0\u011e\u011a a request from Imperial Valley Computer Manufacturing LLC\n \u037e\u0012\u01b5\u0190\u019a\u017d\u0175\u011e\u018c\u037f\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u0003their Imperial Data Center Campus (Project) in the Imperial Valley.\n The facility\u2019s \u0189\u018c\u017d\u0189\u017d\u0190\u011e\u011a\u0003W\u017d\u015d\u0176\u019a\u0003\u017d\u0128\u0003/\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u037eWK/\u037f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003//\u0018\u0003^\u01c7\u0190\u019a\u011e\u0175\u0003\u015d\u0190\u0003at the 230kV \u2018S\u2019 line between\n IID\u2019s El Centro \u0190\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003 \u0190\u019a\u0102\u019f\u017d\u0176\u0003 \u037e\u001c\u0012^^\u037f and San Diego Gas & Electric\u2019s (SDG&E\u2019s) Imperial Valley\n \u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176. \u0004\u0190\u0003\u0189\u0102\u018c\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u015d\u0190\u0003\u0190\u019a\u01b5\u011a\u01c7\u0355\u0003//\u0018\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u03ee\u03f1\u03ec\u0003Dt of load \u019a\u017d\u0003\u0102\u0190\u0190\u011e\u0190\u0190\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\n system impacts and infrastructure requirements. \u0012\u017d\u0175\u0175\u011e\u018c\u0110\u015d\u0102\u016f\u0003K\u0189\u011e\u018c\u0102\u019f\u017d\u0176\u0003Date (COD) is planned to be in\n service by the year 2027.\n\n IID\u2019s Transmission Planning Department performed a System Impact Study (SIS) \u019a\u017d\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\n \u015d\u0175\u0189\u0102\u0110\u019a\u0003 \u017d\u0128\u0003 \u015d\u0176\u019a\u011e\u0150\u018c\u0102\u019f\u0176\u0150\u0003 \u019a\u015a\u015d\u0190\u0003 W\u018c\u017d\u0169\u011e\u0110\u019a\u0003 \u015d\u0176\u019a\u017d\u0003 \u019a\u015a\u011e\u0003 //\u0018\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0358\u0003 d\u015a\u011e\u0003 \u0190\u019a\u01b5\u011a\u01c7\u0003 \u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003\n (steady-state), transient stability, and post-transient stability analysis. The scope of the analyses is to\n \u015d\u011a\u011e\u0176\u019f\u0128\u01c7\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u0190\u017d\u016f\u011e\u016f\u01c7\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0102\u0176\u011a\u0003\u018c\u011e\u015d\u0176\u0128\u017d\u018c\u0110\u011e\u0175\u011e\u0176\u019a\u0190\u0003\n \u0176\u011e\u0110\u011e\u0190\u0190\u0102\u018c\u01c7\u0003\u019a\u017d\u0003\u0175\u015d\u019f\u0150\u0102\u019a\u011e\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u01c0\u011e\u018c\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u019a\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\n following scenarios were studied accordingly:\n        \u00be 2027 Heavy Summer\n        \u00be 2027 Heavy Summer (Solar reduced)\n        \u00be 2027 Light Spring (Early morning solar reduced)\n Each scenario includes two versions, a pre-case and a post-case including the project load. All cases\n \u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u0003\u0102\u016f\u016f\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003\u01c1\u015d\u019a\u015a\u0003\u0102\u0176\u0003\u011e\u01c6\u011e\u0110\u01b5\u019a\u011e\u011a\u0003'\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003/\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u0004\u0150\u018c\u011e\u011e\u0175\u011e\u0176\u019a\u0003\u037e'/\u0004\u037f\u0355\u0003\u0189\u016f\u0102\u0176\u0176\u011e\u011a\u0003//\u0018\u0003\n \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0355\u0003\u0102\u0190\u0003\u01c1\u011e\u016f\u016f\u0003\u0102\u0190\u0003\u0102\u0176\u019f\u0110\u015d\u0189\u0102\u019a\u011e\u011a\u0003\u011a\u015d\u0190\u019a\u018c\u015d\u010f\u01b5\u019f\u017d\u0176\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003\u0102\u0190\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u03ee\u03ec\u03ee\u03f0-33\n Capital Investment plan. The project was modeled as a new load with a value of 250 MW for the year\n 2027. The analysis tested the impact of the load addi\u019fon on the reliability of IID\u2019s electrical system.\n\n\n Note: IID Transmission Planning assumed that the majority of the power required to serve this load\n would be imported for the purposes of this study. IID currently does not have the capability to reliably\n support a large-\u0190\u0110\u0102\u016f\u011e\u0003 \u016f\u017d\u0102\u011a\u0003\u018c\u011e\u018b\u01b5\u015d\u018c\u015d\u0176\u0150\u0003 \u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003\u03ee\u03f0-hour service \u01c1\u015d\u019a\u015a\u0003\u011e\u01c6\u015d\u0190\u019f\u0176\u0150\u0003\u018c\u011e\u0190\u017d\u01b5\u018c\u0110\u011e\u0190. As such, this\n report does not represent a commitment by IID to serve the requested load.\n\n\n\n\n 7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                                 4\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43         Filed 01/09/26       PageID.302        Page\n                                            50 of 132\n\n\n\n2. PROJECT DESCRIPTION\n The proposed Project consists of a large-scale data center campus, upwards of 250MW, that is to be\n placed in a land parcel near the 230kV \u2018S\u2019 line between IID\u2019s El Centro \u0190\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003\u0190\u019a\u0102\u019f\u017d\u0176 and SDG&E\u2019s\n Imperial s\u0102\u016f\u016f\u011e\u01c7\u0003\u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0355 which will serve as the POI for the Project. The Project had an assumed power\n factor of 0.95. The Figures 1, 2, & 3 below indicate the single line diagram\u0355\u0003\u0150\u011e\u017d\u0150\u018c\u0102\u0189\u015a\u015d\u0110\u0102\u016f\u0003\u016f\u017d\u0110\u0102\u019f\u017d\u0176\u0355\u0003\u0102\u0176\u011a\u0003\n site plan of the Project.\n\n\n\n\n                                  FIGURE 1: PROJECT SINGLE LINE DIAGRAM\n\n\n \u038eE\u017d\u019a\u011e\u0357\u0003\u0011\u0102\u0190\u011e\u011a\u0003\u017d\u0176\u0003\u0102\u0003\u0128\u011e\u0102\u0190\u015d\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0190\u019a\u01b5\u011a\u01c7\u0355\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u015d\u019f\u0102\u016f\u0003\u0189\u018c\u017d\u0189\u017d\u0190\u011e\u011a\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0102\u019a\u0003\u03f1\u03ec\u03ecDt\u0003\u015a\u0102\u0190\u0003\u0176\u017d\u01c1\u0003\u010f\u011e\u011e\u0176\u0003\u018c\u011e\u011a\u01b5\u0110\u011e\u011a\u0003\u019a\u017d\u0003\n 250MW. The single line has not been updated and serves as a high-level \u011e\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0102\u016f\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0102\u019f\u017d\u0176\u0358\u0003\n\n\n\n\n 7/25/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                           5\n                                    SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43         Filed 01/09/26   PageID.303   Page\n                                     51 of 132\n\n\n\n\n                          FIGURE 2: PROJECT GEOGRAPHICAL LOCATION\n\n\n\n\n                                FIGURE 3: PROJECT SITE PLAN\n\n\n 7/25/2025   IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)            6\n                                 SYSTEM IMPACT STUDY\n\f  Case 3:26-cv-00128-JLS-BJW                 Document 1-43           Filed 01/09/26         PageID.304         Page\n                                                  52 of 132\n\n\n\n   3. STUDY DATA ASSUMPTIONS AND METHODOLOGY\n   3.1 BASE CASES AND ASSUMPTIONS\n    s\u0102\u018c\u015d\u017d\u01b5\u0190\u0003 \u010f\u0102\u0190\u011e\u0003 \u0110\u0102\u0190\u011e\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 \u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003 \u0128\u017d\u018c\u0003 \u019a\u015a\u015d\u0190\u0003 \u0102\u0190\u0190\u011e\u0190\u0190\u0175\u011e\u0176\u019a\u0003 \u01c1\u015d\u019a\u015a\u0003 \u019a\u015a\u011e\u0003 \u015d\u0176\u019a\u011e\u0176\u019a\u0003\u019a\u017d\u0003 \u0110\u017d\u01c0\u011e\u018c\u0003 \u0102\u016f\u016f\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\n    \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0355\u0003\u0102\u0176\u011a\u0003\u019a\u017d\u0003\u011a\u017d\u0110\u01b5\u0175\u011e\u0176\u019a\u0003\u0102\u016f\u016f\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u019a\u015a\u0102\u019a\u0003\u0110\u017d\u01b5\u016f\u011a\u0003\u010f\u011e\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u016f\u011e\u0175\u011e\u0176\u019a\u0102\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\n    Project. \u0004\u0176\u01c7\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u019a\u015a\u0102\u019a had \u0102\u0176\u0003 \u011e\u01c6\u011e\u0110\u01b5\u019a\u011e\u011a\u0003 '\u011e\u0176\u011e\u018c\u0102\u019fon /\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003 \u0004\u0150\u018c\u011e\u011e\u0175\u011e\u0176\u019a\u0003 \u037e'/\u0004\u037f\u0355\u0003 \u0102\u0003W\u017d\u01c1\u011e\u018c\u0003\n    Purchase Agreement (PPA), or a Tolling Agreement with the IID, and the project is in accordance with\n    \u0190\u011e\u0110\u019f\u017d\u0176\u0003 \u03f0\u0358\u03ec\u0003 \u017d\u0128\u0003 //\u0018\u2019s Planning Standards was included in the base cases\u0358\u0003 \u0018\u015d\u0190\u019a\u018c\u015d\u010f\u01b5\u019f\u017d\u0176\u0003 \u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003\n    included with either an executed Joint Power Agreement (JPA) or \u0102\u0003\u012e\u0176\u0102\u016f\u015d\u01cc\u011e\u011a\u0003system impact study. The\n    base cases were \u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003\u019a\u017d\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003,\u011e\u0102\u01c0\u01c7\u0003^\u01b5\u0175\u0175\u011e\u018c\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0355\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u015a\u015d\u0150\u015a\u0003\u016f\u017d\u0102\u011a\u0003\n    \u01c1\u015d\u019a\u015a\u0003 \u015a\u015d\u0150\u015a\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003 \u0004\u0003 ,\u011e\u0102\u01c0\u01c7\u0003 ^\u01b5\u0175\u0175\u011e\u018c\u0003 \u0190\u011e\u0176\u0190\u015d\u019f\u01c0\u015d\u019a\u01c7\u0003 \u011a\u01b5\u018c\u015d\u0176\u0150\u0003 \u019a\u015a\u011e\u0003 \u019f\u0175\u011e\u0003 \u0128\u018c\u0102\u0175\u011e\u0003 \u017d\u0128\u0003 \u03ed\u03f5\u03ec\u03ec-2100,\n    \u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u015a\u015d\u0150\u015a\u0003\u016f\u017d\u0102\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u011a\u01b5\u0110\u011e\u011a\u0003\u0190\u017d\u016f\u0102\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003&\u015d\u0176\u0102\u016f\u016f\u01c7\u0355\u0003>\u015d\u0150\u015a\u019a\u0003^\u0189\u018c\u015d\u0176\u0150\u0003\u0190\u011e\u0176\u0190\u015d\u019f\u01c0\u015d\u019a\u01c7\u0355\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u019f\u0175\u011e\u0003\u0128\u018c\u0102\u0175\u011e\u0003\n    of 0600-\u03ec\u03f4\u03ec\u03ec\u0355\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u0175\u017d\u011a\u011e\u018c\u0102\u019a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u011a\u01b5\u0110\u011e\u011a\u0003\u0190\u017d\u016f\u0102\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003\n\n    Table 1 below lists the WECC approved base cases that were used to model the IID system:\n\nWECC Seed Case               PSLF Base Case Name                                       Description\n                                          Heavy Summer Peak Scenarios\n                    27HS_IVCM_Peak_pre.sav                   2027 Heavy Summer without Project (pre-case)\n  25HS4a.sav\n                    27HS_IVCM_250MW_Peak.sav                 2027 Heavy Summer with Project (250MW)\n                                     Heavy Summer Solar Reduced Scenarios\n                    27HS_IVCM_Solar_Reduced_pre.sav          2027 Heavy Summer without Project (pre-case); 20% solar\n  25HS4a.sav\n                    27HS_IVCM_250MW_Solar_Reduced.sav 2027 Heavy Summer with Project (250MW); 20% solar\n                               Light Spring Early Morning Solar Reduced Scenarios\n                    27LSP_IVCM_Solar_Reduced_pre.sav         2027 Light Spring without Project (pre-case); 40% solar\n 26LSP1Sa.sav\n                    27LSP_IVCM_250MW_Solar_Reduced.sav 2027 Light Spring with Project (250MW); 40% solar\n                                      TABLE 1: SUMMARY OF BASE CASES ANALYZED\n\n   The GE PSLF version 23.0.8.2 \u0190\u017d\u014c\u01c1\u0102\u018c\u011e\u0003\u01c1\u0102\u0190\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u011e\u0003\u0102\u0176\u011a\u0003\u0189\u017d\u0190\u019a\u0003Project study cases, with\n   respect to the E\u017d\u018c\u019a\u015a\u0003\u0004\u0175\u011e\u018c\u015d\u0110\u0102\u0176\u0003\u001c\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0003Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0012\u017d\u018c\u0189\u017d\u018c\u0102\u019f\u017d\u0176\u0003\u037eE\u001cZ\u0012\u037f\u0003revised NERC TPL-001-5.1 standard,\n   \u018c\u011e\u0147\u011e\u0110\u019f\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u01b5\u0190\u011e\u0003\u017d\u0128\u0003W0-P7 outage categories and the corresponding WECC system performance criteria.\n   GE PSLF was also used to check for system performance crit\u011e\u018c\u015d\u0102\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003\u011e\u0102\u0110\u015a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0189ost-Project\n   cases when comparing to the corresponding pre-Project case. '\u001c\u0003W\u018c\u017d\u01c0\u015d\u0190\u017d,\u0018\u0003\u01c1\u0102\u0190\u0003\u01b5\u019f\u016f\u015d\u01cc\u011e\u011a\u0003\u019a\u017d\u0003\u0102\u0110\u0110\u01b5\u0175\u01b5\u016f\u0102\u019a\u011e\u0003\n   \u019a\u015a\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u015dn order to facilitate the comparison between pre and post Project cases. The base\n   \u0110\u0102\u0190\u011e\u0190\u0003 \u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003 \u0102\u018c\u011e\u0003 \u011a\u011e\u0190\u015d\u0150\u0176\u011e\u011a\u0003 \u019a\u017d\u0003 \u018c\u011e\u0147\u011e\u0110\u019a\u0003 \u019a\u015a\u011e\u0003 //\u0018\u0003 \u011e\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0102\u016f\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0003 \u01c0\u015d\u0102\u0003 \u016f\u017d\u0102\u011a\u0190\u0355\u0003 \u018c\u011e\u0190\u017d\u01b5\u018c\u0110\u011e\u0190\u0355\u0003 \u019a\u017d\u0189\u017d\u016f\u017d\u0150\u01c7\u0003 \u0102\u0176\u011a\u0003\n   \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003 \u01c1\u015a\u011e\u0176\u0003 \u019a\u015a\u011e\u0003 \u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003 \u0190\u019a\u0102\u018c\u019a\u0190\u0003 \u017d\u0189\u011e\u018c\u0102\u019f\u017d\u0176\u0358\u0003 While it is impossible to study all the IID\n   \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0003 \u0147\u017d\u01c1\u0190\u0003 \u0102\u0176\u011a\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u016f\u011e\u01c0\u011e\u016f\u0190\u0003 \u011a\u01b5\u018c\u015d\u0176\u0150\u0003 \u0102\u016f\u016f\u0003 \u0190\u011e\u0102\u0190\u017d\u0176\u0190\u0355\u0003 \u019a\u015a\u011e\u0190\u011e\u0003 \u0189\u018c\u011e-Project base cases\n   \u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003 \u011e\u01c6\u019a\u018c\u011e\u0175\u011e\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u0102\u0176\u011a\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0147\u017d\u01c1\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u01c1\u015d\u016f\u016f\u0003 \u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u016f\u01c7\u0003 \u011e\u01c6\u0189\u017d\u0190\u011e\u0003 \u0102\u0176\u01c7\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\n   constraints at the POI. However, the IID cannot guarantee that the Project can operate at its maximum\n   \u018c\u0102\u019fng year-\u018c\u017d\u01b5\u0176\u011a\u0003\u01c1\u015d\u019a\u015a\u017d\u01b5\u019a\u0003\u015d\u0175\u0189\u0102\u0110\u019f\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175, \u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u019f\u0175\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0190\u011e\u0102\u0190\u017d\u0176\u0190\u0003\u0176\u017d\u019a\u0003\u0190\u019a\u01b5\u011a\u015d\u011e\u011a\u0358\n\n\n\n\n    7/25/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                                  7\n                                         SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43          Filed 01/09/26       PageID.305          Page\n                                            53 of 132\n\n\n\n 3.2 METHODOLOGY\nSteady state, transient stability and post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003analysis were performed for this\nassessment. Table 2 describes the type of analysis completed on each base case.\n\n\n                                                  Steady\n             PSLF Base Case Name                         Transient Stability          Post Transient\n                                                   State\n   27HS_IVCM_Peak_pre.sav                            X                X                         X\n   27HS_IVCM_250MW_Peak.sav                          X                X                         X\n   27HS_IVCM_Solar_Reduced_pre.sav                   X                X\n   27HS_IVCM_250MW_Solar_Reduced.sav                 X                X\n   27LSP_IVCM_Solar_Reduced_pre.sav                  X                X\n   27LSP_IVCM_250MW_Solar_Reduced.sav                X                X\n              TABLE 2: DESCRIPTION OF THE ANALYSIS COMPLETED ON DEVELOPED BASE CASES VIA PSLF\n\n\n 3.2.1 ^\u019a\u011e\u0102\u011a\u01c7\u0003^\u019a\u0102\u019a\u011e\u0003\u0012\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\n The assessment considered all of IIDs credible single and \u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0355\u0003\u0102\u0190\u0003 \u01c1\u011e\u016f\u016f\u0003\u0102\u0190\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u0190\u019a\u0003\n \u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0358\u0003\u001c\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u019a\u015a\u0102\u019a\u0003\u0102\u018c\u011e\u0003\u016c\u0176\u017d\u01c1\u0176\u0003\u019a\u017d\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u019a\u015a\u011e\u0003\n \u0175\u017d\u0190\u019a\u0003\u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u01c1\u011e\u018c\u011e\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u011a\u0003\u0102\u016f\u0190\u017d\u0358\u0003d\u015a\u011e\u0003\u0190\u0110\u017d\u0189\u011e\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u019a\u011e\u0102\u011a\u01c7-state\n analysi\u0190\u0003\u0110\u017d\u0176\u0190\u015d\u0190\u019a\u011e\u011a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0355\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003\u0102\u0176\u011a\u0003\u0102\u0176\u0150\u016f\u011e\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u0110\u011e\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u01b5\u016f\u016f\u0003\u0190\u01b5\u015d\u019a\u011e\u0003\u017d\u0128\u0003E\u001cZ\u0012\u0003\n standard TPL-001-5.1 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0190\u011e\u019a\u0190\u0355\u0003W\u03ed-W\u03f3\u0355\u0003\u01c1\u0102\u0190\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u011a\u0358\n\n 3.2.2 Transient Stability Analysis\n Transient stability \u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u015d\u0190\u0003\u0102\u0003\u019f\u0175\u011e-\u010f\u0102\u0190\u011e\u011a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u0102ssesses the performance of the power system\n \u0190\u015a\u017d\u018c\u019a\u016f\u01c7\u0003\u010f\u011e\u0128\u017d\u018c\u011e\u0355\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0355\u0003\u0102\u0176\u011a\u0003\u0102\u014c\u011e\u018c\u0003\u0102\u0003\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u011a\u015d\u0190\u019a\u01b5\u018c\u010f\u0102\u0176\u0110\u011e\u0358\u0003/\u0176\u015d\u019f\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u0102\u018c\u011e\u0003\u0110\u015a\u0102\u018c\u0102\u0110\u019a\u011e\u018c\u015d\u01cc\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\n \u0147\u017d\u01c1\u0003\u0110\u0102\u0190\u011e\u0003\u0102\u0176\u011a\u0003\u0175\u017d\u011a\u011e\u016f\u0003\u011e\u018b\u01b5\u0102\u019f\u017d\u0176\u0190\u0003\u0102\u018c\u011e\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u0003\u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003\u010f\u011e\u015a\u0102\u01c0\u015d\u017d\u018c\u0003\u0128\u018c\u017d\u0175\u0003\u011a\u01c7\u0176\u0102\u0175\u015d\u0110\u0003\u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0190\u0355\u0003\u0190\u01b5\u0110\u015a\u0003\u0102\u0190\u0003\n gen\u011e\u018c\u0102\u019a\u017d\u018c\u0190\u0003\u0102\u0176\u011a\u0003\u016f\u017d\u0102\u011a\u0190\u0003\u017d\u01c0\u011e\u018c\u0003\u019f\u0175\u011e\u0358\u0003\u0011\u01b5\u0190\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0102\u0176\u011a\u0003\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003\u0189\u016f\u017d\u019a\u0190\u0003\u0102\u018c\u011e\u0003\u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u0102\u0176\u0003\u011e\u0175\u0189\u015a\u0102\u0190\u015d\u0190\u0003\u017d\u0176\u0003\u0102\u016f\u016f\u0003\n BES buses, and various non-BES buses in the IID system. These buses are the following:\n\n\u00be BES Buses\n    x Alhambra Switching Station 161kV                x   Highline 230kV\n    x Arkansas Switching Station 161kV                x   Hudson Ranch 230kV\n    x Avenue 58 161kV                                 x   Midway 230kV\n    x Calipatria Switching Station 230kV              x   Midway 92kV\n    x Coachella Switching 92kV                        x   Nelson Switching Station 230kV\n    x Coachella Valley 92kV                           x   Niland 161kV\n    x Coachella Valley 161kV                          x   Pilot Knob 161kV\n    x Coachella Valley 230kV                          x   Ramon 230kV\n    x El Centro Switching Station 161kV               x   Sonora Switching Station 230kV\n    x El Cento Switching Station 230kV                x   Yucca 161kV\n    x El Centro Switching Station 92kV\n\n\n\n\n 7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                            8\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                Document 1-43          Filed 01/09/26         PageID.306         Page\n                                               54 of 132\n\n\n    \u0083   Non-BES Buses\n            o Ave 42 92kV                                        o   Ave. 58 92kV\n            o Niland 92kV                                        o   El Centro 34.5kV\n            o Ramon 92kV                                         o   Blythe 161kV\n\n B\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u0102\u0003 \u0175\u011e\u0102\u0176\u0190\u0003 \u017d\u0128\u0003 \u011a\u011e\u019a\u011e\u0110\u019f\u0176\u0150\u0003 \u017d\u01b5\u019a-of-\u0190\u019a\u011e\u0189\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u0102\u0176\u011a\u0003 \u0102\u018c\u011e\u0003 \u01b5\u0190\u011e\u0128\u01b5\u016f\u0003 \u019a\u017d\u0003 \u0102\u0190\u0190\u011e\u0190\u0190\u0003 \u019a\u015a\u011e\u0003\n \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance voltage dips and peak-to-\u0189\u011e\u0102\u016c\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003 d\u015a\u011e\u0003\n voltage plots also indicate system damping response and the expected bus voltage following the\n \u011a\u015d\u0190\u019a\u01b5\u018c\u010f\u0102\u0176\u0110\u011e\u0358\u0003 \u0011\u01b5\u0190\u0003 \u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003 \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance\n \u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0190\u01c1\u015d\u0176\u0150\u0190\u0355\u0003 \u0102\u0190\u0003 \u01c1\u011e\u016f\u016f\u0003 \u0102\u0190\u0003 \u015d\u0176\u011a\u015d\u0110\u0102\u019f\u0176\u0150\u0003 \u0189\u017d\u0190\u0190\u015d\u010f\u016f\u011e\u0003 \u017d\u01c0\u011e\u018c-frequency or under-\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003\n \u0004\u011a\u011a\u015d\u019f\u017d\u0176\u0102\u016f\u016f\u01c7\u0355\u0003//\u0018\u0003\u01b5\u019f\u016f\u015d\u01cc\u011e\u0190\u0003\u0102\u0003\u011a\u01c7\u0176\u0102\u0175\u015d\u0110\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u001cW\u0012>\u0003\u0190\u0110\u018c\u015d\u0189\u019a\u0003\u019a\u017d\u0003\u0102\u0190\u0190\u015d\u0190\u019a\u0003\u015d\u0176\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019f\u0176\u0150\u0003\u015d\u0128\u0003\u0175\u017d\u0176\u015d\u019a\u017d\u018c\u011e\u011a\u0003\u010f\u01b5\u0190\u011e\u0190\u0003\u0175\u011e\u011e\u019a\u0003\n WECC regional criteria as shown in Figures 4 and 5\u0358\u0003d\u015a\u011e\u0003\u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u016f\u015d\u0190\u019a\u011e\u011a\u0003\u010f\u011e\u016f\u017d\u01c1\u0003\u015d\u0176\u0003\n d\u0102\u010f\u016f\u011e\u0003\u03ef\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0358\u0003d\u015a\u015d\u0190\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003list contains the most severe\n \u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n\n             #                                 IID Critical Contingencies\n             1      P1 - Colorado River-Red Bluff 500kV Line Fault\n             2      P1 - Coachella Valley-Mirage 230kV Line Fault\n             3      P1 - Coachella Valley-Ramon 230kV Line Fault\n             4      P1 - Devers-Mirage 230kV Line Fault\n             5      P1 - Devers-Red Bluff 500kV Line Fault\n             6      P1 - EL Centro Bank#4\n             7      P1 - Eco-Miguel 500kV Line Fault\n             8      P1 - El Centro-Mall 92kV Line Fault\n             9      P1 - El Centro Steam #2\n             10     P1 - Hassayampa-Hoodoowash 500kV Line Fault\n             11     P1 - Hassayampa-North Gila 500kV Line Fault\n             12     P1 - Imperial Valley-Eco 500kV Line Fault\n             13     P1 - Midway-Coachella Valley 230kV Circuit 1 Line Fault\n             14     P1 - Midway 1 Tap-Midway 92kV Circuit 1 Line Fault\n             15     P1 - N. Gila-Imperial Valley 500kV Line Fault\n             16     P1 - Paloverde-Colorado River 500kV Line Fault\n             17     P1 - Ramon Bank #1\n             18     P1 - Ramon-Mirage 230kV Line Fault\n             19     P1 - El Centro-Imperial Valley Data Center 230kV Line Fault\n             20     P1 - Imperial Valley Data Center-Imperial Valley 230kV Line Fault\n             21     P2 - Ave. 58 161kV Bus Fault\n             22     P2 - Colorado River Bus Fault\n             23     P2 - El Centro Bus #1 92kV Bus Fault\n             24     P2 - El Centro Bus #2 92kV Bus Fault\n\n 7/25/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                                 9\n                                      SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                 Document 1-43        Filed 01/09/26       PageID.307         Page\n                                                55 of 132\n\n\n\n               25      P2 - Midway 230kV Bus Fault\n               26      P6 - Coachella Valley-Mirage & Ramon-Mirage 230kV Line Fault\n               27      P7 - Devers-Mirage Circuit 1&2 230kV Line Fault\n               28      P7 - Coachella Valley-Mirage & Coachella Valley-Ramon 230kV Line Fault\n               29    P7 - Coachella Valley-Midway #1 and #2 230kV Line Fault\n                 TABLE 3: CRITICAL CONTINGENCIES USED FOR TRANSIENT AND POST-TRANSIENT ANALYSIS\n\n\n 3.2.3 Post-d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u037eZ\u011e\u0102\u0110\u019f\u01c0\u011e\u0003D\u0102\u018c\u0150\u015d\u0176\u037f\n Post-transient stability analysis was performed on selected buses in the IID transmission system following\n selected, most se\u01c0\u011e\u018c\u011e\u0355\u0003 \u0102\u0176\u011a\u0003 \u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0358\u0003 D\u017d\u018c\u011e\u017d\u01c0\u011e\u018c\u0355\u0003 \u0150\u017d\u01c0\u011e\u018c\u0176\u017d\u018c\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003 \u019a\u017d\u017d\u016f\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 \u01b5\u0190\u011e\u011a\u0003 for the\n analysis. For each bus assessed, a synchronous condenser was modeled to determine the highest\n \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u01c0\u0102\u015d\u016f\u0102\u010f\u016f\u011e\u0003\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u010f\u01b5\u0190\u0358\u0003\u0004\u016f\u016f\u0003\u0011\u001c^\u0003\u0102\u0176\u011a\u0003\u0176\u017d\u0176-BES buses were monitored.\n During post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0190\u0355\u0003\u019a\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0190\u0190\u01b5\u0175\u0189\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u01b5sed:\n\n     x   Loads were modeled as constant MVAs, during the post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u019f\u0175\u011e\u0003\u0128\u018c\u0102\u0175\u011e\n     x   Z\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0190\u01c1\u015d\u0176\u0150\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\u01c1\u0102\u0190\u0003\u016f\u015d\u0175\u015d\u019a\u011e\u011a\u0003\u019a\u017d\u0003\u015d\u019a\u0190\u0003\u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003\u0110\u0102\u0189\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\n     x   E\u017d\u0003\u0175\u0102\u0176\u01b5\u0102\u016f\u0003\u017d\u0189\u011e\u018c\u0102\u019a\u017d\u018c\u0003\u015d\u0176\u019a\u011e\u018c\u01c0\u011e\u0176\u019f\u017d\u0176\u0003\u01c1\u0102\u0190\u0003\u0102\u016f\u016f\u017d\u01c1\u011e\u011a\u0003\u019a\u017d\u0003\u015d\u0176\u0110\u018c\u011e\u0102\u0190\u011e\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003Ds\u0004Z\u0003\u0147\u017d\u01c1\n     x   Remedial a\u0110\u019f\u017d\u0176\u0190\u0355\u0003\u0190\u01b5\u0110\u015a\u0003\u0102\u0190\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\u011a\u018c\u017d\u0189\u0189\u015d\u0176\u0150\u0355\u0003\u016f\u017d\u0102\u011a\u0003\u0190\u015a\u011e\u011a\u011a\u015d\u0176\u0150\u0355\u0003\u017d\u018c\u0003\u010f\u016f\u017d\u0110\u016c\u015d\u0176\u0150\u0003\u017d\u0128\u0003\u0102\u01b5\u019a\u017d\u0175\u0102\u019f\u0110\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\n         control were not considered for single outages\n\n W\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u015d\u0190\u0003\u011a\u011e\u0190\u015d\u018c\u011e\u011a\u0003\u0102\u019a\u0003\u0102\u016f\u016f\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u010f\u01b5\u0190\u011e\u0190\u0358\u0003&\u017d\u018c\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0355\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u0190\u019a-transient\n stability analysis criteria are the following:\n\n     x   For transfer paths, all P0-W\u03ed\u0003 \u011e\u01c0\u011e\u0176\u019a\u0190\u0003 \u0190\u015a\u0102\u016f\u016f\u0003 \u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003 \u0102\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0175\u0102\u018c\u0150\u015d\u0176\u0003 \u0102\u019a\u0003 \u0102\u0003\n         \u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\u017d\u0128\u0003\u03ed\u03ec\u03f1\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u019a\u018c\u0102\u0176\u0190\u0128\u011e\u018c\u0003\u0189\u0102\u019a\u015a\u0003\u0147\u017d\u01c1\u0358\u0003\n     x   For transfer paths, all P2-W\u03f3\u0003 \u011e\u01c0\u011e\u0176\u019a\u0190\u0003 \u0190\u015a\u0102\u016f\u016f\u0003 \u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003 \u0102\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 margin at a\n         \u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\u017d\u0128\u0003\u03ed\u03ec\u03ee\u0358\u03f1\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u019a\u018c\u0102\u0176\u0190\u0128\u011e\u018c\u0003\u0189\u0102\u019a\u015a\u0003\u0147\u017d\u01c1\u0358\u0003\n     x   For load areas, all P0-W\u03ed\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0003\u0190\u015a\u0102\u016f\u016f\u0003\u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003\u0102\u0003\u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u019a\u0003\u0102\u0003\u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\n         of 105 percent of forecasted peak load.\n     x   For load areas, all P2-P7 events shall demonstrate a posi\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u019a\u0003\u0102\u0003\u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\n         of 102.5 percent of forecasted peak load.\n\n ^\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u016f\u015d\u0190\u019a\u011e\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u015d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03ef\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u0189\u017d\u0190\u019a-transient stability analysis.\n d\u015a\u011e\u0190\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u0190\u019a\u0003\u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003\n\n 3.3 MODELING\n d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u011e\u0110\u019f\u017d\u0176\u0003\u011a\u017d\u0110\u01b5\u0175\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u011a\u011e\u016f\u015d\u0176\u0150\u0003\u0175\u011e\u019a\u015a\u017d\u011a\u0190\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u015d\u0176\u0003\u0190\u019a\u011e\u0102\u011a\u01c7\u0003\u0190\u019a\u0102\u019a\u011e\u0003\u0102\u0176\u011a\u0003\n dynamics analyses.\n 3.3.1 Power Flow Modeling\n Equivalent load of project:\n           x        A 250MW equivalent load on the 230kV IVCM data center bus.\n\n\n\n\n 7/25/2025           IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                         10\n                                         SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43         Filed 01/09/26       PageID.308         Page\n                                            56 of 132\n\n\n\n 3.3.2 Dynamic Models\n WECC approved models from the GE PSLF library was used to represent the Project. For this Project,\n dynamic stability models included models for the following:\n    x   Commercial and Industrial Load\n        o WECC Composite Load Model: cmpldw\n\u03ef\u0358\u03ef\u0358\u03ef\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0003D\u017d\u011a\u011e\u016f\u015d\u0176\u0150\ns\u0102\u018c\u015d\u017d\u01b5\u0190\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0190\u0003\u037eZ\u0004^\u037f\u0003\u01c1\u011e\u018c\u011e\u0003\u0175\u017d\u011a\u011e\u016f\u011e\u011a\u0003\u015d\u0176\u0003\u0110\u017d\u0176\u0169\u01b5\u0176\u0110\u019f\u017d\u0176\u0003\u01c1\u015d\u019a\u015a\u0003\u019a\u015a\u011e\u0003\u01c0\u0102\u018c\u015d\u017d\u01b5\u0190\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003\n\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0358\u0003\u0004\u0003\u0190\u01b5\u0175\u0175\u0102\u018c\u01c7\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u01b5\u019a\u017d\u0175\u0102\u019f\u0110\u0003\u0102\u0110\u019f\u017d\u0176\u0190\u0003\u019a\u0102\u016c\u011e\u0176\u0003\u0102\u018c\u011e\u0003\u011a\u011e\u0190\u0110\u018c\u015d\u010f\u011e\u011a\u0003\u010f\u011e\u016f\u017d\u01c1\u0357\n    x   South R-Line RAS: Open breaker \u201cRNO\u201d at Dixieland will send a trip signal to K\u0110\u017d\u019f\u016f\u016f\u017d\u0003t\u011e\u016f\u016f\u0190\u0003^\u017d\u016f\u0102\u018c\u0358\u0003\n    x   North R->\u015d\u0176\u011e\u0003Z\u0004^\u0357\u0003>\u017d\u0190\u0190\u0003\u017d\u0128\u0003\u0004\u0176\u01cc\u0102\u0003\u019a\u017d\u0003K\u0102\u0190\u015d\u0190\u0003\u0102\u0176\u011a\u0003\u0004\u01c0\u011e\u0003\u03f1\u03f4\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003^\u011e\u01c0\u015d\u016f\u016f\u011e\u0003\u03ef\u0358\n    x   \u201cK\u201d line SPS: Loss of the \u201cK\u201d line, \u201cN\u201d Line, and the loss of the Niland 92/161kV transformer will\n        send a trip signal to Colgreen.\n    x   Path 42 RAS:\n        \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage and the 230kV \u201cKS\u201d line\n            \u010f\u011e\u019a\u01c1\u011e\u011e\u0176\u0003\u0012\u017d\u0102\u0110\u015a\u011e\u016f\u016f\u0102\u0003s\u0102\u016f\u016f\u011e\u01c7\u0003\u0102\u0176\u011a\u0003Z\u0102\u0175\u017d\u0176\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage and the 230kV \u201cKS\u201d line\n            \u010f\u011e\u019a\u01c1\u011e\u011e\u0176\u0003Z\u0102\u0175\u017d\u0176\u0003\u0102\u0176\u011a\u0003D\u015d\u018c\u0102\u0150\u011e\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Devers-Mirage 1 & 2: Loss of circuit numbers 1 and 2 will send a trip signal to the \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\n            \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x   Path 42 RAS N-1:\n        \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Ramon will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKS\u201d line between Ramon and Mirage will send a trip signal to the\n            \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Midway will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Midway will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x   Coachella Valley \u2013 Midway RAS:\n        \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Midway will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n        \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Midway will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x   Midway Transformer RAS N-1:\n        \u00be Loss of either bank #1 or bank #2 92/230kV Transformer at Midway will send a trip signal to\n            \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x   El Centro 161kV Bus RAS N-1:\n        \u00be >\u017d\u0190\u0190\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u03ed\u03f2\u03ed\u016cs\u0003\u0011\u01b5\u0190\u0003\u0102\u019a\u0003\u001c\u016f\u0003\u0012\u011e\u0176\u019a\u018c\u017d\u0003^\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\n            \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n\n\n\n\n 7/25/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                          11\n                                    SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43          Filed 01/09/26       PageID.309          Page\n                                            57 of 132\n\n\n\n 3.4 SYSTEM UPGRADES/MITIGATIONS\n    x   Southern 92kV R-Line Upgraded \u2013 Y\u03ee\u0003\u03ee\u03ec\u03ee\u03f2\u0003\u037eK\u0110\u017d\u019f\u016f\u016f\u017d\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   \u0012\u017d\u0102\u0110\u015a\u011e\u016f\u016f\u0102\u0003s\u0102\u016f\u016f\u011e\u01c7\u0003^\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003^\u019a\u0102\u019f\u017d\u0176\u0003h\u0189\u0150\u018c\u0102\u011a\u011e\u0003\u2013 Q2 2026 (TPL-001)\n    x   Ramon-Mirage 230kV Circuit 2 \u2013 Q4 2028 (TPL-001)\n    x   \u03ed\u03ef\u03f1Ds\u0004Z\u0003Z\u011e\u0102\u0110\u019f\u01c0\u011e\u0003^\u01b5\u0189\u0189\u017d\u018c\u019a\u0003\u0102\u019a\u0003Z\u0102\u0175\u017d\u0176\u0003\u03ee\u03ef\u03ec\u016cs\u0003\u2013 Q2 2026 \u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   ECSS RAS N-1 \u2013 Y\u03ef\u0003\u03ee\u03ec\u03ee\u03f1\u0003\u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   Northern 92kV R-Line Upgraded \u2013 Y\u03f0\u0003\u03ee\u03ec\u03ee\u03f2\u0003\u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   Midway Transformer RAS \u2013 Q4 2025 (IPP D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n 4. STUDY CRITERIA\nGrid Reliability Criteria, which incorporates the WECC and NERC planning criteria, was used for this\nassessment. IID\u2019s standards and procedures were followed during the study process.\n\n\n4.1 NERC RELIABILITY STANDARDS\nThe need \u0128\u017d\u018c\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u01c1as determined in accordance with NERC Reliability\nStandards. These standards set forth criteria for system performance requirements, which must be met\n\u01b5\u0176\u011a\u011e\u018c\u0003\u0190\u0189\u011e\u0110\u015d\u012e\u0110\u0003\u0190\u011e\u019a\u0003\u017d\u0128\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003E\u001cZ\u0012\u0003Reliability Standards are applicable to the\nTransmission Operators (TOs) as registered NEZ\u0012\u0003W\u016f\u0102\u0176\u0176\u015d\u0176\u0150\u0003\u0004\u01b5\u019a\u015a\u017d\u018c\u015d\u019f\u011e\u0190\u0355\u0003Transmission Planners, and are the\n\u0189\u018c\u015d\u0175\u0102\u018c\u01c7\u0003\u0190\u019a\u0102\u0176\u011a\u0102\u018c\u011a\u0190\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u0176\u011e\u01c1\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u0102\u0176\u0110\u011e\u0357\u0003\n\n    x    FAC-001: Facility \u0012\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003Z\u011e\u018b\u01b5\u015d\u018c\u011e\u0175\u011e\u0176\u019a\u0190\n    x    FAC-\u03ec\u03ec\u03ee\u0357\u0003\u0012\u017d\u017d\u018c\u011a\u015d\u0176\u0102\u019f\u017d\u0176\u0003\u017d\u0128\u0003W\u016f\u0102\u0176\u0190\u0003\u0128\u017d\u018c\u0003E\u011e\u01c1\u0003&\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\n    x    TPL-001-5.1: Transmission System Planning Performance Requirements\n\n4.2 WECC RELIABILITY CRITERIA\nThe WECC TPL system performance criteria, TPL-001-WECC-CRT-4\u0355\u0003\u0190\u011e\u019a\u0190\u0003\u0128\u017d\u018c\u019a\u015a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0102\u016f requirements that\n\u0175\u01b5\u0190\u019a\u0003\u010f\u011e\u0003\u0175\u011e\u019a\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u01c0\u0102\u018c\u015d\u017d\u01b5\u0190\u0355\u0003\u010f\u01b5\u019a\u0003\u0190\u0189\u011e\u0110\u015d\u012e\u0110\u0003\u0190\u011e\u019a\u0003\u017d\u0128\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u0102\u0176\u011a\u0003\u0175\u0102\u01c7\u0003\u010f\u011e\u0003\u0102\u0189\u0189\u016f\u015d\u0110\u0102\u010f\u016f\u011e\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003dK\u0190\u0003\u0102\u0190\u0003\nW\u016f\u0102\u0176\u0176\u015d\u0176\u0150\u0003\u0004\u01b5\u019a\u015a\u017d\u018c\u015d\u019f\u011e\u0190\u0358\n4.3 STEADY STATE STUDY CRITERIA\nThe system performance, \u01c1\u015d\u019a\u015a\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a, was evaluated under n\u017d\u018c\u0175\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u0102\u0176\u011a\u0003\nfollowing losses of a \u0190\u015d\u0176\u0150\u016f\u011e\u0003\u017d\u018c\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003Bulk Electric System (BES) element(s), \u0102\u0190\u0003\u011a\u011e\u012e\u0176\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0102\u0189\u0189\u016f\u015d\u0110\u0102\u010f\u016f\u011e\u0003\nreliability s\u019a\u0102\u0176\u011a\u0102\u018c\u011a\u0190\u0003 \u0102\u0176\u011a\u0003 \u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0358\u0003 \u0003 &\u015d\u0150\u01b5\u018c\u011e\u0003 \u03f0\u0357\u0003 >\u015d\u0190\u019f\u0176\u0150\u0003 \u017d\u0128\u0003 dW>-001-5.1 P1-W\u03f3\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003 \u011a\u011e\u0190\u0110\u018c\u015d\u0189\u019f\u017d\u0176\u0190\n\u0190\u01b5\u0175\u0175\u0102\u018c\u015d\u01cc\u011e\u0190\u0003\u019a\u015a\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110ies per NERC Reliability Standards, and WECC Regional Criteria.\n\n\n\n\n 7/25/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                            12\n                                    SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43          Filed 01/09/26       PageID.310        Page\n                                            58 of 132\n\n\n\n\n                     FIGURE 4: LISTING OF TPL-001-5.1 P1-P7 CONTINGENCY DESCRIPTIONS\n 4.3.1 Normal Overloads\n E\u017d\u018c\u0175\u0102\u016f\u0003\u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003\u0102\u018c\u011e\u0003\u019a\u015a\u017d\u0190\u011e\u0003\u019a\u015a\u0102\u019a\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0003\u03ed\u03ec\u03ec\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019a\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003P0\n \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u037e\u0176\u017d\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u037f\u0358\u0003 E\u017d\u018c\u0175\u0102\u016f\u0003 \u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003 \u0102\u018c\u011e\u0003 \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003 \u015d\u0176\u0003 \u019a\u015a\u011e\u0003 Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003 ^\u019a\u01b5\u011a\u01c7\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003\n analysis, in accordance with the Reliability Standard, TPL-001-5.1. It is required that loading of all\n \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u010f\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u015d\u018c\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003W\u03ec\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003\n\n 4.3.2 Emergency Overloads\n Emergency overloads are those that exceed 100 percent of emergen\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0102\u0176\u011a\u0003t\u001c\u0012C\n Category P1-W\u03f3\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003 \u001c\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003 \u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003 \u0102\u018c\u011e\u0003 \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003 \u015d\u0176\u0003 \u019a\u015a\u011e\u0003 Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003 ^\u019a\u01b5\u011a\u01c7\u0003\n \u0189\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u0102\u0176\u0102\u016f\u01c7\u0190is in accordance with Reliability Standards, TPL-001-5.1. It is required that loading of\n \u0102\u016f\u016f\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u010f\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u015d\u018c\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u019a\u015a\u011e\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003W\u03ed-W\u03f3\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\n \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\n 7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                          13\n                                     SYSTEM IMPACT STUDY\n\f  Case 3:26-cv-00128-JLS-BJW               Document 1-43           Filed 01/09/26        PageID.311         Page\n                                                59 of 132\n\n\n\n   4.3.3 Voltage Criteria\n   \u0004\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0003\u017d\u0110\u0110\u01b5\u018c\u0190\u0003\u015d\u0128\u0003\u0102\u0003\u010f\u01b5\u0190 within the transmission system, of each TO, fails to meet the\n   r\u011e\u018b\u01b5\u015d\u018c\u011e\u0175\u011e\u0176\u019a\u0190\u0003 \u011a\u011e\u012e\u0176\u011e\u011a\u0003 \u015d\u0176\u0003 d\u0102\u010f\u016f\u011e\u0003 \u03f0. For Voltage Criteria, b\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0190\u0003 \u0102\u018c\u011e\u0003 \u018c\u011e\u016f\u0102\u019f\u01c0\u011e\u0003 \u019a\u017d\u0003 \u019a\u015a\u011e\u0003 \u0176\u017d\u0175\u015d\u0176\u0102\u016f\u0003 \u010f\u01b5\u0190\u0003\n   voltages of the system under study.\n\n                 Normal Conditions          Contingency Conditions\n                                                                                        Voltage Deviation\n                         (P0)                      (P1-P7)\nVoltage Level\n                  VMIN        VMAX                                           Load Buses       Non-Load (P1) & All\n                                          VMIN (p.u.)       VMAX (p.u.)\n                  (p.u.)      (p.u.)                                            (P1)            Buses (P2-P7)\n   \u0447\u03ee\u03ec\u03ec\u016cs          0.95         1.05           0.9              1.1               \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n   \u0448\u03ee\u03ec\u03ec\u016cs          0.95         1.05           0.9              1.1               \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n   \u04485\u03ec\u03ec\u016cs          0.95         1.05           0.9              1.1               \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n                                             TABLE 1: VOLTAGE CRITERIA\n   d\u015a\u011e\u0003\u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003\u019a\u017d\u019a\u0102\u016f\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0003\u0128\u017d\u018c\u0003W\u03ef\u0003\u0102\u0176\u011a\u0003W\u03f2\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0003\u01c1\u015d\u016f\u016f\u0003\u010f\u011e\u0003\u0175\u011e\u0102\u0190\u01b5\u018c\u011e\u011a\u0003\u0128\u018c\u017d\u0175\u0003\u019a\u015a\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u019a\u015a\u0102\u019a\u0003\u011e\u01c6\u015d\u0190\u019a\u0190\u0003\n   \u0102\u014c\u011e\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u015d\u019f\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0003\u0102\u0176\u011a\u0003\u019a\u015a\u011e\u018c\u011e\u0128\u017d\u018c\u011e\u0003\u019a\u0102\u016c\u011e\u0190\u0003\u015d\u0176\u019a\u017d\u0003\u0110\u017d\u0176\u0190\u015d\u011a\u011e\u018c\u0102\u019f\u017d\u0176\u0003\u017d\u0176\u016f\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0003\u011a\u01b5\u011e\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0003\n   event. Buses within the IID controlled grid that cannot meet the requirements in Table 4 will be further\n   \u015d\u0176\u01c0\u011e\u0190\u019f\u0150\u0102\u019a\u011e\u011a\u0358\u0003\n\n   4.3 TRANSIENT STABILITY DATA\n   d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u015d\u0190\u0003\u0102\u0003\u019f\u0175\u011e-\u010f\u0102\u0190\u011e\u011a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u0102\u0190\u0190\u011e\u0190\u0190\u011es the performance of the power system\n   shortly before, during, and quickly \u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110y. Transient stability studies were performed to\n   verify the stability of the system following a system fault. Transient stability analysis was performed\n   based on the WECC Disturbance-Performance Criteria, for selected syste\u0175\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011encies, using Version\n   \u03ee\u03ef\u0358\u03ec\u0358\u03f4\u0358\u03ee\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003'\u001c\u0003W^>&\u0003\u0190\u017d\u014c\u01c1\u0102\u018c\u011e\u0358\u0003d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003for a minimum of 10\n   seconds, including 1 second of pre-disturbance data. Un\u016f\u011e\u0190\u0190\u0003 \u0190\u0189\u011e\u0110\u015d\u012e\u011e\u011a\u0355\u0003 \u0102\u016f\u016f\u0003 \u0128\u0102\u01b5\u016f\u019a\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 modeled as 3-\n   phases with 4 cycles of breaker \u0110\u016f\u011e\u0102\u018c\u015d\u0176\u0150\u0003 \u019f\u0175\u011e\u0358\u0003 ^\u01c7\u0190\u019a\u011e\u0175\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150\u0003 was assessed visually with the aid of\n   stability plots.\n\n   4.4.1 Bus Voltage\n   \u0011\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u0102\u0003 \u0175\u011e\u0102\u0176\u0190\u0003 \u017d\u0128\u0003 \u011a\u011e\u019a\u011e\u0110\u019f\u0176\u0150\u0003 \u017d\u01b5\u019a-of-\u0190\u019a\u011e\u0189\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u0102\u0176\u011a\u0003 \u0102\u018c\u011e\u0003 \u01b5\u0190\u011e\u0128\u01b5\u016f\u0003 \u019a\u017d\u0003 \u0102\u0190\u0190\u011e\u0190\u0190\u0003 \u019a\u015a\u011e\n   \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance voltage dips and peak-to-peak voltage \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003 d\u015a\u011e\u0003\n   voltage plots also indicate system damping response and the expected bus voltage following the\n   disturbance. WECC Regional Criteria, TPL-001-WECC-CRT-4, requires that the following criteria be\n   applied:\n       x Following fault clearing, the voltage shall recover to 80% of the pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\n            \u03ee\u03ec\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0190\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u015d\u019f\u0102\u019f\u0176\u0150\u0003\u011e\u01c0\u011e\u0176\u019a\u0003\u0128\u017d\u018c\u0003\u0102\u016f\u016f\u0003W\u03ed\u0003\u019a\u015a\u018c\u017d\u01b5\u0150\u015a\u0003W\u03f3\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0355\u0003and for each applicable BES bus\n            serving load.\n       x Following fault clearing and voltage recovery above 80%, voltage at each applicable BES bus\n            serving load shall neither dip below pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e, for more than 30 cycles, nor remain\n            below 80% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0128\u017d\u018c\u0003\u0175\u017d\u018c\u011e\u0003\u019a\u015a\u0102\u0176\u00032 seconds, for all P1 through P7 events.\n       x For c\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u01c1\u015d\u019a\u015a\u017d\u01b5\u019a\u0003a fault (P2.1 category event), voltage dips at each applicable BES bus\n            serving load shall neither dip below 70% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e, for more than 30 cycles,\n            nor remain below 80% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0128\u017d\u018c\u0003\u0175\u017d\u018c\u011e\u0003\u019a\u015a\u0102\u0176\u0003\u019a\u01c1\u017d\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0190\u0358\u0003\n       x \u0004\u016f\u016f\u0003 \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u011a\u017d\u0003 \u0176\u017d\u019a\u0003 \u0190\u015a\u017d\u01c1\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150\u0003 \u01c1\u015d\u019a\u015a\u015d\u0176\u0003 \u03ef\u03ec-seconds, \u0102\u014c\u011e\u018c\u0003 \u019a\u015a\u011e\u0003 \u0190\u019a\u0102\u018c\u019a\u0003 \u017d\u0128\u0003 \u019a\u015a\u011e\u0003\n            studied event, shall be deemed unstable.\n\n   7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                               14\n                                       SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW            Document 1-43         Filed 01/09/26   PageID.312   Page\n                                           60 of 132\n\n\n\n    x   Figure 5 and 6 represent the acceptable recovery trajectory.\n\n\n\n\n              FIGURE 5: WECC DIAGRAM REPRESENTING ADEQUATE VOLTAGE RECOVERY (DELAYED)\n\n\n\n\n              FIGURE 6: WECC DIAGRAM REPRESENTING ADEQUATE VOLTAGE RECOVERY (NORMAL)\n 7/25/2025     IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                15\n                                   SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-43          Filed 01/09/26        PageID.313         Page\n                                              61 of 132\n\n\n\n\n 4.4.2 Bus Frequency\n \u0011\u01b5\u0190\u0003\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003\u0189\u016f\u017d\u019a\u0190\u0003\u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003\u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003\u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003\u0102\u0176\u011a\u0003\u011a\u01b5\u018c\u0102\u019f\u017d\u0176 of post-disturbance frequency swings,\n and possible over-frequency or under-\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358 WECC Regional Criteria, TPL-001-WECC-\n CRT-4, requires that the following be applied:\n\n     x   \u0004\u016f\u016f\u0003 \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u011a\u017d\u0003 \u0176\u017d\u019a\u0003 \u0190\u015a\u017d\u01c1\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150, within 30-seconds, \u0102\u014c\u011e\u018c\u0003 \u019a\u015a\u011e\u0003 \u0190\u019a\u0102\u018c\u019a\u0003 \u017d\u0128\u0003 \u019a\u015a\u011e\u0003\n         studied event, shall be deemed unstable.\n\n 4.5 REACTIVE MARGIN CRITERIA\n Post-transient stability analysis was performed on selected buses in the IID transmission system,\n \u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003 \u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190. For each bus assessed, a synchronous condenser was modeled to\n \u011e\u01c6\u019a\u018c\u0102\u0110\u019a\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0355\u0003 \u01b5\u0176\u019f\u016f\u0003 \u019a\u015a\u011e\u0003 \u0189\u017d\u015d\u0176\u019a\u0003 \u01c1\u015a\u011e\u018c\u011e\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0110\u017d\u016f\u016f\u0102\u0189\u0190\u011e\u0003 \u017d\u0110\u0110\u01b5\u018c\u0190\u0358\u0003 d\u015a\u011e\u0003 \u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003\n \u0110\u017d\u0176\u0190\u01b5\u0175\u011e\u011a\u0003\u0189\u018c\u015d\u017d\u018c\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0110\u017d\u016f\u016f\u0102\u0189\u0190\u011e\u0003\u015d\u0190\u0003\u011a\u011e\u019a\u011e\u018c\u0175\u015d\u0176\u011e\u011a\u0358\u0003W\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u015d\u0190\u0003\u011a\u011e\u0190\u015d\u018c\u011e\u011a\u0003\u0102\u019a\u0003\u0102\u016f\u016f\u0003\u010f\u01b5\u0190\u011e\u0190.\n\n\n 5. STUDY RESULTS\n This System impact study modeled the new load with a total of 250MW for summer and light spring\n scenarios\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0176\u0003\u019a\u015a\u011e\u0003\u018c\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u017d\u0128\u0003//\u0018\u0190\u0003\u011e\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0102\u016f\u0003\n system.\n 5.1 POWER FLOW ANALYSIS:\n W\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u01c1\u0102\u0190\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u011e\u011a\u0003\u01b5\u0190\u015d\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03ed\u0355\u0003\u01b5\u0176\u011a\u011e\u018c\u0003^\u011e\u0110\u019f\u017d\u0176\u0003\u03ef\u0358\u0003^\u01c7\u0190\u019a\u011e\u0175\u0003\n \u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u0102\u0176\u0110\u011e\u0003\u01c1\u011e\u018c\u011e\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u037e\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u037f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0355\u0003\n in order to compare pre-Project and post-Project \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0358\u0003/\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0355\u0003\u015d\u0128\u0003\u0102\u0176\u01c7\u0355\u0003\u0102\u018c\u011e\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u0190\u017d\u016f\u011e\u016f\u01c7\u0003\n by this Project.\n\n Thermal and voltage performance of the system was evaluated for base cases under normal, (P0), single\n \u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0355\u0003 \u037eW\u03ed\u0355\u0003 W\u03ee\u037f\u0355\u0003 \u0102\u0176\u011a\u0003 \u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003 \u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003 \u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0355\u0003 \u037eW\u03ef-P7). Thermal loadings were\n \u018c\u011e\u0189\u017d\u018c\u019a\u011e\u011a\u0003\u01c1\u015a\u011e\u0176\u0003\u0102\u0003\u0175\u017d\u011a\u011e\u016f\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0110\u017d\u0175\u0189\u017d\u0176\u011e\u0176\u019a\u0003\u01c1\u0102\u0190\u0003\u016f\u017d\u0102\u011a\u011e\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u03f5\u03f1\u0439\u0003\u017d\u0128\u0003\u015d\u019a\u0190\u0003\u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003Ds\u0004\u0003\u018c\u0102\u019f\u0176\u0150\u0355\u0003\n \u037eW\u03ec\u037f\u0355\u0003\u0102\u0176\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u03f5\u03f1\u0439\u0003\u017d\u0128\u0003\u015d\u019a\u0190\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0355\u0003\u037eW\u03ed-P7). Generally, the concerns are raised when an element\n is found loaded above 100% of its nor\u0175\u0102\u016f\u0003\u017d\u018c\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0356\u0003\u015a\u017d\u01c1\u011e\u01c0\u011e\u018c\u0355\u0003\u03f5\u03f1\u0439\u0003\u01c1\u0102\u0190\u0003\u0110\u015a\u017d\u0190\u011e\u0176\u0003\u019a\u017d\u0003\u015d\u011a\u011e\u0176\u019f\u0128\u01c7\u0003\n circuits that are also at the edge of an overload. Moreover, such circuits need to be closely monitored\n \u0102\u0176\u011a\u0003\u0110\u0102\u0176\u0003\u010f\u011e\u0003\u0189\u016f\u0102\u0110\u011e\u011a\u0003\u0102\u0190\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\u0110\u0102\u0176\u011a\u015d\u011a\u0102\u019a\u011e\u0190\u0003\u0128\u017d\u018c\u0003\u0128\u01b5\u019a\u01b5\u018c\u011e\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0358\u0003\n\n Transmission voltage viola\u019f\u017d\u0176\u0190\u0003\u0128\u017d\u018c\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0355\u0003\u037eW\u03ec\u037f\u0355\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u018c\u011e\u0189\u017d\u018c\u019a\u011e\u011a\u0003\u01c1\u015a\u011e\u0176\u0003\u0189\u011e\u018c\u0003\u01b5\u0176\u015d\u019a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\n \u016f\u011e\u0190\u0190\u0003\u019a\u015a\u0102\u0176\u0003\u03ec\u0358\u03f5\u03f1\u0003\u017d\u018c\u0003\u0150\u018c\u011e\u0102\u019a\u011e\u018c\u0003\u019a\u015a\u0102\u0176\u0003\u03ed\u0358\u03ec\u03f1\u0358\u0003d\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0355\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u015d\u0176\u0150\u016f\u011e\u0003\u017d\u018c\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0355\u0003\n were reported when per unit voltages were less than 0.90 or greater tha\u0176\u0003\u03ed\u0358\u03ed\u0358\u0003s\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\n \u018c\u011e\u0110\u017d\u018c\u011a\u011e\u011a\u0003\u01c1\u015a\u011e\u0176\u011e\u01c0\u011e\u018c\u0003 \u019a\u015a\u011e\u0190\u011e\u0003 \u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 \u0150\u018c\u011e\u0102\u019a\u011e\u018c\u0003\u019a\u015a\u0102\u0176\u0003 \u03f4\u0439\u0003 \u0128\u017d\u018c\u0003 \u016f\u017d\u0102\u011a\u0003 \u0190\u011e\u018c\u01c0\u015d\u0176\u0150\u0003 \u010f\u01b5\u0190\u011e\u0190\u0003 \u0102\u0176\u011a\u0003 \u03ed\u03ec\u0439\u0003 \u0176\u017d\u0176-load\n serving buses.\n\n d\u015a\u011e\u0003\u0190\u019a\u011e\u0102\u011a\u01c7\u0003\u0190\u019a\u0102\u019a\u011e\u0003\u0190\u019a\u01b5\u011a\u01c7\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0128\u017d\u018c\u0003\u011e\u0102\u0110\u015a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0003\u015d\u0190\u0003\u011a\u011e\u0190\u0110\u018c\u015d\u010f\u011e\u011a\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u011e\u0110\u019f\u017d\u0176\u0190\u0355\u0003\u01c1\u015a\u015d\u016f\u011e\u0003\u019a\u015a\u011e\u0003\n complete results can be found in Appendix B.\n\n\n\n\n 7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                              16\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43         Filed 01/09/26          PageID.314     Page\n                                            62 of 132\n\n\n\n 5.1.1 (2027) Heavy Summer Peak\n 5.1.1.1 Voltage and Thermal Performance\n     x The project did not cause any buses in the base case to experience voltage exceedances or\n         \u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u0190\u0189\u011e\u0110\u019a\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u017d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03f0\u0358\n     x The project \u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system.\n\n 5.1.2 (2027) Heavy Summer Peak Solar Reduced 20%\n 5.1.2.1 Voltage and Thermal Performance\n     x The project did not cause any buses in the base case to experience voltage exceedances or\n         \u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\u01c1\u015d\u019ah respect to the criteria on Table 4.\n     x The project \u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system.\n\n 5.1.3 (2027) Light Spring Solar Reduced 40%\n 5.1.3.1 Voltage and Thermal Performance\n     x The project did not cause any buses in the base case to experience voltage exceedances or\n         \u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u0190\u0189\u011e\u0110\u019a\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u017d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03f0\u0358\n     x The project \u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system.\n\n 5.2 TRANSIENT STABILITY ANALYSIS\n Transient stability was performed on the Heavy Summer and Light Spring pre- and post- Project base\n cases.\n 5.2.1 (2027) Heavy Summer Transient Stability Results\n d\u015a\u011e\u0190\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u0003\u019a\u015a\u0102\u019a\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u017d\u0176\u0003//\u0018\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u0102\u0176\u01c7\u0003\n \u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix C for the 2027 Heavy Summer Transient pre and post stability plots.\n\n 5.2.2 (2027) Heavy Summer Solar Reduced Transient Stability Results\n d\u015a\u011e\u0190\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u0003\u019a\u015a\u0102\u019a\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u017d\u0176\u0003//\u0018\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u0102\u0176\u01c7\u0003\n \u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix D for the 2027 Heavy Summer Solar Reduced transient pre and post stability plots.\n\n 5.2.3 (2027) Light Spring Solar Reduced Transient Stability Results\n d\u015a\u011e\u0190\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u0003\u019a\u015a\u0102\u019a\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u017d\u0176\u0003//\u0018\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0190\u019a\u0102\u010fility under any\n \u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix E for the 2027 Light Spring Solar Reduced transient pre and post stability plots.\n\n 5.3 POST TRANSIENT STABILITY AND REACTIVE POWER MARGIN: HEAVY SUMMER\n Post-transient stability was performed on selected buses in IID transmission system following selected\n \u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0358\u0003Z\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u0003\u019a\u015a\u0102\u019a\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u017d\u0176\u0003//\u0018\u0003^\u01c7\u0190\u019a\u011e\u0175\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\n \u0102\u0176\u01c7\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\n\n Refer to Appendix F for complete post-transient \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u037e\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u037f\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190.\n\n\n\n\n 7/25/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                         17\n                                    SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-43          Filed 01/09/26        PageID.315         Page\n                                              63 of 132\n\n\n\n 6. CONCLUSION\n The System Impact Study modeled the new load with a total of 250MW for summer and light spring\n \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0176\u0003\u019a\u015a\u011e\u0003\u018c\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u017d\u0128\u0003//\u0018\u2019s electrical\n system. The Project\u2019s POI is located on the 230kV 'S' Line between IID\u2019\u0190\u0003\u001c\u016f\u0003\u0012\u011e\u0176\u019a\u018c\u017d\u0003\u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0003\u0102\u0176\u011a\u0003^\u0018'\u0398\u001c\u2019s\n /\u0175\u0189\u011e\u018c\u015d\u0102\u016f\u0003 s\u0102\u016f\u016f\u011e\u01c7\u0003 \u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0358\u0003 d\u015a\u011e\u0003 \u0190\u019a\u01b5\u011a\u01c7\u0003 \u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u011a\u0003 \u011a\u015d\u012b\u011e\u018c\u011e\u0176\u019a\u0003 \u0190\u011e\u0102\u0190\u017d\u0176\u0190\u0003 \u0102\u0176\u011a\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0003 \u0128\u017d\u018c\u0003 \u019a\u015a\u011e\u0003\n Project\u2019s target year, using Heavy Summer and Lig\u015a\u019a\u0003^\u0189\u018c\u015d\u0176\u0150\u0003\u0110\u0102\u0190\u011e\u0190\u0358\u0003\u0011\u011e\u016f\u017d\u01c1\u0003\u0102\u018c\u011e\u0003\u019a\u015a\u011e\u0003\u012e\u0176\u011a\u015d\u0176\u0150\u0190\u0003\u0102\u0176\u011a\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0128\u017d\u018c\u0003\n this loading scenario:\n\n 250 MW load\n    x Z\u011e\u0190\u01b5\u016f\u019a\u0190\u0003 \u0190\u015a\u017d\u01c1\u011e\u011a\u0003 \u019a\u015a\u011e\u018c\u011e\u0003 \u01c1\u011e\u018c\u011e\u0003 \u0176\u017d\u0003 \u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003 \u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003 \u015d\u0176\u0003 //\u0018\u2019s transmission system under P0-P7\n       \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u0102\u0176\u01c7\u0003\u010f\u01b5\u0190\u011e\u0190\u0003\u019a\u017d\u0003\u011e\u01c6\u0189\u011e\u018c\u015d\u011e\u0176\u0110\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0102\u0176\u0110\u011e\u0190\u0003\u017d\u018c\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0358\n    x Z\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u011e\u011a\u0003\u019a\u015a\u011e\u018c\u011e\u0003\u01c1\u011e\u018c\u011e\u0003\u0176\u017d\u0003\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s transmission system under\n       \u0102\u0176\u01c7\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003\n\n Study results show that this project can be deemed feasible. Please note that IID currently does not have\n the capability to reliably support a large-\u0190\u0110\u0102\u016f\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u018c\u011e\u018b\u01b5\u015d\u018c\u015d\u0176\u0150\u0003\u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003\u03ee\u03f0-hour service. As such, this\n report does not represent a commitment by IID to serve the amount of requested load.\n\n\n\n\n 7/25/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #1)                              18\n                                     SYSTEM IMPACT STUDY\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW       Document 1-43          Filed 01/09/26        PageID.316   Page\n                                          64 of 132\n\n\n\n\n                  Customer Project Development Services\n\n\n\n\n   Customer Project Application for Services of 34.5 kV and Above\n\n                                           Coachella Valley \u0003\n                   \u0010\u0083\u008b\u008e\u0200\u0013\u008a\u009b\u0095\u008b \u0083\u008e\u0003\u0004\u0086\u0086\u0094\u0087\u0095\u0095\u01e3\u0003\u037a\u0373\u01e6\u0378\u0372\u0372\u0003\u0004\u0098\u0087\u0090\u0097\u0087\u0003\u0377\u037a\u01e1\u0003\u000f\u0083\u0003\u0014\u0097\u008b\u0090\u0096\u0083\u01e1\u0003\u0006\u0004\u0003\u037b\u0374\u0374\u0377\u0375\u0003\u0003\n            \u0012\u0088\u0088\u008b \u0087\u0003 \u0091\u0097\u0094\u0095\u01e3\u0003\u0379\u01e3\u0372\u0372\u0003\u0083\u01e4\u008f\u01e4\u0003\u01e6\u0003\u0377\u01e3\u0372\u0372\u0003\u0092\u01e4\u008f\u01e4\u0003\u020b \u008e\u0091\u0095\u0087\u0086\u0003\u0087\u0098\u0087\u0094\u009b\u0003\u0091\u0096\u008a\u0087\u0094\u0003 \u0094\u008b\u0086\u0083\u009b\u020c\u0003\u0379\u0378\u0372\u01e6\u0375\u037b\u037a\u01e6\u0377\u037a\u0376\u0373\u0003\n\n                                           Imperial Valley \u0003\n                                 \u0375\u0375\u0375\u0003\u0016\u01e4\u0003\u001a\u0083\u0096\u0087\u0094\u008f\u0083\u0090\u0003\u0004\u0098\u0087\u01e4\u01e1\u0003\b\u008e\u0003\u0006\u0087\u0090\u0096\u0094\u0091\u01e1\u0003\u0006\u0004\u0003\u0003\n                    \u0010\u0083\u008b\u008e\u01e3\u0003\u0006\u0097\u0095\u0096\u0091\u008f\u0087\u0094\u0003\u0013\u0094\u0091\u008c\u0087 \u0096\u0003\u0007\u0087\u0098\u01e4\u01e1\u0003\u0013\u0012\u0003\u0005\u0091\u009a\u0003\u037b\u0375\u0379\u01e1\u0003 \u008f\u0092\u0087\u0094\u008b\u0083\u008e\u01e1\u0003\u0006\u0004\u0003\u037b\u0374\u0374\u0377\u0373\u0003\u0003\n            \u0012\u0088\u0088\u008b \u0087\u0003 \u0091\u0097\u0094\u0095\u01e3\u0003\u0379\u01e3\u0375\u0372\u0003\u0083\u01e4\u008f\u01e4\u0003\u01e6\u0003\u0377\u01e3\u0375\u0372\u0003\u0092\u01e4\u008f\u01e4\u0003\u020b \u008e\u0091\u0095\u0087\u0086\u0003\u0087\u0098\u0087\u0094\u009b\u0003\u0091\u0096\u008a\u0087\u0094\u0003 \u0094\u008b\u0086\u0083\u009b\u020c\u0003\u0379\u0378\u0372\u01e6\u0376\u037a\u0374\u01e6\u0375\u0375\u0372\u0372\n\n\n\n         \u0016\u0097\u0084\u008f\u008b\u0096\u0003 \u0091\u008f\u0092\u008e\u0087\u0096\u0087\u0086\u0003\u0088\u0091\u0094\u008f\u0003\u0096\u0091\u0003\u0096\u008a\u0087\u0003\u0083\u0084\u0091\u0098\u0087\u0003 \u0091\u0094\u0094\u0087\u0095\u0092\u0091\u0090\u0086\u008b\u0090\u0089\u0003\u0083\u0086\u0086\u0094\u0087\u0095\u0095\u0087\u0095\u01e4\n      \b\u0010\u0004 \u000f\u01e3\u0003\u0003\u0016\u0097\u0084\u008f\u008b\u0096\u0003 \u0091\u008f\u0092\u008e\u0087\u0096\u0087\u0086\u0003\u0083\u0090\u0086\u0003\u0095\u008b\u0089\u0090\u0087\u0086\u0003\u0088\u0091\u0094\u008f\u0003\u0091\u0094\u0003\u0083\u0086\u0086\u0094\u0087\u0095\u0095\u0003\u0083\u0090\u009b\u0003\u0093\u0097\u0087\u0095\u0096\u008b\u0091\u0090\u0095\u0003\u0091\u0094\u0003\n                           \u0091\u0090 \u0087\u0094\u0090\u0095\u0003\u0096\u0091\u01e3\u0003\u0017\u0006\u0016\u0013\u0337\u008b\u008b\u0086\u01e4 \u0091\u008f\n\n\n\n\n                                                                                                1\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW               Document 1-43              Filed 01/09/26        PageID.317        Page\n                                                  65 of 132\n\n\n                          Developer Customer Account Application\n                              Customer Development Operations\n                     333 SouthWaterman \u2022 El Centro, CA 92243 \u2022 (800) 303-7756\n                                      Electrical Services\n    New Account          Account Transfer/Change of Name                 Existing Account\n\n Project Information\n 1DPH\u001d\u0003IMPERIAL VALLEY HYPERSCALE DATA CENTER\n 6HUYLFH\u0003$GGUHVV\u001d\u00032300-2360 Imperial Avenue and 219-269 West Aten Road\n &LW\\\u001d\u0003Imperial                         6WDWH\u001d\u0003California                       =LS\u0003&RGH\u001d\u000392243\n 9DOOH\\\u0003 ,PSHULDO\u0003RU\u0003&RDFKHOOD \u001d\u0003Imperial\n Applicant Information\n 1DPH\u001d\u0003Imperial Valley Computer Manufacturing, LLC\n 'RLQJ\u0003%XVLQHVV\u0003$V\u0003 '%$ \u001d\u0003\n 6WUHHW\u0003$GGUHVV\u001d\u000316400 Pacific Coast Highway, Suite 212\n 0DLOLQJ\u0003$GGUHVV\u0003 LI\u0003GLIIHUHQW \u001d\u0003\n 3KRQH\u001d\u0003(562) 901-0199       (\u0010PDLO\u001d Sebastian@RucciLaw.com                     )D[\u001d\u0003(562) 249-6910\n &LW\\\u001d\u0003Huntington Beach                           6WDWH\u001d\u0003CA                     =LS\u0003&RGH\u001d\u000392649\n $IILOLDWLRQ\u0003WR\u00033URMHFW\u001d\u0003Equitable Owner of Land (Owner Under Contract)\n Account Information\n &RQWUDFW\u0003$FFRXQW\u00031R\u001d\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003                            %XVLQHVV\u00033DUWQHU\u00031R\u001d\u0003\n 0DLO\u0003%LOO\u0003$WWHQWLRQ\u00037R\u001d\u0003Sebastian Rucci                  $GGUHVV\u001d\u000316400 Pacific Coast Highway, Suite 212\n &LW\\\u001d\u0003Huntington Beach          6WDWH\u001d\u0003CA                =LS\u0003&RGH\u001d\u000392649                3KRQH\u001d\u0003(562) 901-0199\n $IILOLDWLRQ\u0003WR\u00033URMHFW\u001d\u0003Equitable Owner of Land (Owner Under Contract)\n ,I\u0003$FFRXQW\u0003ZDV\u00033UHYLRXVO\\\u00038QGHU\u0003$QRWKHU\u00031DPH\u000f\u0003SOHDVH\u0003OLVW\u0003KHUH\u001d\u0003\n ,V\u0003WKHUH\u0003\u00033URRI\u0003RI\u0003'LVVROXWLRQ\u0003IRU\u00033UHYLRXV\u0003$FFRXQW\u0003+ROGHU\u0003\u001d\u0003\u0003\u0003          \u0003\u0003<HV\u0003\u0003\u0003\u0003\u0003   \u0003\u00031R\u0003\u0003\u0003,I\u0003<HV\u000f\u0003SOHDVH\u0003\n DWWDFK\u001d\u0003\n Commercial Information\n ,V\u0003WKLV\u0003%XVLQHVV\u0003$\u00036ROH\u00033URSULHWRUVKLS\"\u0003 ,I\u0003<HV\u000f\u0003SOHDVH\u0003LQFOXGH\u0003QDPH \u001d\u0003\n ,V\u0003WKLV\u0003%XVLQHVV\u0003D\u0003&RUSRUDWLRQ\u001d\u0003\u0003    \u0003<HV\u0003\u0003\u0003   \u0003\u00031R\u0003\u0003\u0003\n ,I\u0003<HV\u000f\u00033OHDVH\u0003LQGLFDWH\u00036WDWH\u0003RI\u0003,QFRUSRUDWLRQ\u001d\u0003\u0003California\n ,I\u00031R\u000f\u0003%XVLQHVV\u0003(QWLW\\\u00037\\SH\u001d\u0003\n 3UHVLGHQW\u00120HPEHU\u001d\u0003Sebastian Rucci                        6LJQDWXUH\u001d\u0003\n 9LFH\u00103UHVLGHQW\u0003\u001d\u0003                                        6LJQDWXUH\u001d\u0003\n 6HFUHWDU\\\u001d\u0003Sebastian Rucci                               6LJQDWXUH\u001d\u0003\n   \u0003\u0003$UWLFOHV\u0003RI\u0003,QFRUSRUDWLRQ\u0012(QWLW\\\u0003)RUPDWLRQ\u0003'RFV\u0011\u001d\u0003 SOHDVH\u0003DWWDFK \u001d\u0003\n 3ODFH\u0003RI\u0003%XVLQHVV\u001d\u0003Imperial Valley                       7\\SH\u0003RI\u0003%XVLQHVV\u001d\u0003Data Center Development\n )HGHUDO\u00037D[\u0003,'\u00031R\u0011\u0003XXX-XX-XXXX                             \u0003/HWWHU\u0003RI\u0003$XWKRUL]DWLRQ\u0003 SOHDVH\u0003DWWDFK \u001d\u0003\n\n                                   Sebastian Rucci                    03/05/2025\nBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003BBBBBBBBBBBBBB\u0003\n$XWKRUL]HG\u00036LJQDWXUH\u0003\u0003\u0003\u0003\u0003\u0003          3ULQW\u00031DPH                         'DWH\n\n                                                                                                                 2\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW         Document 1-43        Filed 01/09/26      PageID.318       Page\n                                            66 of 132\n\n\n                                   SYSTEM PLANNING\n                  IID SYSTEM IMPACT STUDY DATA REQUIREMENTS\n\n$\u0003W\\SLFDO\u00036\\VWHP\u0003,PSDFW\u00036WXG\\\u0003LQFOXGHV\u00033RZHU\u0003)ORZ\u000f\u00037UDQVLHQW\u00036WDELOLW\\\u000f\u00033RVW\u00107UDQVLHQW\u0003\n6WDELOLW\\\u000f\u0003DQG\u00036KRUW\u0003&LUFXLW\u0003$QDO\\VLV\u0011\u0003'HSHQGLQJ\u0003RQ\u0003SURMHFW\u0003FKDUDFWHULVWLFV\u0003,,'\u00036\\VWHP\u00033ODQQLQJ\u0003\nPD\\\u0003UHFRPPHQG\u0003H[SDQGLQJ\u0003RU\u0003UHGXFLQJ\u0003WKH\u0003VFRSH\u0003RI\u0003WKH\u0003VWXG\\\u0011\u0003\n\n,,'\u0003XVHV\u0003WKH\u0003ODVW\u0003YHUVLRQ\u0003RI\u0003G.E. PSLF\u0003VRIWZDUH\u0003DSSURYHG\u0003E\\\u0003:(&&\u0003WR\u0003SHUIRUP\u00033RZHU\u0003)ORZ\u000f\u0003\n7UDQVLHQW\u00036WDELOLW\\\u0003DQG\u00033RVW\u00107UDQVLHQW\u00036WDELOLW\\\u0003DQDO\\VHV\u0011\u0003)RU\u0003WKH\u00036KRUW\u0003&LUFXLW\u0003DQDO\\VLV\u0003WKH\u0003ODWHVW\u0003\nYHUVLRQ\u0003RI\u0003ASPEN VRIWZDUH\u0003ZLOO\u0003EH\u0003XVHG\u0011\u0003\u0003\n\nPower Flow (project\u2019s data)\n3OHDVH\u0003SURYLGH\u0003WKH\u0003IROORZLQJ\u0003LQIRUPDWLRQ\u0011\u0003 $GGLWLRQDO\u0003VKHHWV\u0003RU\u0003GRFXPHQWV\u0003FDQ\u0003EH\u0003DGGHG \u0003\n\n   \u0014\u0011 3URMHFW\u00031DPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n                     IMPERIAL DATA CENTER CAMPUS #2\n      :KDW\u0003LV\u0003WKH\u0003QDPH\u0003RI\u0003WKH\u0003SURMHFW\"\u0003 SOHDVH\u0003SURYLGH\u0003WKUHH\u0003GLIIHUHQW\u0003DOWHUQDWLYH\u0003QDPHV\n\n           D\u0011 $OWHUQDWLYH\u0003\u0014\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n           E\u0011 $OWHUQDWLYH\u0003\u0015\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n           F\u0011 $OWHUQDWLYH\u0003\u0016\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n       Note:\u0003,I\u0003WKH\u0003QDPH\u0003RI\u0003WKH\u0003SURMHFW\u0003UHSUHVHQWV\u0003D\u0003SRWHQWLDO\u0003FRQIOLFW\u0003IRU\u0003,,'\u00b6V\u0003VWDII\u000f\u0003,,'\u0003ZLOO\u0003\n       VXJJHVW\u0012UHTXHVW\u0003D\u0003QHZ\u0003QDPH\u0003IRU\u0003\\RXU\u0003SURMHFW\u0003WR\u0003SUHYHQW\u0003WKH\u0003SRWHQWLDO\u0003FRQFHUQ\u0011\u00037KLV\u0003LV\u0003QRW\u0003\n       LQWHQGHG\u0003WR\u0003FUHDWH\u0003DQ\\\u0003OHJDO\u0003RU\u0003FRPPHUFLDO\u0003LVVXHV\u0003RQ\u0003WKH\u0003GHYHORSPHQW\u0003RI\u0003\\RXU\u0003SURMHFW\u0011\u0003\n\n   \u0015\u0011 3URMHFW\u00032QH\u0010/LQH\u0003'LDJUDP\u0003DQG\u00033URMHFW\u00036LWH\u00033ODQ\n      3OHDVH\u0003SURYLGH\u0003D\u0003VLPSOLILHG\u0003RQH\u0010OLQH\u0003GLDJUDP\u0003DQG\u0003VLWH\u0003SODQ\u0003LQ\u0003 3') \u0003RI\u0003WKH\u0003IDFLOLW\\ LHV \u0003WR\n      EH\u0003VWXGLHG\u0011\n\n   \u0016\u0011 3URYLGH\u0003D\u0003*RRJOH\u0003(DUWK\u0003PDS\u0003 \u0011NP]\u0003ILOH \u0003ZLWK\u0003JHRJUDSKLFDO\u0003ORFDWLRQ\u0003RI\u0003WKH\u0003QHZ\u0003SURMHFW\n      UHTXLULQJ\u0003,,'\u0003VHUYLFH\u0011\n\n\n   \u0017\u0011 :LOO\u0003WKLV\u0003SURMHFW\u0003EH\u0003FRPSOHWHG\u0003LQ\u0003SKDVH\"\u0003<HV\u0003        1R\n      ,I\u0003<HV\u000f\u0003SURYLGH\u0003D\u0003GHVFULSWLRQ\u0003DQG\u0003HVWLPDWH\u0003WLPHOLQHV\u0003IRU\u0003HDFK\u0003SKDVH\u0011\n\n   \u0018\u0011 3URYLGH\u0003SURRI\u0003RI\u0003VLWH\u0003FRQWURO\u0011\n\n   \u0019\u0011 3URYLGH\u0003WKH\u0003LQ\u0010VHUYLFH\u0003GDWH\u0003IRU\u0003WKH\u0003WRWDO\u0003FRPSOHWLRQ\u0003RI\u0003WKH\u0003SURMHFW\u0003RU\u0003SHU\u0003SKDVH\u0011\n\n             03/05/2027\n       'DWH\u001d\u0003BBBBBBBBBBBBBBB\n\n\n\n\n                                                                                                    3\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW      Document 1-43       Filed 01/09/26      PageID.319      Page\n                                         67 of 132\n\n\n   \u001a\u0011 7KH\u00036\\VWHP\u00033ODQQLQJ\u0003JURXS\u0003XVXDOO\\\u0003VWXGLHV\u0003WKH\u0003+HDY\\\u00036XPPHU\u0003 3($. \u0003DQG\u0003/LJKW\n      :LQWHU\u0003 2))\u00103($. \u0003FRQGLWLRQV\u0003WR\u0003GHWHUPLQH\u0003WKH\u0003PRVW\u0003FULWLFDO\u0003RSHUDWLQJ\u0003FRQGLWLRQV\u0003IRU\n      WKH\u0003,,'\u00036\\VWHP\u0011\u0003'R\u0003\\RX\u0003FRQVLGHU\u0003WKH\u0003QHHG\u0003IRU\u0003VWXG\\LQJ\u0003DQRWKHU\u0003VHDVRQ\u0003RU\u0003\\HDU\u0003IRU\u0003\\RXU\n      SURMHFW\"\n\n      <HV\u0003    \u0003      1R\n\n      :KLFK\u0003VHDVRQ\u0003RU\u0003\\HDU\"\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n      5HDVRQ\"\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n      Note:\u00031RWLFH\u0003WKDW\u0003DQ\\\u0003DGGLWLRQDO\u0003VHDVRQ\u0003RU\u0003\\HDU\u0003WR\u0003EH\u0003VWXGLHG\u0003IRU\u0003D\u0003QHZ\u0003JHQHUDWLRQ\u0003SURMHFW\n      ZRXOG\u0003SRWHQWLDOO\\\u0003UHSUHVHQW\u0003DGGLWLRQDO\u0003FRVWV\u0003IRU\u0003WKH\u0003VWXG\\\u0011\n\n   \u001b\u0011 3URSRVH\u00033RLQW\u0003RI\u0003,QWHUFRQQHFWLRQ\u0003 32, \u0003WR\u0003WKH\u0003,,'\u00036\\VWHP\u0011\u00037KH\u000332,\u0003LV\u0003WKH\u0003HOHFWULFDO\u0003SRLQW\n      ZKHUH\u0003\\RX\u0003SURSRVH\u0003WR\u0003FRQQHFW\u0003\\RXU\u0003SURMHFW\u0003WR\u0003WKH\u0003H[LVWLQJ\u0003,,'\u0003JULG\u0011\u00033URYLGH\u0003WKH\u00036WDWLRQ\u00b6V\n      1DPH\u0003RU\u0003/LQH\u00b6V\u00031DPH\u0003DQG\u0003N9\u0011\u0003,,'\u0003PD\\\u0003SURYLGH\u0012SURSRVH\u0003D\u0003GLIIHUHQW\u000332,\u0003LI\u0003WKH\u0003RUJLQDO\n      ORFDWLRQ\u0003LV\u0003GHHPHG\u0003SUREOHPDWLF\u0003IRU\u0003SURMHFW\u0003GHYHORSPHQW\u0011\n\n      6WDWLRQ\u0003QDPH\u0003RU\u0003OLQH\u00b6V\u0003QDPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003N9\u001d\u0003BBBBBBBBBBBBB\n                                   92 kV Line at Southern Property Line 92\n\n\n      ,QFOXGH\u0003$31\u0006\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n                   044220046\n\n\n   \u001c\u0011 ,V\u0003\\RXU\u0003SURMHFW\u0003ORDG\u0003FRQIRUPLQJ\u0003RU\u0003QRQ\u0010FRQIRUPLQJ\"\u0003,I\u0003QRQ\u0010FRQIRUPLQJ\u000f\u0003SOHDVH\u0003SURYLGH\u0003D\n      GHVFULSWLRQ\u0003RI\u0003SODQQHG\u0003RSHUDWLRQ\u0011\n      Data Center (Permitted Use in Existing Zone)\n      BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n   \u0014\u0013\u0011 3URYLGH\u0003WKH\u0003FRPSDQ\\\u0003RZQHU\u00b6V\u0003QDPH\u001d\n\n      BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n      Imperial Valley Computer Manufacturing, LLC\n\n   \u0014\u0014\u0011 7RWDO\u00030:\u0003LQSXW\u0012VHUYLFH\u0003UHTXLUHG\u0003RI\u0003\\RXU\u0003SURMHFW\"\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n                                                        80\n\n   \u0014\u0015\u0011 6\\VWHP\u00036WHS\u0010'RZQ\u00037UDQVIRUPHU\n /RZ\u00036LGH\u00039ROWDJH\u0003 N9 \u0003             34.5        +LJK\u00036LGH\u00039ROWDJH\u0003 N9 \u0003           92\n 09$\u0003%DVH\u0003 09$ \u0003                    60          5HDFWDQFH\u0003 S\u0011X\u0011 \u0003RU\u0003\b\u0003            0.099944 pu\n &RQWLQXRXV\u00031RUPDO\u00035DWLQJ\u0003                      (PHUJHQF\\\u00035DWLQJ\u0003 09$ \u0003\n  09$ \u0003                             100                                           100\n 1XPEHU\u0003RI\u00037UDQIRUPHUV\u0003                         :LQGLQJ\u0003&RQILJ\u0011\u0003 'HOWD\u000f\u0003<\u000f\u0003\n                                    2           HWF\u0011 \u0003                            Delta-WYE-GND\n\n\n\n\n                                                                                                  4\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW       Document 1-43        Filed 01/09/26      PageID.320      Page\n                                          68 of 132\n\n\n   \u0014\u0016\u0011 3OHDVH\u0003SURYLGH\u0003SURMHFW\u0003PRGHOV\u0003LQ\u0003\u0011HSF\u0003IRUPDW\u0003 36/) \u0003WKDW\u0003DFFXUDWHO\\\u0003UHSUHVHQWV\u0003WKH\n       HOHFWLFDO\u0003FRQILJXUDWLRQ\u0003RI\u0003\\RXU\u0003SURMHFW\u0011\u00030RGHOV\u0003PXVW\u0003LQFOXGH\u000f\u0003EXW\u0003QRW\u0003OLPLWHG\u0003WR\u0003WKH\n       IROORZLQJ\u001d\n           D\u0011 %XV\u0003GDWD\n           E\u0011 7UDQVIRUPHU\u0003GDWD\n           F\u0011 /RDG\u0003GDWD\n           G\u0011 *HQHUDWRU\u0003GDWD\u000f\u0003LI\u0003DSSOLFDEOH\u0003 EHKLQG\u0003WKH\u0003PHWHU\n\n   \u0014\u0017\u0011 3OHDVH\u0003SURYLGH\u0003G\\QDPLF\u0003PRGHO\u0003UHSUHVHQWDWLRQ\u0003YLD\u0003D\u0003:(&&\u0003DSSURYHG\u0003FRPSRVLWH\u0003ORDG\n       PRGHO\u0003WKDW\u0003DFFXUDWHO\\\u0003UHSUHVHQWV\u0003WKH\u0003G\\QDPLF\u0003EHKDYLRU\u0003RI\u0003\\RXU\u0003SURMHFW\u0011\u00033URMHFWV\u0003PXVW\n       XVH\u0003WKH\u0003:(&&\u0003FRPSRVLWH\u0003ORDG\u0003PRGHO\u0003 FPSOGZ \u0011\u0003See Attachment A for instructions.\n\n   \u0014\u0018\u0011 3URYLGH\u0003WKH\u0003FRQWDFW\u0003SHUVRQ\u0003QDPH\u000f\u0003WHOHSKRQH\u0003QXPEHU\u0003DQG\u0003HPDLO\u0003DGGUHVV\u0003IRU\u0003TXHVWLRQV\u0003RQ\n       WKH\u00033RZHU\u0003)ORZ\u0003DQDO\\VLV\u0003GDWD\u0003SURYLGHG\u0011\n\n           D\u0011 1DPH\u001d        Chris Goulet\n                          \u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n                              Transmission Planning\n           E\u0011 7LWOH\u001d \u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n                        Power Engineers, Inc.\n           F\u0011 &RPSDQ\\\u001d\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n                           1060 Maitland Center Commons Blvd., Maitland, Florida 32751\n           G\u0011 $GGUHVV\u001d\u0003\u0003\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n                         (913) 408-5311\n           H\u0011 7HOHSKRQH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n                             Christopher.Goulet@PowerEng.com\n           I\u0011 (PDLO\u001d \u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\nA hard copy or scanned document of the completed template should be provided back to\nIID including data, and signed by the person(s) responsible for the data provided.\n\n       5HVSRQVLEOH\u00033HUVRQ\u00036LJQDWXUH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n                                Sebastian Rucci\n       5HVSRQVLEOH\u00033HUVRQ\u00031DPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n                                 Managing Member                     03/05/2025\n       5HVSRQVLEOH\u00033HUVRQ\u00037LWOH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB'DWH\u001d\u0003BBBBBBBBBBBBBBB\u0003\n\n,I\u0003\\RX\u0003KDYH\u0003DQ\\\u0003TXHVWLRQV\u0003UHJDUGLQJ\u0003WKH\u0003GDWD\u0003UHTXHVWHG\u000f\u0003SOHDVH\u0003FRQWDFW\u0003-HVXV\u00030DUWLQH]\u000f\u0003,PSHULDO\u0003\n,UULJDWLRQ\u0003'LVWULFW\u00036\\VWHP\u0003DW\u0003 \u001a\u0019\u0013 \u0003\u0016\u0016\u001c\u0010\u0013\u0018\u001a\u0017\u0011\u0003\n\n\n\n\n                                                                                                   5\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW         Document 1-43         Filed 01/09/26       PageID.321           Page\n                                            69 of 132\n\n\n              CUSTOMER PROJECT DEVELOPMENT SERVICES\n         REGULATIONS GOVERNING SALE AND USE OF ELECTRIC ENERGY\n\nExcerpts from Regulation No. 6\n7KH\u0003FXVWRPHU\u0003VKDOO\u000f\u0003DW\u0003KLV\u0003RZQ\u0003ULVN\u0003DQG\u0003H[SHQVH\u000f\u0003IXUQLVK\u000f\u0003LQVWDOO\u0003DQG\u0003NHHS\u0003LQ\u0003JRRG\u0003DQG\u0003VDIH\u0003\nFRQGLWLRQ\u0003\u0003DOO\u0003HOHFWULF\u0003ZLUHV\u000f\u0003OLQHV\u000f\u0003PDFKLQHU\\\u0003DQG\u0003DSSDUDWXV\u0003RI\u0003DQ\\\u0003VRUW\u0003ZKLFK\u0003PD\\\u0003EH\u0003UHTXLUHG\u0003\nIRU\u0003UHFHLYLQJ\u0003HOHFWULF\u0003HQHUJ\\\u0003IURP\u0003WKH\u0003'LVWULFW\u000f\u0003DQG\u0003IRU\u0003DSSO\\LQJ\u0003DQG\u0003XWLOL]LQJ\u0003VXFK\u0003HQHUJ\\\u000f\u0003\nLQFOXGLQJ\u0003DOO\u0003QHFHVVDU\\\u0003SURWHFWLYH\u0003DSSOLDQFHV\u0003DQG\u0003VXLWDEOH\u0003KRXVLQJ\u0003WKHUHIRU\u0011\u00037KH\u0003'LVWULFW\u0003VKDOO\u0003QRW\u0003\nEH\u0003UHVSRQVLEOH\u0003IRU\u0003DQ\\\u0003ORVV\u0003RU\u0003GDPDJH\u0003RFFDVLRQHG\u0003RU\u0003FDXVHG\u0003E\\\u0003WKH\u0003QHJOLJHQFH\u0003RU\u0003ZDQW\u0003RI\u0003SURSHU\u0003\nFDUH\u0003RU\u0003ZURQJIXO\u0003DFW\u0003RI\u0003WKH\u0003FXVWRPHU\u0003RU\u0003DQ\\\u0003RI\u0003KLV\u0003DJHQWV\u000f\u0003HPSOR\\HHV\u0003RU\u0003OLFHQVHHV\u0003RQ\u0003WKH\u0003SDUW\u0003RI\u0003\nWKH\u0003FXVWRPHU\u0003LQ\u0003LQVWDOOLQJ\u000f\u0003PDLQWDLQLQJ\u000f\u0003XVLQJ\u000f\u0003RSHUDWLQJ\u0003RU\u0003LQWHUIHULQJ\u0003ZLWK\u0003DQ\\\u0003VXFK\u0003ZLUHV\u000f\u0003OLQHV\u000f\u0003\nPDFKLQHU\\\u0003RU\u0003DSSDUDWXV\u0011\u0003\n\nExcerpts from Regulation No. 11\n7KH\u0003GLVWULFW\u0003VKDOO\u000f\u0003DW\u0003LWV\u0003RSWLRQ\u000f\u0003KDYH\u0003WKH\u0003ULJKW\u0003WR\u0003GLVFRQQHFW\u0003LWV\u0003VHUYLFHV\u0003XQWLO\u0003WKH\u0003FXVWRPHU\u0003KDV\u0003\nFRPSOLHG\u0003ZLWK\u0003DOO\u0003WKH\u0003WHUPV\u0003RI\u0003WKH\u0003DJUHHPHQW\u0003DQG\u0003RI\u0003WKH\u0003'LVWULFW\u00b6V\u0003UHJXODWLRQ\u0011\u0003\n\nExcerpts from Regulation No. 15\n7KH\u0003'LVWULFW\u0003ZLOO\u0003FRQVWUXFW\u000f\u0003RZQ\u000f\u0003RSHUDWH\u0003DQG\u0003PDLQWDLQ\u0003OLQHV\u0003RQO\\\u0003DORQJ\u0003SXEOLF\u0003VWUHHWV\u000f\u0003URDGV\u0003DQG\u0003\nKLJKZD\\V\u0003ZKLFK\u0003WKH\u0003'LVWULFW\u0003KDV\u0003WKH\u0003OHJDO\u0003ULJKW\u0003WR\u0003RFFXS\\\u0003DQG\u0003RQ\u0003SXEOLF\u0003ODQGV\u0003DQG\u0003SULYDWH\u0003\nSURSHUW\\\u0003DFURVV\u0003ZKLFK\u0003ULJKWV\u0010RI\u0010ZD\\\u0003VDWLVIDFWRU\\\u0003WR\u0003WKH\u0003'LVWULFW\u0003PD\\\u0003EH\u0003REWDLQHG\u0003ZLWKRXW\u0003FRVW\u0003RU\u0003\nFRQGHPQDWLRQ\u0003E\\\u0003WKH\u0003'LVWULFW\u0011\u0003\n\n$OO\u0003,PSHULDO\u0003,UULJDWLRQ\u0003'LVWULFW\u00035HJXODWLRQV\u0003*RYHUQLQJ\u0003WKH\u00036DOH\u0003DQG\u00038VH\u0003RI\u0003(OHFWULF\u0003(QHUJ\\\u0003DUH\u0003\nDYDLODEOH\u0003IRU\u0003YLHZLQJ\u0003DW\u0003DOO\u0003,,'\u0003'LYLVLRQ\u00032IILFHV\u000f\u0003,PSHULDO\u00032SHUDWLQJ\u0003+HDGTXDUWHUV\u0003DQG\u0003RQOLQH\u0003DW\u0003\nZZZ\u0011LLG\u0011FRP\u0011\u0003\n\n\u202b\u0706\u202c       ,\u0003KDYH\u0003UHDG\u0003DQG\u0003DJUHH\u0003WR\u0003WKH\u00035HJXODWLRQV\u0003OLVWHG\u0003DERYH\u0011\n\n                                                           Managing Member\n6LJQDWXUH\u001dBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u00037LWOH\u001dBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n             Sebastian Rucci                              03/05/2025\n3ULQW\u00031DPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003'DWH\u001dBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n\n\n\n                                                                                                        6\n\fCase 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016\nIID-792\u0003 3:26-cv-00128-JLS-BJW            Document 1-43          Filed 01/09/26          PageID.322   Page\n                                               70 of 132\n\n\n                             CONTRACTOR INFORMATION SHEET\u0003\n\n ,I\u0003DSSOLFDEOH\u000f\u0003SOHDVH\u0003VHOHFW\u0003WKH\u0003OHYHO\u0003RI\u0003DXWKRUL]DWLRQ\u0003IRU\u0003FRPPXQLFDWLRQ\u0003ZLWK\u0003\\RXU\u0003FRQWUDFWRU\u0011\u0003\n\n  &RQWUDFWRU\u00031DPH\u001d\u0003\n\n\n  &RQWUDFWRU\u0003$GGUHVV\u001d\u0003\n\n\n  &RQWDFW\u0003SHUVRQ\u001d\u0003\n\n\n  &RQWUDFWRU\u0003&RQWDFW\u00033KRQH\u001d\u0003\n\n\n  &RQWUDFWRU\u0003(PDLO\u0003$GGUHVV\u001d\u0003\n\n\n\n\n\u202b \u0706\u202c$WWHQG\u0003PHHWLQJV\u0003DQG\u0012RU\u0003UHVSRQG\u0003WR\u0003FRUUHVSRQGHQFH\u0003UHJDUGLQJ\u0003WKLV\u0003SURMHFW\u0011\n\u202b \u0706\u202c5HFHLYH\u0003HOHFWURQLF\u0003 ILOHV\u0003IRU\u0003WKLV\u0003SURMHFW\u000f\u0003 LQFOXGLQJ\u0003 HQHUJ\\\u0003DFFRXQW\u0003 LQIRUPDWLRQ\u0011\n\u202b \u0706\u202c2EWDLQ\u0003 DSSURYDOV\u000f\u0003WR\u0003FRPSOHWH\u0003WKLV\u0003SURMHFW\u0011\n\n\n\n\n 6LJQDWXUH\u001d\u0003                                      7LWOH\u001d\u0003\u0003\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n\n 3ULQW\u00031DPH\u001d\u0003                                    \u0003\u0003'DWH\u001d\u0003 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n\n\n\n                                                                                                       7\n\f   Case 3:26-cv-00128-JLS-BJW             Document 1-43        Filed 01/09/26       PageID.323       Page\nIID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                              71 of 132\n\n                           PROJECT DEVELOPMENT SERVICES\n                                        TERMS & CONDITIONS\n\nIndemnification Agreement\n,Q\u0003FRQVLGHUDWLRQ\u0003IRU\u0003WKH\u0003SURYLVLRQ\u0003RI\u0003HOHFWULFDO\u0003XWLOLW\\\u0003VHUYLFH\u0003E\\\u0003,,'\u0003IRU\u0003WKH\u0003GHYHORSPHQW\u0003SURMHFW\u0003\nLGHQWLILHG\u0003LQ\u0003WKH\u00036WDQGDUGV\u00036SHFLILFDWLRQV\u0003DQG\u0003&RQWUDFWRU\u0003,QIRUPDWLRQ\u00036KHHW\u000f\u0003$SSOLFDQW\u0003DQG\u0003,,'\u0003DJUHH\u0003DV\u0003\nIROORZV\u001d\u00037KH\u0003SURYLVLRQ\u0003RI\u0003HOHFWULF\u0003XWLOLW\\\u0003VHUYLFH\u0003WR\u0003$SSOLFDQW\u0003LV\u0003FRQGLWLRQHG\u0003RQ\u0003FRPSOLDQFH\u0003E\\\u0003$SSOLFDQW\u0003\nZLWK\u0003DOO\u0003DSSOLFDEOH\u0003ODZV\u0003LQFOXGLQJ\u0003WKH\u0003,PSHULDO\u0003,UULJDWLRQ\u0003'LVWULFW\u00035HJXODWLRQV\u0003*RYHUQLQJ\u0003WKH\u00036DOH\u0003DQG\u0003\n8VH\u0003RI\u0003(OHFWULF\u0003(QHUJ\\\u0003DQG\u00035DWH\u00036FKHGXOHV\u0011\u0003\n\n$SSOLFDQW\u0003VKDOO\u0003GHIHQG\u0003DQG\u0003LQGHPQLI\\\u0003,,'\u000f\u0003IURP\u0003DQ\\\u001d\u0003OLDELOLW\\\u000f\u0003FODLPV\u000f\u0003VXLWH\u0003RU\u0003DFWLRQV\u001e\u0003ORVVHV\u000f\u0003H[SHQVHV\u000f\u0003\nIHHV\u000f\u0003RU\u0003FRVWV\u0003RI\u0003DQ\\\u0003NLQG\u000f\u0003VR\u0003ORQJ\u0003DV\u0003VXFK\u0003WKLQJV\u0003DUH\u0003LQ\u0003UHODWLRQ\u0003WR\u000f\u0003DV\u0003D\u0003FRQVHTXHQFH\u0003RI\u000f\u0003DULVLQJ\u0003RXW\u0003RI\u000f\u0003RU\u0003\nLQ\u0003DQ\\\u0003ZD\\\u0003DWWULEXWDEOH\u0003\u0003DFWXDOO\\\u000f\u0003DOOHJHGO\\\u0003RU\u0003LPSOLHGO\\\u000f\u0003LQ\u0003ZKROH\u0003RU\u0003LQ\u0003SDUW\u000f\u0003WR\u0003WKH\u0003SURYLVLRQ\u0003RI\u0003HOHFWULFDO\u0003\nVHUYLFH\u0003E\\\u0003,,'\u0003WR\u0003$SSOLFDQW\u0003IRU\u0003WKH\u0003GHYHORSPHQW\u0003SURMHFW\u0003LGHQWLILHG\u0003LQ\u0003WKH\u00036WDQGDUGV\u00036SHFLILFDWLRQV\u0003DQG\u0003\n&RQWUDFWRU\u0003,QIRUPDWLRQ\u00036KHHW\u001e\u0003KRZHYHU\u000f\u0003$SSOLFDQW\u0003VKDOO\u0003QRW\u0003EH\u0003UHTXLUHG\u0003WR\u0003LQGHPQLI\\\u0003DQG\u0003KROG\u0003KDUPOHVV\u0003\n,,'\u0003DV\u0003VHW\u0003IRUWK\u0003DERYH\u0003IRU\u0003OLDELOLW\\\u0003DWWULEXWDEOH\u0003WR\u0003WKH\u0003VROH\u0003IDXOW\u0003RI\u0003,,'\u0011\u0003\n                                                                         Customer Initials ____________\nEnvironmental Impact Information\n7KH\u0003ZRUN\u0003,,'\u0003KDV\u0003WR\u0003XQGHUWDNH\u0003WR\u0003SURYLGH\u0003WKH\u0003HOHFWULF\u0003VHUYLFH\u0003UHTXHVWHG\u0003PD\\\u0003FDXVH\u0003LPSDFWV\u0003WR\u0003WKH\u0003\nHQYLURQPHQW\u0011\u00036LQFH\u0003WKH\u0003ZRUN\u0003LV\u0003FXVWRPHU\u0010GULYHQ\u0003DQG\u0003QRW\u0003D\u0003V\\VWHP\u0003XSJUDGH\u000f\u0003LW\u0003LV\u0003,,'\u00b6V\u0003SROLF\\\u0003WKDW\u0003DQ\\\u0003\nHQYLURQPHQWDO\u0003LPSDFWV\u0003FUHDWHG\u0003E\\\u0003QHZ\u000f\u0003UHORFDWHG\u000f\u0003PRGLILHG\u0003RU\u0003UHFRQVWUXFWHG\u0003,,'\u0003IDFLOLWLHV\u0003 ZKLFK\u0003FDQ\u0003\nLQFOXGH\u000f\u0003EXW\u0003DUH\u0003QRW\u0003OLPLWHG\u0003WR\u000f\u0003VXEVWDWLRQV\u000f\u0003WUDQVPLVVLRQ\u0003DQG\u0003GLVWULEXWLRQ\u0003OLQHV\u000f\u0003,,'\u0010RZQHG\u0003FDQDOV\u0003DQG\u0003\nGUDLQV\u000f\u0003HWF\u0011 \u0003UHTXLUHG\u0003WR\u0003SURYLGH\u0003HOHFWULF\u0003VHUYLFH\u0003WR\u0003WKH\u0003FXVWRPHU\u0003QHHG\u0003WR\u0003EH\u0003DVVHVVHG\u0003LQ\u0003DFFRUGDQFH\u0003ZLWK\u0003\nWKH\u0003&DOLIRUQLD\u0003(QYLURQPHQWDO\u00034XDOLW\\\u0003$FW\u0003DQG\u00031DWLRQDO\u0003(QYLURQPHQWDO\u00033ROLF\\\u0003$FW\u000f\u0003LI\u0003DSSOLFDEOH\u000f\u0003DQG\u000f\u0003LI\u0003\nUHTXLUHG\u000f\u0003PLWLJDWHG\u0011\u0003)DLOXUH\u0003WR\u0003FRPSO\\\u0003ZLWK\u0003VXFK\u0003UHTXLUHPHQWV\u0003ZLOO\u0003UHVXOW\u0003LQ\u0003WKH\u0003SRVWSRQHPHQW\u0003RI\u0003WKH\u0003\nVHUYLFH\u0003UHTXHVWHG\u0003XQWLO\u0003WKH\u0003DSSURSULDWH\u0003HQYLURQPHQWDO\u0003GRFXPHQWDWLRQ\u0003LV\u0003REWDLQHG\u0003E\\\u0003WKH\u0003FXVWRPHU\u0003IURP\u0003\nWKH\u0003OHDG\u0003DJHQF\\\u0003KDYLQJ\u0003MXULVGLFWLRQ\u0003WR\u0003SHUPLW\u0003WKH\u0003FXVWRPHU\u00b6V\u0003SURMHFW\u0003DQG\u0003WKH\u0003HQYLURQPHQWDO\u0003LPSDFWV\u0003DUH\u0003\nIXOO\\\u0003DVVHVVHG\u0003DQG\u0003PLWLJDWHG\u0011\u0003$Q\\\u0003DQG\u0003DOO\u0003PLWLJDWLRQ\u0003QHFHVVDU\\\u0003DV\u0003D\u0003UHVXOW\u0003RI\u0003WKH\u0003LPSDFWV\u0003RQ\u0003WKH\u0003\nHQYLURQPHQW\u0003FDXVHG\u0003E\\\u0003WKH\u0003FRQVWUXFWLRQ\u000f\u0003UHORFDWLRQ\u0003DQG\u0012RU\u0003XSGDWH\u0003RI\u0003WKH\u0003,,'\u0003IDFLOLWLHV\u0003LV\u0003WKH\u0003\nUHVSRQVLELOLW\\\u0003RI\u0003WKH\u0003FXVWRPHU\u0011$W\u0003LWV\u0003GLVFUHWLRQ\u0003,,'\u0003ZLOO\u0003YHULI\\\u000f\u0003YLD\u0003LWV\u0003ILHOG\u0003FUHZV\u0003DQG\u0003SURMHFW\u0003LQVSHFWRUV\u000f\u0003\nLI\u0003LPSDFWV\u0003DUH\u0003EHLQJ\u0003PLWLJDWHG\u0003\u0003SHU\u0003FXVWRPHU\u00b6V\u0003HQYLURQPHQWDO\u0003GRFXPHQW\u0003DQG\u0003LI\u0003FXVWRPHU\u0003LV\u0003SURYLGLQJ\u0003RQ\u0010\nVLWH\u0003PLWLJDWLRQ\u0003PRQLWRULQJ\u0011\u0003,I\u0003QRW\u000f\u0003FXVWRPHU\u0003ZLOO\u0003EH\u0003DGYLVHG\u0003RI\u0003WKLV\u0003DQG\u0003,,'\u0003ZRUN\u0003ZLOO\u0003EH\u0003KDOWHG\u0003XQWLO\u0003WKH\u0003\nDSSURSULDWH\u0003PLWLJDWLRQ\u0003PHDVXUHV\u0003DQG\u0003PRQLWRULQJ\u0003DUH\u0003LQ\u0003SODFH\u0011\u0003\n                                                                         Customer Initials ____________\nEngineering Fee\n,\u0003DFNQRZOHGJH\u0003WKDW\u0003IDLOXUH\u0003WR\u0003FRPSOHWH\u0003DQG\u0003UHWXUQ\u0003DOO\u0003SHUWLQHQW\u0003\u0003IRUPV\u0003WR\u0003,,'\u0003FRXOG\u0003FDXVH\u0003D\u0003GHOD\\\u0003LQ\u0003\nHOHFWULF\u0003VHUYLFH\u0011\u0003,\u0003DJUHH\u0003DQG\u0003XQGHUVWDQG\u0003WKDW\u0003WKH\u0003(QJLQHHULQJ\u0003)HH\u0003ZLOO\u0003EH\u0003SDLG\u0003WR\u0003EHJLQ\u0003HQJLQHHULQJ\u0003D\u0003\nSURMHFW\u0003DQG\u0003ZLOO\u0003EH\u0003DSSOLHG\u0003DV\u0003D\u0003FUHGLW\u0003WRZDUG\u0003WKH\u0003FRQVWUXFWLRQ\u0003FRVW\u0003RI\u0003WKH\u0003SURMHFW\u0011\u00037KH\u0003(QJLQHHULQJ\u0003)HH\u0003LV\u0003\nQRQ\u0010UHIXQGDEOH\u0011\u0003$Q\\\u0003GHVLJQ\u0003FKDQJHV\u0003WKDW\u0003UHVXOW\u0003LQ\u0003WKH\u0003UHGHVLJQ\u0003RI\u0003WKH\u0003SURMHFW\u000f\u0003DQG\u0003WKHUHIRUH\u0003DOWHUV\u0003SULRU\u0003\nVFKHGXOH\u0003,,'\u0003FRPPLWPHQWV\u0003ZLOO\u0003UHTXLUH\u0003DQ\u0003DGGLWLRQDO\u0003QRQ\u0010\u0003UHIXQGDEOH\u0003(QJLQHHULQJ\u0003)HH\u0003DQG\u0003PD\\\u0003FDXVH\u0003\nGHOD\\V\u0003LQ\u0003FRQVWUXFWLRQ\u0003VFKHGXOHV V \u0011\u0003 \u0003\n                                                                         Customer Initials ____________\n\n                                                              Managing Member\n6LJQDWXUH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u00037LWOH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBB\n\n            Sebastian Rucci                                  03/05/2025\n3ULQW\u00031DPH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003\u0003'DWH\u001d\u0003BBBBBBBBBBBBBBBBBBBBBBBBBBBBB\u0003\n\n\n\n\n                                                                                                             8\n\f   Case 3:26-cv-00128-JLS-BJW            Document 1-43       Filed 01/09/26     PageID.324       Page\nIID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                             72 of 132\n\n\n\n                                      SYSTEM PLANNING\n                                 WECC COMPOSITE LOAD MODEL\n                                         EXAMPLE\n                                       (ATTACHMENT A)\n\nModel Name:                 FPSOGZ\nDescription                 :(&&\u0003&RPSRVLWH\u0003ORDG\u0003PRGHO\u0003\nPrerequisites:               /RDG\u0003LQ\u0003ORDG\u0003IORZ\u0003VROYHG\u0003FDVH\u0003\nInputs:                     9ROWDJH\u0003DW\u0003EXV\u0003WR\u0003ZKLFK\u0003WKH\u0003FRPSRVLWH\u0003ORDG\u0003LV\u0003FRQQHFWHG\u0003\nInvocation:                 FPSOGZ\u0003>\u001fQ!@\u0003^\u001fQDPH!\u0003\u001fNY!`\u0003\u001fLG!\u0003\u001d\u0003\u0006U\u0003PYD \u001fPYDEDVH!\u0003\n\nParameters:\n\n           EPCL      Default\n          Variable     Data Description\n        (see Note b)\n             %VV\u0003       \u0013\u0011\u0013\u0003   6XEVWDWLRQ\u0003VKXQW\u0003FDSDFLWRU\u0003VXVFHSWDQFH\u000f\u0003S\u0011X\u0011\u0003\n            5IGU\u0003       \u0013\u0011\u0013\u0003   )HHGHU\u0003HTXLYDOHQW\u0003UHVLVWDQFH\u000f\u0003S\u0011X\u0011\u0003\n            ;IGU\u0003       \u0013\u0011\u0013\u0003   )HHGHU\u0003HTXLYDOHQW\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n             )E\u0003        \u0013\u0011\u0013\u0003   )UDFWLRQ\u0003RI\u0003IHHGHU\u0003VKXQW\u0003FDSDFLWDQFH\u0003DW\u0003VXEVWDWLRQ\u0003EXV\u0003HQG\u0003\n             ;[I\u0003       \u0013\u0011\u0013\u0003   6XEVWDWLRQ\u0003WUDQVIRUPHU\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n           7IL[KV\u0003       \u0014\u0011    7UDQVIRUPHU\u0003KLJK\u0003VLGH\u0003IL[HG\u0003WDS\u000f\u0003S\u0011X\u0011\n           7IL[OV\u0003       \u0014\u0011    7UDQVIRUPHU\u0003ORZ\u0003VLGH\u0003IL[HG\u0003WDS\u000f\u0003S\u0011X\u0011\n            /7&\u0003          \u0013\u0003    \u0003\u0014\u0003IRU\u0003DXWRPDWLF\u0003WDS\u0003DGMXVWPHQW\u0003 ORZ\u0003VLGH\u0003YDULDEOH\u0003WDS \u0003\n            7PLQ\u0003       \u0013\u0011\u001c\u0003   0LQLPXP\u0003YDULDEOH\u0003WDS\u000f\u0003S\u0011X\u0011\u0003\n           7PD[\u0003        \u0014\u0011\u0014\u0003   0D[LPXP\u0003YDULDEOH\u0003WDS\u000f\u0003S\u0011X\u0011\u0003\n            VWHS\u0003    \u0013\u0011\u0013\u0013\u0019\u0015\u0018\u0003 9DULDEOH\u0003WDS\u0003VWHS\u0003VL]H\u000f\u0003S\u0011X\u0011\u0003\n           9PLQ\u0003       \u0014\u0011\u0013\u0015\u0003 0LQLPXP\u0003ORZ\u0010VLGH\u0003YROWDJH\u000f\u0003S\u0011X\u0011\u0003\n           9PD[\u0003       \u0014\u0011\u0013\u0017\u0003 0D[LPXP\u0003ORZ\u0010VLGH\u0003YROWDJH\u000f\u0003S\u0011X\u0011\u0003\n            7GHO\u0003       \u0016\u0013\u0011    7LPH\u0003GHOD\\\u0003WR\u0003LQLWLDWH\u0003WDS\u0003DGMXVWPHQW\u000f\u0003VHF\u0011\n            7WDS\u0003        \u0018\u0011    7LPH\u0003GHOD\\\u0003EHWZHHQ\u0003WDS\u0003VWHSV\u000f\u0003VHF\u0011\n           5FPS\u0003        \u0013\u0011\u0013\u0003   7UDQVIRUPHU\u0003/7&\u0003FRPSHQVDWLQJ\u0003UHVLVWDQFH\u000f\u0003S\u0011X\u0011\u0003\n           ;FPS\u0003        \u0013\u0011\u0013\u0003   7UDQVIRUPHU\u0003/7&\u0003FRPSHQVDWLQJ\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n            )P$\u0003        \u0013\u0011\u0013\u0003   0RWRU\u0003$\u0003IUDFWLRQ\u0003RI\u0003ORDG\u00033\u0003\n            )P%\u0003        \u0013\u0011\u0013\u0003   0RWRU\u0003%\u0003IUDFWLRQ\u0003RI\u0003ORDG\u00033\u0003\n            )P&\u0003        \u0013\u0011\u0013\u0003   0RWRU\u0003&\u0003IUDFWLRQ\u0003RI\u0003ORDG\u00033\u0003\n            )P'\u0003        \u0013\u0011\u0013\u0003   0RWRU\u0003'\u0003IUDFWLRQ\u0003RI\u0003ORDG\u00033\u0003\n             )HO\u0003       \u0013\u0011\u0013\u0003   (OHFWURQLF\u0003ORDG\u0003IUDFWLRQ\u0003RI\u0003ORDG\u00033\u0003\n            3)HO\u0003       \u0013\u0011\u0013\u0003   (OHFWURQLF\u0003ORDG\u0003SRZHU\u0003IDFWRU\u0003\n            9G\u0014\u0003        \u0013\u0011\u0013\u0003   9ROWDJH\u0003EHORZ\u0003ZKLFK\u0003HOHFWURQLF\u0003ORDG\u0003GHFUHDVHV\u000f\u0003S\u0011X\u0011\u0003\n            9G\u0015\u0003        \u0013\u0011\u0013\u0003   9ROWDJH\u0003EHORZ\u0003ZKLFK\u0003HOHFWURQLF\u0003ORDG\u0003LV\u0003]HUR\u000f\u0003S\u0011X\u0011\u0003\n            IUFHO\u0003      \u0013\u0011\u0013\u0003   )UDFWLRQ\u0003RI\u0003HOHFWURQLF\u0003ORDG\u0003WKDW\u0003UHFRYHUV\u0003IURP\u0003ORZ\u0003YROWDJH\u0003WULS\u0003(see\n                               note n)\n             3)V\u0003       \u0013\u0011\u001b\u0003   3RZHU\u0003IDFWRU\u0003RI\u0003VWDWLF\u0003ORDG\u0003FRPSRQHQW\u0003\n             3\u0014H\u0003       \u0014\u0011\u0013\u0003   6WDWLF\u0003ORDG\u0003\u00b1\u0003H[SRQHQW\u0003RI\u0003ILUVW\u00033\u0003WHUP\u0003\n            3\u0014F\u0003          \u0014\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003FRHIILFLHQW\u0003RI\u0003ILUVW\u00033\u0003WHUP\u0003\n            3\u0015H\u0003          \u0015\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003H[SRQHQW\u0003RI\u0003VHFRQG\u00033\u0003WHUP\u0003\n\n                                                                                                        9\n\f   Case 3:26-cv-00128-JLS-BJW          Document 1-43        Filed 01/09/26          PageID.325   Page\nIID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                           73 of 132\n\n             3\u0015F\u0003       \u0013\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003FRHIILFLHQW\u0003RI\u0003VHFRQG\u00033\u0003WHUP\u0003\n             3IUT\u0003      \u0013\u0011\u0013\u0003 )UHTXHQF\\\u0003VHQVLWLYLW\\\u0003IDFWRU\u0003IRU\u00033\u0003\n             4\u0014H\u0003       \u0014\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003H[SRQHQW\u0003RI\u0003ILUVW\u00034\u0003WHUP\u0003\n             4\u0014F\u0003       \u0013\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003FRHIILFLHQW\u0003RI\u0003ILUVW\u00034\u0003WHUP\u0003\n             4\u0015H\u0003       \u0015\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003H[SRQHQW\u0003RI\u0003VHFRQG\u00034\u0003WHUP\u0003\n             4\u0015F\u0003       \u0014\u0011\u0013\u0003 6WDWLF\u0003ORDG\u0003\u00b1\u0003FRHIILFLHQW\u0003RI\u0003VHFRQG\u00034\u0003WHUP\u0003\n             4IUT\u0003      \u0013\u0011\u0013\u0003 )UHTXHQF\\\u0003VHQVLWLYLW\\\u0003IDFWRU\u0003IRU\u00034\u0003\n             0W\\SD\u0003     \u0013\u0011\u0013\u0003 )LUVW\u0003PRWRU\u0003W\\SH\u001d\u0003 \u0003\u0016\u0003\u0010\u0010\u0003WKUHH\u0010SKDVH\u0003PRWRU\u0003\n                                           \u0003\u0003\u0003\u0003\u0003\u0003\u0003 \u0003\u0014\u0003\u0010\u0010\u0003\u0014\u0010SKDVH\u0003DLU\u0003FRQGLWLRQHU\u0003\n             0W\\SE\u0003     \u0013\u0011\u0013\u0003 6HFRQG\u0003PRWRU\u0003W\\SH\u0003\n             0W\\SF\u0003     \u0013\u0011\u0013\u0003 7KLUG\u0003PRWRU\u0003W\\SH\u0003\n             0W\\SG\u0003     \u0013\u0011\u0013\u0003 )RXUWK\u00030RWRU\u0003W\\SH\u0003\n\n7KH\u0003IROORZLQJ\u0003PRWRU\u0003SDUDPHWHUV\u0003PXVW\u0003EH\u0003LQFOXGHG\u0003 see Note a \u0003IRU\u0003HDFK\u0003PRWRU\u0003ZLWK\u0003)P\u0003!\u0003\u0013\u0011\u001d\u0003\n       )RU\u00037\\SH\u0003\u0016\u0003PRWRU\u000f\u0003WKH\u0003IROORZLQJ\u0003SDUDPHWHUV\u0003PXVW\u0003EH\u0003LQSXW\u001d\u0003 VHH\u0003EHORZ\u0003IRU\u00037\\SH\u0003\u0014 \u0003\n              /)Pn           \u0013\u0011\u001b\u0003    0RWRU\u0003J\u0003OIRDDFGWRLQU\u0003\n              5Dn            \u0013\u0011\u0013\u0015\u0003 6WDWRU\u0003UHVLVWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              /Vn            \u0015\u0011\u0013\u0003    6V\\QFKURQRXV\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              /Sn            \u0013\u0011\u0015\u0003 7UDQVLHQW\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              /SSn           \u0013\u0011\u0015\u0003 6XEWUDQVLHQW\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              7SRn           \u0013\u0011\u0014\u0019\u0003 7UDQVLHQW\u0003RSHQ\u0003FLUFXLW\u0003WLPH\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n              7SSRn          \u0013\u0011\u0013\u0015\u0003 6XEWUDQVLHQW\u0003RSHQ\u0003FLUFXLW\u0003WLPH\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n              +n             \u0013\u0011\u0016\u0003    ,QHUWLD\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n              (WUTn          \u0015\u0011\u0013\u0003 0HFKDQLFDO\u0003WRUTXH\u0003H[SRQHQW\u0003\n              9WU\u0014n          \u0013\u0011\u0013\u0003    )LUVW\u0003ORZ\u0003JH\u0003WYURLSOW\u0003DOHYHO\u000f\u0003S\u0011X\u0011\u00039\u0003\n              7WU\u0014n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 )LUVW\u0003ORZ\u0003JHY\u0003WRUOLWSD\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n              )WU\u0014n          \u0013\u0011\u0013\u0003    )LUVW\u0003ORZ\u0003JH\u0003WYURLSOW\u0003IDUDFWLRQ\u0003\n              9UF\u0014n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 )LUVW\u0003ORZ\u0003JHY\u0003RUHOWFDRQQHFWLRQ\u0003OHYHO\u000f\u0003S\u0011X\u0011\u00039\u0003\n              7UF\u0014n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 )LUVW\u0003ORZ\u0003JHY\u0003RUHOWFDRQQHFWLRQ\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n              9WU\u0015n          \u0013\u0011\u0013\u0003    6HFRQG\u0003ORZ\u0003YROWDJH\u0003WULS\u0003OHYHO\u000f\u0003S\u0011X\u0011\u00039\u0003\n              7WU\u0015n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 6HFRQG\u0003ORZ\u0003YROWDJH\u0003WULS\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n              )WU\u0015n          \u0013\u0011\u0013\u0003    6HFRQG\u0003ORZ\u0003YROWDJH\u0003WULS\u0003IUDFWLRQ\u0003\n              9UF\u0015n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 6HFRQG\u0003ORZ\u0003YROWDJH\u0003UHFRQQHFWLRQ\u0003OHYHO\u000f\u0003S\u0011X\u0011\u00039\u0003\n              7UF\u0015n          \u001c\u001c\u001c\u001c\u0011\u0003\u0003 6HFRQG\u0003ORZ\u0003YROWDJH\u0003UHFRQQHFWLRQ\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n       )RU\u00037\\SH\u0003\u0014\u0003$\u0012&\u0003ORDG\u000f\u0003WKH\u0003IROORZLQJ\u0003SDUDPHWHUV\u0003PXVW\u0003EH\u0003LQSXW\u001d\u0003\n              /)Pn           \u0014\u0011\u0013\u0003\u0003 0RWRU\u0003J\u0003OIRDDFGWRLQU\u0003\n              &RPS3)n        \u0013\u0011\u001c\u001a\u0003\u0003 3RZHU\u0003UIDFWR\u0003\n              9VWDOOn        \u0013\u0011\u0019\u0003\u0003 6WDOO\u0003YROWDJH\u000f\u0003S\u0011X\u0011\u0003\n              5VWDOOn        \u0013\u0011\u0014\u0015\u0017\u0003\u0003 6WDOO\u0003UHVLVWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              ;VWDOOn        \u0013\u0011\u0014\u0014\u0017\u0003\u0003 6WDOO\u0003UHDFWDQFH\u000f\u0003S\u0011X\u0011\u0003\n              7VWDOOn        \u0013\u0011\u0013\u0016\u0016\u0003\u0003 6WDOO\u0003WLPH\u0003GHOD\\\u000f\u0003VHF\u0011\u0003\n              )UVWn          \u0013\u0011\u0018\u0003    )UDFWLRQ\u0003RI\u0003ORDG\u0003WKDW\u0003FDQ\u0003UHVWDUW\u0003DIWHU\u0003VWDOOLQJ\u0003\n              9UVWn          \u0013\u0011\u0019\u0003    9ROWDJH\u0003DW\u0003ZKLFK\u0003UHVWDUW\u0003FDQ\u0003RFFXU\u000f\u0003S\u0011X\u0011\u0003\n              7UVWn          \u0013\u0011\u0017\u0003    5HVWDUW\u0003WLPH\u0003GHOD\\\u000f\u0003VHF\u0011\u0003\n              )XYUn          \u0013\u0011      )UDFWLRQ\u0003RI\u0003ORDG\u0003ZLWK\u0003XQGHUYROWDJH\u0003UHOD\\\u0003SURWHFWLRQ\n              9WU\u0014n           \u0013\u0011\u0013\u0003 )LUVW\u0003XQGJHHU\u0003WYURLSOW\u0003DOHYHO\u000f\u0003S\u0011X\u0011\u0003\n              7WU\u0014Q\u0003         \u0003\u0013\u0011\u0015\u0003 )LUVW\u0003XQGHUYROWDJH\u0003WULS\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n              9WU\u0015Q\u0003         \u0003\u0013\u0011\u0013\u0003 6HFRQG\u0003XQGHUYROWDJH\u0003WULS\u0003OHYHO\u000f\u0003S\u0011X\u0011\u0003\n              7WU\u0015Q\u0003         \u0003\u0018\u0011\u0013\u0003 6HFRQG\u0003XQGHUYROWDJH\u0003WULS\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n\n\n                                                                                                        10\n\f       Case 3:26-cv-00128-JLS-BJW              Document 1-43         Filed 01/09/26       PageID.326        Page\n    IID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                               74 of 132\n\n                    9F\u0014RIIQ\u0003       \u0003\u0013\u0011\u0018\u0003 &RQWDFWRU\u0003YROWDJH\u0003DW\u0003ZKLFK\u0003WULSSLQJ\u0003VWDUWV\u000f\u0003S\u0011X\u0011\u0003\n                    9F\u0015RIIQ\u0003       \u0003\u0013\u0011\u0017\u0003 &RQWDFWRU\u0003YROWDJH\u0003DW\u0003ZKLFK\u0003WULSSLQJ\u0003LV\u0003FRPSOHWH\u0003S\u0011X\u0011\u0003\n                    9F\u0014RQQ\u0003        \u0003\u0013\u0011\u0019\u0003 &RQWDFWRU\u0003YROWDJH\u0003DW\u0003ZKLFK\u0003UHFRQQHFWLRQ\u0003LV\u0003FRPSOHWH\u000f\u0003S\u0011X\u0011\u0003\n                    9F\u0015RQQ\u0003        \u0003\u0013\u0011\u0018\u0003 &RQWDFWRU\u0003YROWDJH\u0003DW\u0003ZKLFK\u0003UHFRQQHFWLRQ\u0003VWDUWV\u000f\u0003S\u0011X\u0011\u0003\n                    7WKQ\u0003 \u0003        \u0003\u0015\u0013\u0011\u0003 7KHUPDO\u0003WLPH\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n                    7K\u0014WQ\u0003         \u0003\u0013\u0011\u001a\u0003 7KHUPDO\u0003SURWHFWLRQ\u0003WULS\u0003VWDUW\u0003OHYHO\u000f\u0003S\u0011X\u0011\u0003WHPSHUDWXUH\u0003\n                    7K\u0015WQ\u0003         \u0003\u0014\u0011\u0016\u0003 7KHUPDO\u0003SURWHFWLRQ\u0003WULS\u0003FRPSOHWLRQ\u0003OHYHO\u000f\u0003S\u0011X\u0011\u0003WHPSHUDWXUH\u0003\n                    7YQ\u0003           \u0003\u0011\u0013\u0018\u0003 9ROWDJH\u0003PHDVXUHPHQW\u0003ODJ\u000f\u0003VHF\u0011\u0003\n    Note\u001d\u0003 ,QSXW\u0003 SDUDPHWHUV\u0003 WKURXJK\u0003 Mtypd PXVW\u0003 EH\u0003 LQFOXGHG\u0011\u0003 ,I\u000f\u0003 DW\u0003 DQ\\\u0003 SRLQW\u0003 DIWHU\u0003 WKDW\u000f\u0003 WKH\u0003 UHPDLQLQJ\u0003\n    SDUDPHWHUV\u0003DUH\u0003RPLWWHG\u000f\u0003WKH\u0003GHIDXOW\u0003YDOXHV\u0003VKRZQ\u0003LQ\u0003WKH\u0003WDEOH\u0003ZLOO\u0003EH\u0003XVHG\u0011\u0003\n    Note\u001d\u0003,I\u0003D\u0003PRWRU\u0003LV\u0003WR\u0003EH\u0003RPLWWHG\u000f\u0003EXW\u0003D\u0003PRWRU\u0003DIWHU\u0003LW\u0003LV\u0003WR\u0003EH\u0003LQFOXGHG\u000f\u0003WKH\u0003PRWRU\u0003IUDFWLRQ\u000f\u0003H\u0011J\u0011\u0003)PF\u000f\u0003\n    PXVW\u0003EH\u0003VHW\u0003WR\u0003D\u0003QRQ\u0010]HUR\u0003YDOXH\u0003\u001f \u0003\u0013\u0011\u0013\u0013\u0013\u0014\u0011\u0003,I\u0003LW\u0003LV\u0003VHW\u0003WR\u0003]HUR\u000f\u0003GDWD\u0003IRU\u0003WKH\u0003ODWHU\u0003PRGHO V \u0003ZLOO\u0003QRW\u0003EH\u0003UHDG\u0011\u0003\n\n    Notes:\n\nD   7KH\u0003IROORZLQJ\u0003JOREDO\u0003 G\\SDU \u0003SDUDPHWHUV\u0003KDYH\u0003EHHQ\u0003DGGHG\u0003LQ\u00039\u0015\u0014\u0003RI\u000336/)\u001d\n                                  'HIDXOW\u0003                       cmpldw PRGHO\u0003ZLOO\u0003QRW\u0003EH\u0003\n                                  YDOXHV\u0003                        XVHG\u0003LI\u001d\u0003\n            dypar.cmp_pmin          \u0013\u00030:\u0003                        3ORDG\u0003\u001f\u0003G\\SDU\u0011FPSBSPLQ\u0003\n            dypar.cmp_pqmin           \u0013\u0011\u0013\u0003                       3ORDG\u0003     \u0012\u0003    4ORDG\u0003    \u001f\u0003\n                                                                 G\\SDU\u0011FPSBSTPLQ\u0003\n            dypar.cmp_vmin        \u0013\u0011\u0013\u0003S\u0011X\u0011\u0003                      6\\VWHP\u0003       EXV\u0003   9\u0003    \u001f\u0003\n                                                                 G\\SDU\u0011FPSBYPLQ\u0003\n    :DUQLQJ\u0003PHVVDJHV\u0003DUH\u0003ZULWWHQ\u0003LI\u0003DQ\\\u0003RI\u0003WKHVH\u0003FRQGLWLRQV\u0003RFFXU\u0011\u00037KH\u0003YDOXHV\u0003RI\u0003WKHVH\u0003SDUDPHWHUV\u0003FDQ\u0003EH\u0003\n    FKDQJHG\u0003E\\\u0003HQWHULQJ\u0003GLIIHUHQW\u0003YDOXHV\u0003LQ\u0003WKH\u0003MDYDLQL\u0011S\u0003ILOH\u0011\u0003\n\nE   )RU\u0003DOO\u0003PRWRU\u0003LQSXW\u0003SDUDPHWHUV\u000f\u0003WKH\u0003WUDLOLQJ\u0003\u00b3n\u00b4\u0003LV\u0003WR\u0003EH\u0003UHSODFHG\u0003E\\\u0003\u00b3D\u00b4\u000f\u0003\u00b3E\u00b4\u000f\u0003\u00b3F\u00b4\u000f\u0003RU\u0003\u00b3G\u00b4\u0003FRUUHVSRQGLQJ\n    WR\u0003WKH\u0003PRWRU\u0003IUDFWLRQV\u0003)PD\u000f\u0003)PE\u000f\u0003)PF\u000f\u0003)PG\u0011\u0003\u0003,I\u0003)Pn \u0003\u0013\u0011\u000f\u0003WKH\u0003\u0003GDWD\u0003IRU\u0003WKDW\u0003PRWRU\u0003PXVW\u0003EH\u0003RPLWWHG\u0011\u0003,I\u0003LW\n    LV\u0003GHVLUHG\u0003WR\u0003LQFOXGH\u0003PRWRU\u0003GDWD\u0003IRU\u0003D\u0003PRWRU\u0003ZLWK\u0003)Pn \u0003\u0013\u0011\u000f\u0003)Pn PXVW\u0003EH\u0003VHW\u0003WR\u0003D\u0003VPDOO\u0003SRVLWLYH\u0003YDOXH\n     \u001f \u0003\u0013\u0011\u0013\u0013\u0013\u0014 \u0003\u00b1\u0003WKH\u0003GDWD\u0003ZLOO\u0003EH\u0003UHDG\u000f\u0003EXW\u0003WKH\u0003PRWRU\u0003IUDFWLRQ\u0003ZLOO\u0003EH\u0003VHW\u0003WR\u0003]HUR\u0011\n\nF   7R\u0003UHIHUHQFH\u0003WKH\u0003PRWRU\u0003SDUDPHWHUV\u0003LQ\u0003WKH\u0003HSFO\u0003IXQFWLRQV\u0003 getmodpar DQG\u0003setmodpar\u000f\u0003ERWK\u0003QDPHV\u0003 LI\n    GLIIHUHQW \u000f\u0003VHSDUDWHG\u0003E\\\u0003D\u0003XQGHUVFRUH\u000f\u0003PXVW\u0003EH\u0003XVHG\u0011\u0003)RU\u0003H[DPSOH\u000f\u0003IRU\u0003WKH\u0003ILUVW\u0003PRWRU\u000f\u0003WKH\u0003IROORZLQJ\u0003DUH\n    WKH\u0003SDUDPHWHU\u0003QDPHV\u001d\n\n             /)PD\u0003\u0003\n             5DDB&RPS3)D\u0003\n             /VDB9VWDOOD\u0003\u0003\n             /SDB5VWDOOD\u0003\u0003\n             /SSDB;VWDOOD\u0003\u0003\n             7SRDB7VWDOOD\u0003\u0003\n             7SSRDB)UVWD\u0003\n             +DB9UVWD\u0003\n             (WUTDB7UVWD\u0003\n             )WU\u0014DB)XYUD\u0003\n             9WU\u0014D\u0003\n             7WU\u0014D\u0003\n             9WU\u0015D\u0003\n\n                                                                                                                   11\n\f           Case 3:26-cv-00128-JLS-BJW             Document 1-43         Filed 01/09/26      PageID.327        Page\n        IID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                              75 of 132\n\n                7WU\u0015D\u0003\n                )WU\u0015DB9F\u0014RIID\u0003\u0003\n                9UF\u0014DB9F\u0015RIID\u0003\n                7UF\u0014DB9F\u0014RQD\u0003\u0003\n                9UF\u0015DB9F\u0015RQD\u0003\u0003\n                7UF\u0015DB7WKD\u0003\u0003\n                7K\u0014WD\u0003\n                7K\u0015WD\u0003\u0003\n                7YD\u0003\n        )RU\u000336/)\u0003YHUVLRQ\u0003\u0014\u001a\u0011\u0013B\u0013\u001a\u0003DQG\u0003ODWHU\u000f\u0003FDSLWDOL]DWLRQ\u0003LV\u0003RSWLRQDO\u0003 JHWPRGSDU\u0012VHWPRGSDU\u0003DUH\u0003QR\u0003ORQJHU\u0003FDVH\u0003\n        VHQVLWLYH \u0011\u0003)RU\u0003SUHYLRXV\u0003YHUVLRQV\u000f\u0003WKH\u0003SDUDPHWHUV\u0003PXVW\u0003EH\u0003HQWLUHO\\\u0003ORZHU\u0003FDVH\u0011\u0003\n\n    G 7KH\u0003FRPSRVLWH\u0003ORDG\u0003PRGHO\u0003LV\u0003UHSUHVHQWHG\u0003E\\\u0003D\u0003ORDG\u0003LQ\u0003WKH\u0003ORDG\u0003IORZ\u0003VROXWLRQ\u0011\u0003$IWHU\u0003LQLWLDOL]DWLRQ\u000f\u0003DOO\u0003WKH\n      ORDG\u00033\u0003DQG\u00034\u0003DUH\u0003LQFOXGHG\u0003LQ\u0003WKH\u0003FPSOGZ\u0003PRGHO\u0003DQG\u0003DUH\u0003VKRZQ\u0003LQ\u0003WKH\u00033PRW\u000f\u00034PRW\u0003FROXPQV\u0003RI\u0003WKH\u0003ORDG\n      WDEOH\u0011\u0003\u00037KH\u0003RULJLQDO\u0003ORDG\u0003YDOXHV\u0003DUH\u0003VHW\u0003WR\u0003]HUR\u0011\n\n    H    'XULQJ\u0003LQLWLDOL]DWLRQ\u000f\u0003WKH\u0003ORZ\u0010VLGH\u0003EXV\u0003DQG\u0003IDU\u0010HQG\u0003EXV\u0003DUH\u0003DGGHG\u0003WR\u0003WKH\u0003V\\VWHP\u0003<\u0003PDWUL[\u0003DQG\u0003DUH\u0003JLYHQ\n         QXPEHUV\u0003HTXDO\u0003WR\u0003WKH\u0003RULJLQDO\u0003 KLJK\u0010VLGH \u0003EXV\u0003SOXV\u0003\u001b\u0013\u0013\u000f\u0013\u0013\u0013\u0003DQG\u0003\u001c\u0013\u0013\u000f\u0013\u0013\u0013\u000f\u0003UHVSHFWLYHO\\\u0011\u0003,I\u0003PRUH\u0003WKDQ\u0003RQH\n         ORDG\u0003LV\u0003FRQQHFWHG\u0003WR\u0003WKH\u0003VDPH\u0003KLJK\u0010VLGH\u0003EXV\u000f\u0003WKH\u0003EXV\u0003QXPEHUV\u0003IRU\u0003WKH\u0003VHFRQG\u0003DQG\u0003VXEVHTXHQW\u0003ORDGV\u0003ZLOO\n         KDYH\u0003 Q\u0010\u0014 \u0003 \u0003\u0014\u000f\u0013\u0013\u0013\u000f\u0013\u0013\u0013\u0003DGGHG\u0011\u0003$IWHU\u0003LQLWLDOL]DWLRQ\u000f\u0003WKH\u0003QHZ\u0003EXVHV\u0003DQG\u0003DGGHG\u0003WUDQVIRUPHU\u000f\u0003IHHGHU\u000f\u0003DQG\n         VKXQWV\u0003FDQ\u0003EH\u0003YLHZHG\u0003ZLWK\u00036&$1\u0011\u0003Note: A history (sav) file should not be saved after initialization.\n         The load flow program will not recognize the new buses.\n\nI       7KH\u0003 09$\u0003 EDVH\u0003 IRU\u0003 WKH\u0003 HOHPHQWV\u0003 WUDQVIRUPHU\u000f\u0003 HTXLYDOHQW\u0003 IHHGHU\u000f\u0003 VKXQW\u0003 FDSDFLWRUV \u0003 LQ\u0003 WKH\u0003 ORDG\u0003 PRGHO\n        GHSHQGV\u0003RQ\u0003WKH\u0003YDOXH\u0003HQWHUHG\u0003IRU\u0003\u00b3mva=<mvabase>\u00b4\u0003DV\u0003IROORZV\u001d\n                  \u0014 ,I\u0003<mvabase> > 0\u0011\u000f\u0003WKH\u0003HQWHUHG\u0003YDOXH\u0003LV\u0003XVHG\u0003DV\u0003WKH\u000309$\u0003EDVH\u0011\n                  \u0015 ,I\u0003<mvabase> < 0\u0011\u000f\u0003WKH\u0003HQWHUHG\u0003YDOXH\u0003LV\u0003XVHG\u0003DV\u0003D\u0003\u00b3ORDGLQJ\u0003IDFWRU\u00b4\u0011\u0003\u00037KH\u0003\u000309$\u0003EDVH\u0003LV\u0003VHW\n                       HTXDO\u0003WR\u0003WKH\u0003ORDG\u00033\u0003GLYLGHG\u0003E\\\u0003WKH\u0003ORDGLQJ\u0003IDFWRU\u0011\n                  \u0016 ,I\u0003<mvabase> = 0\u0011\u0003RU\u0003LI\u0003\u00b3PYD \u001fPYDEDVH!\u00b4\u0003LV\u0003RPLWWHG\u000f\u0003D\u0003ORDGLQJ\u0003IDFWRU\u0003RI\u0003\u0013\u0011\u001b\u0003LV\u0003DVVXPHG\u0011\n                       7KDW\u0003LV\u000f\u0003WKH\u000309$\u0003EDVH\u0003LV\u0003VHW\u0003HTXDO\u0003WR\u0003WKH\u0003ORDG\u00033\u0003\u0012\u0003\u0013\u0011\u001b\u0011\n        1RWH\u001d\u00037KH\u0003LQSXW\u0003YDOXH\u0003RI\u0003mvabase LV\u0003VKRZQ\u0003LQ\u0003WKH\u0003HGPG\u0003WDEOH\u0003DV\u0003MbaseR DQG\u0003PD\\\u0003EH\u0003PRGLILHG\u0003WKHUH\u0003\n        SULRU\u0003WR\u0003LQLWLDOL]DWLRQ\u0011\u00037KH\u0003Mbase FROXPQ\u0003LQ\u0003HGPG\u0003VKRZV\u0003WKH\u0003DFXWDO\u000309$\u0003EDVH\u0003XVHG\u0003IRU\u0003WKH\u0003ORDG\u000f\u0003H\u0011J\u0011\u0003LI\u0003\n        D\u0003\u00b3ORDGLQJ\u0003IDFWRU\u00b4\u0003ZDV\u0003HQWHUHG\u000f\u0003Mbase LV\u0003WKH\u0003FRPSXWHG\u0003YDOXH\u0003RI\u000309$\u0003EDVH\u0011\u0003\u00037KLV\u0003LV\u0003VHW\u0003E\\\u0003WKH\u0003PRGHO\u0003\n        GXULQJ\u0003LQLWLDOL]DWLRQ\u0011\u0003\nJ       7KH\u0003VWDWLF\u0003ORDG\u0003PRGHO\u0003XVHV\u0003WKH\u0003IROORZLQJ\u0003IRUPXODV\u001d\n                P = Po*(P1c*V/VoP1e+P2c*V/VoP2e+P3)*(1+Pf *\u0394f)\n                Q = Qo*(Q1c*V/VoQ1e+Q2c*V/VoQ2e+Q3)*(1+Qf*\u0394f)\n                 Po = Pload(1.\u2013Fma\u2013Fmb\u2013Fmc-Fmd)\n                 Qo = Po*tan(acos(PFs)) = Po*sqrt(PFs-2-1.)\n                 P3 = 1.-P1c-P2c\n                 Q3 = 1.-Q1c-Q2c\n\nK 7KH\u0003HOHFWURQLF\u0003ORDG\u0003PRGHO\u0003LV\u0003FRQVWDQW\u00033\u000f\u00034\u0003ZLWK\u0003WKH\u0003SRZHU\u0003IDFWRU\u0003Pfel\u0011\u00037KH\u00033\u0003DQG\u00034\u0003DUH\u0003GHFUHDVHG\u0003OLQHDUO\\\n  WR\u0003]HUR\u0003EHWZHHQ\u0003YROWDJHV\u0003Vd1 DQG\u0003Vd2\u0011\u0003,I\u0003frcel LV\u0003JUHDWHU\u0003WKDQ\u0003]HUR\u000f\u0003WKDW\u0003IUDFWLRQ\u0003RI\u0003WKH\u0003ORDG\u0003WKDW\u0003ZDV\n  WULSSHG\u0003ZLOO\u0003EH\u0003UHFRQQHFWHG\u0003OLQHDUO\\\u0003DV\u0003WKH\u0003YROWDJH\u0003UHFRYHUV\u0011\n\nL       $Q\\\u0003RI\u0003WKH\u0003IRXU\u0003PRWRUV\u0003FDQ\u0003EH\u0003UHSUHVHQWHG\u0003E\\\u0003DQ\u0003HTXLYDOHQW\u0003RI\u0003D\u0003JURXS\u0003RI\u0003WKUHH\u0010SKDVH\u0003PRWRUV\u0003RU\u0003E\\\u0003DQ\n        HTXLYDOHQW\u0003RI\u0003D\u0003JURXS\u0003RI\u0003VLQJOH\u0010SKDVH\u0003DLU\u0003FRQGLWLRQHUV\u001d\n\n\n\n                                                                                                                     12\n\f           Case 3:26-cv-00128-JLS-BJW                 Document 1-43          Filed 01/09/26         PageID.328     Page\n        IID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                                  76 of 132\n\n                   \u0014    7KH\u0003WKUHH\u0010SKDVH\u0003PRWRU\u0003PRGHO\u0003XVHV\u0003WKH\u0003VDPH\u0003HOHFWULFDO\u0003IOX[\u0003PRGHO\u0003DV\u0003WKH\u0003motorw PRGHO\u0003LQ\n                        WKH\u000336/)\u0003G\\QDPLF\u0003PRGHO\u0003OLEUDU\\\u0011\u00037KH\u0003PHFKDQLFDO\u0003WRUTXH\u0003LV\u0003FRPSXWHG\u0003XVLQJ\u0003WKH\u0003IROORZLQJ\n                        IRUPXOD\u001d\n                        Tm = Tmo*\u03c9Etrq\n\n                   \u0015    7KH\u0003 VLQJOH\u0010SKDVH\u0003 DLU\u0003 FRQGLWLRQHU\u0003 PRGHO\u0003 LQ\u0003 WKH\u0003 FRPSRVLWH\u0003 ORDG\u0003 PRGHO\u0003 XVHV\u0003 HVVHQWLDOO\\\u0003 WKH\n                        VDPH\u0003 PRGHO\u0003 DV\u0003 WKH\u0003 ld1pac PRGHO\u0003 LQ\u0003 WKH\u0003 36/)\u0003 G\\QDPLF\u0003 PRGHO\u0003 OLEUDU\\\u0011\u0003 6RPH\u0003 RI\u0003 WKH\n                        SDUDPHWHUV\u0003RI\u0003WKDW\u0003PRGHO\u0003DUH\u0003KDUG\u0010ZLUHG\u0003WR\u0003WKH\u0003IROORZLQJ\u0003YDOXHV\u001d\n                         7Y\u0003 \u0003\u0013\u0011\u0013\u0015\u0003         YROWDJH\u0003VHQVLQJ\u0003WLPH\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n                         7I\u0003\u0003 \u0003\u0013\u0011\u0013\u0018\u0003\u0003       IUHTXHQF\\\u0003VHQVLQJ\u0003WLPH\u0003FRQVWDQW\u000f\u0003VHF\u0011\u0003\n                         .S\u0014\u0003 \u0003\u0013\u0011\u0003          UHDO\u0003SRZHU\u0003FRHIILFLHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0014\u000f\u0003SX\u0003:\u0012\u0003SX\u00039\u0003\u0003\n                         1S\u0014\u0003 \u0003\u0014\u0011\u0013\u0003         UHDO\u0003SRZHU\u0003H[SRQHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0014\u0003\n                         .T\u0014\u0003 \u0003\u0019\u0011\u0013\u0003         UHDFWLYH\u0003SRZHU\u0003FRHIILFLHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0014\u000f\u0003SX\u00039$U\u0012\u0003SX\u00039\u0003\n                         1T\u0014\u0003 \u0003\u0015\u0011\u0013\u0003         UHDFWLYH\u0003SRZHU\u0003H[SRQHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0014\u0003\n                         .S\u0015\u0003 \u0003\u0014\u0015\u0011\u0013\u0003        UHDO\u0003SRZHU\u0003FRHIILFLHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0015\u000f\u0003SX\u0003:\u0012\u0003SX\u00039\u0003\u0003\n                         1S\u0015\u0003 \u0003\u0016\u0011\u0015\u0003         UHDO\u0003SRZHU\u0003H[SRQHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0015\u0003\n                         .T\u0015\u0003 \u0003\u0014\u0014\u0011\u0013\u0003        UHDFWLYH\u0003SRZHU\u0003FRHIILFLHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0015\u000f\u0003SX\u00039$U\u0012\u0003SX\u00039\u0003\n                         1T\u0015\u0003 \u0003\u0015\u0011\u0018\u0003         UHDFWLYH\u0003SRZHU\u0003H[SRQHQW\u0003IRU\u0003UXQLQJ\u0003VWDWH\u0003\u0015\u0003\n                         &PS.SI\u0003 \u0003\u0014\u0011\u0013\u0003 UHDO\u0003SRZHU\u0003IUHTXHQF\\\u0003VHQVLWLYLW\\\u000f\u0003SX\u0003:\u0003\u0012\u0003SX\u0003IUHT\u0011\u0003\n                         &PS.TI\u0003 \u0003\u0010\u0016\u0011\u0016\u0003 UHDFWLYH\u0003SRZHU\u0003IUHTXHQF\\\u0003VHQVLWLYLW\\\u000f\u0003SX\u00039$U\u0003\u0012\u0003SX\u0003IUHT\u0011\u0003\n                         7UVWUW\u0003 \u0003\u0013\u0011\u0017\u0003      UHVWDUW\u0003GHOD\\\u0003WLPH\u000f\u0003VHF\u0011\u0003\n                         /IDGM\u0003 \u0003\u0013\u0011\u0003        VWDOO\u0003YROWDJH\u0003VHQVLWLYLW\\\u0003WR\u0003ORDGLQJ\u0003IDFWRU\u0003\n\nM       ,I\u0003WKH\u0003WUDQVIRUPHU\u0003UHDFWDQFH\u0003 Xxf \u0003LV\u0003OHVV\u0003WKDQ\u0003WKH\u0003MXPSHU\u0003WKUHVKROG\u000f\u0003WKH\u0003WUDQVIRUPHU\u0003LV\u0003RPLWWHG\u0011\u0003,I\u0003WKH\n        WUDQVIRUPHU\u0003LV\u0003LQFOXGHG\u0003DQG\u0003Vmax !\u0003Vmin \u000e\u0003\u0015 step\u000f\u0003WKH\u0003 ORZ\u0010\u0003\u0003VLGH \u0003YDULDEOH\u0003WDS\u0003ZLOO\u0003EH\u0003DGMXVWHG\u0003WR\u0003VHW\n        WKH\u0003ORZ\u0010VLGH\u0003YROWDJH\u0003DW\u0003DSSUR[LPDWHO\\\u0003WKH\u0003PLG\u0010SRLQW\u0003RI\u0003Vmin \u0010\u0010\u0003Vmax XQOHVV\u0003Tmin RU\u0003Tmax LV\u0003H[FHHGHG\u0011\n        ,I\u0003LTC \u0003\u0014\u000f\u00037KH\u0003WUDQVIRUPHU\u0003WDS\u0003PRYHV\u0003LQ\u0003GLVFUHWH\u0003VWHSV\u0003GXULQJ\u0003WKH\u0003G\\QDPLF\u0003VLPXODWLRQ\u0003WR\u0003FRQWURO\u0003WKH\n        ORZ\u0010VLGH\u0003YROWDJH\u0011\u0003,I\u0003WKH\u0003YROWDJH\u0003LV\u0003OHVV\u0003WKDQ\u0003Vmin RU\u0003JUHDWHU\u0003WKDQ\u0003Vmax IRU\u0003D\u0003WLPH\u0003SHULRG\u0003JUHDWHU\u0003WKDQ\n        Tdel\u000f\u0003WKH\u0003WUDQVIRUPHU\u0003WDS\u0003PRYHV\u0003LQ\u0003VWHSV\u0003XQWLO\u0003WKH\u0003YROWDJH\u0003LV\u0003ZLWKLQ\u0003UDQJH\u0011\u0003Ttap LV\u0003WKH\u0003GHOD\\\u0003WLPH\u0003EHWZHHQ\n        VXFFHVVLYH\u0003WDS\u0003VWHS\u0003PRYHPHQWV\u0011\n\nN       ,I\u0003Xfdr LV\u0003OHVV\u0003WKDQ\u0003WKH\u0003MXPSHU\u0003WKUHVKROG\u000f\u0003WKH\u0003IHHGHU\u0003HTXLYDOHQW\u0003LV\u0003RPLWWHG\u0011\n\n    O   ,I\u000f\u0003 GXULQJ\u0003 LQLWLDOL]DWLRQ\u000f\u0003 WKH\u0003 IDU\u0003 HQG\u0003 YROWDJH\u0003 LV\u0003 FRPSXWHG\u0003 WR\u0003 EH\u0003 OHVV\u0003 WKDQ\u0003 \u0013\u0011\u001c\u0018\u0003 S\u0011X\u0011\u000f\n        Rfdr DQG\u0003Xfdr DUH\u0003UHGXFHG\u0003WR\u0003EULQJ\u0003LW\u0003DERYH\u0003\u0013\u0011\u001c\u0018\u0011\n\nP $IWHU\u0003 WKH\u0003 ORDG\u0003 FRPSRQHQWV\u0003 DUH\u0003 LQLWLDOL]HG\u0003 WR\u0003 GHWHUPLQH\u0003 WKHLU\u0003 UHDFWLYH\u0003 SRZHU\u0003 FRQVXPSWLRQ\u000f\u0003 VKXQW\n  FDSDFLWDQFH\u0003LV\u0003DGGHG\u0003WR\u0003PDNH\u0003WKH\u00034\u0003DW\u0003WKH\u0003RULJLQDO\u0003ORDG\u0003EXV\u0003\u0003HTXDO\u0003WKH\u0003YDOXH\u0003IURP\u0003WKH\u0003ORDG\u0003IORZ\u0003VROXWLRQ\u0011\n  ,I\u0003Fb \u0003\u0013\u0011\u000f\u0003DOO\u0003RI\u0003WKLV\u0003FDSDFLWDQFH\u0003LV\u0003DGGHG\u0003DW\u0003WKH\u0003IDU\u0003HQG\u0003RI\u0003WKH\u0003IHHGHU\u0003 Bf2 \u0011\u0003,I\u0003WKLV\u0003FDSDFLWDQFH\u0003LV\u0003QHJDWLYH\n   LQGXFWLYH \u000f\u0003WKH\u0003VXEVWDWLRQ\u0003FDSDFLWRU\u0003 Bss \u0003LV\u0003UHGXFHG\u0003WR\u0003PDNH\u0003Bf2 ]HUR\u0003RU\u0003VOLJKWO\\\u0003SRVLWLYH\u0011\n\nQ       Cmpldw UHVSRQGV\u0003WR\u0003WKH\u0003load[ ].shed VLJQDO\u0003IURP\u0003DQ\\\u0003RI\u0003WKH\u0003ORDG\u0003VKHGGGLQJ\u0003UHOD\\\u0003PRGHOV\u0003DV\u0003IROORZV\u001d\n              \u0014 6WDWLF\u0003DQG\u0003HOHFWURQLF\u0003ORDG\u00033\u0003DQG\u00034\u0003YDOXHV\u0003DUH\u0003PXOWLSOLHG\u0003E\\\u0003load[ ].shed\u0011\n              \u0015 0RWRU\u0003 7\\SH\u0003\u0014\u0003DQG\u0003\u0016 \u000309$\u0003EDVHV\u0003DUH\u0003PXOWLSOLHG\u0003E\\\u0003load[ ].shed WR\u0003UHGXFH\u0003WKH\u0003PRWRU\u00030:\n                  ZLWKRXW\u0003FKDQJLQJ\u0003WKH\u0003LQWHUQDO\u0003YDULDEOHV\u0011\n              \u0016 )HHGHU\u00035\u0003DQG\u0003;\u0003YDOXHV\u0003DUH\u0003LQFUHDVHG\u0003E\\\u0003\u0014\u0011\u0003\u0012\u0003load[ ].shed DQG\u0003IHHGHU\u0003%\u0003YDOXHV\u0003GHFUHDVHG\u0003E\\\n                  load[ ].shed WR\u0003VLPXODWH\u0003WULSSLQJ\u0003RI\u0003DQ\u0003HTXLYDOHQW\u0003IUDFWLRQ\u0003RI\u0003WKH\u0003IHHGHUV\u0003IURP\u0003WKH\u0003VXEVWDWLRQ\u0011\n              \u0017 7UDQVIRUPHU\u0003DQG\u0003VXEVWDWLRQ\u0003VKXQW\u0003%\u0003YDOXHV\u0003DUH\u0003QRW\u0003FKDQJHG\u0011\n              \u0018 7KH\u0003FKDQJH\u0003LQ\u00030:\u0003DW\u0003WKH\u0003VXEVWDWLRQ\u0003KLJK\u0003VLGH\u0003EXV\u0003GXH\u0003WR\u0003WKH\u0003ORDG\u0003VKHGGLQJ\u0003DFWLRQ\u0003LV\u0003UHFRUGHG\n\n\n                                                                                                                          13\n\f      Case 3:26-cv-00128-JLS-BJW             Document 1-43        Filed 01/09/26        PageID.329   Page\n   IID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                              77 of 132\n\n                   LQ\u0003WKH\u0003YDULDEOH\u0003load[ ].pshed IRU\u0003XVH\u0003E\\\u0003WKH\u0003lsmon PRGHO\u0003\u0003LQ\u0003DFFXPODWLQJ\u00030:\u0003VKHG\u0003IRU\u0003WKH\u0003\n                   V\\VWHP\u0003DQG\u0003E\\\u0003DUHD\u0011\u0003\n\nR 7KH\u0003SDUDPHWHU\u0003frcel ZDV\u0003DGGHG\u0003LQ\u00039HUVLRQ\u0003\u0014\u001a\u0011\u0013B\u0013\u001a\u0011\u0003\u0003(DUOLHU\u0003GDWD\u0003VHWV\u0003PXVW\u0003EH\u0003\u0003XSGDWHG\u0003WR\u0003LQFOXGH\u0003WKLV\n  SDUDPHWHU\u0003LQ\u0003WKH\u0003VSHFLILHG\u0003ORFDWLRQ\u0011\n\nS 7KH\u0003RXWSXW\u0003FKDQQHOV\u0003KDYH\u0003EHHQ\u0003PRGLILHG\u0003LQ\u00039\u0014\u001c\u0003WR\u0003LQFOXGH\u0003ORDG\u0003WULS\u00030:\u0003YDOXHV\u000f\u0003ZKLFK\u0003PD\\\u0003EH\u0003VXPPHG\n  IRU\u0003DUHDV\u000f\u0003]RQHV\u000f\u0003HWF\u0011\u0003XVLQJ\u0003WKH\u0003/'753021\u0003PRGHO\u0011\u00036HH\u0003PDQXDO\u0003SDJH\u0003IRU\u0003/'75021\u0003IRU\u0003GHILQLWLRQ\u0003RI\n  WKHVH\u0003RXWSXWV\u0011\n\n   Output Channels:\n\n          5HFRUG\u0003\n          /HYHO\u0003  1DPH\u0003           'HVFULSWLRQ\u0003\n          \u0014\u0003      3OG\u0003            7RWDO\u0003ORDG\u0003DFWLYH\u0003SRZHU\u0003DW\u0003KLJK\u0003VLGH\u0003EXV\u000f\u00030:\u0003\n          \u0014\u0003      4OG\u0003            7RWDO\u0003ORDG\u0003UHDFWLYH\u0003SRZHU\u0003DW\u0003KLJK\u0003VLGH\u0003EXV\u000f\u000309$U\u0003\n\n         \u0015\u0003        9OV\u0003           9ROWDJH\u0003PDJQLWXGH\u0003DW\u0003VXEVWDWLRQ\u0003ORZ\u1028VLGH\u0003EXV\u000f\u0003S\u0011X\u0011\u0003\n         \u0015\u0003        9OG\u0003           9ROWDJH\u0003PDJQLWXGH\u0003DW\u0003IDU\u0003HQG\u0003EXV\u000f\u0003S\u0011X\u0011\u0003\n         \u0015\u0003        [VKQ\u0003          1RPLQDO\u0003YDOXH\u0003ORDG\u0003VKHG\u000f\u00030:\u0003\n         \u0015\u0003        [WRQ\u0003          1RPLQDO\u0003WRWDO\u0003ORDG\u0003WULSSHG\u000f\u00030:\u0003\n         \u0015\u0003        [WRL\u0003          ,QVWDQWDQHRXV\u0003WRWDO\u0003ORDG\u0003WULSSHG\u000f\u00030:\u0003\n         \u0015\u0003        3VW\u0003           6WDWLF\u0003ORDG\u00033\u000f\u00030:\u0003\n         \u0015\u0003        3HO\u0003           (OHFWURQLF\u0003ORDG\u00033\u000f\u00030:\u0003\n         \u0015\u0003        [HOQ\u0003          1RPLQDO\u0003HOHFWURQLF\u0003ORDG\u0003WULSSHG\u000f\u00030:\u0003\n         \u0015         [HOL           ,QVWDQWDQHRXV\u0003HOHFWURQLF\u0003ORDG\u0003WULSSHG\u000f\u00030:\n   )RU\u0003HDFK\u0003PRWRU\u0003LQ\u0003XVH\u001d\u0003\n         \u0015     3Pn                0RWRU\u0003n 3\u000f\u00030:\n         \u0015\u0003    [PnQ\u0003              1RPLQDO\u0003PRWRU\u0003n ORDG\u0003WULSSHG\u000f\u00030:\u0003\n         \u0015\u0003    [PnL\u0003              ,QVWDQWDQHRXV\u0003PRWRU\u0003n ORDG\u0003WULSSHG\u000f\u00030:\u0003\n\n         \u0016\u0003    WDS\u0003            WUDQVIRUPHU\u0003WDS\u0003UDWLR\u0003\n         \u0016\u0003    4VW\u0003            6WDWLF\u0003ORDG\u00034\u000f\u000309$U\u0003\n         \u0016     4HO             (OHFWURQLF\u0003ORDG\u00034\u000f\u000309$U\n   )RU\u0003HDFK\u0003PRWRU\u0003LQ\u0003XVH\u001d\u0003\n        \u0016\u0003            4Pn          0RWRU\u00034\u000f\u000309$U\u0003)RU\u0003\n   HDFK\u00037\\SH\u0003\u0016\u0003PRWRU\u0003LQ\u0003XVH\u001d\u0003\n         \u0017     VSGn           0RWRU\u0003VSHHG\u000f\u0003S\u0011X\u0011\n         \u0017\u0003    7Pn            0RWRU\u0003PHFKDQLFDO\u0003WRUTXH\u000f\u0003S\u0011X\u0011\u0003\n         \u0017\u0003    7Hn            0RWRU\u0003HOHFWULFDO\u0003WRUTXH\u000f\u0003S\u0011X\u0011\u0003\n         \u0017\u0003    IXYn           )UDFWLRQ\u0003RI\u0003PRWRU\u0003QRW\u0003WULSSHG\u0003E\\\u000389\u0003UHOD\\\u0003\n         \u0017     IVKn           )UDFWLRQ\u0003RI\u0003PRWRU\u0003QRW\u0003WULSSHG\u0003E\\\u0003ORDG\u0003VKHGGLQJ\u0003UHOD\\V\n   )RU\u0003HDFK\u00037\\SH\u0003\u0014\u0003PRWRU\u0003LQ\u0003XVH\u001d\u0003\n         \u0017     IXYn            )UDFWLRQ\u0003RI\u0003PRWRU\u0003QRW\u0003WULSSHG\u0003E\\\u000389\u0003UHOD\\\n         \u0017\u0003    IFQn            )UDFWLRQ\u0003RI\u0003PRWRU\u0003QRW\u0003WULSSHG\u0003E\\\u0003FRQWDFWRU\u0003\n         \u0017\u0003    FU$n            &XUUHQW\u0003LQ\u0003QRQ\u1028UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u000f\u0003S\u0011X\u0011\u0003\n         \u0017\u0003    FU%n            &XUUHQW\u0003LQ\u0003UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u000f\u0003S\u0011X\u0011\u0003\n         \u0017\u0003    IVKn            )UDFWLRQ\u0003RI\u0003PRWRU\u0003QRW\u0003WULSSHG\u0003E\\\u0003ORDG\u0003VKHGGLQJ\u0003UHOD\\V\u0003\n\n          \u001c\u0003           WPS$\u0003      \u00b37HPSHUDWXUH\u00b4\u0003LQ\u0003QRQ\u1028UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u000f\u0003S\u0011X\u0011\u0003\n\n                                                                                                            14\n\f   Case 3:26-cv-00128-JLS-BJW           Document 1-43       Filed 01/09/26      PageID.330          Page\nIID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                            78 of 132\n\n       \u001c\u0003           IWK$\u0003   )UDFWLRQ\u0003RI\u0003QRQ\u1028UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u0003QRW\u0003WULSSHG\u0003E\\\u0003WKHUPDO\u0003SURW\u0011\u0003\n       \u001c\u0003           WPS%\u0003   \u00b37HPSHUDWXUH\u00b4\u0003LQ\u0003UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u000f\u0003S\u0011X\u0011\u0003\n       \u001c            IWK%    )UDFWLRQ\u0003RI\u0003UHVWDUWLQJ\u0003SDUW\u0003RI\u0003ORDG\u0003QRW\u0003WULSSHG\u0003E\\\u0003WKHUPDO\u0003SURW\u0011\n\n1RWH\u001d\u00030RVW\u0003PRWRU\u0003FKDQQHO\u0003QDPHV\u0003KDYH\u0003\u00b3D\u00b4\u000f\u0003\u00b3E\u00b4\u000f\u0003\u00b3F\u00b4\u000f\u0003RU\u0003\u00b3G\u00b4\u0003DGGHG\u0003LQ\u0003SODFH\u0003RI\u0003\u00b3n\u00b4\u0003WR\u0003LQGLFDWH\u0003\nZKLFK\u0003RI\u0003WKH\u0003IRXU\u0003PRWRUV\u0003WKH\\\u0003DUH\u0003DVVRFLDWHG\u0003ZLWK\u0011\u0003\n\n\nSample data record:\n\nFPSOGZ\u0003\u0014\u0015\u0016\u0017\u0003\u0005;;;;\u0005\u0003\u0014\u0014\u0018\u0011\u0013\u0013\u0003\u0005\u0014\u0005\u001d\u0003\u0006\u0014\u0003PYD \u0014\u0011\u0014\u0003\u0012\u0003\n    \u0005%VV\u0005\u0003     \u0013\u0003\u00055IGU\u0005\u0003\u0013\u0011\u0013\u0017\u0003\u0005;IGU\u0005\u0003\u0013\u0011\u0013\u0017\u0003\u0005)E\u0005\u0003\u0013\u0011\u001a\u0018\u0012\u0003\n    \u0005;[I\u0005\u0003\u0013\u0011\u0013\u001b\u0003\u00057IL[+6\u0005\u0003\u0014\u0003\u00057IL[/6\u0005\u0003\u0014\u0003\u0005/7&\u0005\u0003\u0013\u0003 \u00057PLQ\u0005\u0003 \u0013\u0011\u001c\u0003\u00057PD[\u0005\u0003\u0014\u0011\u0014\u0003\u0005VWHS\u0005\u0003\u0013\u0011\u0013\u0013\u0019\u0015\u0018\u0003\u0012\u0003\n    \u00059PLQ\u0005\u0003 \u0014\u0011\u0013\u0015\u0018\u0003\u00059PD[\u0005\u0003\u0014\u0011\u0013\u0017\u0003\u00057GHO\u0005\u0003\u0016\u0013\u0003 \u00057WDS\u0005\u0003 \u0018\u0003\u00055FRPS\u0005\u0003\u0013\u0003\u0005;FRPS\u0005\u0003\u0013\u0003\u0012\u0003\n    \u0005)PD\u0005\u0003 \u0013\u0011\u0014\u0017\u0019\u0015\u0017\u0019\u0003\u0005)PE\u0005\u0003\u0013\u0011\u0014\u0017\u001a\u0015\u0015\u0015\u0003\u0005)PF\u0005\u0003\u0013\u0011\u0013\u0016\u0019\u0018\u0015\u0014\u0003\u0005)PG\u0005\u0013\u0011\u0016\u0019\u001a\u0013\u0013\u0017\u0003\u0005)HO\u0005\u0003\u0013\u0011\u0014\u0013\u0019\u0015\u001b\u0019\u0003 \u0012\u0003\n    \u00053)HO\u0005\u0003\u0014\u0003\u00059G\u0014\u0005\u0003\u0013\u0011\u001a\u0003\u00059G\u0015\u0005\u0003\u0013\u0011\u0018\u0003\u0005)UFHO\u0005\u0003\u0013\u0011\u001b\u0003\u0012\u0003\n    \u00053IV\u0005\u0003     \u0010\u0013\u0011\u001c\u001c\u001a\u001a\u0014\u0003\u00053\u0014H\u0005\u0003\u0015\u0003\u00053\u0014F\u0005\u0003\u0013\u0011\u0018\u0018\u001a\u0016\u0019\u0014\u0003\u00053\u0015H\u0005\u0003\u0014\u0003\u00053\u0015F\u0005\u0003 \u0013\u0011\u0017\u0017\u0015\u0019\u0016\u001c\u0003\u00053IUHT\u0005\u0003\u0013\u0003\u0012\n                    \u00054\u0014H\u0005\u0003\u0015\u0003\u00054\u0014F\u0005\u0003\u0010\u0013\u0011\u0018\u0003\u00054\u0015H\u0005\u0003\u0014\u0003\u00054\u0015F\u0005\u0003              \u0014\u0011\u0018\u0003\u00054IUHT\u0005\u0003\u0010\u0014\u0003\u0012\u0003\n\u00050WS$\u0005\u0003\u0016\u0003\u00050WS%\u0005\u0003\u0016\u0003\u00050WS&\u0005\u0003\u0016\u0003\u00050WS'\u0005\u0003\u0014\u0003\u0012\u0003\n\u0005/IP$\u0005\u0003\u0013\u0011\u001a\u0018\u0003\u00055V$\u0005\u0003\u0013\u0011\u0013\u0017\u0003\u0005/V$\u0005\u0003\u0014\u0011\u001b\u0003\u0005/S$\u0005\u0003\u0013\u0011\u0014\u0015\u0003\u0005/SS$\u0005\u0003                 \u0013\u0011\u0014\u0013\u0017\u0003\u0012\u0003\n    \u00057SR$\u0005\u0003\u0013\u0011\u0013\u001c\u0018\u0003\u00057SSR$\u0005\u0003\u0013\u0011\u0013\u0013\u0015\u0014\u0003\u0005+$\u0005\u0003             \u0013\u0011\u0014\u0003\u0005HWUT$\u0005\u0003\u0013\u0003\u0012\u0003\n    \u00059WU\u0014$\u0005\u0003\u0013\u0011\u001a\u0003\u00057WU\u0014$\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0014$\u0005\u0003\u0013\u0011\u0015\u0003\u00059UF\u0014$\u0005\u0003\u0014\u0003\u00057UF\u0014$\u0005\u0003\u001c\u001c\u001c\u001c\u001c\u0003\u0012\u0003\n    \u00059WU\u0015$\u0005\u0003\u0013\u0011\u0018\u0003\u00057WU\u0015$\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0015$\u0005\u0003\u0013\u0011\u001a\u0003\u00059UF\u0015$\u0005\u0003\u0013\u0011\u001a\u0003\u00057UF\u0015$\u0005\u0003\u0013\u0011\u0014\u0003\u0012\u0003\n\u0005/IP%\u0005\u0003\u0013\u0011\u001a\u0018\u0003\u00055V%\u0005\u0003\u0013\u0011\u0013\u0016\u0003\u0005/V%\u0005\u0003\u0014\u0011\u001b\u0003\u0005/S%\u0005\u0003\u0013\u0011\u0014\u001c\u0003\u0005/SS%\u0005\u0003                 \u0013\u0011\u0014\u0017\u0003\u0012\u0003\n    \u00057SR%\u0005\u0003\u0013\u0011\u0015\u0003\u00057SSR%\u0005\u0003\u0013\u0011\u0013\u0013\u0015\u0019\u0003\u0005+%\u0005\u0003            \u0013\u0011\u0018\u0003\u0005HWUT%\u0005\u0003\u0015\u0003\u0012\u0003\n    \u00059WU\u0014%\u0005\u0003\u0013\u0011\u0019\u0003\u00057WU\u0014%\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0014%\u0005\u0003\u0013\u0011\u0015\u0003\u00059UF\u0014%\u0005\u0003\u0013\u0011\u001a\u0018\u0003\u00057UF\u0014%\u0005\u0003\u0013\u0011\u0013\u0018\u0003\u0012\u0003\n    \u00059WU\u0015%\u0005\u0003\u0013\u0011\u0018\u0003\u00057WU\u0015%\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0015%\u0005\u0003\u0013\u0011\u0016\u0003\u00059UF\u0015%\u0005\u0003\u0013\u0011\u0019\u0018\u0003\u00057UF\u0015%\u0005\u0003\u0013\u0011\u0013\u0018\u0003\u0012\u0003\n\u0005/IP&\u0005\u0003\u0013\u0011\u001a\u0018\u0003\u00055V&\u0005\u0003\u0013\u0011\u0013\u0016\u0003\u0005/V&\u0005\u0003\u0014\u0011\u001b\u0003\u0005/S&\u0005\u0003\u0013\u0011\u0014\u001c\u0003\u0005/SS&\u0005\u0003                 \u0013\u0011\u0014\u0017\u0003\u0012\u0003\n    \u00057SR&\u0005\u0003\u0013\u0011\u0015\u0003\u00057SSR&\u0005\u0003\u0013\u0011\u0013\u0013\u0015\u0019\u0003\u0005+&\u0005\u0003            \u0013\u0011\u0014\u0003\u0005HWUTF\u0005\u0003\u0015\u0003\u0012\u0003\n    \u00059WU\u0014&\u0005\u0003\u0013\u0011\u0019\u0018\u0003\u00057WU\u0014&\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0014&\u0005\u0003\u0013\u0011\u0015\u0003\u00059UF\u0014&\u0005\u0003\u0014\u0003\u00057UF\u0014&\u0005\u0003\u001c\u001c\u001c\u001c\u0003\u0012\u0003\n    \u00059WU\u0015&\u0005\u0003\u0013\u0011\u0018\u0003\u00057WU\u0015&\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005)WU\u0015&\u0005\u0003\u0013\u0011\u0016\u0003\u00059UF\u0015&\u0005\u0003\u0013\u0011\u0019\u0018\u0003\u00057UF\u0015&\u0005\u0003\u0013\u0011\u0014\u0003\u0012\u0003\n\u0005/IP'\u0005\u0003\u0014\u0003\u0005&RPS3)\u0005\u0003\u0013\u0011\u001c\u001b\u0003\u0012\u0003\n   \u00059VWDOO\u0005\u0003\u0013\u0011\u0018\u0019\u0003\u00055VWDOO\u0005\u0003\u0013\u0011\u0014\u0003\u0005;VWDOO\u0005\u0003\u0013\u0011\u0014\u0003\u00057VWDOO\u0005\u0003\u0013\u0011\u0013\u0016\u0003 \u0012\u0003\n   \u0005)UVW\u0005\u0003\u0013\u0011\u0015\u0003\u00059UVW\u0005\u0003\u0013\u0011\u001c\u0018\u0003\u00057UVW\u0005\u0003\u0013\u0011\u0016\u0003\u0012\u0003\n   \u0005IXYU\u0005\u0003\u0013\u0011\u0014\u0003\u0005YWU\u0014\u0005\u0003\u0013\u0011\u0019\u0003\u0005WWU\u0014\u0005\u0003\u0013\u0011\u0013\u0015\u0003\u0005YWU\u0015\u0005\u0003\u0014\u0003\u0005WWU\u0015\u0005\u0003\u001c\u001c\u001c\u001c\u0003\u0012\u0003\n   \u00059F\u0014RII\u0005\u0003\u0013\u0011\u0018\u0003\u00059F\u0015RII\u0005\u0003\u0013\u0011\u0017\u0003\u00059F\u0014RQ\u0005\u0003\u0013\u0011\u0019\u0003\u00059F\u0015RQ\u0005\u0003\u0013\u0011\u0018\u0003\u0012\u0003\n  \u0003\u00057WK\u0005\u0003\u0014\u0018\u0003\u00057K\u0014W\u0005\u0003\u0013\u0011\u001a\u0003\u00057K\u0015W\u0005\u0003\u0014\u0011\u001c\u0003\u0005WY\u0005\u0003\u0013\u0011\u0013\u0015\u0018\u0003\n\n\n\n\n                                                                                                           15\n\f   Case 3:26-cv-00128-JLS-BJW   Document 1-43    Filed 01/09/26   PageID.331   Page\nIID-792\u0003 5\u0014\u0003\u0013\u001a\u0010\u0015\u0016                    79 of 132\n\n\n\n\nSchematic Diagram:\n\n\n\n\n                                                                                      16\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43      Filed 01/09/26      PageID.332      Page\n                                     80 of 132\n                                                                          IID-693 (10-08)\n                                                       SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                     IMPERIAL IRRIGATION DISTRICT\n                       System Impact Study Agreement\n                           Imperial Data Center #2 - 80 MW\n\n          THIS AGREEMENT is made and entered into this 15th day of April, 2025\n   by and between Imperial Valley Computer Manufacturing, LLC, a company\n   organized and existing under the laws of the State of Delaware and registered to\n   do business in the state of California (\"Interconnection Customer\"), and the\n   Imperial Irrigation District an irrigation district organized under the Water Code\n   of the State of California, (\"Transmission Provider\"). Interconnection Customer\n   and Transmission Provider each may be referred to as a \"Party\" or collectively as\n   the \"Parties.\"\n\n                                            RECITALS\n\n           WHEREAS, Interconnection Customer is proposing to develop a\n   Generating Facility or generating capacity addition to an existing Generating\n   Facility consistent with the Interconnection Request submitted by\n   Interconnection Customer dated March 3, 2025; and\n\n          WHEREAS, Interconnection Customer desires to interconnect the\n   Generating Facility with Transmission Provider\u2019s Transmission System or\n   Distribution System; and\n\n          WHEREAS, Transmission Provider has completed a Scoping Meeting\n   with Interconnection Customer; and\n\n          WHEREAS, Interconnection Customer has requested Transmission\n   Provider to perform an Interconnection System Impact Study to assess the\n   impact of interconnecting the Generating Facility to the Transmission System or\n   Distribution System.\n\n         NOW, THEREFORE, in consideration of and subject to the mutual\n   covenants contained herein the Parties agree as follows:\n\n             1.0    When used in this Agreement, unless otherwise defined herein,\n                    terms with initial capitalization shall have the meaning\n                    specified in the Transmission Provider\u2019s Tariff.\n\n                                                                                       1\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43    Filed 01/09/26    PageID.333      Page\n                                     81 of 132\n                                                                      IID-693 (10-08)\n                                                   SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n             2.0   Interconnection Customer requests that Transmission Provider\n                   prepare an Interconnection System Impact Study consistent\n                   with Section 7 of the GIP in accordance with the Tariff. At\n                   Transmission Provider\u2019s option, Interconnection Customer\u2019s\n                   Interconnection Request may be studied serially or in a cluster\n                   with    Interconnection  Requests    submitted     by     other\n                   Interconnection Customers.\n\n             3.0   The Interconnection System Impact Study will be based upon\n                   the results of the Scoping Meeting and the technical information\n                   provided by Interconnection Customer in the Interconnection\n                   Request, subject to any modifications in accordance with\n                   Sections 4.4.1 and 7.2 of the GIP. When Clustering is used to\n                   perform the Interconnection System Impact Study, the\n                   Interconnection System Impact Study also will be based upon\n                   the results of Scoping Meetings and technical information\n                   provided by other interconnection customers in their\n                   Interconnection Requests, subject to any modifications in\n                   accordance with Sections 4.4.1 and 7.2 of the GIP. Transmission\n                   Provider has the right to request additional technical\n                   information from Interconnection Customer that Transmission\n                   Provider determines is reasonably necessary, consistent with\n                   Good Utility Practice, during the course of the Interconnection\n                   System Impact Study. Upon request by Transmission Provider,\n                   Interconnection Customer shall provide such additional\n                   information to Transmission Provider within seven (7) Calendar\n                   Days.\n\n             4.0   Transmission Provider's non-binding, good faith estimate for\n                   the time of completion of the Interconnection System Impact\n                   Study is December 2024 and Transmission Provider's non-\n                   binding, good faith estimate of the cost for completing the\n                   Interconnection System Impact Study is $50,000.00.\n\n             5.0   If Interconnection Customer, or any other interconnection\n                   customer with an Interconnection Request in the same study\n                   cluster as the Interconnection Customer\u2019s Interconnection\n                   Request, modifies its designated Point of Interconnection,\n                                                                                   2\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43    Filed 01/09/26    PageID.334      Page\n                                     82 of 132\n                                                                      IID-693 (10-08)\n                                                   SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                   Interconnection Request, or the technical information provided\n                   therein is modified, the time to complete the Interconnection\n                   System Impact Study may be extended. Similarly, if the\n                   Interconnection Request of another interconnection customer is\n                   withdrawn from Transmission Provider\u2019s queue or removed\n                   from the cluster, the time to complete the Interconnection\n                   System Impact Study may be extended.\n\n             6.0   Following the completion of the Interconnection System Impact\n                   Study, the Transmission Provider shall provide an\n                   Interconnection System Impact Study report to Interconnection\n                   Customer. Subject to the confidentially provisions of Section\n                   13.1 of the GIP, this report shall provide the following\n                   information:\n\n                   \u0010 identification of any circuit breaker short circuit capability\n                     limits exceeded as a result of the interconnection or, when\n                     Clustering is used, as a result of the interconnections of the\n                     group of Generating Facilities studied in the cluster;\n\n                   \u0010 identification of any thermal overload or voltage limit\n                     violations resulting from the interconnection or, when\n                     Clustering is used, resulting from the interconnections of the\n                     group of Generating Facilities studied in the cluster;\n\n                   \u0010 identification of any instability or inadequately damped\n                     response to system disturbances resulting from the\n                     interconnection or when Clustering is used, resulting from\n                     the interconnections of the group of Generating Facilities\n                     studied in the cluster; and\n\n                   \u0010 a description and non-binding, good faith estimate of the\n                     cost and time to construct facilities projected to be required\n                     to interconnect the Generating Facility to the Transmission\n                     System or Distribution System, or, when Clustering is used,\n                     to interconnect of the group of Generating Facilities studied\n                     in the cluster, and to address the identified short circuit,\n                     instability, and power flow issues.\n\n                                                                                   3\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43      Filed 01/09/26     PageID.335     Page\n                                     83 of 132\n                                                                        IID-693 (10-08)\n                                                     SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n             7.0   When the Interconnection System Impact Study report is\n                   provided to Interconnection Customer, Transmission Provider\n                   shall invoice Interconnection Customer for the actual costs of\n                   the Interconnection System Impact Study, including\n                   Transmission Provider\u2019s administrative costs, if any, that are in\n                   excess of the applicable deposit amount paid previously by\n                   Interconnection Customer in accordance with Section 3.3.1(b)of\n                   the GIP. Interconnection Customer shall pay such invoice\n                   within thirty (30) Calendar Days of its receipt of the invoice.\n\n             8.0   Transmission Provider\u2019s Interconnection System Impact Study\n                   shall not be construed as confirming or endorsing the design, or\n                   as any warranty of safety, durability, reliability or suitability of\n                   Interconnection Customer\u2019s Generating Facility or installation\n                   thereof for any use, including the use intended by\n                   Interconnection Customer.\n\n             9.0   This Agreement shall be interpreted and enforced in accordance\n                   with the substantive and procedural laws of the State of\n                   California. All actions or proceedings arising in connection with\n                   this Agreement shall be tried and litigated exclusively in State\n                   court located in the County of Imperial, California and/or\n                   Federal court located in the County of San Diego, California.\n                   The aforementioned choice of venue is mandatory, thereby\n                   precluding the possibility of litigation between the Parties with\n                   respect to or arising out of this Agreement in any jurisdiction\n                   other than that specified in this section. Each Party hereby\n                   waives any right it may have to assert the doctrine of forum non\n                   conveniens or a similar doctrine or to object to venue with\n                   respect to any proceeding brought in accordance with this\n                   section, and stipulates that the State court located in Imperial\n                   County, California, and/or a Federal court located in the\n                   Counties of Imperial and San Diego, respectively, California,\n                   shall have in personam jurisdiction and venue over each of them\n                   for the purpose of litigating any dispute or proceeding arising\n                   out of or related to this Agreement. Each Party hereby\n                   authorizes service of process sufficient for personal jurisdiction\n\n                                                                                     4\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43      Filed 01/09/26    PageID.336      Page\n                                     84 of 132\n                                                                        IID-693 (10-08)\n                                                     SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                    in any action against it at the address and in the manner for the\n                    giving of notice as set forth in this Agreement.\n\n             10.0   Interconnection Customer shall at all times indemnify, defend,\n                    and save Transmission Provider harmless from, any and all\n                    damages, losses, claims, including claims and actions relating to\n                    injury to or death of any person or damage to property,\n                    demands, suits, recoveries, costs and expenses, court costs,\n                    attorney fees, and all other obligations by or to third parties,\n                    arising out of or resulting from Transmission Provider\u2019s\n                    performance of its obligations under this Agreement on behalf\n                    of     Interconnection Customer, except in cases where\n                    Transmission Provider is solely negligent.\n\n             11.0   Transmission Provider shall not be considered to be in default\n                    of the provisions of this Agreement if delays in or failure of\n                    performance shall be due to uncontrollable forces, the effect of\n                    which, by the exercise of reasonable diligence, Transmission\n                    Provider could not avoid. The term uncontrollable forces shall\n                    mean any event which results in the prevention or delay of\n                    performance by Transmission Provider of its obligations under\n                    this Agreement and which is beyond the control of\n                    Transmission Provider. The term uncontrollable forces includes,\n                    but is not limited to, fire, acts of God, flood, earthquakes,\n                    storms, lightning, epidemic, pandemic, war, riot, civil\n                    disturbance, sabotage, inability to procure permits, licenses, or\n                    authorizations from any state, local, or federal agency, or person\n                    for any of the supplies, materials, accesses, or services required\n                    to be provided by Transmission Provider under this Agreement,\n                    strikes, work slowdowns, or other labor disturbances, and\n                    judicial constraint. The provisions of this section shall not be\n                    interpreted or construed to require Transmission Provider to\n                    prevent, settle, or otherwise avoid a strike, work slowdown, or\n                    other labor action. Transmission Provider shall give timely\n                    written notice to Interconnection Customer describing the\n                    circumstances of uncontrollable forces which prevent the\n                    fulfillment of obligation of this Agreement. Transmission\n                    Provider shall give timely written notice to the Interconnection\n                                                                                     5\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43       Filed 01/09/26     PageID.337      Page\n                                     85 of 132\n                                                                          IID-693 (10-08)\n                                                       SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                    Customer that the uncontrollable forces which prevented the\n                    fulfillment of obligations of this Agreement are no longer\n                    present and work has resumed on those obligations.\n\n             12.0   Each Party makes the following representations, warranties and\n                    covenants:\n\n                       12.1 Such Party is duly organized, validly existing and in\n                           good standing under the laws of the state in which it is\n                           organized, formed, or incorporated, as applicable; that it\n                           is qualified to do business in the state or states in which it\n                           is located, and that it has the corporate power and\n                           authority to own its properties, to carry on its business as\n                           now being conducted and to enter into this Agreement\n                           and carry out the transactions contemplated hereby and\n                           perform and carry out all covenants and obligations on\n                           its part to be performed under and pursuant to this\n                           Agreement.\n\n                       12.2    Such Party has the right, power and authority to\n                           enter into this Agreement, to become a Party hereto and\n                           to perform its obligations hereunder. This Agreement is\n                           a legal, valid and binding obligation of such Party,\n                           enforceable against such Party in accordance with its\n                           terms, except as the enforceability thereof may be limited\n                           by applicable bankruptcy, insolvency, reorganization or\n                           other similar laws affecting creditors' rights generally\n                           and by general equitable principles (regardless of\n                           whether enforceability is sought in a proceeding in\n                           equity or at law).\n\n                       12.3 The execution, delivery and performance of this\n                           Agreement does not violate or conflict with the\n                           organizational or formation documents, or bylaws or\n                           operating agreement, of the Party, or any judgment,\n                           license, permit, order, material agreement or instrument\n                           applicable to or binding upon such Party or any of its\n                           assets.\n\n                                                                                       6\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43     Filed 01/09/26     PageID.338      Page\n                                     86 of 132\n                                                                        IID-693 (10-08)\n                                                     SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n                       12.4 The Party has obtained each consent, approval,\n                           authorization, order, or acceptance by any Governmental\n                           Authority in connection with the execution, delivery and\n                           performance of this Agreement, and it will provide to\n                           any Governmental Authority notice of any actions under\n                           this Agreement that are required by Applicable Laws\n                           and Regulations.\n\n         13.0   All notices, requests, demands, and other communications required\n                or permitted under this Agreement shall be in writing, unless\n                otherwise agreed by the Parties, and shall be delivered in person or\n                sent by certified mail, postage prepaid, by overnight delivery, or by\n                electronic mail or electronic facsimile transmission with an original\n                sent immediately thereafter by postage prepaid mail, and properly\n                addressed as follows:\n\n                When delivered to Transmission Provider:\n\n                Energy Contracts\n                IMPERIAL IRRIGATION DISTRICT\n                333 Barioni Blvd.\n                P.O. Box 937\n                Imperial, CA 92251\n                Email: Energycontracts@iid.com\n\n                When delivered to Interconnection Customer:\n\n                Imperial Valley Computer Manufacturing, LLC\n                16400 Pacific Coast Highway, Suite 212\n                Huntington Beach, CA 92649\n                Email: sebastian@ruccilaw.com\n\n\n\n         14.0   Either Party may, from time to time, change its representative or\n                address for the purpose of notices to that Party by a similar notice\n                specifying a new representative or address, but no such change\n                shall be deemed to have been given until such notice is actually\n                received by the Party being so notified.\n\n                                                                                     7\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW          Document 1-43     Filed 01/09/26     PageID.339      Page\n                                         87 of 132\n                                                                            IID-693 (10-08)\n                                                         SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n            15.0    Where authorized in accordance with Section 4.3 of the GIP, this\n                    Agreement may be assigned and, if so assigned, the Agreement,\n                    and the rights and obligations thereof, shall be binding upon and\n                    shall insure to the benefit of the successors and assigns of the\n                    Parties hereto.\n\n            16.0    This Agreement may be executed in two or more counterparts, by\n                    facsimile signature or an e-mail of a PDF signature, each of which is\n                    deemed an original but all constitute one and the same instrument.\n\n            17.0    The Parties may, by mutual agreement, amend this Agreement by a\n                    written instrument duly executed by the Parties.\n\n            18.0    This Agreement is subject to Transmission Provider\u2019s Tariff, as may\n                    be amended from time-to-time.\n\n           IN WITNESS THEREOF, the Parties have caused this Agreement to be\n   duly executed by their duly authorized officers or agents on the day and year\n   first above written.\n\n\n   Imperial Irrigation District\n\n   Signature:\n   Print\n   Name:           Jesus Martinez\n   Title:\n                    Supt. Gen. of System Planning and Engineering\n   Date:            04/28/2025\n\n\n\n\n                                                                                         8\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43    Filed 01/09/26    PageID.340      Page\n                                       88 of 132\n                                                                        IID-693 (10-08)\n                                                     SYSTEM IMPACT STUDY AGREEMENT\n\n\n\n\n   Imperial Valley Computer Manufacturing, LLC\n\n   Signature:\n   Print\n                Sebastian Rucci\n   Name:\n   Title:       Managing Member\n\n   Date:        4-15-2025\n\n\n\n\n                                                                                     9\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-34547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW     Document 1-43      Filed 01/09/26   PageID.341   Page\n                                    89 of 132\n\n\n\n                                                                     VERSION: FINAL\n                                                                   OCTOBER 3, 2025\n\n\n\n\n                              IMPERIAL VALLEY COMPUTER\n                      MANUFACTURING LLC, (DATA CENTER #2)\n                                   SYSTEM IMPACT STUDY\n\n                                                         TRANSMISSION PLANNING\n\n\n 10/3/2025   IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)         1\n                                 SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                               Document 1-43                    Filed 01/09/26                  PageID.342                 Page\n                                                              90 of 132\n\n\n\n  TABLE OF CONTENTS\n  1.      Executive Summary ........................................................................................................................... 4\n  2.      Project Description............................................................................................................................ 5\n  3.      Study Data Assumptions and Methodology ..................................................................................... 7\n       3.1 Base Cases and Assumptions .......................................................................................................... 7\n       3.2       Methodology ............................................................................................................................. 8\n          3.2.1         ^\u019a\u011e\u0102\u011a\u01c7\u0003^\u019a\u0102\u019a\u011e\u0003\u0012\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190 .................................................................................... 8\n          3.2.2 Transient Stability Analysis ....................................................................................................... 8\n          3.2.3 Post-d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u037eZ\u011e\u0102\u0110\u019f\u01c0\u011e\u0003D\u0102\u018c\u0150\u015d\u0176\u037f ............................................................................. 10\n          3.3.1         Power Flow Modeling ..................................................................................................... 11\n          3.3.2 Dynamic Models .................................................................................................................... 11\n          \u03ef\u0358\u03ef\u0358\u03ef\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0003D\u017d\u011a\u011e\u016f\u015d\u0176\u0150 ....................................................................................... 11\n       3.4 System Upgrades/Mitigations....................................................................................................... 12\n  4. Study Criteria...................................................................................................................................... 12\n       4.1 NERC Reliability Standards ............................................................................................................ 12\n       4.2 WECC Reliability Criteria ............................................................................................................... 12\n       4.3 Steady State Study Criteria ........................................................................................................... 12\n          4.3.1 Normal Overloads .................................................................................................................. 13\n          4.3.2 Emergency Overloads ............................................................................................................ 13\n          4.3.3 Voltage Criteria....................................................................................................................... 14\n       4.3 Transient Stability Data ................................................................................................................. 14\n          4.4.1 Bus Voltage ............................................................................................................................. 14\n          4.4.2 Bus Frequency ........................................................................................................................ 16\n       4.5 Reactive Margin Criteria ............................................................................................................... 16\n  5. Study Results ....................................................................................................................................... 16\n       5.1 Power Flow Analysis: .................................................................................................................... 16\n          5.1.1 (2027) Heavy Summer Peak ................................................................................................... 16\n          5.1.2 (2027) Heavy Summer Peak Solar Reduced 20% ................................................................... 17\n          5.1.3 (2027) Light Spring Solar Reduced 40% ................................................................................. 17\n       5.2 Transient Stability Analysis ........................................................................................................... 17\n          5.2.1 (2027) Heavy Summer Transient Stability Results ................................................................. 17\n          5.2.2 (2027) Heavy Summer Solar Reduced Transient Stability Results.......................................... 17\n          5.2.3 (2027) Light Spring Solar Reduced Transient Stability Results ............................................... 17\n       5.3 Post Transient Stability and Reactive Power Margin: Heavy Summer ......................................... 17\n 10/3/2025             IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                                                       2\n                                           SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                             Document 1-43                     Filed 01/09/26                 PageID.343                  Page\n                                                            91 of 132\n\n\n\n  6.   Conclusion ....................................................................................................................................... 18\n\n\n\n\n 10/3/2025           IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                                                        3\n                                         SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                Document 1-43           Filed 01/09/26         PageID.344         Page\n                                               92 of 132\n\n\n\n1. EXECUTIVE SUMMARY\n\n d\u015a\u011e\u0003/\u0175\u0189\u011e\u018c\u015d\u0102\u016f\u0003/\u018c\u018c\u015d\u0150\u0102\u019f\u017d\u0176\u0003\u0018\u015d\u0190\u019a\u018c\u015d\u0110\u019a\u0003\u037e//\u0018\u037f\u0003\u018c\u011e\u0110\u011e\u015d\u01c0\u011e\u011a a request from Imperial Valley Computer Manufacturing LLC\n \u037e\u0012\u01b5\u0190\u019a\u017d\u0175\u011e\u018c\u037f\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u0003 their Imperial Data Center Campus #2 (Project) in the Imperial\n Valley. The facility\u2019s \u0189\u018c\u017d\u0189\u017d\u0190\u011e\u011a\u0003 W\u017d\u015d\u0176\u019a\u0003 \u017d\u0128\u0003 /\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003 \u037eWK/\u037f\u0003 \u019a\u017d\u0003 \u019a\u015a\u011e\u0003 //\u0018\u0003 ^\u01c7\u0190\u019a\u011e\u0175\u0003 \u015d\u0190\u0003 at the 92kV \u2018R\u2019 line\n between IID\u2019s El Centro \u0190\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003 \u0190\u019a\u0102\u019f\u017d\u0176\u0003 \u037e\u001c\u0012^^\u037f and \u0012\u011e\u0176\u019a\u018c\u0102\u016f\u0003 \u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176. As part of this study, IID\n \u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u000380 MW of load \u019a\u017d\u0003\u0102\u0190\u0190\u011e\u0190\u0190\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u0102\u0176\u011a\u0003\u015d\u0176\u0128\u018c\u0102\u0190\u019a\u018c\u01b5\u0110\u019a\u01b5\u018c\u011e\u0003\n requirements. \u0012\u017d\u0175\u0175\u011e\u018c\u0110\u015d\u0102\u016f\u0003K\u0189\u011e\u018c\u0102\u019f\u017d\u0176\u0003Date (COD) is planned to be in service by the year 2027.\n\n IID\u2019s Transmission Planning Department performed a System Impact Study (SIS) \u019a\u017d\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\n \u015d\u0175\u0189\u0102\u0110\u019a\u0003 \u017d\u0128\u0003 \u015d\u0176\u019a\u011e\u0150\u018c\u0102\u019f\u0176\u0150\u0003 \u019a\u015a\u015d\u0190\u0003 W\u018c\u017d\u0169\u011e\u0110\u019a\u0003 \u015d\u0176\u019a\u017d\u0003 \u019a\u015a\u011e\u0003 //\u0018\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0358\u0003 d\u015a\u011e\u0003 \u0190\u019a\u01b5\u011a\u01c7\u0003 \u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003\n (steady-state), transient stability, and post-transient stability analysis. The scope of the analyses is to\n \u015d\u011a\u011e\u0176\u019f\u0128\u01c7\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u0190\u017d\u016f\u011e\u016f\u01c7\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0102\u0176\u011a\u0003\u018c\u011e\u015d\u0176\u0128\u017d\u018c\u0110\u011e\u0175\u011e\u0176\u019a\u0190\u0003\n \u0176\u011e\u0110\u011e\u0190\u0190\u0102\u018c\u01c7\u0003\u019a\u017d\u0003\u0175\u015d\u019f\u0150\u0102\u019a\u011e\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u01c0\u011e\u018c\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u019a\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\n following scenarios were studied accordingly:\n        \u00be 2027 Heavy Summer\n        \u00be 2027 Heavy Summer (Solar reduced)\n        \u00be 2027 Light Spring (Early morning solar reduced)\n Each scenario includes two versions, a pre-case and a post-case including the project load. All cases\n \u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u0003\u0102\u016f\u016f\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003\u01c1\u015d\u019a\u015a\u0003\u0102\u0176\u0003\u011e\u01c6\u011e\u0110\u01b5\u019a\u011e\u011a\u0003'\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003/\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u0004\u0150\u018c\u011e\u011e\u0175\u011e\u0176\u019a\u0003\u037e'/\u0004\u037f\u0355\u0003\u0189\u016f\u0102\u0176\u0176\u011e\u011a\u0003//\u0018\u0003\n \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0355\u0003\u0102\u0190\u0003\u01c1\u011e\u016f\u016f\u0003\u0102\u0190\u0003\u0102\u0176\u019f\u0110\u015d\u0189\u0102\u019a\u011e\u011a\u0003\u011a\u015d\u0190\u019a\u018c\u015d\u010f\u01b5\u019f\u017d\u0176\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003\u0102\u0190\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u03ee\u03ec\u03ee\u03f0-33\n Capital Investment plan. The project was modeled as a new load with a value of 80 MW for the year\n 2027. The analysis tested the impact of the load addi\u019fon on the reliability of IID\u2019s electrical system.\n\n\n Note: IID Transmission Planning assumed that the majority of the power required to serve this load\n would be imported for the purposes of this study. IID currently does not have the capability to reliably\n support a large-\u0190\u0110\u0102\u016f\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u018c\u011e\u018b\u01b5\u015d\u018c\u015d\u0176\u0150\u0003\u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003\u03ee\u03f0-hour service \u01c1\u015d\u019a\u015a\u0003\u011e\u01c6\u015d\u0190\u019f\u0176\u0150\u0003 \u018c\u011e\u0190\u017d\u01b5\u018c\u0110\u011e\u0190. As such, this\n report does not represent a commitment by IID to serve the requested load.\n\n\n\n\n 10/3/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                  4\n                                      SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43          Filed 01/09/26       PageID.345        Page\n                                            93 of 132\n\n\n\n2. PROJECT DESCRIPTION\n The proposed Project consists of a large-scale data center campus, upwards of 80MW, that is to be placed\n in a land parcel near the 92kV \u2018R\u2019 line between IID\u2019s El Centro \u0190\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003\u0190\u019a\u0102\u019f\u017d\u0176 and Central \u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0355\n which will serve as the POI for the Project. The Project had an assumed power factor of 0.99. The Figures\n 1, 2, & 3 below indicate the single line diagram\u0355\u0003\u0150\u011e\u017d\u0150\u018c\u0102\u0189\u015a\u015d\u0110\u0102\u016f\u0003\u016f\u017d\u0110\u0102\u019f\u017d\u0176\u0355\u0003\u0102\u0176\u011a\u0003\u0190\u015d\u019a\u011e\u0003\u0189\u016f\u0102\u0176 of the Project.\n\n\n\n\n                                  FIGURE 1: PROJECT SINGLE LINE DIAGRAM\n\n\n\n\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                           5\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43         Filed 01/09/26   PageID.346   Page\n                                     94 of 132\n\n\n\n\n                          FIGURE 2: PROJECT GEOGRAPHICAL LOCATION\n\n\n\n\n                                FIGURE 3: PROJECT SITE PLAN\n\n\n\n\n 10/3/2025   IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)            6\n                                 SYSTEM IMPACT STUDY\n\f  Case 3:26-cv-00128-JLS-BJW                 Document 1-43           Filed 01/09/26         PageID.347         Page\n                                                  95 of 132\n\n\n\n   3. STUDY DATA ASSUMPTIONS AND METHODOLOGY\n   3.1 BASE CASES AND ASSUMPTIONS\n    Various base cases were developed for this assessment with the intent to cover all \u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003 \u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\n    \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0355\u0003\u0102\u0176\u011a\u0003\u019a\u017d\u0003\u011a\u017d\u0110\u01b5\u0175\u011e\u0176\u019a\u0003\u0102\u016f\u016f\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u019a\u015a\u0102\u019a\u0003\u0110\u017d\u01b5\u016f\u011a\u0003\u010f\u011e\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u016f\u011e\u0175\u011e\u0176\u019a\u0102\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\n    Project. \u0004\u0176\u01c7\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u019a\u015a\u0102\u019a had \u0102\u0176\u0003 \u011e\u01c6\u011e\u0110\u01b5\u019a\u011e\u011a\u0003 '\u011e\u0176\u011e\u018c\u0102\u019fon /\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003 \u0004\u0150\u018c\u011e\u011e\u0175\u011e\u0176\u019a\u0003 \u037e'/\u0004\u037f\u0355\u0003 \u0102\u0003 W\u017d\u01c1\u011e\u018c\u0003\n    Purchase Agreement (PPA), or a Tolling Agreement with the IID, and the project is in accordance with\n    \u0190\u011e\u0110\u019f\u017d\u0176\u0003 \u03f0\u0358\u03ec\u0003 \u017d\u0128\u0003 //\u0018\u2019s Planning Standards was included in the base cases\u0358\u0003 \u0018\u015d\u0190\u019a\u018c\u015d\u010f\u01b5\u019f\u017d\u0176\u0003 \u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003\n    included with either an executed Joint Power Agreement (JPA) or \u0102\u0003\u012e\u0176\u0102\u016f\u015d\u01cc\u011e\u011a\u0003system impact study. The\n    \u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003\u019a\u017d\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003,\u011e\u0102\u01c0\u01c7\u0003^\u01b5\u0175\u0175\u011e\u018c\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0355\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u015a\u015d\u0150\u015a\u0003\u016f\u017d\u0102\u011a\u0003\n    \u01c1\u015d\u019a\u015a\u0003 \u015a\u015d\u0150\u015a\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003 \u0004\u0003 ,\u011e\u0102\u01c0\u01c7\u0003 ^\u01b5\u0175\u0175\u011e\u018c\u0003 \u0190\u011e\u0176\u0190\u015d\u019f\u01c0\u015d\u019a\u01c7\u0003 \u011a\u01b5\u018c\u015d\u0176\u0150\u0003 \u019a\u015a\u011e\u0003 \u019f\u0175\u011e\u0003 \u0128\u018c\u0102\u0175\u011e\u0003 \u017d\u0128\u0003 \u03ed\u03f5\u03ec\u03ec-2100,\n    \u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u015a\u015d\u0150\u015a\u0003\u016f\u017d\u0102\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u011a\u01b5\u0110\u011e\u011a\u0003\u0190\u017d\u016f\u0102\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003&\u015d\u0176\u0102\u016f\u016f\u01c7\u0355\u0003>\u015d\u0150\u015a\u019a\u0003^\u0189\u018c\u015d\u0176\u0150\u0003\u0190\u011e\u0176\u0190\u015d\u019f\u01c0\u015d\u019a\u01c7\u0355\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u019f\u0175\u011e\u0003\u0128\u018c\u0102\u0175\u011e\u0003\n    of 0600-\u03ec\u03f4\u03ec\u03ec\u0355\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019f\u0176\u0150\u0003\u0175\u017d\u011a\u011e\u018c\u0102\u019a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u018c\u011e\u011a\u01b5\u0110\u011e\u011a\u0003\u0190\u017d\u016f\u0102\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0358\u0003\n\n    Table 1 below lists the WECC approved base cases that were used to model the IID system:\n\nWECC Seed Case               PSLF Base Case Name                                       Description\n                                          Heavy Summer Peak Scenarios\n                    27HS_IVCM_Peak_pre.sav                   2027 Heavy Summer without Project (pre-case)\n  25HS4a.sav\n                    27HS_IVCM_80MW_Peak.sav                  2027 Heavy Summer with Project (80MW)\n                                     Heavy Summer Solar Reduced Scenarios\n                    27HS_IVCM_Solar_Reduced_pre.sav          2027 Heavy Summer without Project (pre-case); 20% solar\n  25HS4a.sav\n                    27HS_IVCM_80MW_Solar_Reduced.sav         2027 Heavy Summer with Project (80MW); 20% solar\n                               Light Spring Early Morning Solar Reduced Scenarios\n                    27LSP_IVCM_Solar_Reduced_pre.sav         2027 Light Spring without Project (pre-case); 40% solar\n 26LSP1Sa.sav\n                    27LSP_IVCM_80MW_Solar_Reduced.sav        2027 Light Spring with Project (80MW); 40% solar\n                                      TABLE 1: SUMMARY OF BASE CASES ANALYZED\n\n   The GE PSLF version 23.0.8.2 \u0190\u017d\u014c\u01c1\u0102\u018c\u011e\u0003\u01c1\u0102\u0190\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u011e\u0003\u0102\u0176\u011a\u0003\u0189\u017d\u0190\u019a\u0003Project study cases, with\n   respect to the E\u017d\u018c\u019a\u015a\u0003\u0004\u0175\u011e\u018c\u015d\u0110\u0102\u0176\u0003\u001c\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0003Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0012\u017d\u018c\u0189\u017d\u018c\u0102\u019f\u017d\u0176\u0003\u037eE\u001cZ\u0012\u037f\u0003revised NERC TPL-001-5.1 standard,\n   \u018c\u011e\u0147\u011e\u0110\u019f\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u01b5\u0190\u011e\u0003\u017d\u0128\u0003W0-P7 outage categories and the corresponding WECC system performance criteria.\n   GE PSLF was also used to check for system performance crit\u011e\u018c\u015d\u0102\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003\u011e\u0102\u0110\u015a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0189ost-Project\n   cases when comparing to the corresponding pre-Project case. '\u001c\u0003W\u018c\u017d\u01c0\u015d\u0190\u017d,\u0018\u0003\u01c1\u0102\u0190\u0003\u01b5\u019f\u016f\u015d\u01cc\u011e\u011a\u0003\u019a\u017d\u0003\u0102\u0110\u0110\u01b5\u0175\u01b5\u016f\u0102\u019a\u011e\u0003\n   \u019a\u015a\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u015d\u0176\u0003\u017d\u018c\u011a\u011e\u018c\u0003\u019a\u017d\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019a\u0102\u019a\u011e\u0003\u019a\u015a\u011e\u0003\u0110\u017d\u0175\u0189\u0102\u018c\u015d\u0190\u017d\u0176\u0003\u010f\u011e\u019a\u01c1\u011e\u011e\u0176\u0003\u0189\u018c\u011e\u0003\u0102\u0176\u011a\u0003\u0189\u017d\u0190\u019a\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0110ases. The base\n   \u0110\u0102\u0190\u011e\u0190\u0003 \u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003 \u0102\u018c\u011e\u0003 \u011a\u011e\u0190\u015d\u0150\u0176\u011e\u011a\u0003 \u019a\u017d\u0003 \u018c\u011e\u0147\u011e\u0110\u019a\u0003 \u019a\u015a\u011e\u0003 //\u0018\u0003 \u011e\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0102\u016f\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0003 \u01c0\u015d\u0102\u0003 \u016f\u017d\u0102\u011a\u0190\u0355\u0003 \u018c\u011e\u0190\u017d\u01b5\u018c\u0110\u011e\u0190\u0355\u0003 \u019a\u017d\u0189\u017d\u016f\u017d\u0150\u01c7\u0003 \u0102\u0176\u011a\u0003\n   \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003 \u01c1\u015a\u011e\u0176\u0003 \u019a\u015a\u011e\u0003 \u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003 \u0190\u019a\u0102\u018c\u019a\u0190\u0003 \u017d\u0189\u011e\u018c\u0102\u019f\u017d\u0176\u0358\u0003 While it is impossible to study all the IID\n   \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0190\u01c7\u0190\u019a\u011e\u0175\u0003 \u0147\u017d\u01c1\u0190\u0003 \u0102\u0176\u011a\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 levels during all seasons, these pre-Project base cases\n   \u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003 \u011e\u01c6\u019a\u018c\u011e\u0175\u011e\u0003 \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003 \u0102\u0176\u011a\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003 \u0147\u017d\u01c1\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u01c1\u015d\u016f\u016f\u0003 \u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u016f\u01c7\u0003 \u011e\u01c6\u0189\u017d\u0190\u011e\u0003 \u0102\u0176\u01c7\u0003 \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\n   constraints at the POI. However, the IID cannot guarantee that the Project can operate at its maximum\n   \u018c\u0102\u019fng year-\u018c\u017d\u01b5\u0176\u011a\u0003\u01c1\u015d\u019a\u015a\u017d\u01b5\u019a\u0003\u015d\u0175\u0189\u0102\u0110\u019f\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175, \u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u019f\u0175\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0190\u011e\u0102\u0190\u017d\u0176\u0190\u0003\u0176\u017d\u019a\u0003\u0190\u019a\u01b5\u011a\u015d\u011e\u011a\u0358\n\n\n\n\n    10/3/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                  7\n                                         SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43          Filed 01/09/26       PageID.348           Page\n                                            96 of 132\n\n\n\n 3.2 METHODOLOGY\nSteady state, transient stability and post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u015d\u0190\u0003\nassessment. Table 2 describes the type of analysis completed on each base case.\n\n\n                                                  Steady\n             PSLF Base Case Name                         Transient Stability          Post Transient\n                                                   State\n   27HS_IVCM_Peak_pre.sav                            X                X                      X\n   27HS_IVCM_80MW_Peak.sav                           X                X\n   27HS_IVCM_80MW_Peak_Mit.sav                       X                X                      X\n   27HS_IVCM_Solar_Reduced_pre.sav                   X                X\n   27HS_IVCM_80MW_Solar_Reduced.sav                  X                X\n   27HS_IVCM_80MW_Solar_Reduced_Mit.sav              X                X\n   27LSP_IVCM_Solar_Reduced_pre.sav                  X                X\n   27LSP_IVCM_80MW_Solar_Reduced.sav                 X                X\n   27LSP_IVCM_80MW_Solar_Reduced_Mit.sav             X                X\n              TABLE 2: DESCRIPTION OF THE ANALYSIS COMPLETED ON DEVELOPED BASE CASES VIA PSLF\n\n\n 3.2.1 ^\u019a\u011e\u0102\u011a\u01c7\u0003^\u019a\u0102\u019a\u011e\u0003\u0012\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\n The assessment \u0110\u017d\u0176\u0190\u015d\u011a\u011e\u018c\u011e\u011a\u0003\u0102\u016f\u016f\u0003\u017d\u0128\u0003//\u0018\u0190\u0003\u0110\u018c\u011e\u011a\u015d\u010f\u016f\u011e\u0003\u0190\u015d\u0176\u0150\u016f\u011e\u0003\u0102\u0176\u011a\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0355\u0003\u0102\u0190\u0003\u01c1\u011e\u016f\u016f\u0003\u0102\u0190\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u0190\u019a\u0003\n \u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0358\u0003\u001c\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u019a\u015a\u0102\u019a\u0003\u0102\u018c\u011e\u0003\u016c\u0176\u017d\u01c1\u0176\u0003\u019a\u017d\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u019a\u015a\u011e\u0003\n \u0175\u017d\u0190\u019a\u0003\u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003//\u0018\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u01c1\u011e\u018c\u011e\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u011a\u0003also. The scope of the steady-state\n \u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u0110\u017d\u0176\u0190\u015d\u0190\u019a\u011e\u011a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0355\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003\u0102\u0176\u011a\u0003\u0102\u0176\u0150\u016f\u011e\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u0110\u011e\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u01b5\u016f\u016f\u0003\u0190\u01b5\u015d\u019a\u011e\u0003\u017d\u0128\u0003E\u001cZ\u0012\u0003\n standard TPL-001-5.1 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u0190\u011e\u019a\u0190\u0355\u0003W\u03ed-W\u03f3\u0355\u0003\u01c1\u0102\u0190\u0003\u0102\u0176\u0102\u016f\u01c7\u01cc\u011e\u011a\u0358\n\n 3.2.2 Transient Stability Analysis\n Transient stability \u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u015d\u0190\u0003\u0102\u0003\u019f\u0175\u011e-\u010f\u0102\u0190\u011e\u011a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u0102\u0190\u0190\u011e\u0190\u0190\u011e\u0190\u0003\u019a\u015a\u011e\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u0102\u0176\u0110\u011e\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\n \u0190\u015a\u017d\u018c\u019a\u016f\u01c7\u0003\u010f\u011e\u0128\u017d\u018c\u011e\u0355\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0355\u0003\u0102\u0176\u011a\u0003\u0102\u014c\u011e\u018c\u0003\u0102\u0003\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u011a\u015d\u0190\u019a\u01b5\u018c\u010f\u0102\u0176\u0110\u011e\u0358\u0003/\u0176\u015d\u019f\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u0102\u018c\u011e\u0003\u0110\u015a\u0102\u018c\u0102\u0110\u019a\u011e\u018c\u015d\u01cc\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\n \u0147\u017d\u01c1\u0003\u0110\u0102\u0190\u011e\u0003\u0102\u0176\u011a\u0003\u0175\u017d\u011a\u011e\u016f\u0003\u011e\u018b\u01b5\u0102\u019f\u017d\u0176\u0190\u0003\u0102\u018c\u011e\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u0003\u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003behavior from dynamic elements, such as\n \u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0190\u0003\u0102\u0176\u011a\u0003\u016f\u017d\u0102\u011a\u0190\u0003\u017d\u01c0\u011e\u018c\u0003\u019f\u0175\u011e\u0358\u0003\u0011\u01b5\u0190\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0102\u0176\u011a\u0003\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003\u0189\u016f\u017d\u019a\u0190\u0003\u0102\u018c\u011e\u0003\u011a\u011e\u01c0\u011e\u016f\u017d\u0189\u011e\u011a\u0003\u01c1\u015d\u019a\u015a\u0003\u0102\u0176\u0003\u011e\u0175\u0189\u015a\u0102\u0190\u015d\u0190\u0003\u017d\u0176\u0003\u0102\u016f\u016f\u0003\n BES buses, and various non-BES buses in the IID system. These buses are the following:\n\n\u00be BES Buses\n    x Alhambra Switching Station 161kV                x   Highline 230kV\n    x Arkansas Switching Station 161kV                x   Hudson Ranch 230kV\n    x Avenue 58 161kV                                 x   Midway 230kV\n    x Calipatria Switching Station 230kV              x   Midway 92kV\n    x Coachella Switching 92kV                        x   Nelson Switching Station 230kV\n    x Coachella Valley 92kV                           x   Niland 161kV\n    x Coachella Valley 161kV                          x   Pilot Knob 161kV\n    x Coachella Valley 230kV                          x   Ramon 230kV\n    x El Centro Switching Station 161kV               x   Sonora Switching Station 230kV\n    x El Cento Switching Station 230kV                x   Yucca 161kV\n    x El Centro Switching Station 92kV\n\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                            8\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW                Document 1-43          Filed 01/09/26         PageID.349         Page\n                                               97 of 132\n\n\n\n    \u0083   Non-BES Buses\n            o Ave 42 92kV                                        o   Ave. 58 92kV\n            o Niland 92kV                                        o   El Centro 34.5kV\n            o Ramon 92kV                                         o   Blythe 161kV\n\n \u0011\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u0102\u0003 \u0175\u011e\u0102\u0176\u0190\u0003 \u017d\u0128\u0003 \u011a\u011e\u019a\u011e\u0110\u019f\u0176\u0150\u0003 \u017d\u01b5\u019a-of-\u0190\u019a\u011e\u0189\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u0102\u0176\u011a\u0003 \u0102\u018c\u011e\u0003 \u01b5\u0190\u011e\u0128\u01b5\u016f\u0003 \u019a\u017d\u0003 \u0102\u0190\u0190\u011e\u0190\u0190\u0003 \u019a\u015a\u011e\u0003\n \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance voltage dips and peak-to-\u0189\u011e\u0102\u016c\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003 d\u015a\u011e\u0003\n voltage plots also indicate system damping response and the expected bus voltage following the\n \u011a\u015d\u0190\u019a\u01b5\u018c\u010f\u0102\u0176\u0110\u011e\u0358\u0003 \u0011\u01b5\u0190\u0003 \u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003 \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance\n \u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0190\u01c1\u015d\u0176\u0150\u0190\u0355\u0003 \u0102\u0190\u0003 \u01c1\u011e\u016f\u016f\u0003 \u0102\u0190\u0003 \u015d\u0176\u011a\u015d\u0110\u0102\u019f\u0176\u0150\u0003 \u0189\u017d\u0190\u0190\u015d\u010f\u016f\u011e\u0003 \u017d\u01c0\u011e\u018c-frequency or under-\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003\n \u0004\u011a\u011a\u015d\u019f\u017d\u0176\u0102\u016f\u016f\u01c7\u0355\u0003//\u0018\u0003\u01b5\u019f\u016f\u015d\u01cc\u011e\u0190\u0003\u0102\u0003\u011a\u01c7\u0176\u0102\u0175\u015d\u0110\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u001cW\u0012>\u0003\u0190\u0110\u018c\u015d\u0189\u019a\u0003\u019a\u017d\u0003\u0102\u0190\u0190\u015d\u0190\u019a\u0003\u015d\u0176\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019f\u0176\u0150\u0003\u015d\u0128\u0003\u0175\u017d\u0176\u015d\u019a\u017d\u018c\u011e\u011a\u0003\u010f\u01b5\u0190\u011e\u0190\u0003\u0175\u011e\u011e\u019a\u0003\n WECC regional criteria as shown in Figures 4 and 5\u0358\u0003d\u015a\u011e\u0003\u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u016f\u015d\u0190\u019a\u011e\u011a\u0003\u010f\u011e\u016f\u017d\u01c1\u0003\u015d\u0176\u0003\n d\u0102\u010f\u016f\u011e\u0003\u03ef\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0358\u0003d\u015a\u015d\u0190\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7 list contains the most severe\n \u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n\n             #                                 IID Critical Contingencies\n             1      P1 \u2013 Miguel - Eco 500kV Line Fault\n             2      P1 \u2013 Imperial Valley \u2013 N. Gila 500kV ck 1 Line Fault\n             3      P1 \u2013 Suncrest \u2013 Ocotillo 500kV ck 1 Line Fault\n             4      P1 \u2013 Imperial Valley \u2013 Ocotillo 500kV ck 1 Line Fault\n             5      P1 \u2013 Devers - Red Bluff 500kV Line Fault\n             6      P1 \u2013 Colorado River \u2013 Palo Verde 500kV Line Fault\n             7      P1 \u2013 Devers - Mirage 230kV Line Fault\n             8      P4 \u2013 Stuck Breaker # 8, Fault at N. Gila 500kV\n             9      P4 \u2013 Stuck Breaker # 9, Fault at N. Gila 500kV\n             10     P1 - Imperial Valley Data Center - Imperial Valley 230kV Line Fault\n             11     P1 - El Centro SS. - Imperial Valley Data Center 230kV Line Fault\n             12     P1 \u2013 Ramon Bank #1 92/230kV \u2013 Bus Fault / Loss of Transformer\n             13     P1 \u2013 Ramon - Mirage 230kV Line Fault\n             14     P1 \u2013 Coachella Valley - Mirage 230kV Line Fault\n             15     P1 \u2013 Coachella Valley - Midway 230kV Line Fault\n             16     P1 \u2013 Coachella Valley - Ramon 230kV Line Fault\n             17     P1 \u2013 El Centro Bank #1 161/230kV \u2013 Bus Fault / Loss of Transformer\n             18     P1 \u2013 El Centro Bank #4 92/230kV \u2013 Bus Fault / Loss of Transformer\n             19     P1 \u2013 El Centro Bank #5 92/230kV \u2013 Bus Fault / Loss of Transformer\n             20     P2 \u2013 Avenue 58 161kV \u2013 Bus Fault\n             21     P2 \u2013 Stuck Breaker El Centro S.S. (CKTB H40) 230kV\n             22     P2 \u2013 Stuck Breaker El Centro S.S. (CKTB H50) 230kV\n             23     P2 \u2013 Stuck Breaker El Centro S.S. (CKTB S10) 230kV\n             24     P2 \u2013 Stuck Breaker El Centro S.S. (CKTB S20) 230kV\n\n 10/3/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                 9\n                                      SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW              Document 1-43           Filed 01/09/26       PageID.350         Page\n                                             98 of 132\n\n\n\n             25    P2 \u2013 Stuck Breaker El Centro S.S. (CKTB AOB, MOB, H20) 161kV\n             26    P2 \u2013 Stuck Breaker El Centro S.S. (CKTB X1EO, LOB) 161kV\n             27    P2 \u2013 Stuck Breaker El Centro S.S. (CKTB X1WO) 161kV\n             28    P5 \u2013 Delayed Fault Clearing at El Centro Steam REPU2\n             29    P5 \u2013 Delayed Fault Clearing at El Centro Steam REPU2 GSU\n             30    P5 \u2013 Delayed Fault Clearing at El Centro S. S. 161kV\n             31    P6 - Coachella Valley-Mirage & Ramon-Mirage 230kV Line Fault\n             32    P7 - Devers-Mirage Circuit 1&2 230kV Line Fault\n             33    P7 - Coachella Valley-Mirage & Coachella Valley-Ramon 230kV Line Fault\n               TABLE 3: CRITICAL CONTINGENCIES USED FOR TRANSIENT AND POST-TRANSIENT ANALYSIS\n\n\n 3.2.3 Post-d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0004\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u037eZ\u011e\u0102\u0110\u019f\u01c0\u011e\u0003D\u0102\u018c\u0150\u015d\u0176\u037f\n Post-transient stability analysis was performed on selected buses in the IID transmission system following\n selected, most severe, and cri\u019f\u0110\u0102\u016f\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0358\u0003 D\u017d\u018c\u011e\u017d\u01c0\u011e\u018c\u0355\u0003 \u0150\u017d\u01c0\u011e\u018c\u0176\u017d\u018c\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003 \u019a\u017d\u017d\u016f\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 \u01b5\u0190\u011e\u011a\u0003 \u0128\u017d\u018c\u0003 \u019a\u015a\u011e\u0003\n analysis. For each bus assessed, a synchronous condenser was modeled to determine the highest\n \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u01c0\u0102\u015d\u016f\u0102\u010f\u016f\u011e\u0003\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u010f\u01b5\u0190\u0358\u0003\u0004\u016f\u016f\u0003\u0011\u001c^\u0003\u0102\u0176\u011a\u0003\u0176\u017d\u0176-BES buses were monitored.\n During post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0190\u0355\u0003\u019a\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0190\u0190\u01b5\u0175\u0189\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u01b5\u0190\u011e\u011a\u0357\n\n     x   Loads were modeled as constant MVAs, during the post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u019f\u0175\u011e\u0003\u0128\u018c\u0102\u0175\u011e\n     x   Z\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u017d\u01b5\u019a\u0189\u01b5\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0190\u01c1\u015d\u0176\u0150\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\u01c1\u0102\u0190\u0003\u016f\u015d\u0175\u015d\u019a\u011e\u011a\u0003\u019a\u017d\u0003\u015d\u019a\u0190\u0003\u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003\u0110\u0102\u0189\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\n     x   No manual operator interv\u011e\u0176\u019f\u017d\u0176\u0003\u01c1\u0102\u0190\u0003\u0102\u016f\u016f\u017d\u01c1\u011e\u011a\u0003\u019a\u017d\u0003\u015d\u0176\u0110\u018c\u011e\u0102\u0190\u011e\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003Ds\u0004Z\u0003\u0147\u017d\u01c1\n     x   Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0102\u0110\u019f\u017d\u0176\u0190\u0355\u0003\u0190\u01b5\u0110\u015a\u0003\u0102\u0190\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\u011a\u018c\u017d\u0189\u0189\u015d\u0176\u0150\u0355\u0003\u016f\u017d\u0102\u011a\u0003\u0190\u015a\u011e\u011a\u011a\u015d\u0176\u0150\u0355\u0003\u017d\u018c\u0003\u010f\u016f\u017d\u0110\u016c\u015d\u0176\u0150\u0003\u017d\u0128\u0003\u0102\u01b5\u019a\u017d\u0175\u0102\u019f\u0110\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019a\u017d\u018c\u0003\n         control were not considered for single outages\n\n W\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u015d\u0190\u0003\u011a\u011e\u0190\u015d\u018c\u011e\u011a\u0003\u0102\u019a\u0003\u0102\u016f\u016f\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u010f\u01b5\u0190\u011e\u0190\u0358\u0003&\u017d\u018c\u0003the IID transmission system, the post-transient\n stability analysis criteria are the following:\n\n     x   For transfer paths, all P0-W\u03ed\u0003 \u011e\u01c0\u011e\u0176\u019a\u0190\u0003 \u0190\u015a\u0102\u016f\u016f\u0003 \u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003 \u0102\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0175\u0102\u018c\u0150\u015d\u0176\u0003 \u0102\u019a\u0003 \u0102\u0003\n         \u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\u017d\u0128\u0003\u03ed\u03ec\u03f1\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u019a\u018c\u0102\u0176\u0190\u0128\u011e\u018c\u0003\u0189\u0102\u019a\u015a\u0003\u0147\u017d\u01c1\u0358\u0003\n     x   For transfer paths, all P2-W\u03f3\u0003 \u011e\u01c0\u011e\u0176\u019a\u0190\u0003 \u0190\u015a\u0102\u016f\u016f\u0003 \u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003 \u0102\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0175\u0102\u018c\u0150\u015d\u0176\u0003 \u0102\u019a\u0003 \u0102\u0003\n         \u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\u017d\u0128\u0003\u03ed\u03ec\u03ee\u0358\u03f1\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u019a\u018c\u0102\u0176\u0190\u0128\u011e\u018c\u0003\u0189\u0102\u019a\u015a\u0003\u0147\u017d\u01c1\u0358\u0003\n     x   For load areas, all P0-W\u03ed\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0003\u0190\u015a\u0102\u016f\u016f\u0003\u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003\u0102\u0003\u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u019a\u0003\u0102\u0003\u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\n         of 105 percent of forecasted peak load.\n     x   For load areas, all P2-W\u03f3\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0003\u0190\u015a\u0102\u016f\u016f\u0003\u011a\u011e\u0175\u017d\u0176\u0190\u019a\u018c\u0102\u019a\u011e\u0003\u0102\u0003\u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u0102\u019a\u0003\u0102\u0003\u0175\u015d\u0176\u015d\u0175\u01b5\u0175\u0003\n         of 102.5 percent of forecasted peak load.\n\n ^\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u016f\u015d\u0190\u019a\u011e\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u015d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03ef\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u0189\u017d\u0190\u019a-transient stability analysis.\n d\u015a\u011e\u0190\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u0190\u019a\u0003\u0190\u011e\u01c0\u011e\u018c\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u01c6\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003\n\n 3.3 MODELING\n d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u011e\u0110\u019f\u017d\u0176\u0003\u011a\u017d\u0110\u01b5\u0175\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003\u0175\u017d\u011a\u011e\u016f\u015d\u0176\u0150\u0003\u0175\u011e\u019a\u015a\u017d\u011a\u0190\u0003\u01b5\u0190\u011e\u011a\u0003\u019a\u017d\u0003\u018c\u011e\u0189\u018c\u011e\u0190\u011e\u0176\u019a\u0003\u019a\u015a\u011e\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u015d\u0176\u0003\u0190\u019a\u011e\u0102\u011a\u01c7\u0003\u0190\u019a\u0102\u019a\u011e\u0003\u0102\u0176\u011a\u0003\n dynamics analyses.\n\n\n 10/3/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                            10\n                                      SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW              Document 1-43         Filed 01/09/26       PageID.351         Page\n                                             99 of 132\n\n\n\n 3.3.1 Power Flow Modeling\n Equivalent load of project:\n           x   A 80MW equivalent load on the 92kV IVCM data center bus.\n 3.3.2 Dynamic Models\n WECC approved models from the GE PSLF library was used to represent the Project. For this Project,\n dynamic stability models included models for the following:\n     x   Commercial and Industrial Load\n         o WECC Composite Load Model: cmpldw\n\u03ef\u0358\u03ef\u0358\u03ef\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0003Modeling\ns\u0102\u018c\u015d\u017d\u01b5\u0190\u0003Z\u011e\u0175\u011e\u011a\u015d\u0102\u016f\u0003\u0004\u0110\u019f\u017d\u0176\u0003^\u0110\u015a\u011e\u0175\u011e\u0190\u0003\u037eZ\u0004^\u037f\u0003\u01c1\u011e\u018c\u011e\u0003\u0175\u017d\u011a\u011e\u016f\u011e\u011a\u0003\u015d\u0176\u0003\u0110\u017d\u0176\u0169\u01b5\u0176\u0110\u019f\u017d\u0176\u0003\u01c1\u015d\u019a\u015a\u0003\u019a\u015a\u011e\u0003\u01c0\u0102\u018c\u015d\u017d\u01b5\u0190\u0003\u0189\u018c\u017d\u0169\u011e\u0110\u019a\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u011a\u0003\n\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0358\u0003\u0004\u0003\u0190\u01b5\u0175\u0175\u0102\u018c\u01c7\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0176\u0102\u016f\u0003\u0102\u01b5\u019a\u017d\u0175\u0102\u019f\u0110\u0003\u0102\u0110\u019f\u017d\u0176\u0190\u0003\u019a\u0102\u016c\u011e\u0176\u0003\u0102\u018c\u011e\u0003\u011a\u011e\u0190\u0110\u018c\u015d\u010f\u011e\u011a\u0003\u010f\u011e\u016f\u017d\u01c1\u0357\n    x    South R-Line RAS: Open breaker \u201cRNO\u201d at Dixieland will send a trip signal to K\u0110\u017d\u019f\u016f\u016f\u017d\u0003t\u011e\u016f\u016f\u0190\u0003^\u017d\u016f\u0102\u018c\u0358\u0003\n    x    North R->\u015d\u0176\u011e\u0003Z\u0004^\u0357\u0003>\u017d\u0190\u0190\u0003\u017d\u0128\u0003\u0004\u0176\u01cc\u0102\u0003\u019a\u017d\u0003K\u0102\u0190\u015d\u0190\u0003\u0102\u0176\u011a\u0003\u0004\u01c0\u011e\u0003\u03f1\u03f4\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003^\u011e\u01c0\u015d\u016f\u016f\u011e\u0003\u03ef\u0358\n    x    \u201cK\u201d line SPS: Loss of the \u201cK\u201d line, \u201cN\u201d Line, and the loss of the Niland 92/161kV transformer will\n         send a trip signal to Colgreen.\n    x    Path 42 RAS:\n         \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage and the 230kV \u201cKS\u201d line\n             \u010f\u011e\u019a\u01c1\u011e\u011e\u0176\u0003\u0012\u017d\u0102\u0110\u015a\u011e\u016f\u016f\u0102\u0003s\u0102\u016f\u016f\u011e\u01c7\u0003\u0102\u0176\u011a\u0003Z\u0102\u0175\u017d\u0176\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage and the 230kV \u201cKS\u201d line\n             \u010f\u011e\u019a\u01c1\u011e\u011e\u0176\u0003Z\u0102\u0175\u017d\u0176\u0003\u0102\u0176\u011a\u0003D\u015d\u018c\u0102\u0150\u011e\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Devers-Mirage 1 & 2: Loss of circuit numbers 1 and 2 will send a trip signal to the \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\n             \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x    Path 42 RAS N-1:\n         \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Mirage will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Ramon will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKS\u201d line between Ramon and Mirage will send a trip signal to the\n             \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Midway will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Midway will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x    Coachella Valley \u2013 Midway RAS:\n         \u00be Loss of the 230kV \u201cKN\u201d line between Coachella Valley and Midway will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n         \u00be Loss of the 230kV \u201cKS\u201d line between Coachella Valley and Midway will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x    Midway Transformer RAS N-1:\n         \u00be Loss of either bank #1 or bank #2 92/230kV Transformer at Midway will send a trip signal to\n             \u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n    x    El Centro 161kV Bus RAS N-1:\n         \u00be Loss of the 161kV Bus at E\u016f\u0003\u0012\u011e\u0176\u019a\u018c\u017d\u0003^\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003\u01c1\u015d\u016f\u016f\u0003\u0190\u011e\u0176\u011a\u0003\u0102\u0003\u019a\u018c\u015d\u0189\u0003\u0190\u015d\u0150\u0176\u0102\u016f\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\n             \u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0358\n\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                          11\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43 Filed 01/09/26                PageID.352          Page\n                                           100 of 132\n\n\n\n3.4 SYSTEM UPGRADES/MITIGATIONS\n    x   Southern 92kV R-Line Upgraded \u2013 Y\u03ee\u0003\u03ee\u03ec\u03ee\u03f2\u0003\u037eK\u0110\u017d\u019f\u016f\u016f\u017d\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   \u0012\u017d\u0102\u0110\u015a\u011e\u016f\u016f\u0102\u0003s\u0102\u016f\u016f\u011e\u01c7\u0003^\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003^\u019a\u0102\u019f\u017d\u0176\u0003h\u0189\u0150\u018c\u0102\u011a\u011e\u0003\u2013 Q2 2026 (TPL-001)\n    x   4\u03f1Ds\u0004Z\u0003Z\u011e\u0102\u0110\u019f\u01c0\u011e\u0003^\u01b5\u0189\u0189\u017d\u018c\u019a\u0003at Ramon 230kV \u2013 Q2 2026 \u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   ECSS RAS N-1 \u2013 Y\u03ef\u0003\u03ee\u03ec\u03ee\u03f1\u0003\u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n    x   Midway Transformer RAS \u2013 Y\u03f0\u0003\u03ee\u03ec\u03ee\u03f1\u0003\u037e/WW\u0003D\u015d\u019f\u0150\u0102\u019f\u017d\u0176\u037f\n\n\n 4. STUDY CRITERIA\nGrid Reliability Criteria, which incorporates the WECC and NERC planning criteria, was used for this\nassessment. IID\u2019s standards and procedures were followed during the study process.\n\n\n4.1 NERC RELIABILITY STANDARDS\nd\u015a\u011e\u0003\u0176\u011e\u011e\u011a\u0003\u0128\u017d\u018c\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u01c1as determined in accordance with NERC Reliability\nStandards. These standards set forth criteria for system performance requirements, which must be met\n\u01b5\u0176\u011a\u011e\u018c\u0003\u0190\u0189\u011e\u0110\u015d\u012e\u0110\u0003\u0190\u011e\u019a\u0003\u017d\u0128\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003E\u001cZ\u0012\u0003Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003^tandards are applicable to the\nTransmission Operators (TOs) as registered NEZ\u0012\u0003W\u016f\u0102\u0176\u0176\u015d\u0176\u0150\u0003\u0004\u01b5\u019a\u015a\u017d\u018c\u015d\u019f\u011e\u0190\u0355\u0003Transmission Planners, and are the\n\u0189\u018c\u015d\u0175\u0102\u018c\u01c7\u0003\u0190\u019a\u0102\u0176\u011a\u0102\u018c\u011a\u0190\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u019a\u011e\u018c\u0110\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u0176\u011e\u01c1\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u0102\u0176\u011a\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u0102\u0176\u0110\u011e\u0357\u0003\n\n    x    FAC-\u03ec\u03ec\u03ed\u0357\u0003&\u0102\u0110\u015d\u016f\u015d\u019a\u01c7\u0003\u0012\u017d\u0176\u0176\u011e\u0110\u019f\u017d\u0176\u0003Z\u011e\u018b\u01b5\u015d\u018c\u011e\u0175\u011e\u0176\u019a\u0190\n    x    FAC-\u03ec\u03ec\u03ee\u0357\u0003\u0012\u017d\u017d\u018c\u011a\u015d\u0176\u0102\u019f\u017d\u0176\u0003\u017d\u0128\u0003W\u016f\u0102\u0176\u0190\u0003\u0128\u017d\u018c\u0003E\u011e\u01c1\u0003&\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\n    x    TPL-001-5.1: Transmission System Planning Performance Requirements\n\n4.2 WECC RELIABILITY CRITERIA\nThe WECC TPL system performance criteria, TPL-001-WECC-CRT-4\u0355\u0003\u0190\u011e\u019a\u0190\u0003\u0128\u017d\u018c\u019a\u015a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0102\u016f\u0003\u018c\u011e\u018b\u01b5\u015d\u018c\u011e\u0175\u011e\u0176\u019a\u0190\u0003\u019a\u015a\u0102\u019a\u0003\n\u0175\u01b5\u0190\u019a\u0003\u010f\u011e\u0003\u0175\u011e\u019a\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u01c0\u0102\u018c\u015d\u017d\u01b5\u0190\u0355\u0003\u010f\u01b5\u019a\u0003\u0190\u0189\u011e\u0110\u015d\u012e\u0110\u0003\u0190\u011e\u019a\u0003\u017d\u0128\u0003\u017d\u0189\u011e\u018c\u0102\u019f\u0176\u0150\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190 and may be applicable to the TOs as\nW\u016f\u0102\u0176\u0176\u015d\u0176\u0150\u0003\u0004\u01b5\u019a\u015a\u017d\u018c\u015d\u019f\u011e\u0190\u0358\n4.3 STEADY STATE STUDY CRITERIA\nThe system performance, \u01c1\u015d\u019a\u015a\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a, \u01c1\u0102\u0190\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u011a\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u0102\u0176\u011a\u0003\nfollowing losses of a \u0190\u015d\u0176\u0150\u016f\u011e\u0003\u017d\u018c\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003Bulk Electric System (BES) element(s), \u0102\u0190\u0003\u011a\u011e\u012e\u0176\u011e\u011a\u0003\u010f\u01c7\u0003\u019a\u015a\u011e\u0003\u0102\u0189\u0189\u016f\u015d\u0110\u0102\u010f\u016f\u011e\u0003\nreliability s\u019a\u0102\u0176\u011a\u0102\u018c\u011a\u0190\u0003 \u0102\u0176\u011a\u0003 \u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0358\u0003 \u0003 &\u015d\u0150\u01b5\u018c\u011e\u0003 \u03f0\u0357\u0003 >\u015d\u0190\u019f\u0176\u0150\u0003 \u017d\u0128\u0003 dW>-001-5.1 P1-W\u03f3\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003 \u011a\u011e\u0190\u0110\u018c\u015d\u0189\u019f\u017d\u0176\u0190\n\u0190\u01b5\u0175\u0175\u0102\u018c\u015d\u01cc\u011e\u0190\u0003\u019a\u015a\u011e\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u0189\u011e\u018c\u0003E\u001cZ\u0012\u0003Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003^\u019a\u0102\u0176\u011a\u0102rds, and WECC Regional Criteria.\n\n\n\n\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                           12\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43 Filed 01/09/26                PageID.353        Page\n                                           101 of 132\n\n\n\n\n                     FIGURE 4: LISTING OF TPL-001-5.1 P1-P7 CONTINGENCY DESCRIPTIONS\n 4.3.1 Normal Overloads\n E\u017d\u018c\u0175\u0102\u016f\u0003\u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003\u0102\u018c\u011e\u0003\u019a\u015a\u017d\u0190\u011e\u0003\u019a\u015a\u0102\u019a\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0003\u03ed\u03ec\u03ec\u0003\u0189\u011e\u018c\u0110\u011e\u0176\u019a\u0003\u017d\u0128\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019a\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003P0\n \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u037e\u0176\u017d\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u037f\u0358\u0003 E\u017d\u018c\u0175\u0102\u016f\u0003 \u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003 \u0102\u018c\u011e\u0003 \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003 \u015d\u0176\u0003 \u019a\u015a\u011e\u0003 Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003 ^\u019a\u01b5\u011a\u01c7\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003 \u0147\u017d\u01c1\u0003\n analysis, in accordance with the Reliability Standard, TPL-001-5.1. It is required that loading of all\n \u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u010f\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u015d\u018c\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003W\u03ec\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003\n\n 4.3.2 Emergency Overloads\n Emergency overloads are those that exceed 100 percent of emergen\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003E\u001cZ\u0012\u0003\u0102\u0176\u011a\u0003t\u001c\u0012\u0012\n Category P1-W\u03f3\u0003 \u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\u0003 \u001c\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003 \u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003 \u0102\u018c\u011e\u0003 \u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003 \u015d\u0176\u0003 \u019a\u015a\u011e\u0003 Z\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003 ^\u019a\u01b5\u011a\u01c7\u0003\n \u0189\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u0102\u0176\u0102\u016f\u01c7\u0190is in accordance with Reliability Standards, TPL-001-5.1. It is required that loading of\n \u0102\u016f\u016f\u0003\u019a\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u0190\u01c7\u0190\u019a\u011e\u0175\u0003\u0128\u0102\u0110\u015d\u016f\u015d\u019f\u011e\u0190\u0003\u010f\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\u019a\u015a\u011e\u015d\u018c\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0190\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\u019a\u015a\u011e\u0003\u0012\u0102\u019a\u011e\u0150\u017d\u018c\u01c7\u0003W\u03ed-W\u03f3\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\n \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                          13\n                                     SYSTEM IMPACT STUDY\n\f  Case 3:26-cv-00128-JLS-BJW                Document 1-43 Filed 01/09/26                   PageID.354         Page\n                                                102 of 132\n\n\n\n   4.3.3 Voltage Criteria\n   \u0004\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0110\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0003\u017d\u0110\u0110\u01b5\u018c\u0190\u0003\u015d\u0128\u0003\u0102\u0003\u010f\u01b5\u0190 within the transmission system, of each TO, fails to meet the\n   r\u011e\u018b\u01b5\u015d\u018c\u011e\u0175\u011e\u0176\u019a\u0190\u0003 \u011a\u011e\u012e\u0176\u011e\u011a\u0003 \u015d\u0176\u0003 d\u0102\u010f\u016f\u011e\u0003 \u03f0\u0358\u0003 &\u017d\u018c\u0003 s\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0012\u018c\u015d\u019a\u011e\u018c\u015d\u0102\u0355\u0003 \u010f\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0190\u0003 \u0102\u018c\u011e\u0003 \u018c\u011e\u016f\u0102\u019f\u01c0\u011e\u0003 \u019a\u017d\u0003 \u019a\u015a\u011e\u0003 \u0176\u017d\u0175\u015d\u0176\u0102\u016f\u0003 \u010f\u01b5\u0190\u0003\n   voltages of the system under study.\n\n                 Normal Conditions           Contingency Conditions\n                                                                                         Voltage Deviation\n                         (P0)                       (P1-P7)\nVoltage Level\n                  VMIN        VMAX                                             Load Buses       Non-Load (P1) & All\n                                           VMIN (p.u.)       VMAX (p.u.)\n                  (p.u.)      (p.u.)                                              (P1)            Buses (P2-P7)\n   \u0447\u03ee\u03ec\u03ec\u016cs           0.95         1.05          0.9              1.1                \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n   \u0448\u03ee\u03ec\u03ec\u016cs           0.95         1.05          0.9              1.1                \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n   \u04485\u03ec\u03ec\u016cs           0.95         1.05          0.9              1.1                \u0447\u03f4%                  \u0447\u03ed\u03ec\u0439\n                                             TABLE 1: VOLTAGE CRITERIA\n   d\u015a\u011e\u0003\u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003\u019a\u017d\u019a\u0102\u016f\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0003\u0128\u017d\u018c\u0003W\u03ef\u0003\u0102\u0176\u011a\u0003W\u03f2\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0003\u01c1\u015d\u016f\u016f\u0003\u010f\u011e\u0003\u0175\u011e\u0102\u0190\u01b5\u018c\u011e\u011a\u0003\u0128\u018c\u017d\u0175\u0003\u019a\u015a\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u019a\u015a\u0102\u019a\u0003\u011e\u01c6\u015d\u0190\u019a\u0190\u0003\n   \u0102\u014c\u011e\u018c\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u015d\u019f\u0102\u016f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0003\u0102\u0176\u011a\u0003\u019a\u015a\u011e\u018c\u011e\u0128\u017d\u018c\u011e\u0003\u019a\u0102\u016c\u011e\u0190\u0003\u015d\u0176\u019a\u017d\u0003\u0110\u017d\u0176\u0190\u015d\u011a\u011e\u018c\u0102\u019f\u017d\u0176\u0003\u017d\u0176\u016f\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0003\u011a\u01b5\u011e\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0003\n   event. Buses within the IID controlled grid that cannot meet the requirements in Table 4 will be further\n   \u015d\u0176\u01c0\u011e\u0190\u019f\u0150\u0102\u019a\u011e\u011a\u0358\u0003\n\n   4.3 TRANSIENT STABILITY DATA\n   d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u015d\u0190\u0003\u0102\u0003\u019f\u0175\u011e-\u010f\u0102\u0190\u011e\u011a\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u019a\u015a\u0102\u019a\u0003\u0102\u0190\u0190\u011e\u0190\u0190\u011es the performance of the power system\n   shortly before, during, and quickly following \u0102\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110y. Transient stability studies were performed to\n   verify the stability of the system following a system fault. Transient stability analysis was performed\n   based on the WECC Disturbance-Performance Criteria, for selected syste\u0175\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0355\u0003\u01b5\u0190\u015d\u0176\u0150\u0003s\u011e\u018c\u0190\u015d\u017d\u0176\u0003\n   \u03ee\u03ef\u0358\u03ec\u0358\u03f4\u0358\u03ee\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003'\u001c\u0003W^>&\u0003\u0190\u017d\u014c\u01c1\u0102\u018c\u011e\u0358\u0003d\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003for a minimum of 10\n   seconds, including 1 second of pre-disturbance data. Un\u016f\u011e\u0190\u0190\u0003 \u0190\u0189\u011e\u0110\u015d\u012e\u011e\u011a\u0355\u0003 \u0102\u016f\u016f\u0003 \u0128\u0102\u01b5\u016f\u019a\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 modeled as 3-\n   phases with 4 cycles of \u010f\u018c\u011e\u0102\u016c\u011e\u018c\u0003 \u0110\u016f\u011e\u0102\u018c\u015d\u0176\u0150\u0003 \u019f\u0175\u011e\u0358\u0003 ^\u01c7\u0190\u019a\u011e\u0175\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150\u0003 was assessed visually with the aid of\n   stability plots.\n\n   4.4.1 Bus Voltage\n   \u0011\u01b5\u0190\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0189\u016f\u017d\u019a\u0190\u0003 \u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003 \u0102\u0003 \u0175\u011e\u0102\u0176\u0190\u0003 \u017d\u0128\u0003 \u011a\u011e\u019a\u011e\u0110\u019f\u0176\u0150\u0003 \u017d\u01b5\u019a-of-\u0190\u019a\u011e\u0189\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003 \u0102\u0176\u011a\u0003 \u0102\u018c\u011e\u0003 \u01b5\u0190\u011e\u0128\u01b5\u016f\u0003 \u019a\u017d\u0003 \u0102\u0190\u0190\u011e\u0190\u0190\u0003 \u019a\u015a\u011e\n   \u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003 \u0102\u0176\u011a\u0003 \u011a\u01b5\u018c\u0102\u019f\u017d\u0176\u0003 \u017d\u0128\u0003 \u0189\u017d\u0190\u019a-disturbance voltage dips and peak-to-peak voltage \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0358\u0003 d\u015a\u011e\u0003\n   voltage plots also indicate system damping response and the expected bus voltage following the\n   disturbance. WECC Regional Criteria, TPL-001-WECC-CRT-4, requires that the following criteria be\n   applied:\n       x Following fault clearing, the voltage shall recover to 80% of the pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u01c1\u015d\u019a\u015a\u015d\u0176\u0003\n            \u03ee\u03ec\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0190\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u015d\u0176\u015d\u019f\u0102\u019f\u0176\u0150\u0003\u011e\u01c0\u011e\u0176\u019a\u0003\u0128\u017d\u018c\u0003\u0102\u016f\u016f\u0003W\u03ed\u0003\u019a\u015a\u018c\u017d\u01b5\u0150\u015a\u0003W\u03f3\u0003\u011e\u01c0\u011e\u0176\u019a\u0190\u0355\u0003and for each applicable BES bus\n            serving load.\n       x Following fault clearing and voltage recovery above 80%, voltage at each applicable BES bus\n            serving load shall neither dip below pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e, for more than 30 cycles, nor remain\n            below 80% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0128\u017d\u018c\u0003\u0175\u017d\u018c\u011e\u0003\u019a\u015a\u0102\u0176\u00032 seconds, for all P1 through P7 events.\n       x For c\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003without a fault (P2.1 category event), voltage dips at each applicable BES bus\n            serving load shall neither dip below 70% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e, for more than 30 cycles,\n            nor remain below 80% of pre-\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0128\u017d\u018c\u0003\u0175\u017d\u018c\u011e\u0003\u019a\u015a\u0102\u0176\u0003\u019a\u01c1\u017d\u0003\u0190\u011e\u0110\u017d\u0176\u011a\u0190\u0358\u0003\n       x All osc\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u011a\u017d\u0003 \u0176\u017d\u019a\u0003 \u0190\u015a\u017d\u01c1\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150\u0003 \u01c1\u015d\u019a\u015a\u015d\u0176\u0003 \u03ef\u03ec-seconds, \u0102\u014c\u011e\u018c\u0003 \u019a\u015a\u011e\u0003 \u0190\u019a\u0102\u018c\u019a\u0003 \u017d\u0128\u0003 \u019a\u015a\u011e\u0003\n            studied event, shall be deemed unstable.\n\n   10/3/2025        IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                                14\n                                        SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW            Document 1-43 Filed 01/09/26           PageID.355   Page\n                                          103 of 132\n\n\n\n    x   Figure 5 and 6 represent the acceptable recovery trajectory.\n\n\n\n\n              FIGURE 5: WECC DIAGRAM REPRESENTING ADEQUATE VOLTAGE RECOVERY (DELAYED)\n\n\n\n\n              FIGURE 6: WECC DIAGRAM REPRESENTING ADEQUATE VOLTAGE RECOVERY (NORMAL)\n 10/3/2025     IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                15\n                                   SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-43 Filed 01/09/26                 PageID.356         Page\n                                             104 of 132\n\n\n\n 4.4.2 Bus Frequency\n \u0011\u01b5\u0190\u0003\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003\u0189\u016f\u017d\u019a\u0190\u0003\u0189\u018c\u017d\u01c0\u015d\u011a\u011e\u0003\u011e\u01c6\u0189\u011e\u0110\u019a\u011e\u011a\u0003\u0175\u0102\u0150\u0176\u015d\u019a\u01b5\u011a\u011e\u0003\u0102\u0176\u011a\u0003\u011a\u01b5\u018c\u0102\u019f\u017d\u0176 of post-disturbance frequency swings,\n and possible over-frequency or under-\u0128\u018c\u011e\u018b\u01b5\u011e\u0176\u0110\u01c7\u0003 \u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0358 WECC Regional Criteria, TPL-001-WECC-\n CRT-4, requires that the following be applied:\n\n     x   \u0004\u016f\u016f\u0003 \u017d\u0190\u0110\u015d\u016f\u016f\u0102\u019f\u017d\u0176\u0190\u0003 \u019a\u015a\u0102\u019a\u0003 \u011a\u017d\u0003 \u0176\u017d\u019a\u0003 \u0190\u015a\u017d\u01c1\u0003 \u0189\u017d\u0190\u015d\u019f\u01c0\u011e\u0003 \u011a\u0102\u0175\u0189\u015d\u0176\u0150, within 30-seconds, \u0102\u014c\u011e\u018c\u0003 \u019a\u015a\u011e\u0003 \u0190\u019a\u0102\u018c\u019a\u0003 \u017d\u0128\u0003 \u019a\u015a\u011e\u0003\n         studied event, shall be deemed unstable.\n\n 4.5 REACTIVE MARGIN CRITERIA\n Post-transient stability analysis was performed on selected buses in the IID transmission system,\n \u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003\u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190. For each bus assessed, a synchronous condenser was modeled to\n extract \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0355\u0003 \u01b5\u0176\u019f\u016f\u0003 \u019a\u015a\u011e\u0003 \u0189\u017d\u015d\u0176\u019a\u0003 \u01c1\u015a\u011e\u018c\u011e\u0003 \u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003 \u0110\u017d\u016f\u016f\u0102\u0189\u0190\u011e\u0003 \u017d\u0110\u0110\u01b5\u018c\u0190\u0358\u0003 d\u015a\u011e\u0003 \u0175\u0102\u01c6\u015d\u0175\u01b5\u0175\u0003 \u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003 \u0189\u017d\u01c1\u011e\u018c\u0003\n \u0110\u017d\u0176\u0190\u01b5\u0175\u011e\u011a\u0003\u0189\u018c\u015d\u017d\u018c\u0003\u019a\u017d\u0003\u019a\u015a\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0110\u017d\u016f\u016f\u0102\u0189\u0190\u011e\u0003\u015d\u0190\u0003\u011a\u011e\u019a\u011e\u018c\u0175\u015d\u0176\u011e\u011a\u0358\u0003W\u017d\u0190\u015d\u019f\u01c0\u011e\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u015d\u0190\u0003\u011a\u011e\u0190\u015d\u018c\u011e\u011a\u0003\u0102\u019a\u0003\u0102\u016f\u016f\u0003\u010f\u01b5\u0190\u011e\u0190\u0358\u0003\n\n\n 5. STUDY RESULTS\n This System impact study modeled the new load with a total of 80MW for summer and light spring\n scenarios\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0176\u0003\u019a\u015a\u011e\u0003\u018c\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u017d\u0128\u0003//\u0018\u0190\u0003\u011e\u016f\u011e\u0110\u019a\u018c\u015d\u0110\u0102\u016f\u0003\n system.\n 5.1 POWER FLOW ANALYSIS:\n W\u017d\u01c1\u011e\u018c\u0003\u0147\u017d\u01c1\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u01c1\u0102\u0190\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u011e\u011a\u0003\u01b5\u0190\u015d\u0176\u0150\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0190\u0003\u015d\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0176\u0003d\u0102\u010f\u016f\u011e\u0003\u03ed\u0355\u0003\u01b5\u0176\u011a\u011e\u018c\u0003^\u011e\u0110\u019f\u017d\u0176\u0003\u03ef\u0358\u0003^\u01c7\u0190\u019a\u011e\u0175\u0003\n \u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0189\u011e\u018c\u0128\u017d\u018c\u0175\u0102\u0176\u0110\u011e\u0003\u01c1\u011e\u018c\u011e\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u011a\u01b5\u018c\u015d\u0176\u0150\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u0102\u0176\u011a\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u037e\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u01c7\u037f\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0355\u0003\n in order to compare pre-Project and post-W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0358\u0003/\u011a\u011e\u0176\u019f\u012e\u011e\u011a\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0355\u0003\u015d\u0128\u0003\u0102\u0176\u01c7\u0355\u0003\u0102\u018c\u011e\u0003\u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u0190\u017d\u016f\u011e\u016f\u01c7\u0003\n by this Project.\n\n Thermal and voltage performance of the system was evaluated for base cases under normal, (P0), single\n \u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0355\u0003 \u037eW\u03ed\u0355\u0003 W\u03ee\u037f\u0355\u0003 \u0102\u0176\u011a\u0003 \u0190\u011e\u016f\u011e\u0110\u019a\u011e\u011a\u0003 \u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003 \u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0003 \u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0355\u0003 \u037eW\u03ef-P7). Thermal loadings were\n reported when a model transmission component wa\u0190\u0003\u016f\u017d\u0102\u011a\u011e\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u03f5\u03f1\u0439\u0003\u017d\u0128\u0003\u015d\u019a\u0190\u0003\u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003Ds\u0004\u0003\u018c\u0102\u019f\u0176\u0150\u0355\u0003\n \u037eW\u03ec\u037f\u0355\u0003\u0102\u0176\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u03f5\u03f1\u0439\u0003\u017d\u0128\u0003\u015d\u019a\u0190\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0355\u0003\u037eW\u03ed-P7). Generally, the concerns are raised when an element\n \u015d\u0190\u0003\u0128\u017d\u01b5\u0176\u011a\u0003\u016f\u017d\u0102\u011a\u011e\u011a\u0003\u0102\u010f\u017d\u01c0\u011e\u0003\u03ed\u03ec\u03ec\u0439\u0003\u017d\u0128\u0003\u015d\u019a\u0190\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0003\u017d\u018c\u0003\u011e\u0175\u011e\u018c\u0150\u011e\u0176\u0110\u01c7\u0003\u018c\u0102\u019f\u0176\u0150\u0356\u0003\u015a\u017d\u01c1\u011e\u01c0\u011e\u018c\u0355\u0003\u03f5\u03f1\u0439\u0003\u01c1\u0102\u0190\u0003\u0110\u015a\u017d\u0190\u011e\u0176\u0003\u019a\u017d\u0003\u015d\u011a\u011e\u0176\u019f\u0128\u01c7\u0003\n circuits that are also at the edge of an overload. Moreover, such circuits need to be closely monitored\n \u0102\u0176\u011a\u0003\u0110\u0102\u0176\u0003\u010f\u011e\u0003\u0189\u016f\u0102\u0110\u011e\u011a\u0003\u0102\u0190\u0003\u0189\u017d\u019a\u011e\u0176\u019f\u0102\u016f\u0003\u0110\u0102\u0176\u011a\u015d\u011a\u0102\u019a\u011e\u0190\u0003\u0128\u017d\u018c\u0003\u0128\u01b5\u019a\u01b5\u018c\u011e\u0003\u01b5\u0189\u0150\u018c\u0102\u011a\u011e\u0190\u0358\u0003\n\n d\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u0128\u017d\u018c\u0003\u0176\u017d\u018c\u0175\u0102\u016f\u0355\u0003\u037eW\u03ec\u037f\u0355\u0003\u0110\u017d\u0176\u011a\u015d\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\u018c\u011e\u0189\u017d\u018c\u019a\u011e\u011a\u0003\u01c1\u015a\u011e\u0176\u0003\u0189\u011e\u018c\u0003\u01b5\u0176\u015d\u019a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\n \u016f\u011e\u0190\u0190\u0003\u019a\u015a\u0102\u0176\u0003\u03ec\u0358\u03f5\u03f1\u0003\u017d\u018c\u0003\u0150\u018c\u011e\u0102\u019a\u011e\u018c\u0003\u019a\u015a\u0102\u0176\u0003\u03ed\u0358\u03ec\u03f1\u0358\u0003d\u018c\u0102\u0176\u0190\u0175\u015d\u0190\u0190\u015d\u017d\u0176\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0355\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0190\u015d\u0176\u0150\u016f\u011e\u0003\u017d\u018c\u0003\u0175\u01b5\u016f\u019f\u0189\u016f\u011e\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0355\u0003\n were reported when per unit voltages were les\u0190\u0003\u019a\u015a\u0102\u0176\u0003\u03ec\u0358\u03f5\u03ec\u0003\u017d\u018c\u0003\u0150\u018c\u011e\u0102\u019a\u011e\u018c\u0003\u019a\u015a\u0102\u0176\u0003\u03ed\u0358\u03ed\u0358\u0003s\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\u01c1\u011e\u018c\u011e\u0003\n \u018c\u011e\u0110\u017d\u018c\u011a\u011e\u011a\u0003 \u01c1\u015a\u011e\u0176\u011e\u01c0\u011e\u018c\u0003 \u019a\u015a\u011e\u0190\u011e\u0003 \u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003 \u01c1\u011e\u018c\u011e\u0003 \u0150\u018c\u011e\u0102\u019a\u011e\u018c\u0003 \u019a\u015a\u0102\u0176\u0003 \u03f4\u0439\u0003 \u0128\u017d\u018c\u0003 \u016f\u017d\u0102\u011a\u0003 \u0190\u011e\u018c\u01c0\u015d\u0176\u0150\u0003 \u010f\u01b5\u0190\u011e\u0190\u0003 \u0102\u0176\u011a\u0003 \u03ed\u03ec\u0439\u0003 \u0176\u017d\u0176-load\n serving buses.\n\n The steady state study results for each of the cases is described in the following sec\u019f\u017d\u0176\u0190\u0355\u0003\u01c1\u015a\u015d\u016f\u011e\u0003\u019a\u015a\u011e\u0003\n complete results can be found in Appendix B.\n\n\n 5.1.1 (2027) Heavy Summer Peak\n 5.1.1.1 Voltage and Thermal Performance\n     x The project caused \u010f\u01b5\u0190\u011e\u0190\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0003\u019a\u017d\u0003\u011e\u01c6\u0189\u011e\u018c\u015d\u011e\u0176\u0110\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0102\u0176\u0110\u011e\u0190\u0003\u017d\u018c\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\n          with respect to voltage criteria on Table 4.\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                              16\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW             Document 1-43 Filed 01/09/26                  PageID.357     Page\n                                           105 of 132\n\n\n\n     x   The project caused \u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system. Thermal issues were found under P-1 and\n         P-\u03ee\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003d\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u011e\u011a\u0003\u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u0003\u019a\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0357\n             \u00be 92kV \u2018R\u2019 Line Dixieland Prison to Central\n             \u00be 92kV \u2018R\u2019 Line Dixieland to Dixieland Prison\n\n 5.1.2 (2027) Heavy Summer Peak Solar Reduced 20%\n 5.1.2.1 Voltage and Thermal Performance\n     x The project caused \u010f\u01b5\u0190\u011e\u0190\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0003\u019a\u017d\u0003\u011e\u01c6\u0189\u011e\u018c\u015d\u011e\u0176\u0110\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0102\u0176\u0110\u011e\u0190\u0003\u017d\u018c\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\n          with respect to voltage criteria on Table 4.\n     x The project \u0110\u0102\u01b5\u0190\u011e\u011a\u0003\u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system. Thermal issues were found under P-1 and\n          P-\u03ee\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\u0003d\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u011e\u011a\u0003\u011e\u016f\u011e\u0175\u011e\u0176\u019a\u0190\u0003\u015d\u0176\u0110\u016f\u01b5\u011a\u011e\u0003\u019a\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0357\n              \u00be 92kV \u2018R\u2019 Line Dixieland Prison to Central\n              \u00be 92kV \u2018R\u2019 Line Dixieland to Dixieland Prison\n\n 5.1.3 (2027) Light Spring Solar Reduced 40%\n 5.1.3.1 Voltage and Thermal Performance\n     x The project caused \u010f\u01b5\u0190\u011e\u0190\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u010f\u0102\u0190\u011e\u0003\u0110\u0102\u0190\u011e\u0003\u019a\u017d\u0003\u011e\u01c6\u0189\u011e\u018c\u015d\u011e\u0176\u0110\u011e\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u011e\u01c6\u0110\u011e\u011e\u011a\u0102\u0176\u0110\u011e\u0190\u0003\u017d\u018c\u0003\u011a\u011e\u01c0\u015d\u0102\u019f\u017d\u0176\u0190\u0003\n          with respect to voltage criteria on Table 4.\n     x The project did not cause \u019a\u015a\u011e\u018c\u0175\u0102\u016f\u0003\u01c0\u015d\u017d\u016f\u0102\u019f\u017d\u0176\u0190\u0003\u015d\u0176\u0003//\u0018\u2019s system.\n\n 5.2 TRANSIENT STABILITY ANALYSIS\n Transient stability was performed on the Heavy Summer and Light Spring pre- and post- Project base\n cases.\n 5.2.1 (2027) Heavy Summer Transient Stability Results\n S\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1ed that the Project did not cause impacts on IID system stability under any of\n \u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix C for the 2027 Heavy Summer Transient pre and post stability plots.\n\n 5.2.2 (2027) Heavy Summer Solar Reduced Transient Stability Results\n S\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1ed that the Project did not cause impacts on IID system stability under any of\n \u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix D for the 2027 Heavy Summer Solar Reduced transient pre and post stability plots.\n\n 5.2.3 (2027) Light Spring Solar Reduced Transient Stability Results\n S\u015d\u0175\u01b5\u016f\u0102\u019f\u017d\u0176\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1ed that the Project did not cause impacts on IID system stability under any of\n \u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0358\n Refer to Appendix D for the 2027 Light Spring Solar Reduced transient pre and post stability plots.\n\n 5.3 POST TRANSIENT STABILITY AND REACTIVE POWER MARGIN: HEAVY SUMMER\n Post-transient stability was performed on selected buses in IID transmission system following selected\n \u0110\u018c\u015d\u019f\u0110\u0102\u016f\u0003\u017d\u01b5\u019a\u0102\u0150\u011e\u0190\u0358\u0003Z\u011e\u0190\u01b5\u016f\u019a\u0190\u0003\u0190\u015a\u017d\u01c1\u0003\u019a\u015a\u0102\u019a\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u011a\u015d\u011a\u0003\u0176\u017d\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0190\u0003\u017d\u0176\u0003//\u0018\u0003^\u01c7\u0190\u019a\u011e\u0175\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u0003\u01b5\u0176\u011a\u011e\u018c\u0003\n \u0102\u0176\u01c7\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u0190\u015d\u0175\u01b5\u016f\u0102\u019a\u011e\u011a\u0003\u0110\u017d\u0176\u019f\u0176\u0150\u011e\u0176\u0110\u015d\u011e\u0190\u0003\n\n Refer to Appendix E for complete post-\u019a\u018c\u0102\u0176\u0190\u015d\u011e\u0176\u019a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u037e\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0175\u0102\u018c\u0150\u015d\u0176\u037f\u0003\u018c\u011e\u0190\u01b5\u016f\u019a\u0190.\n\n\n\n 10/3/2025      IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                            17\n                                    SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW               Document 1-43 Filed 01/09/26                 PageID.358         Page\n                                             106 of 132\n\n\n\n 6. CONCLUSION\n The System Impact Study modeled the new load with a total of 80MW for summer and light spring\n \u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0358\u0003d\u015a\u011e\u0003\u0128\u017d\u016f\u016f\u017d\u01c1\u015d\u0176\u0150\u0003\u0102\u0176\u0102\u016f\u01c7\u0190\u015d\u0190\u0003\u019a\u011e\u0190\u019a\u011e\u011a\u0003\u019a\u015a\u011e\u0003\u015d\u0175\u0189\u0102\u0110\u019a\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003\u016f\u017d\u0102\u011a\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0176\u0003\u019a\u015a\u011e\u0003\u018c\u011e\u016f\u015d\u0102\u010f\u015d\u016f\u015d\u019a\u01c7\u0003\u017d\u0128\u0003//\u0018\u2019s electrical\n system. The Project\u2019s POI is located on the 92kV 'R' Line between IID\u2019\u0190\u0003\u001c\u016f\u0003\u0012\u011e\u0176\u019a\u018c\u017d\u0003\u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0003\u0102\u0176\u011a\u0003Central\n \u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0358\u0003d\u015a\u011e\u0003\u0190\u019a\u01b5\u011a\u01c7\u0003\u011e\u01c0\u0102\u016f\u01b5\u0102\u019a\u011e\u011a\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u019a\u0003\u0190\u011e\u0102\u0190\u017d\u0176\u0190\u0003\u0102\u0176\u011a\u0003\u0150\u011e\u0176\u011e\u018c\u0102\u019f\u017d\u0176\u0003\u0190\u0110\u011e\u0176\u0102\u018c\u015d\u017d\u0190\u0003\u0128\u017d\u018c\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u2019s target year,\n using Heavy Summer and Light Spring cases. The steady state, transient, and post-transient analyses\n indicated that the Project can be deemed feasible\u0358\u0003E\u011e\u01c0\u011e\u018c\u019a\u015a\u011e\u016f\u011e\u0190\u0190\u0355\u0003\u019a\u015a\u011e\u0003\u0102\u011a\u011a\u015d\u019f\u017d\u0176\u0003\u017d\u0128\u0003\u019a\u015a\u011e\u0003W\u018c\u017d\u0169\u011e\u0110\u019a\u0003\u0110\u0102\u01b5\u0190\u011e\u0190\u0003W-1\n and P-\u03ee\u0003\u017d\u01c0\u011e\u018c\u016f\u017d\u0102\u011a\u0190\u0003\u015d\u0176\u0003\u011a\u015d\u012b\u011e\u018c\u011e\u0176\u019a\u0003\u0190\u011e\u0110\u019f\u017d\u0176\u0190\u0003\u017d\u0128\u0003//\u0018\u2019s system in Heavy Summer scenarios. \u0011\u011e\u016f\u017d\u01c1\u0003\u0102\u018c\u011e\u0003\u019a\u015a\u011e\u0003\u012e\u0176\u011a\u015d\u0176\u0150\u0190\u0003\n and impacted elements for this loading scenario:\n\n 80 MW load:\n\n         x   92kV \u2018R\u2019 Line Dixieland Prison to Central\n         x   92kV \u2018R\u2019 Line Dixieland to Dixieland Prison\n\n Due to these impacted elements, the Project can be deemed feasible with some transmission\n infrastructure upgrades. The following upgrades must \u010f\u011e\u0003\u015d\u0176\u0190\u019a\u0102\u016f\u016f\u011e\u011a\u0003\u015d\u0176\u0003\u019a\u015a\u011e\u0003\u0176\u011e\u01c1\u0003/s\u0012D\u0003\u0190\u01b5\u010f\u0190\u019a\u0102\u019f\u017d\u0176\u0357\n\n         x   One s\u019a\u0102\u019f\u0110\u0003var device rated 75 MVAR\u0355\u0003\u0110\u017d\u0176\u012e\u0150\u01b5\u018c\u011e\u011a\u0003\u015d\u0176\u0003\u019a\u015a\u018c\u011e\u011e\u0003\u0190\u01c1\u015d\u019a\u0110\u015a\u015d\u0176\u0150\u0003\u010f\u016f\u017d\u0110\u016c\u0190\u0003\u017d\u0128\u0003\u03ee\u03f1Ds\u0004Z\u0003\u011e\u0102\u0110\u015a\n             \u0128\u017d\u018c\u0003\u018c\u011e\u0102\u0110\u019f\u01c0\u011e\u0003\u0189\u017d\u01c1\u011e\u018c\u0003\u0190\u01b5\u0189\u0189\u017d\u018c\u019a\u0003\u0102\u0176\u011a\u0003\u01c0\u017d\u016f\u019a\u0102\u0150\u011e\u0003\u0190\u019a\u0102\u010f\u015d\u016f\u015d\u019a\u01c7.\n\n\n  Please note that IID currently does not have the capability to reliably support a large-scale load requiring\n \u0110\u017d\u0176\u019f\u0176\u01b5\u017d\u01b5\u0190\u0003\u03ee\u03f0-hour service. As such, this report does not represent a commitment by IID to serve the\n amount of requested load.\n\n\n\n\n 10/3/2025       IMPERIAL VALLEY COMPUTER MANUFACTURING LLC, (DATA CENTER #2)                              18\n                                     SYSTEM IMPACT STUDY\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26         PageID.359      Page\n                                    107 of 132\n                                                                        IID-691 (10-14)\n                                        INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n                    IMPERIAL IRRIGATION DISTRICT\n                 Interconnection Facilities Study Agreement\n                          Imperial Data Center #1 \u2013 250 MW\n\n           THIS AGREEMENT is made and entered into this\u0231 \u0157\u0157\u009d\u0091 day of\n   September, 2025, by and between Imperial Valley Computer Manufacturing,\n   LLC, a limited liability company organized and existing under the laws\n   of the State of California, (\"Interconnection Customer,\") and the Imperial\n   Irrigation District an irrigation district organized and existing under the\n   Water Code of the State of California,                 (\"Transmission Provider\").\n   Interconnection      Customer        and     Transmission Provider each may be\n   referred to as a \"Party,\" or collectively as the \"Parties.\"\n\n                                     RECITALS\n\n         WHEREAS, Interconnection Customer is proposing to develop a Facility\n   or capacity addition to an existing Facility consistent with the submitted\n   documentation by Interconnection Customer dated April 15, 2025; and\n\n         WHEREAS, Interconnection Customer desires to interconnect the Facility\n   with Transmission Provider\u2019s Transmission System or Distribution System;\n\n          WHEREAS, Transmission Provider has completed an Interconnection\n   System Impact Study (the \"System Impact Study\") and provided the results of\n   said study to Interconnection Customer; and\n\n         WHEREAS, Interconnection Customer has requested Transmission\n   Provider to perform an Interconnection Facilities Study to specify and estimate\n   the cost of the equipment, engineering, procurement and construction work\n   needed to implement the conclusions of the Interconnection System Impact\n   Study in accordance with Good Utility Practice to physically and electrically\n   connect the Facility or, when Clustering is used by the Transmission Provider, a\n   group of Facilities, to the Transmission System or Distribution System.\n\n         NOW, THEREFORE, in consideration of and subject to the mutual\n   covenants contained herein the Parties agreed as follows:\n\n\n                                                                                     1\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26         PageID.360      Page\n                                    108 of 132\n                                                                        IID-691 (10-14)\n                                        INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n         1.0    When used in this Agreement, unless otherwise defined herein,\n                terms with initial capitalization shall have the meaning specified\n                herein.\n\n         2.0    Interconnection Customer elects and Transmission Provider shall\n                cause an Interconnection Facilities Study consistent with the terms\n                of this Agreement.\n\n         3.0    At the time of execution of this Agreement, Interconnection\n                Customer shall provide to Transmission Provider all data\n                requested in the Transmission Customer Service Proposal (TCSP)\n                Application. Transmission Provider has the right to request\n                additional technical information from Interconnection Customer\n                that Transmission Provider determines is reasonably necessary,\n                consistent with Good Utility Practice, during the course of the\n                Interconnection Facilities Study. Upon request by Transmission\n                Provider, Interconnection Customer shall provide such additional\n                information to Transmission Provider within seven (7) Calendar\n                Days.\n\n         4.0    The Interconnection Facilities Study will be based upon the results\n                of the Interconnection System Impact Study and the technical\n                information provided by Interconnection Customer. When\n                Clustering is used to perform the Interconnection Facilities Study,\n                the Interconnection Facilities Study also will be based upon\n                technical information provided by other interconnection customers\n                with Interconnection Requests in the cluster.\n\n         5.0    Transmission Provider's non-binding, good faith estimate for the\n                time of completion of the Interconnection Facilities Study is 90 days\n                and Transmission Provider's non-binding, good faith estimate of\n                the cost for completing the Interconnection Facilities Study is\n                $70,000 which is due upon execution of the Interconnection\n                Facilities Study Agreement.\n\n         6.0    If Interconnection Customer, or any other interconnection customer\n                with an Interconnection Request in the same study cluster as the\n\n                                                                                     2\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26          PageID.361      Page\n                                    109 of 132\n                                                                         IID-691 (10-14)\n                                         INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n                Interconnection Customer\u2019s Interconnection Request, modifies its\n                designated Point of Interconnection, Interconnection Request, or\n                the technical information provided therein is modified, the time to\n                complete the Interconnection Facilities Study may be extended.\n                Similarly, if the Interconnection Request of another interconnection\n                customer is withdrawn from Transmission Provider\u2019s queue or\n                removed from the cluster, the time to complete the Interconnection\n                Facilities Study may be extended.\n\n         7.0    Following the completion of the Interconnection Facilities Study,\n                the Transmission Provider shall provide an Interconnection\n                Facilities Study report to Interconnection Customer. This report: (i)\n                shall provide a description, estimated cost, and estimated schedule\n                for the construction of facilities projected to be required to\n                interconnect the Facility or, when Clustering is used the group of\n                Facilities to the Transmission System or Distribution System and\n                (ii) shall address the short circuit, instability, and power flow issues\n                identified in the Interconnection System Impact Study.\n\n         8.0    When the Interconnection Facilities Study report is provided to\n                Interconnection Customer, Transmission Provider shall invoice\n                Interconnection Customer for the actual costs of the\n                Interconnection Facilities Study, including Transmission Provider\u2019s\n                administrative costs, if any, that are in excess of the applicable\n                deposit amount paid previously by Interconnection Customer.\n                Interconnection Customer shall pay such invoice within thirty (30)\n                Calendar Days of its receipt of the invoice\n\n         9.0    Transmission Provider\u2019s Interconnection Facilities Study shall not\n                be construed as confirming or endorsing the design, or as any\n                warranty of safety, durability, reliability or suitability of\n                Interconnection Customer\u2019s Generating Facility or installation\n                thereof for any use, including the use intended by Interconnection\n                Customer.\n\n\n\n\n                                                                                      3\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26         PageID.362      Page\n                                    110 of 132\n                                                                        IID-691 (10-14)\n                                        INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n         10.0   This Agreement shall be interpreted and enforced in accordance\n                with the substantive and procedural laws of the State of California.\n                All actions or proceedings arising in connection with this\n                Agreement shall be tried and litigated exclusively in State court\n                located in the County of Imperial, California and/or Federal court\n                located in the County of San Diego, California.                  The\n                aforementioned choice of venue is mandatory, thereby precluding\n                the possibility of litigation between the parties with respect to or\n                arising out of this Agreement in any jurisdiction other than that\n                specified in this section. Each Party hereby waives any right it may\n                have to assert the doctrine of forum non conveniens or a similar\n                doctrine or to object to venue with respect to any proceeding\n                brought in accordance with this section, and stipulates that the\n                State court located in Imperial County, California, and/or Federal\n                court located in the Counties of Imperial and San Diego,\n                respectively, California, shall have in personam jurisdiction and\n                venue over each of them for the purpose of litigating any dispute or\n                proceeding arising out of or related to this Agreement. Each Party\n                hereby authorizes service of process sufficient for personal\n                jurisdiction in any action against it at the address and in the\n                manner for the giving of notice as set forth in this Agreement.\n\n\n         11.0   Interconnection Customer shall at all times indemnify, defend, and\n                save Transmission Provider harmless from, any and all damages,\n                losses, claims, including claims and actions relating to injury to or\n                death of any person or damage to property, demands, suits,\n                recoveries, costs and expenses, court costs, attorney fees, and all\n                other obligations by or to third parties, arising out of or resulting\n                from Transmission Provider\u2019s performance of its obligations under\n                this Agreement on behalf of the Transmission Customer, except in\n                cases where Transmission Provider is solely negligent.\n\n\n         12.0   Transmission Provider shall not be considered to be in default of\n                the provisions of this Agreement if delays in or failure of\n                performance shall be due to uncontrollable forces, the effect of\n                                                                                     4\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26          PageID.363      Page\n                                    111 of 132\n                                                                         IID-691 (10-14)\n                                         INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n                which, by the exercise of reasonable diligence, Transmission\n                Provider could not avoid. The term uncontrollable forces shall\n                mean any event which results in the prevention or delay of\n                performance by Transmission Provider of its obligations under this\n                Agreement and which is beyond the control of Transmission\n                Provider. The term uncontrollable forces includes, but is not limited\n                to, fire, acts of God, flood, earthquakes, storms, lightning, epidemic,\n                war, riot, civil disturbance, sabotage, inability to procure permits,\n                licenses, or authorizations from any state, local, or federal agency,\n                or person for any of the supplies, materials, accesses, or services\n                required to be provided by Transmission Provider under this\n                Agreement, strikes, work slowdowns, or other labor disturbances,\n                and judicial constraint. The provisions of this section shall not be\n                interpreted or construed to require Transmission Provider to\n                prevent, settle, or otherwise avoid a strike, work slowdown, or\n                other labor action. Transmission Provider shall give timely written\n                notice to Interconnection Customer describing the circumstances of\n                uncontrollable forces which prevent the fulfillment of obligation of\n                this Agreement. Transmission Provider shall give timely written\n                notice to Interconnection Customer that the uncontrollable forces\n                which prevented the fulfillment of obligations of this Agreement\n                are no longer present and work has resumed on those obligations.\n\n         13.0   Each Party makes the following representations, warranties and\n                covenants:\n\n\n                   13.1       Such Party is duly organized, validly existing and in\n                      good standing under the laws of the state in which it is\n                      organized, formed, or incorporated, as applicable; that it is\n                      qualified to do business in the state or states in which it is\n                      located, and that it has the corporate power and authority to\n                      own its properties, to carry on its business as now being\n                      conducted and to enter into this Agreement and carry out\n                      the transactions contemplated hereby and perform and carry\n                      out all covenants and obligations on its part to be performed\n                      under and pursuant to this Agreement.\n                                                                                   5\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26         PageID.364      Page\n                                    112 of 132\n                                                                        IID-691 (10-14)\n                                        INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n                   13.2       Such Party has the right, power and authority to enter\n                      into this Agreement, to become a Party hereto and to\n                      perform its obligations hereunder. This Agreement is a\n                      legal, valid and binding obligation of such Party, enforceable\n                      against such Party in accordance with its terms, except as the\n                      enforceability thereof may be limited by applicable\n                      bankruptcy, insolvency, reorganization or other similar laws\n                      affecting creditors' rights generally and by general equitable\n                      principles (regardless of whether enforceability is sought in\n                      a proceeding in equity or at law).\n\n                   13.3      The execution, delivery and performance of this\n                      Agreement does not violate or conflict with the\n                      organizational or formation documents, or bylaws or\n                      operating agreement, of the Party, or any judgment, license,\n                      permit, order, material agreement or instrument applicable\n                      to or binding upon such Party or any of its assets.\n\n                   13.4     The Party has obtained each consent, approval,\n                      authorization, order, or acceptance by any Governmental\n                      Authority in connection with the execution, delivery and\n                      performance of this Agreement, and it will provide to any\n                      Governmental Authority notice of any actions under this\n                      Agreement that are required by Applicable Laws and\n                      Regulations.\n\n   14.0         All notices, requests, demands, and other communications required\n                or permitted under this Agreement shall be in writing, unless\n                otherwise agreed by the Parties, and shall be delivered in person or\n                sent by certified mail, postage prepaid, by overnight delivery, or by\n                electronic mail or electronic facsimile transmission with an original\n                sent immediately thereafter by postage prepaid mail, and properly\n                addressed as follows:\n\n\n\n\n                                                                                     6\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW      Document 1-43 Filed 01/09/26         PageID.365      Page\n                                    113 of 132\n                                                                        IID-691 (10-14)\n                                        INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n                When delivered to Transmission Provider:\n\n                Energy Contracts\n                IMPERIAL IRRIGATION DISTRICT\n                333 Barioni Blvd.\n                P.O. Box 937\n                Imperial, CA 92251\n                Email: Energycontracts@iid.com\n\n\n                When delivered to Interconnection Customer:\n\n                Imperial Valley Computer Manufacturing, LLC\n                16400 Pacific Coast Highway, Suite 212\n                Huntington Beach, CA 92649\n                Email: sebastian@ruccilaw.com\n\n         15.0   Either Party may, from time to time, change its representative or\n                address for the purpose of notices to that Party by a similar notice\n                specifying a new representative or address, but no such change\n                shall be deemed to have been given until such notice is actually\n                received by the Party being so notified.\n\n\n         16.0   This Agreement may be executed in two or more counterparts, each\n                of which is deemed an original but all constitute one and the same\n                instrument.\n\n\n         17.0   The Parties may, by mutual agreement, amend this Agreement by a\n                written instrument duly executed by the Parties.\n\n\n\n\n                                                                                     7\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43 Filed 01/09/26        PageID.366      Page\n                                      114 of 132\n                                                                         IID-691 (10-14)\n                                         INTERCONNECTION FACILITIES STUDY AGREEMENT\n\n\n\n\n   IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly\n   executed by their duly authorized officers or agents on the day and year first\n   above written.\n\n   Imperial Irrigation District\n\n   Signature:\n   Print\n   Name:\n   Title:\n\n   Date:\n\n\n\n   Interconnection Customer Imperial Valley Computer Manufacturing, LLC\n\n   Signature:\n   Print\n                Sebastian Rucci\n   Name:\n   Title:       Managing Member\n\n   Date:        9-03-2025\n\n\n\n\n                                                                                      8\n   CRITICAL BUSINESS & REGULATORY AFFAIRS\n   P.O. BOX 937, IMPERIAL, CA 92251\n   TEL: (760) 482-3547 REV 6/9/2017\n\f10/2/25, 1:21Case\n              PM  3:26-cv-00128-JLS-BJW        Document\n                                   Rucci Law Mail                1-43 Supply\n                                                  - Proposal for Temporary Filedof01/09/26\n                                                                                   Load from CAISOPageID.367\n                                                                                                   Wholesale Market         Page\n                                                                115 of 132\n\n                                                                                        Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  1 message\n\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                  Thu, Oct 2, 2025 at 10:32 AM\n  To: Jamie Asbury <jlasbury@iid.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, prodriguez@iid.com, \"Hamilton, Timothy L\" <TLHamilton@iid.com>,\n  \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez, Jesus\"\n  <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo, Lauren\"\n  <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>\n\n    Dear Mrs. Asbury,\n\n    I've attached a proposal requesting that IID consider the possibility of temporarily supplying energy on a short-term basis\n    from CAISO markets (Day Ahead and/or Real-Time). We are not requesting direct procurement of energy outside of IID's\n    balancing authority. Under this proposal, IID faces no stranded investment risk, no credit risk, and no operational burden,\n    while being compensated for its services through a cost-plus framework.\n\n    We would set up a dedicated account for IID to draw from for paying for CAISO energy purchases, transmission charges,\n    and all related costs. This ensures no credit risk or exposure to IID. The draw account would be continuously replenished.\n    If energy is unavailable, we would meet the load with the on-site emergency generators.\n\n    The arrangement is a cost-plus model with upside for IID. IID will receive a fee for scheduling coordinator time and\n    expenses, the OATT transmission rate, and an administrative markup. We estimate this to be over $22 million in positive\n    annual revenue to IID. This is more than twice the cost to the data center if only the OATT rate were to apply. There is no\n    financial risk to IID. All economic and reliability risk is borne solely by the data center, which will absorb all energy,\n    capacity, and administrative costs. This allows the $10 billion data center to proceed while long-term PPAs are secured.\n    This will generate permanent jobs, tax revenue, and demand for future renewable generation in the valley.\n\n    If the numerous positive benefits of this arrangement meet with your approval. In that case, we request that IID approve a\n    temporary market-sourced supply arrangement under OATT \u00a7 III.30.6, with all risks and costs to be borne by the data\n    center. If you agree, we are also requesting that IID conduct a sensitivity analysis to identify feasible import paths for\n    CAISO market energy and assess the available transmission import capability from geothermal areas. We are also\n    requesting that IID establish applicable markup, scheduling coordinator cost recovery, and administrative fees.\n\n    Carl Stills has arrived at this proposal, and if you have concerns, please let us know. We are confident that we can arrive\n    at a solution acceptable to IID. You have the power to make this data center a reality. We respectfully urge IID to adopt\n    this short-term bridging mechanism to enable the data center to proceed while long-term PPAs are secured.\n\n    Sincerely,\n\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n\n          Memo Temporary Supply Energy from Wholesale Market.pdf\n          66K\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permthid=thread-a:r-3529042161582352397&simpl=msg-a:r-86731739121790\u2026   1/1\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43 Filed 01/09/26         PageID.368     Page\n                                      116 of 132\n\n\n\n       TEMPORARY SUPPLY OF 330 MW LOAD FROM CAISO WHOLESALE MARKET\n\n                               EXECUTIVE SUMMARY\n\nPURPOSE: Imperial Valley Computer Manufacturing (IVCM) is developing a 330 MW AI\ndata center in Imperial County (Google as anchor tenant). Long-term power contracts with\nin-valley resources (e.g., geothermal, solar) will take several years to complete. This\nagreement provides a temporary bridge solution: IID procures energy from the CAISO\nmarket on IVCM\u2019s behalf, ensuring the project moves forward immediately.\n\nKEY FEATURES\n  \u2022 IID acts as Scheduling Coordinator and Load-Serving Entity\n  \u2022 Energy is bought from CAISO Day-Ahead or Real-Time markets\n  \u2022 IID delivers power to the data center under its balancing authority\n  \u2022 Generate new revenue for IID with zero risk\n\nZERO RISK TO IID\n   \u2022    IVCM funds a draw account in advance.\n   \u2022    Draw account used to pay for all CAISO costs, transmission charges, and staff time.\n   \u2022    IVCM replenishes the account daily/weekly.\n\nRELIABILITY PROTECTION\n  \u2022 IID has no obligation to curtail other customers or assume reliability risk.\n \u2022   If CAISO energy is unavailable, IVCM uses on-site BESS and emergency generators.\n  \u2022 IID maintain full control under its OATT authority\n\nREVENUE STREAM FOR IID (Full Cost Recovery + Markup)\n  \u2022 All CAISO energy costs\n  \u2022 IID\u2019s OATT transmission rate\n  \u2022 IID\u2019s Scheduling Coordinator costs\n  \u2022 Administrative markup (additional revenue for IID)\n\nBENEFITS TO IID & IMPERIAL VALLEY\n  \u2022 No Financial Exposure to IID, all costs are paid up front.\n  \u2022 IID collects transmission fees, scheduling charges, and markup.\n  \u2022 Creates demand for new geothermal and renewable generation in IID\u2019s service area.\n  \u2022 Support a transformational economic project. Enables a $10B+ data center project,\n     with permanent jobs, tax revenue, and long-term load growth.\n\n                                           Page 1\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43 Filed 01/09/26          PageID.369      Page\n                                      117 of 132\n\n\n\nBACKGROUND: IVCM respectfully requests that IID examine the possibility of temporarily\nsupplying energy on a short-term basis from CAISO markets (Day Ahead and/or Real Time).\nIVCM is not requesting to directly procure energy outside of IID\u2019s balancing authority. IID\nhas the authority under its Open Access Transmission Tariff to secure arrangements for\nresources not physically interconnected with IID\u2019s transmission system. The proposal ensures\nIID faces no stranded investment risk, no credit risk, and no operational burden, while being\ncompensated for its services through a cost-plus framework.\n\nPROPOSED COMMERCIAL STRUCTURE\nA. DRAW ACCOUNT MECHANISM\nContinuously fund dedicated account is set up from which IID may draw to pay for CAISO\nenergy purchases, transmission charges, and all related costs. This ensures no credit risk or\nexposure to IID. Dedicated draw account that is continuously replenished allows IID to pay:\n   \u2022 CAISO market purchases (energy and capacity, if applicable)\n   \u2022 Transmission charges\n   \u2022 Scheduling coordinator costs\n   \u2022 OATT Rate Application: IID\u2019s existing OATT transmission rate applied.\n   \u2022 Administrative Markup: IID may determine and impose an additional administrative\n      premium for its role in facilitating the transaction.\n\nB. NO RELIABILITY BURDEN IS PLACED ON IID\n   \u2022 If CAISO energy is unavailable (a rare event, documented only once in the past three\n      years), IVCM will meet load with on-site batteries and emergency generators.\n    \u2022 IID\u2019s system reliability is thus protected, and the arrangement cannot result in\n      unserved load to IID\u2019s native customers.\n\nC. FULL COST RECOVERY + ADMINISTRATIVE PREMIUM\nThe arrangement is a cost-plus model with upside for IID.\n   \u2022 IID will receive a fee for scheduling coordinator time and expenses,\n   \u2022 IID will receive the OATT transmission rate, and\n   \u2022 IID will receive an administrative markup for handling\n\nD. BENEFITS TO IID AND IMPERIAL VALLEY\n   \u2022 No Financial Risk to IID. All financial and reliability risk is borne solely by data\n      center which will absorb all energy, capacity, and administrative costs.\n   \u2022 Positive Revenue Stream to IID from the OATT rates, scheduling charges, and an\n      administrative markup.\n\n\n                                           Page 2\n\fCase 3:26-cv-00128-JLS-BJW        Document 1-43 Filed 01/09/26          PageID.370      Page\n                                      118 of 132\n\n\n\n   \u2022   The request is consistent with Section III.30.6's directive for IID to use \u201creasonable\n       efforts\u201d to assist network customers in arranging delivery of energy.\n   \u2022   The $10 billion data center will generate permanent jobs, tax revenue, and demand\n       for future renewable generation. IID will benefit from expanded generation in-valley.\n\nREQUESTED ACTION\n  \u2022 Conduct Sensitivity Analyses: Identify feasible import paths for CAISO market\n     energy and available transmission import capability from geothermal areas.\n  \u2022 Develop Rate Structure: Establish applicable markup, scheduling coordinator cost\n     recovery, and administrative fees.\n  \u2022 Adopt Bridging Framework: Approve a temporary market-sourced supply\n     arrangement under OATT \u00a7 III.30.6, with all risks and costs borne by IVCM.\n\nGOVERNING LEGAL FRAMEWORK\nA. IID\u2019s OATT \u2013 Section III.30.6\nSection III.30.6, Transmission Arrangements for Network Resources Not Physically\nInterconnected with the Transmission Provider, provides: \u201cThe Network Customer shall be\nresponsible for any arrangements necessary to deliver capacity and energy from a Network\nResource not physically interconnected with the Transmission Provider\u2019s Transmission\nSystem. The Transmission Provider will undertake reasonable efforts to assist the Network\nCustomer in obtaining such arrangements \u2026\u201d This language contemplates exactly the present\nsituation: a Network Customer seeking delivery from a non-interconnected resource, with\nthe Transmission Provider tasked with reasonable assistance.\n\nB. IID\u2019s POLICY ON DIRECT ACCESS\nIVCM acknowledges that IID does not permit Direct Access. The proposed arrangement does\nnot constitute Direct Access. IID, as Load-Serving Entity and Balancing Authority, would\nremain the energy procurer of record, purchasing energy through CAISO markets\n(Day-Ahead or Real-Time) and delivering it under its balancing authority. IVCM bears all\ncosts, ensuring IID\u2019s tariff integrity and avoiding a precedent that undermines IID\u2019s retail\nservice exclusivity.\n\nCONCLUSION\nIID has clear authority under its OATT to assist Network Customers in securing\narrangements for non-interconnected resources. IVCM\u2019s proposal operationalizes this\nauthority in a manner that is cost-neutral, risk-free, and beneficial to IID and the Imperial\nValley community. We respectfully urge IID to adopt this short-term bridging mechanism\nto enable the Aten Road Data Center to proceed while long-term PPAs are finalized.\n\n                                           Page 3\n\fCase 3:26-cv-00128-JLS-BJW       Document 1-43 Filed 01/09/26         PageID.371      Page\n                                     119 of 132\n\n\n\n        APPENDIX \u2013 SUPPORTING AUTHORITIES AND FRAMEWORK\n\nA. IID OATT Excerpts\nSection III.30.6 \u2013 Transmission Arrangements for Network Resources Not Physically\nInterconnected\n       \u201cThe Network Customer shall be responsible for any arrangements necessary\n       to deliver capacity and energy from a Network Resource not physically\n       interconnected with the Transmission Provider's Transmission System. The\n       Transmission Provider will undertake reasonable efforts to assist the Network\n       Customer in obtaining such arrangements \u2026\u201d\n\nSection III.28.2 \u2013 Designated Resources\n       Provides that a Network Customer may designate Network Resources not\n       physically interconnected with the Transmission Provider\u2019s Transmission\n       System, subject to the Network Customer arranging delivery and the\n       Transmission Provider assisting.\n\nSection III.30.1 \u2013 General Principles\n       Confirms that service is provided for the purpose of serving designated\n       Network Load and that Transmission Provider must act in a manner consistent\n       with OATT obligations.\n\nB. Risk Allocation Summary\n\u2022     Financial Risk: 100% borne by IVCM.\n\u2022     Credit Risk: Eliminated by draw account mechanism.\n\u2022     Reliability Risk: None to IID (IVCM covers via on-site backup).\n\u2022     Proposal is consistent with IID OATT \u00a7 III.30.6; does not constitute Direct Access.\n\nC. Suggested IID Next Steps\n1. Sensitivity Analysis:\n\u2022      Map feasible CAISO import paths (Day-Ahead and Real-Time markets).\n\u2022      Analyze import capability from geothermal area.\n2. Rate Setting:\n\u2022      Establish administrative markup percentage and scheduling coordinator cost schedule.\n3. Formalize Bridging Agreement:\n\u2022      Enter into a short-term \u201cBridging Energy Agreement\u201d under OATT umbrella.\n\n\n\n\n                                          Page 4\n\f     Case 3:26-cv-00128-JLS-BJW     Document 1-43 Filed 01/09/26              PageID.372   Page\n                                        120 of 132\n\n\n\n\n                                        Annual Revenue to IID\nAnnual Energy                     330     MW     x              8,760   hrs    =      2,890,800 MWhr\n\n\nIID OATT Rate                  $3.38 $/MWhr x              2,890,800 MWhr =          $9,770,904\nScheduling Coordinator Rate    $0.29 $/MWhr x              2,890,800 MWhr =           $838,332\n                                        Total Annual IID Revenue SCR + OATT =       $10,609,236\n\n\nAvg Wholesale CAISO cost      $52.34 $/MWhr x              2,890,800 MWhr =        $151,304,472\nCAISO TAC cost                $14.08 $/MWhr x              2,890,800 MWhr =         $40,702,464\n                                                           Total CAISO + TAC =     $192,006,936\n\n\nIID Administrative Mark Up     6.0%              x     $192,006,936            =    $11,520,416\n                                                     Total Annual IID Revenue =     $22,129,652\n\f            Case\n10/14/25, 10:00 AM 3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail - Proposal for1-43\n                                                                 Temporary Filed  01/09/26\n                                                                           Supply of               PageID.373\n                                                                                     Load from CAISO Wholesale Market     Page\n                                                               121 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Asbury, Jamie <jlasbury@iid.com>                                                           Tue, Oct 14, 2025 at 9:05 AM\n  To: Sebastian Rucci <sebastian@ruccilaw.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"wstrumpfer@gmail.com\" <wstrumpfer@gmail.com>\n\n\n    Dear Mr. Rucci:\n    Thank you for your recent energy service option proposal for the Imperial Valley\n    Computer Manufacturing, LLC data center project (Project). IID appreciates your\n    efforts to advance this initiative. However, the proposed service plan does not\n    comply with the IID Open Access Transmission Tariff (OATT). The IID OATT aligns\n    with the Federal Energy Regulatory Commission (FERC) regulations, specifically\n    Order No. 888, issued in 1996, which mandate non-discriminatory access to\n    transmission systems and standardized interconnection processes to ensure grid\n    reliability and fairness. These rules govern all interconnections to IID\u2019s transmission\n    system, including IID-owned facilities. The OATT ensures equitable treatment for all\n    interconnection requests, and IID is obligated to adhere to this standardized process\n    without exception.\n    The OATT requires project developers to secure sufficient transmission capacity to\n    serve wholesale loads within IID\u2019s network transmission system. Your reference to\n    Network Integration Transmission Service, Section 30.6, appears to be a\n    misinterpretation, as the OATT mandates arranging necessary transmission capacity\n    for your Project from a generation source to the load. Currently, over 3,000 MW of\n    transmission service reservations have been submitted and are being analyzed by\n    the IID, primarily for battery energy storage systems. These reservation requests are\n    in queue for access to the California Independent System Operator (ISO) system at\n    two separate inter-tie points with the IID. Most of these reservations are tied to\n    projects with executed generator interconnection agreements and approved\n    environmental entitlements. Short-term transmission service is available through\n    IID\u2019s Open Access Same-time Information System (OASIS) on a daily or weekly\n    basis, subject to securing capacities through a \u201cfirst come-first serve\u201d process.\n    It is critical to distinguish between wholesale and retail services in this context.\n    Wholesale services, governed by the OATT and FERC regulations, involve the\n    transmission of energy across IID\u2019s system to serve large-scale loads, such as your\n    data center, typically delivery of energy to other utilities or entities. These services\n    require adherence to standardized interconnection and transmission reservation\n    processes to ensure non-discriminatory access to the grid. In contrast, retail services\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094   1/3\n\f            Case\n10/14/25, 10:00 AM 3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail - Proposal for1-43\n                                                                 Temporary Filed  01/09/26\n                                                                           Supply of               PageID.374\n                                                                                     Load from CAISO Wholesale Market     Page\n                                                               122 of 132\n    involve the direct sale and delivery of energy to end-use customers, such as\n    residential or commercial consumers, and are managed under IID\u2019s retail tariffs,\n    which are separate from OATT requirements.\n    Your Project, as proposed, is a large-scale load seeking interconnection to IID\u2019s\n    transmission system, falls under wholesale services and must comply with OATT\n    protocols. IID is legally obligated to treat all wholesale interconnection requests\n    equitably, and we cannot circumvent these processes, as they are rooted in FERC\n    mandates and industry standards for maintaining grid stability. Any generation\n    impacting the Bulk Electric System must undergo rigorous studies to ensure grid\n    reliability, consistent with industry standards for which IID is accountable.\n    The feasibility study for your Project identifies available capacity at the proposed\n    point of interconnection to IID\u2019s transmission system, marking the initial step in the\n    interconnection process. However, upon review of your interconnection application,\n    we noted the omission of critical generator data. This omission constitutes a material\n    modification, requiring reanalysis that includes the 300MW of behind the meter\n    generation. This step is critical, as your proposed data center will interconnect to\n    IID\u2019s Bulk Electric System, a vital component of the western electric grid.\n    To proceed with your amended request, IID will require (at a minimum) the following:\n         1. An   updated interconnection application, including dynamic gas generation\n            models in GE PSLF format.\n         2. A transmission service application specifying the generating facility\u2019s point of\n            interconnection to the data center\u2019s load point of interconnection. This must be\n            submitted via IID\u2019s OASIS platform, which manages transmission service\n            requests in accordance with FERC orders. Upon submission, your request will\n            be assigned a queue position and reference number for study purposes.\n         3. Generation interconnection request queue information designating the\n            generation as a network resource serving your network load, accompanied by a\n            written letter from the generation project owner confirming the transmission\n            network configuration.\n         4. If a new generator interconnection application is required, the next study cycle\n            opens in January 2026.\n    Your Project\u2019s development involves multiple phases, including load and generation\n    planning. While environmental permitting is critical, securing transmission capacity\n    and energy access is equally essential. Should your Project necessitate upgrades to\n    IID\u2019s transmission network to serve a specific location, your organization is\n    responsible for the associated environmental permitting of those facilities.\n    IID supports your data center Project and is committed to facilitating the\n    interconnection process within the framework of FERC and OATT requirements.\n    Upon receipt of the requested information, we will diligently process your application\n    in accordance with OATT study timelines. For further assistance or to submit the\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094   2/3\n\f            Case\n10/14/25, 10:00 AM 3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail - Proposal for1-43\n                                                                 Temporary Filed  01/09/26\n                                                                           Supply of               PageID.375\n                                                                                     Load from CAISO Wholesale Market                                   Page\n                                                                             123 of 132\n    required materials, please contact Mrs. Lauren Olivo, Manager of Energy Business &\n    Regulatory Compliance Programs at (760) 482-3448 or lolivo@IID.com.\n    Best regards,\n\n\n\n\n                                Jamie L. Asbury\n                                General Manager\n                                IMPERIAL IRRIGATION DISTRICT\n                                333 E Barioni Blvd, Imperial CA 92251\n                                (760) 339-9477 | email: jlasbury@IID.com\n                                Mobile (760) 791-7471\n\n\n\n    The foregoing electronic message, together with any a\u01a9achments thereto, is confiden\u019fal and may be legally privileged against disclosure other than to the\n    intended recipient. It is intended solely for the addressee(s) and access to the message by anyone else is unauthorized. If you are not the intended recipient of\n    this electronic message, you are hereby no\u019ffied that any dissemina\u019fon, distribu\u019fon, or any ac\u019fon taken or omi\u01a9ed to be taken in reliance on it is strictly\n    prohibited and may be unlawful. If you have received this electronic message in error, please delete and immediately no\u019ffy the sender of this error.\n\n    From: Sebastian Rucci <sebastian@ruccilaw.com>\n    Sent: Thursday, October 2, 2025 10:32 AM\n    To: Asbury, Jamie <jlasbury@IID.com>\n    Cc: Smelser, Matthew H <mhsmelser@IID.com>; Rodriguez, Paul <prodriguez@IID.com>; Hamilton, Timothy L\n    <TLHamilton@IID.com>; Gutierrez, Noe R <NRGutierrez@IID.com>; Ambriz, Jose-Said <JAmbriz@IID.com>; Martinez,\n    Jesus <jamartinez@IID.com>; Garcia, Matthew <msgarcia@IID.com>; Sampedro, Daniel <dsampedro@IID.com>; Olivo,\n    Lauren <lolivo@IID.com>; Carl Stills <cestills@sbcglobal.net>; Tom DuBose <tom@dubosedesigngroup.com>\n    Subject: Proposal for Temporary Supply of Load from CAISO Wholesale Market\n\n\n\n\n     [CAUTION] This email originated from outside of the IID. Do not reply, click on any links or open any attachments\n     unless you trust the sender and know the content is safe.\n\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1845973957985461094&simpl=msg-f:1845973957985461094                                  3/3\n\f            Case\n10/14/25, 11:28 AM 3:26-cv-00128-JLS-BJW       Document\n                                    Rucci Law Mail - Proposal for1-43\n                                                                 Temporary Filed  01/09/26\n                                                                           Supply of               PageID.376\n                                                                                     Load from CAISO Wholesale Market     Page\n                                                               124 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                 Tue, Oct 14, 2025 at 10:56 AM\n  To: \"Asbury, Jamie\" <jlasbury@iid.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"wstrumpfer@gmail.com\" <wstrumpfer@gmail.com>\n\n    Dear Mrs. Asbury,\n\n    As you mentioned in our previous meeting, the IID could provide approximately 50 MW. That is sufficient for a cloud\n    storage data center. We could reduce the data center loan, and it will become a small data center. Instead, we have made\n    significant efforts\u2014at considerable expense\u2014to secure a larger capacity for an AI data center, which requires 250\n    MW. Our proposal to the IID eliminates financial risk to the district, as it comprehensively covers all associated costs. Per\n    our calculation, this provides twice the payment to the IID than under the OATS. We estimate at least $22 million per year.\n    We are not seeking special treatment; we aim to pay our way. We could be wrong, but the IID has the authority to\n    establish special rates for large loads, should it wish to accommodate such a transformative project.\n\n    Regarding the concern about \u201comission of critical generator data\u201d in our application, we have been engaged in\n    discussions with IID and Power Engineers for over a year, through multiple studies and technical exchanges. At no point\n    have the backup generators been tied to the grid\u2014they never have been, and never will be. Likewise, the onsite batteries\n    are not designed to export power to the grid. This project represents a large load only, and that is precisely how our\n    application has been prepared, submitted, and processed by the IID. We therefore find it difficult to understand why a re-\n    application would be necessary for backup equipment that is not grid-connected.\n\n    The proposed AI data center represents a $10 billion investment in the Imperial Valley, offering substantial economic and\n    technological benefits to the region. If the IID, under your leadership, wishes to advance this opportunity, we would like to\n    have another meeting to discuss a clear and positive path forward. Following our last meeting, we listened carefully to\n    IID\u2019s concerns and submitted a proposal specifically designed to address them. If, however, there are other\u2014perhaps\n    unstated\u2014reasons why such a transformative project is not desired in the Valley, it would be best to clarify that now, as\n    we are concurrently advancing discussions to locate the data center on tribal land in other jurisdictions. As I stated\n    previously, we are eager to address any concerns to IID\u2019s satisfaction.\n\n    We look forward to meeting at your convenience to work toward an outcome that benefits both IID and the Imperial Valley\n    community. Speed of approval remains critical, as large-scale data center investments are rapidly moving to business-\n    friendly states such as Texas and beyond.\n\n    Sincerely,\n\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r-1844820220557423384&simpl=msg-a:r-18448202205574\u2026   1/1\n\f            Case\n10/17/25, 2:21 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.377\n                                                                                    Load from CAISO Wholesale Market      Page\n                                                               125 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Asbury, Jamie <jlasbury@iid.com>                                                            Fri, Oct 17, 2025 at 8:30 AM\n  To: Sebastian Rucci <sebastian@ruccilaw.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"Strumpfer, Wayne K\" <wkstrumpfer@iid.com>\n\n\n    Thank you for your email. We look forward to your presentation to the IID board next week.\n\n\n\n    In the interim, the information below may be helpful. My communication to you was based upon the proposal you recently\n    directed to my attention for IID\u2019s assessment that now contains a transmission component. The OATT process is to\n    ensure reliability to both the IID system and your facilities in a manner that is fair and nondiscriminatory to other users of\n    the IID system. In our prior discussion, IID made clear it is not subject to and would not allow direct access but that it\n    would facilitate a network resource/network load scenario. That transactional scenario is governed by IID\u2019s OATT; your\n    import to the system requires transmission service- also governed by the OATT. Further, IID analyzes all generators,\n    even behind the meter resources, to ensure our base cases are accurate and have all scenarios identified and mitigated.\n    There is no way to avoid the study process outlined in the tariff. In fact, your proposal references the OATT in a number\n    of places; you acknowledge its importance and governance.\n\n\n\n    IID is not attempting to impede your progress, but your project has gone through a number of iterations and it has not\n    been formally analyzed in the current configuration you propose in your recent communication. IID has an obligation to\n    your project (and all other projects) that seek interconnection to the system. You propose to have the project served from\n    the high voltage system so the OATT does apply. There is no provision in the tariff that allows IID to provide preferential\n    treatment to your project or any other project. To facilitate the proposal you submitted, IID would need to disregard higher\n    queued projects and allow your project to be accelerated to the top of the queue. To do so could disrupt the plans of such\n    higher queued projects that have initiated the process, which have made financial commitments and deposits and are\n    following their own, tight development timelines. IID follows the federal standard interconnection process which provides\n    for interconnections to utilities based on a queue process, and there is no precedent of which I am aware that allows IID\n    to take the action you propose.\n\n\n\n    All projects that seek interconnection have economic benefit to Imperial Valley and the IID has been and will continue to\n    be supportive of them; what we cannot do is circumvent the tariff process and subject IID \u2013 and your project \u2013 to\n    challenge. Your suggestion that there is some unstated reason why we do not support your project is without basis and\n    not well received. IID has an obligation to serve all of its customers in a fair and non-discriminatory manner. We are\n    merely asking that you follow the process that all other developers are required to follow to achieve commercial\n    operation. The process requires more than a feasibility assessment; it requires an analysis of system impacts and\n    identification of necessary mitigations.\n\n\n\n    Staff are available to meet with you to finalize your project\u2019s technical parameters and perform the necessary studies.\n\n\n\n    Regards,\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1846243506973517592&simpl=msg-f:1846243506973517592   1/2\n\f            Case\n10/17/25, 2:21 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.378\n                                                                                    Load from CAISO Wholesale Market                                    Page\n                                                                             126 of 132\n                                Jamie L. Asbury\n                                General Manager\n                                IMPERIAL IRRIGATION DISTRICT\n                                333 E Barioni Blvd, Imperial CA 92251\n                                (760) 339-9477 | email: jlasbury@IID.com\n                                Mobile (760) 791-7471\n\n\n\n    The foregoing electronic message, together with any a\u01a9achments thereto, is confiden\u019fal and may be legally privileged against disclosure other than to the\n    intended recipient. It is intended solely for the addressee(s) and access to the message by anyone else is unauthorized. If you are not the intended recipient of\n    this electronic message, you are hereby no\u019ffied that any dissemina\u019fon, distribu\u019fon, or any ac\u019fon taken or omi\u01a9ed to be taken in reliance on it is strictly\n    prohibited and may be unlawful. If you have received this electronic message in error, please delete and immediately no\u019ffy the sender of this error.\n\n    From: Sebastian Rucci <sebastian@ruccilaw.com>\n    Sent: Tuesday, October 14, 2025 10:57 AM\n    To: Asbury, Jamie <jlasbury@IID.com>\n    Cc: Smelser, Matthew H <mhsmelser@IID.com>; Rodriguez, Paul <prodriguez@IID.com>; Hamilton, Timothy L\n    <TLHamilton@IID.com>; Gutierrez, Noe R <NRGutierrez@IID.com>; Ambriz, Jose-Said <JAmbriz@IID.com>; Martinez,\n    Jesus <jamartinez@IID.com>; Garcia, Matthew <msgarcia@IID.com>; Sampedro, Daniel <dsampedro@IID.com>; Olivo,\n    Lauren <lolivo@IID.com>; Carl Stills <cestills@sbcglobal.net>; Tom DuBose <tom@dubosedesigngroup.com>; Holbrook,\n    Geoffrey <gpholbrook@IID.com>; wstrumpfer@gmail.com\n    Subject: Re: Proposal for Temporary Supply of Load from CAISO Wholesale Market\n\n\n\n\n     [CAUTION] This email originated from outside of the IID. Do not reply, click on any links or open any attachments\n     unless you trust the sender and know the content is safe.\n\n\n    Dear Mrs. Asbury,\n\n    [Quoted text hidden]\n\n    [Quoted text hidden]\n\n\n\n\n    [Quoted text hidden]\n\n       [Quoted text hidden]\n\n                                    Jamie L. Asbury\n                                    General Manager\n                                    IMPERIAL IRRIGATION DISTRICT\n                                    333 E Barioni Blvd, Imperial CA 92251\n                                    (760) 339-9477 | email: jlasbury@IID.com\n                                    Mobile (760) 791-7471\n\n       [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1846243506973517592&simpl=msg-f:1846243506973517592                                  2/2\n\f            Case\n10/17/25, 2:15 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.379\n                                                                                    Load from CAISO Wholesale Market      Page\n                                                               127 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                   Fri, Oct 17, 2025 at 2:14 PM\n  To: \"Asbury, Jamie\" <jlasbury@iid.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"Strumpfer, Wayne K\" <wkstrumpfer@iid.com>, \"Dockstader, Gina Nicole\"\n  <gndockstader@iid.com>, \"Cardenas, Alex\" <aacardenas@iid.com>, lapacheco@iid.com, Bari Bean\n  <baribean@co.imperial.ca.us>\n\n    Dear General Manager Asbury:\n\n    This letter is submitted to clarify the procedural record of the Imperial Valley Computer Manufacturing, LLC (\u201cIVCM\u201d) data\n    center project, to correct several factual and procedural misstatements recently raised by you, and to request IID\u2019s prompt\n    completion of its contractual obligations under the Open Access Transmission Tariff (\u201cOATT\u201d). The project has no\n    transmission component and properly falls under Part III of the OATT (Large Load), not Part II (Generation\n    Interconnection). IID\u2019s recent position represents a late-stage and unsupported deviation from over a year of technical and\n    procedural consensus.\n\n    1. PROJECT SCOPE AND APPLICABILITY OF THE OATT\n\n    The IVCM Data Center does not generate power for sale or transmission through IID\u2019s grid. The project consists of a load\n    served by IID under Part III of the OATT, not generation subject to Part II. The OATT applies to transmission and network\n    load service, not to backup generators that are not connected to the grid.\n\n    In prior correspondence, IID staff, including Lauren Olivo, in her February 11, 2025, email at 1:27 p.m., explicitly\n    confirmed that IID would \u201cremove references to the GIP as this project does not fall under the OATT.\u201d No IID employee,\n    during more than a year of meetings and written exchanges, has ever indicated that the data center\u2019s backup generators\n    required OATT review or interconnection procedures.\n\n    2. CHRONOLOGY OF IID STUDIES AND APPROVALS\n\n    Feasibility Study: Following Power Engineers\u2019 Load Injection Memorandum confirming summer load capacity of 557.8\n    MW on the 230 kV S-Line (Exhibit A), IVCM submitted its application for a feasibility study (Exhibit B). IVCM paid the\n    $50,000 fee, IID executed the study agreement, and on May 22, 2025, IID issued its Feasibility Study Report confirming:\n    \u201cNo thermal violations and no exceedances or deviations observed at any buses.\u201d (Exhibit C).\n\n    System Impact Study (S-line): On June 3, 2025, IVCM submitted a completed System Impact Study application for a 250\n    MW load on the 230 kV S-Line. IID executed the agreement and received the $50,000 fee. On July 25, 2025, IID issued\n    its System Impact Study Report, concluding: \u201cNo thermal violations, no voltage exceedances or deviations at any\n    monitored buses, and no transient stability violations observed under any simulated contingencies. Study results show\n    that this project can be deemed feasible.\u201d (Exhibit D).\n\n    System Impact Study (R-Line): On March 5, 2025, IVCM submitted a System Impact Study application for an 80 MW data\n    center on the 92 kV R-Line (Exhibit E). IID received the $50,000 fee and executed the study agreement. On September\n    23, 2025, IID\u2019s System Impact Study Report concluded: \u201cThe Project can be deemed feasible with some transmission\n    infrastructure upgrades at the new IVCM substation: one static var device rated 75 MVAR, configured in three switching\n    blocks of 25 MVAR each, for reactive power support and voltage stability.\u201d (Exhibit F).\n\n    Facility Study: On July 31, 2025, IID confirmed via email that the System Impact Study was approved and that IID would\n    proceed to perform the Facility Study for the 250 MW data center, estimating six weeks for completion. IID further stated\n    that the remaining $38,876 from the SIS budget would cover the facility study. IID executed the Facility Study Agreement\n    on August 6, 2025 (Exhibit G). This communication and subsequent agreement formally initiated the Facility Study phase,\n    consistent with OATT \u00a719.4.\n\n    3. BACKUP GENERATORS \u2013 FULLY DISCLOSED AND NOT SUBJECT TO OATT\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r-7120809803704558544&simpl=msg-a:r-71208098037045\u2026   1/3\n\f            Case\n10/17/25, 2:15 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.380\n                                                                                    Load from CAISO             Page\n                                                                                                    Wholesale Market\n                                                           128  of  132\n    IID\u2019s recent claim that the backup generators were \u201ca surprise\u201d is demonstrably false. The approved System Impact Study\n    Reports for both the S-Line and R-Line include graphics showing the backup generators and BESS as part of the project\n    (Exhibit D, p. 6; Exhibit G, p. 6). The 16-page development plans repeatedly submitted to IID with our applications specify:\n    \u201cBackup generators will operate only during emergency blackouts. The generators will not connect to the grid and will not\n    export electricity. Their sole purpose is to support the data center,\u201d and that the \u201cBESS provides immediate support for\n    short-term power disruptions. The BESS will not export electricity to the grid; its use is solely for the Data Center.\u201d (See\n    Email on Jun 3, 2025 at 7:46 am to IID staff including Lauren Olivio).\n\n    OATT regulates the use of the Transmission System, not unconnected load-side backup systems. Nowhere in the OATT\n    is there authority requiring a transmission provider to conduct studies for non-connected, non-exporting backup\n    generators. To the extent IID now claims otherwise, please provide a specific citation within the OATT authorizing studies\n    of generators not interconnected to the IID system.\n\n    If IID applies this position to IVCM, then all non-grid-connected backup generators within the District would be subject to\n    identical studies and interconnection agreements. We are unaware of any such precedent, and selective enforcement\n    would constitute discriminatory treatment in violation of the OATT, the Federal Power Act, and FERC precedent.\n\n    4. FACILITY STUDY DELAY AND DISPARATE TREATMENT\n\n    Pursuant to OATT \u00a7 19.4 Facilities Study Procedures: \u201cIf a System Impact Study indicates that additions or upgrades to\n    the Transmission System are needed to supply the Eligible Customer\u2019s service request, the Transmission Provider, within\n    thirty (30) days of the completion of the System Impact Study, shall tender to the Eligible Customer a Facilities Study\n    Agreement.\u201d\n\n    OATT \u00a719.4 requires that, upon completion of the System Impact Study, a Facility Study Agreement be issued within 30\n    days and completed within 60 days of execution. See OATT \u00a7 19.4 (\u201cUpon receipt of an executed Facilities Study\n    Agreement, the Transmission Provider will use due diligence to complete the required Facilities Study within a sixty (60)\n    day period.\u201d). On July 31, 2025, IID stated via email that the facility study would proceed and that IID estimated \u201ca time\n    frame of 6 weeks to complete.\u201d IID executed the Facility Study Agreement on August 6, 2025 (Exhibit G).\n\n    However, on September 4, 2025, IID\u2019s upper management instructed staff to prioritize six projects from Z-Global. This put\n    everything else aside, including our 10 billion data center project, which had completed all required technical studies with\n    each study demonstrating technical feasibility, with no system violations. Because upper management prioritized six\n    projects, which we later concluded were associated with Z-Global. This directive contradicts IID\u2019s previous written\n    commitment and constitutes unequal treatment among applicants.\n\n    All IID studies for the data center confirmed feasibility, with no thermal, voltage, or stability violations. The subsequent\n    delay, despite technical clearance, is inconsistent with the OATT\u2019s due diligence requirement and undermines confidence\n    in IID\u2019s impartial administration of its tariff obligations.\n\n    5. IMPROPER 15-YEAR PREPAYMENT REQUIREMENT\n\n    During the meeting of September 16, 2025, you said that IID could not provide power service unless IVCM prepaid for 15\n    years of electricity. This demand has no basis under the OATT, which at Section \u00a711 mandates only \u201creasonable credit\n    review procedures in accordance with standard commercial practices.\u201d Section 17.3 further provides that credit assurance\n    for firm transmission service may include a deposit equivalent to one month\u2019s charge, not a multi-year prepayment. The\n    15-year demand is therefore unsupported, commercially unreasonable, and discriminatory under the OATT, FERC, and\n    federal law.\n\n    On August 22, 2025, IID\u2019s senior management canceled a meeting with the resource department. The email stated: \u201cIID\n    management [Jamie Asbury] has requested to cancel the meeting today due to the need to have some internal\n    conversations before being ready to talk about power supply.\u201d This further delayed this process. When combined with\n    project reprioritization in favor of Z-Global, these actions collectively suggest non-neutral administration of IID\u2019s tariff\n    obligations.\n\n    6. ECONOMIC AND PUBLIC INTEREST CONSIDERATIONS\n\n    The IVCM Data Center represents a $10 billion investment that will generate over $22 million in annual net revenue to IID,\n    directly benefitting IID\u2019s ratepayers\u201423.3% of whom live below the poverty line. Delaying or obstructing this project\n    deprives the Imperial Valley of significant employment, technology investment, and economic uplift. The recent\n    obstructions contradict IID\u2019s public mission and raise serious questions of governance and fairness.\n\n    7. REQUESTED ACTION AND RESERVATION OF RIGHTS\n\n    We respectfully request that IID:\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r-7120809803704558544&simpl=msg-a:r-71208098037045\u2026   2/3\n\f            Case\n10/17/25, 2:15 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.381\n                                                                                    Load from CAISO Wholesale Market      Page\n                                                            129 of agreement\n    (a) Finalize the Facility Study in accordance with the executed 132      (Exhibit G);\n    (b) Issue a letter confirming IID\u2019s commitment to serve the data center load; and\n    (c) Confirm that the OATT does not apply to non-grid-connected backup generation.\n\n    If IID persists in applying novel or discriminatory requirements. In that case, IVCM will exercise its rights under OATT\n    \u00a712.3 to initiate binding arbitration before a neutral arbitrator and will consider appropriate actions before FERC under the\n    Federal Power Act and other applicable laws, including those governing antitrust and civil racketeering remedies.\n\n    We are ready to meet with the IID staff at any time to finish this process. However, further deviation from the OATT,\n    established precedent, and IID\u2019s prior commitments will leave us no choice but to seek relief to protect our contractual and\n    statutory rights.\n\n    Sincerely,\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n    [Quoted text hidden]\n\n\n     7 attachments\n          Ex. A Load Injection Memo by Power Engineer (12-04-24).pdf\n          1238K\n          Ex. B Application for Sensitivity for Data Center #1 (4-15-25)2.pdf\n          3405K\n          Ex. C. IID Feasibility Study Report by IID for Data Center #1 (5-22-25).pdf\n          1154K\n          Ex. D System Impact Study Report by IID for Data Center #1 (7-25-25).pdf\n          1908K\n          Ex. E Application for System Impact Study for Data Center #2 (3-05-25).pdf\n          1987K\n          Ex. F System Impact Suty Report by IID for Data Center #2 (9-23-25).pdf\n          1088K\n          Ex. G Facilities Study Agreement (9-03-25).pdf\n          309K\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r-7120809803704558544&simpl=msg-a:r-71208098037045\u2026   3/3\n\f            Case\n10/17/25, 3:43 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.382\n                                                                                    Load from CAISO Wholesale Market      Page\n                                                               130 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Asbury, Jamie <jlasbury@iid.com>                                                           Fri, Oct 17, 2025 at 2:50 PM\n  To: Sebastian Rucci <sebastian@ruccilaw.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"Strumpfer, Wayne K\" <wkstrumpfer@iid.com>, \"Dockstader, Gina Nicole\"\n  <gndockstader@iid.com>, \"Cardenas, Alex\" <aacardenas@iid.com>, \"Pacheco, Lewis A\" <lapacheco@iid.com>, Bari Bean\n  <baribean@co.imperial.ca.us>\n\n\n    Dear Mr. Rucci,\n\n    Thank you for your recent communication and the additional assertions you have made, which we will review thoroughly.\n\n    Your correspondence raises serious allegations against the district and its staff, as well as references to potential litigation\n    or legal remedies. We note that you hold yourself out as legal counsel for IVCM in your signature line. As such, we\n    request that all future communications be directed to the IID's General Counsel, Mr. Wayne Strumpfer.\n\n    Please be advised that IID and its staff are represented by legal counsel, and as such, we respectfully request that until\n    such time as these legal issues are resolved that you refrain from any further direct communication with IID staff.\n\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-f:1846267433665227457&simpl=msg-f:1846267433665227457   1/1\n\f            Case\n10/17/25, 3:44 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.383\n                                                                                    Load from CAISO Wholesale Market     Page\n                                                              131 of 132\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Proposal for Temporary Supply of Load from CAISO Wholesale Market\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                   Fri, Oct 17, 2025 at 3:43 PM\n  To: \"Asbury, Jamie\" <jlasbury@iid.com>\n  Cc: \"Smelser, Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\"\n  <TLHamilton@iid.com>, \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Ambriz, Jose-Said\" <JAmbriz@iid.com>, \"Martinez,\n  Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\" <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Olivo,\n  Lauren\" <lolivo@iid.com>, Carl Stills <cestills@sbcglobal.net>, Tom DuBose <tom@dubosedesigngroup.com>, \"Holbrook,\n  Geoffrey\" <gpholbrook@iid.com>, \"Strumpfer, Wayne K\" <wkstrumpfer@iid.com>, \"Dockstader, Gina Nicole\"\n  <gndockstader@iid.com>, \"Cardenas, Alex\" <aacardenas@iid.com>, \"Pacheco, Lewis A\" <lapacheco@iid.com>, Bari Bean\n  <baribean@co.imperial.ca.us>\n\n    Dear General Manager Asbury:\n\n    This letter responds to your recent email asserting that IVCM\u2019s statement of intent to exercise its rights under OATT \u00a712.3\n    somehow precludes us from communicating with IID staff. Respectfully, that interpretation is inconsistent with both the\n    OATT and the First Amendment, and directly obstructs the ongoing development of a $10 billion data center project that\n    has otherwise satisfied every technical and procedural requirement before IID.\n\n    I. Exercise of Rights Under the OATT Does Not Suspend Communication\n\n    Our prior email stated: \u201cIf IID persists in applying novel or discriminatory requirements, IVCM will exercise its rights under\n    OATT \u00a712.3 to initiate binding arbitration before a neutral arbitrator, and will consider appropriate actions before FERC\n    under the Federal Power Act and other applicable laws, including those governing antitrust and civil RICO remedies.\u201d\n\n    That statement is a lawful and protected notice of our intent to utilize dispute-resolution mechanisms expressly provided\n    under the OATT, not a termination of dialogue. The OATT\u2019s \u00a712.1 (Internal Dispute Resolution Procedures) and \u00a712.2\n    (External Arbitration Procedures) specifically exist to resolve disagreements while allowing the applicant to continue\n    working with staff in good faith.\n\n    Your unilateral decision to prohibit communication between IVCM and IID staff deprives us of the process guaranteed by\n    the OATT and prevents us from advancing our project -- effectively using administrative authority to retaliate against a\n    protected assertion of contractual and statutory rights.\n\n    II. Denial of Access Constitutes Retaliation and Procedural Violation\n\n    Your directive obstructs a live project and represents government retaliation for protected speech. IID is a public agency,\n    and we have a First Amendment right to petition our government regarding grievances, including the right to assert our\n    intent to seek remedies before FERC, federal, or state courts.\n\n    If IID genuinely believes it possesses the authority to bar communication with its staff, it should seek a judicial injunction\n    to that effect. Absent such an order, the IID has no legal or moral basis to obstruct our project or deny communication with\n    engineering and planning personnel carrying out the IID\u2019s technical obligations.\n\n    III. Public Interest and Harm to the Community\n\n    Your actions have direct and measurable consequences for the Imperial Valley. This project represents a $10 billion\n    investment and will generate over $22 million in annual net revenue for IID, significantly benefiting ratepayers--23.3% of\n    whom live below the poverty line. It will create high-quality technical employment and long-term infrastructure for the\n    region. Your actions also impact IID's ratepayers from the potential $22 million in net annual revenue that IID would\n    receive for providing power to our project.\n\n    Delaying or obstructing the project for reasons inconsistent with the OATT constitutes not just a contractual violation but a\n    public harm--a deprivation of opportunity and economic growth for a county already suffering from elevated\n    unemployment and systemic underinvestment.\n\n    IV. Notice of Intent to Protect Project Rights\n\n    We reiterate that IVCM will continue to assert its rights through all appropriate forums, including arbitration under OATT\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r1644830356451047017&simpl=msg-a:r164483035645104\u2026   1/2\n\f            Case\n10/17/25, 3:44 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail - Proposal for 1-43      Filed of01/09/26\n                                                                 Temporary Supply                 PageID.384\n                                                                                    Load from CAISO Wholesale Market          Page\n                                                         132 of in132\n    \u00a712.3, administrative proceedings before FERC, and litigation  federal and state courts if necessary.\n\n    Your recent communications make clear that IID\u2019s conduct is not inadvertent but deliberate. As the law recognizes, \u201cEven\n    a dog knows the difference between being kicked and being stumbled over.\u201d This is no administrative stumble--it is a\n    deliberate obstruction of a permitted and economically transformative project.\n\n    We will, therefore, continue to copy IID\u2019s General Counsel on all future correspondence and communications. Should you\n    persist in preventing staff from fulfilling their technical responsibilities, we will seek judicial relief, including injunctive relief\n    to restore lawful access and process. We also intend to inform the public and media of the material economic harm being\n    inflicted upon the Valley\u2019s residents through these actions.\n\n    V. Requested Action\n\n    As previously stated, we respectfully request that IID:\n    1. Finalize the Facility Study in accordance with the executed agreement;\n    2. Issue a letter confirming IID\u2019s commitment to serve the data center load; and\n    3. Confirm in writing that the OATT does not apply to non-grid-connected backup generation.\n\n    We remain ready and willing to meet with IID staff immediately to resolve these matters professionally and transparently.\n    We are also available to meet with IID\u2019s general counsel and seek a resolution of the issues we have identified in our\n    recent emails.\n\n    Sincerely,\n\n    Sebastian Rucci\n    Imperial Valley Computer Manufacturing, LLC\n    Law Office of Sebastian Rucci, P.C.\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Email: Sebastian@RucciLaw.com\n    Website: ImperialDataCenter.com\n    [Quoted text hidden]\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r1644830356451047017&simpl=msg-a:r164483035645104\u2026         2/2\n\f","ocr_status":1,"date_upload":"2026-01-10T23:35:00.327616-08:00","document_number":"1","attachment_number":43,"pacer_doc_id":"037022111112","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 42","acms_document_guid":""},{"resource_uri":"https://www.courtlistener.com/api/rest/v4/recap-documents/464739457/","id":464739457,"tags":[],"absolute_url":"/docket/72127384/1/44/imperial-valley-computer-manufacturing-llc-v-city-of-imperial/","date_created":"2026-01-10T23:19:12.080799-08:00","date_modified":"2026-01-14T02:35:19.444697-08:00","sha1":"98189e85f6a1b7ecbab800f2342dcfb43565011d","page_count":2,"file_size":185169,"filepath_local":"recap/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.44.pdf","filepath_ia":"https://archive.org/download/gov.uscourts.casd.839861/gov.uscourts.casd.839861.1.44.pdf","ia_upload_failure_count":null,"thumbnail":null,"thumbnail_status":0,"plain_text":"Case 3:26-cv-00128-JLS-BJW   Document 1-44   Filed 01/09/26   PageID.385   Page 1\n                                     of 2\n\n\n\n\n               EXHIBIT 43\n           Email to IID Board\n     Arbitration Withdrawn and Case\n             Close (10-22-25)\n\f           Case\n10/22/25, 2:09 PM 3:26-cv-00128-JLS-BJW       Document\n                                   Rucci Law Mail                 1-44 Filed\n                                                  - Initiation of ARBITRATION    01/09/26\n                                                                              Under               PageID.386\n                                                                                    IID\u2019s Open Access Transmission Tariff Page 2\n                                                                   of 2\n\n                                                                                      Sebastian Rucci <sebastian@ruccilaw.com>\n\n\n\n  Initiation of ARBITRATION Under IID\u2019s Open Access Transmission Tariff\n  Sebastian Rucci <sebastian@ruccilaw.com>                                                   Wed, Oct 22, 2025 at 2:09 PM\n  To: \"Strumpfer, Wayne K\" <wkstrumpfer@iid.com>, \"Cardenas, Alex\" <aacardenas@iid.com>, \"Dockstader, Gina Nicole\"\n  <gndockstader@iid.com>, \"Pacheco, Lewis A\" <lapacheco@iid.com>, kseugenio@iid.com, jbhamby@iid.com, Jamie Asbury\n  <jlasbury@iid.com>\n  Cc: jesusescobar@co.imperial.ca.us, ryankelley@co.imperial.ca.us, Bari Bean <baribean@co.imperial.ca.us>, \"Smelser,\n  Matthew H\" <mhsmelser@iid.com>, \"Rodriguez, Paul\" <prodriguez@iid.com>, \"Hamilton, Timothy L\" <TLHamilton@iid.com>,\n  \"Gutierrez, Noe R\" <NRGutierrez@iid.com>, \"Martinez, Jesus\" <jamartinez@iid.com>, \"Garcia, Matthew\"\n  <msgarcia@iid.com>, \"Sampedro, Daniel\" <dsampedro@iid.com>, \"Ambriz, Jose-Said\" <jambriz@iid.com>, Tom DuBose\n  <tom@dubosedesigngroup.com>, Carl Stills <cestills@sbcglobal.net>, Gary Messina <gary@ruccilaw.com>\n\n    Good Afternoon, IID Chairwoman Dockstader, Board Members, and General Manager Asbury,\n\n    We wanted to let you know that our efforts to initiate arbitration were solely to make sure that our pending facility and\n    sensitivity studies were processed in accordance with IID regulations. We have no interest in imposing unnecessary legal\n    expenses or strain on IID. As a gesture of good faith, we have formally withdrawn our request for arbitration, and the case\n    is now closed (see attached). We have also officially withdrawn our public records request that we submitted on\n    Monday. Litigation is not the path required to advance our transformative data center project that offers many substantial\n    benefits to IID and its ratepayers. We are grateful for your continued cooperation in moving the data center to reality.\n    Thank you.\n\n    Warm regards,\n\n    Sebastian\n    Imperial Valley Computer Manufacturing, LLC\n    16400 Pacific Coast Highway, Suite 212\n    Huntington Beach, CA 92649\n    Office: (562) 901-0199\n    Cell: (330) 720-0398\n    Fax: (562) 249-6910\n    Website: ImperialDataCenter.com\n\n    On Mon, Oct 20, 2025 at 5:02 PM Sebastian Rucci <sebastian@ruccilaw.com> wrote:\n    [Quoted text hidden]\n\n\n          11. Email from AAA - Case Closed (10-22-25).pdf\n          316K\n\n\n\n\nhttps://mail.google.com/mail/u/1/?ik=f0edb02d47&view=pt&search=all&permmsgid=msg-a:r4327295351634652778&simpl=msg-a:r432729535163465\u2026   1/1\n\f","ocr_status":1,"date_upload":"2026-01-10T23:52:52.295672-08:00","document_number":"1","attachment_number":44,"pacer_doc_id":"037022111114","is_available":true,"is_free_on_pacer":null,"is_sealed":null,"document_type":2,"description":"Exhibit 43","acms_document_guid":""}],"date_created":"2026-01-09T14:53:16.145141-08:00","date_modified":"2026-06-29T18:54:25.865236-07:00","date_filed":"2026-01-09","time_filed":"13:49:00","entry_number":1,"recap_sequence_number":"2026-01-09.001","pacer_sequence_number":10,"description":"COMPLAINT with Jury Demand against Katherine Burnsworth, City of Imperial, Othon Mora, Dennis Morita, Katie Turner ( Filing fee $ 405 receipt number ACASDC-20653431.), filed by Imperial Valley Computer Manufacturing, LLC. (Attachments: # 1 Civil Cover Sheet, # 2 Exhibit 1, # 3 Exhibit 2, # 4 Exhibit 3, # 5 Exhibit 4, # 6 Exhibit 5, # 7 Exhibit 6, # 8 Exhibit 7, # 9 Exhibit 8, # 10 Exhibit 9, # 11 Exhibit 10, # 12 Exhibit 11, # 13 Exhibit 12, # 14 Exhibit 13, # 15 Exhibit 14, # 16 Exhibit 15, # 17 Exhibit 16, # 18 Exhibit 17, # 19 Exhibit 18, # 20 Exhibit 19, # 21 Exhibit 20, # 22 Exhibit 21, # 23 Exhibit 22, # 24 Exhibit 23, # 25 Exhibit 24, # 26 Exhibit 25, # 27 Exhibit 26, # 28 Exhibit 27, # 29 Exhibit 28, # 30 Exhibit 29, # 31 Exhibit 30, # 32 Exhibit 31, # 33 Exhibit 32, # 34 Exhibit 33, # 35 Exhibit 34, # 36 Exhibit 35, # 37 Exhibit 36, # 38 Exhibit 37, # 39 Exhibit 38, # 40 Exhibit 39, # 41 Exhibit 40, # 42 Exhibit 41, # 43 Exhibit 42, # 44 Exhibit 43)The new case number is 3:26-cv-128-JLS-BJW. Judge Janis L. Sammartino and Magistrate Judge Brian J. White are assigned to the case. (Rucci, Sebastian)(sjt) (Entered: 01/09/2026)","tags":[]}],"entries_total":"https://www.courtlistener.com/api/rest/v4/docket-entries/?count=on&docket=72127384&page_size=40"}